I want to search for...

Permit #2022090221

Permit Details

Status: FINAL

Parcel Id: 23-11-30-6060-00000-00F0
Total Square Footage: 840 sqft
Block: 00000
Subdivision: 2312 - WHITEVIEW VILLAGE SUBDIVISION
Job Phone: 904-323-8928
Location Address: 32 WAVERLY LN
Type: BC - BUILDING COMMERCIAL
Issue Date: 11/30/2022
NOC: RECORDED
Applicant name: BENTLEY JAMES BRADLEY
Owner: KB HOME JACKSONVILLE, LLC

Address

10475 FORTUNE PKWY, STE 100

JACKSONVILLE, FL 32256

Lot: 00F0
Contracted Stated Job Value: ¤475,000.00
Job Description: WHITEVIEW VILLAGE AMENITY CENTER
Type: CN

Contractor

BENT CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

4446 HENDRICKS AVE #109

JACKSONVILLE, FL 32207

CGC1524472 (Exp: 08/31/2026) 904-323-8928

Sub Contractors

HAROLD WILLIAM COFFIELD
Status Location Address State License Number Phone Fax
INACTIVE

14590 LAGOON DRIVE

JACKSONVILLE, FL 32246

CCC1330610 (Exp: 08/31/2024) 904-755-9777 904-220-9979
RAYMOND A PASUKINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

5605 FLORIDA MINING BLVD S

JACKSONVILLE, FL 32257

SUITE 210

JACKSONVILLE, FL 32257

EC13005820 (Exp: 08/31/2026) 904-880-0333
NICHOLAS JOSEPH BRYAN GAY
Status Location Address State License Number Phone
INACTIVE

1518 WHITLOCK AVENUE

JACKSONVILLE, FL 32216

CFC1429377 (Exp: 08/31/2024) 904-322-2301

Inspection History

Type Request Date Result Inspector
BUILDING FINAL 05/14/2024 FINAL APPROVED JWALKER
U - UTILITY COMMERCIAL FINAL 05/14/2024 FINAL APPROVED LFITZGERALD
HVAC FINAL 05/13/2024 FINAL APPROVED CPISCITELLI
Note: 3/26/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 Need to submit revision for the elimination of heaters in bathrooms
ELECTRIC 2ND ROUGH 04/10/2024 APPROVED RMARTIN
Note: 11/9/2023 - PREVIOUS INSPECTION NOTES
ELECTRIC - EARLY POWER 04/10/2024 APPROVED RMARTIN
FIRE FINAL 04/05/2024 APPROVED JMUNSON
EXTERIOR ARCHITECTURAL FEATURES 04/04/2024 APPROVED RPICATAGI
ELECTRIC FINAL 04/02/2024 APPROVED RMARTIN
PLUMBING FINAL 03/26/2024 APPROVED MGIBSON
HVAC FINAL 03/26/2024 CANCELLED BY APPLICANT CPISCITELLI
Note: Inspector Notes from Inspection 3140 Need to submit revision for the elimination of heaters in bathrooms
PLUMBING 2ND ROUGH 12/22/2023 CANCELLED BY APPLICANT WEB
ELECTRIC 2ND ROUGH 12/22/2023 CANCELLED BY APPLICANT WEB
Note: 11/9/2023 - PREVIOUS INSPECTION NOTES
ELECTRIC 2ND ROUGH 11/09/2023 CANCELLED BY APPLICANT MKRASKI
FRAMING 11/09/2023 CANCELLED BY APPLICANT FWILLIS
Note: Inspector Notes from Inspection 3280 10/17/23 1. Contractor is approved to pour all footings. Shade awning footings are fully approved. 2. Contractor still needs to have the engineer submit a revison for the change of the mail kiosk footings from 3, shown on the print, to only 2 footings. This correction was request in the notes from the previous inspection listed below. Please have the revision submitted prior to scheduling further inspections. 9/18/2023 - PREVIOUS INSPECTION NOTES Mail kiosk footings 1. Submitted print shows (3) 7' x 7' x 3' footings, Only 2 have been dug. Please have the engineer submit a revision to the building department showing the change of the number of structual footings. 2. Print calls for 10- #5 rebar e.w. top and bottom, top have not been installed. 3. In the footing closest to the road the reclaimed water pipe has be damaged. Pipe will need to be rerouted around the footing. New inspection will need to be called in when piping has been completed. 4. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of ancho Pool Shade structure. 1. The top footing rebar #5 e.w. pads have not been installed. 2. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of anchor.
FOOTER 10/17/2023 APPROVED - AS NOTED JWALKER
Note: 10/17/23 1. Contractor is approved to pour all footings. Shade awning footings are fully approved. 2. Contractor still needs to have the engineer submit a revison for the change of the mail kiosk footings from 3, shown on the print, to only 2 footings. This correction was request in the notes from the previous inspection listed below. Please have the revision submitted prior to scheduling further inspections. 9/18/2023 - PREVIOUS INSPECTION NOTES Mail kiosk footings 1. Submitted print shows (3) 7' x 7' x 3' footings, Only 2 have been dug. Please have the engineer submit a revision to the building department showing the change of the number of structual footings. 2. Print calls for 10- #5 rebar e.w. top and bottom, top have not been installed. 3. In the footing closest to the road the reclaimed water pipe has be damaged. Pipe will need to be rerouted around the footing. New inspection will need to be called in when piping has been completed. 4. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of ancho Pool Shade structure. 1. The top footing rebar #5 e.w. pads have not been installed. 2. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of anchor.
FOOTER 09/18/2023 Disapproved - NO FEE JWALKER
Note: Mail kiosk footings 1. Submitted print shows (3) 7' x 7' x 3' footings, Only 2 have been dug. Please have the engineer submit a revision to the building department showing the change of the number of structual footings. 2. Print calls for 10- #5 rebar e.w. top and bottom, top have not been installed. 3. In the footing closest to the road the reclaimed water pipe has be damaged. Pipe will need to be rerouted around the footing. New inspection will need to be called in when piping has been completed. 4. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of ancho Pool Shade structure. 1. The top footing rebar #5 e.w. pads have not been installed. 2. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of anchor.
GRAVITY SEWER 06/30/2023 APPROVED JWALKER
Note: 6/29/2023 - PREVIOUS INSPECTION NOTES 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe.
BLD - SEWER TIE IN 06/30/2023 APPROVED JWALKER
Note: 6/29/2023 - PREVIOUS INSPECTION NOTES 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe.
BLD - SEWER TIE IN 06/29/2023 Disapproved - NO FEE JWALKER
Note: 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe.
GRAVITY SEWER 06/29/2023 Disapproved - NO FEE JWALKER
Note: 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe.
WALL SHEATHING 06/20/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 3470 M.E.P's are done 6/14/2023 - PREVIOUS INSPECTION NOTES Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections.
INSULATION 06/20/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 3470 M.E.P's are done 6/14/2023 - PREVIOUS INSPECTION NOTES Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections.
ABOVE CEILING 06/15/2023 APPROVED - AS NOTED RMARTIN
Note: M.E.P's are done 6/14/2023 - PREVIOUS INSPECTION NOTES Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections.
ELECTRIC 2ND ROUGH 06/15/2023 CANCELLED BY APPLICANT RMARTIN
Note: 6/15/23 call back when grid is in 6/14/2023 - PREVIOUS INSPECTION NOTES 6/14/23 No electrical plans on site 6/12/2023 - PREVIOUS INSPECTION NOTES NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION
ELECTRIC 2ND ROUGH 06/15/2023 APPROVED RMARTIN
Note: 6/15/2023 - PREVIOUS INSPECTION NOTES 6/15/23 call back when grid is in 6/14/2023 - PREVIOUS INSPECTION NOTES 6/14/23 No electrical plans on site 6/12/2023 - PREVIOUS INSPECTION NOTES NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION
ELECTRIC 2ND ROUGH 06/14/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 6/14/23 No electrical plans on site 6/12/2023 - PREVIOUS INSPECTION NOTES NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION
ABOVE CEILING 06/14/2023 Disapproved -FEE REQUIRED CPISCITELLI
Note: Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections.
ABOVE CEILING 06/12/2023 Disapproved - NO FEE JWALKER
Note: Need to have the approved for code compliance set of prints onsite for all inspections.
STOREFRONT 06/12/2023 APPROVED JWALKER
Note: No store front needed.
ELECTRIC 2ND ROUGH 06/12/2023 Disapproved - NO FEE RMARTIN
Note: NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION
HVAC ROUGH 06/12/2023 APPROVED - AS NOTED CPISCITELLI
Note: Need to submit revision for the elimination of heaters in bathrooms
PLUMBING 2ND ROUGH 06/12/2023 CANCELLED BY APPLICANT MGIBSON
PLUMBING 2ND ROUGH 06/12/2023 APPROVED JWALKER
Note: 6/12/2023 - PREVIOUS INSPECTION NOTES
FRAMING 06/12/2023 APPROVED JWALKER
FOUNDATION SURVEY - OFFICE USE ONLY 06/09/2023 APPROVED TBAKER
ROOF VALLEY & METAL 05/19/2023 APPROVED FWILLIS
WALL SHEATHING 05/05/2023 APPROVED FWILLIS
ROOF SHEATHING / BRACE / TIE DOWN 05/05/2023 APPROVED FWILLIS
Note: 5/4/2023 - PREVIOUS INSPECTION NOTES 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23 1. Detail S-2.2 on page 4 . The clp system has not been installed as per the details. All threads drilled into the foundation and no bottom plate washers. Submitt a change to the building department showing as built for approval or installed the approved CLP system. 2. The trusses have not been installed as per the structual details on page S-1.1 The girder truss is shown running parrell to the shear wall below. Girder truss has been run perpedicular not allowing the anchor system show on the structual drawings.. Please have the drawings along with required anchors for the new truss layout revised and submitted to the building department showing as built. 3 Missing the simpson DSC2r- SDS3 anchors at the beam to shearwall. Inspection Stopped, 3/10/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints. 5/4/23 - ENGINEERING MISSING ON TRUSS T04 AND TO5. HIGHLIGHTED ON TRUSS PACKAGE PULLOUT.
ROOF SHEATHING / BRACE / TIE DOWN 05/04/2023 Disapproved - NO FEE FWILLIS
Note: 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23 1. Detail S-2.2 on page 4 . The clp system has not been installed as per the details. All threads drilled into the foundation and no bottom plate washers. Submitt a change to the building department showing as built for approval or installed the approved CLP system. 2. The trusses have not been installed as per the structual details on page S-1.1 The girder truss is shown running parrell to the shear wall below. Girder truss has been run perpedicular not allowing the anchor system show on the structual drawings.. Please have the drawings along with required anchors for the new truss layout revised and submitted to the building department showing as built. 3 Missing the simpson DSC2r- SDS3 anchors at the beam to shearwall. Inspection Stopped, 3/10/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints. 5/4/23 - ENGINEERING MISSING ON TRUSS T04 AND TO5. HIGHLIGHTED ON TRUSS PACKAGE PULLOUT.
ROOF SHEATHING / BRACE / TIE DOWN 03/14/2023 Disapproved - NO FEE JWALKER
Note: 3/14/23 1. Detail S-2.2 on page 4 . The clp system has not been installed as per the details. All threads drilled into the foundation and no bottom plate washers. Submitt a change to the building department showing as built for approval or installed the approved CLP system. 2. The trusses have not been installed as per the structual details on page S-1.1 The girder truss is shown running parrell to the shear wall below. Girder truss has been run perpedicular not allowing the anchor system show on the structual drawings.. Please have the drawings along with required anchors for the new truss layout revised and submitted to the building department showing as built. 3 Missing the simpson DSC2r- SDS3 anchors at the beam to shearwall. Inspection Stopped, 3/10/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints.
ROOF SHEATHING / BRACE / TIE DOWN 03/10/2023 Disapproved - NO FEE JWALKER
Note: Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints.
MONOLITHIC SLAB 02/13/2023 APPROVED FWILLIS
ELECTRIC 1ST ROUGH 01/18/2023 APPROVED MKRASKI
PLUMBING 1ST ROUGH 01/12/2023 APPROVED MGIBSON

Review History

Department Status Date In Date Out
MECH COMPLETE 05/13/2024 05/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 05/01/2024 05/13/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plan sheet needs to be digitally signed sealed and verifiable per F.S. 471.025
BLD HOLD 04/04/2024 04/15/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide new plan sheets or engineer's letter signed, sealed and verfiable per F.S.471.025
BADMIN INFORMATION 12/05/2023 12/05/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Already received NOC
BLD COMPLETE 08/16/2023 08/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 08/16/2023 08/16/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For any future submittal, please name your files in accordance with the 'document submittal requirements' that can be found on the permit portal page. We updated the file name for this one submitted.
ENGIN1 COMPLETE 06/08/2023 06/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
DSD COMPLETE 06/08/2023 06/13/2023
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 05/04/2023 05/17/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BLD HOLD 03/31/2023 04/17/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM ALL COMMENTS BELOW PER THE 2020 FLORIDA BUILDING CODE-BUILDING, FLORIDA STATUTES AND FLORIDA ADMINISTRATIVE CODE. 1. Truss layout plan prepared by ICG Innovative Construction Group must be marked / noted as being reviewed and approved and found to be in conformance with the structural design of the building by the design professional in responsible charge. In this case this means by J. Matthew Lowe, Florida PE No. 59027. FBCB Section 107.3.4.1. 2. Sheathing to Roof Deck plan sheet must be signed and sealed by the design professional in responsible charge. In this case this means by J. Matthew Lowe, Florida PE No. 59027. Florida Statute 471.025, Florida Administrative Code 61G15-23.004.
BLD HOLD 02/17/2023 03/07/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building (FBCB). 1. Structural engineer of record to provide approval stamp, signature and date (not sealed) of the truss placement / layout plan and at least the cover sheet of the truss profile plans. FBCB Section 107.3.4.1. 2. Structural engineer of record to revise roof framing plan on Plan Sheet S1.1 reflecting the change from conventional framing to trusses. All loads and reactions shall be verified by engineer and where revised, any corresponding structural requirements as a result of revisions, if any, shall be so described on other structural plan sheets and detailed accordingly.
MECH COMPLETE 10/31/2022 10/31/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 10/31/2022 10/31/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 10/24/2022 10/31/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck.
MECH HOLD 10/24/2022 10/28/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck. (Second Request)
MECH HOLD 10/11/2022 10/13/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck.
ELEC HOLD 10/11/2022 10/13/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck.
FI1 COMPLETE 10/11/2022 10/12/2022
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
BLD COMPLETE 10/11/2022 10/11/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
UD1 COMPLETE 09/08/2022 09/12/2022
Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM
MECH COMPLETE 09/08/2022 09/12/2022
Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM Resulted in error.
MECH HOLD 09/08/2022 09/12/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Resulted in error for original plan review entry. 1. Energy Calcs need to be from FBC 2020 7th edition. Not 2018 IECC 2. Energy Calcs need to be 100% addressed in comcheck
ARCHR COMPLETE 09/06/2022 09/07/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD HOLD 09/06/2022 09/12/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Provide structural plans for review (Note: Full review was not completed due missing sheets). FBC [A]107.2 2. Provide Product Approvals for wood connectors and wood anchors. Per F.S. 471.025 and F.A.C. 61 G15-23.005.
DSD COMPLETE 09/06/2022 09/07/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC HOLD 09/06/2022 09/12/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Energy Calcs need to be from FBC 2020 7th edition. Not 2018 IECC 2. Energy Calcs need to be 100% addressed in comcheck
FI1 HOLD 09/06/2022 09/12/2022
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. And or 2020 FBC Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. PLEASE PROVIDE LOCATIONS FOR REQUIRED FIRE EXTINGUISHERS PER FFPC 1, 13.6.3.2.1.2.2, AND NFPA 10, SECTION 6.1.3 IN A CONSPICUOUSLY LOCATED AREA ALONG NORMAL PATHS OF TRAVEL INCLUDING EXITS FROM AREAS, WHERE THEY ARE READILY ACCESSIBLE AND IMMEDIATELY AVAILABLE FOR USE WHERE THEY ARE NOT OBSTRUCTED OR OBSCURED FROM VIEW.
MECH HOLD 09/06/2022 09/08/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide mechanical plans
PLUM COMPLETE 09/06/2022 09/12/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
UD1 HOLD 09/06/2022 09/07/2022
Note: Held By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM 1. Utility fees, agreement and FDEP permit or Engineers Letter of determination shall be complete prior to issuance of the building permit. Contact Irma Velez (386-986-2355) or Candace Stone (386-986-2539) for required documents 2. Provide plumbing plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 05/21/2024
CONTRACTOR CHANGE ¤20.00 06/14/2023
CONTRACTOR CHANGE ¤20.00 06/14/2023
REINSPECTION - COMMERCIAL ¤60.00 06/14/2023
ADJUSTMENT 50% (¤1,973.13) 11/30/2022
ADMINISTRATIVE - COMMERCIAL ¤75.00 11/30/2022
INSPECTION COMMERCIAL ¤3,325.00 11/30/2022
PLAN REVIEW - COMMERCIAL ¤546.25 11/30/2022
3% FIRE IMPACT FEE CREDIT (¤21.41) 11/30/2022
IMPACT FEE FIRE ¤713.62 11/30/2022
SURCHARGE FS 533.721 ¤20.55 11/30/2022
SURCHARGE - FS 468.631 ¤30.82 11/30/2022
SITE PLAN 30 ¤30.00 11/30/2022
Fees Total Due: ¤0.00 Total Paid: ¤2,906.70