I want to search for...
Permit #2022090215
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7065-00620-0100 |
| CONDITIONED SPACE: 2274 sqft |
| GARAGE: 720 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 36 sqft |
| Total Square Footage: 3206 sqft |
| Block: 00620 |
| Subdivision: - |
| Job Phone: 386-283-7499 |
| Location Address: 86 KASHMIR TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/19/2022 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: JMR III LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤279,325.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RBI ENTERPRISES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
10 WHITTINGTON DR PALM COAST, FL 32164 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
WILLIAM ROBERT BARRICK
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
50 LEANNI WAY PALM COAST, FL 32137 |
STE E2 PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2025) | 229-375-9123 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - DRAINAGE | 07/21/2023 | APPROVED | PFLANAGAN |
| Note: TEMP. CULVERT WAS INSTALLED ALONG TIME AGO CULVERT OPEN WATER IN HOUSE NUMBER 88 IS BECAUSE OF SWALE TO LOW ------------------------------------------------------------------------------------------- 7/17/2023 - PREVIOUS INSPECTION NOTES Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage 7/21/23 | |||
| ROW - DRAINAGE | 07/17/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage 7/21/23 | |||
| ROW - DRAINAGE | 06/02/2023 | APPROVED | PFLANAGAN |
| Note: 5/24/2023 - PREVIOUS INSPECTION NOTES 5/24/23= PLEASE OPEN THE SWALE Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 6/2/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 05/24/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 5/24/23= PLEASE OPEN THE SWALE Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 6/2/23 PICTURE ATTACHED | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| FOUND SURVEY APPROVED (OFFICE) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | |||
| GRAVITY SEWER TEST | |||
| ELECTRIC - EARLY POWER | |||
| MONOLITHIC SLAB | |||
| LATH/BRICK/ WATER BARRIER | |||
| TIE BEAM / LINTEL | |||
| ALL ROUGH | |||
| WALL SHEATHING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| WATER METER INSTALLATION REQUEST | |||
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/14/2022 | 09/14/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/14/2022 | 09/15/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/07/2022 | 01/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/06/2022 | 09/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/06/2022 | 09/08/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 09/06/2022 | 09/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/06/2022 | 09/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/06/2022 | 09/08/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/06/2022 | 09/07/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Manual J load calculation. Resubmit entire energy calc with missing info | |||
| SW1 | COMPLETE | 09/06/2022 | 09/13/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/06/2022 | 09/12/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM FOUNDATION PLANTINGS Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. Please add one shrub to each side |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤467.09 | 10/19/2022 |
| WATER- TURN ON | ¤25.00 | 10/19/2022 |
| WATER- TURN ON | ¤25.00 | 10/19/2022 |
| ADJUSTMENT 50% | (¤528.62) | 10/19/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/19/2022 |
| INSPECTION - RESIDENTIAL | ¤800.25 | 10/19/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤226.98 | 10/19/2022 |
| CONNECTION FEES | ¤1,077.88 | 10/19/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/19/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/19/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/19/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/19/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/19/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/19/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/19/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/19/2022 |
| SURCHARGE FS 533.721 | ¤3.40 | 10/19/2022 |
| SURCHARGE - FS 468.631 | ¤5.10 | 10/19/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/19/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/19/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/19/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/19/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/19/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/19/2022 |
| SEWER INSPECTION | ¤25.00 | 10/19/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/19/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/19/2022 |
| SITE PLAN 30 | ¤30.00 | 10/19/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,102.89 |