Permit #2022090221
Permit Details
Status: FINAL
| Parcel Id: 23-11-30-6060-00000-00F0 |
| Total Square Footage: 840 sqft |
| Block: 00000 |
| Subdivision: 2312 - WHITEVIEW VILLAGE SUBDIVISION |
| Job Phone: 904-323-8928 |
| Location Address: 32 WAVERLY LN |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 11/30/2022 |
| NOC: RECORDED |
| Applicant name: BENTLEY JAMES BRADLEY |
| Owner: KB HOME JACKSONVILLE, LLC |
|
Address 10475 FORTUNE PKWY, STE 100 JACKSONVILLE, FL 32256 |
| Lot: 00F0 |
| Contracted Stated Job Value: ¤475,000.00 |
| Job Description: WHITEVIEW VILLAGE AMENITY CENTER |
| Type: CN |
Contractor
BENT CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4446 HENDRICKS AVE #109 JACKSONVILLE, FL 32207 |
CGC1524472 (Exp: 08/31/2026) | 904-323-8928 |
Sub Contractors
HAROLD WILLIAM COFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
14590 LAGOON DRIVE JACKSONVILLE, FL 32246 |
CCC1330610 (Exp: 08/31/2024) | 904-755-9777 | 904-220-9979 |
RAYMOND A PASUKINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5605 FLORIDA MINING BLVD S JACKSONVILLE, FL 32257 |
SUITE 210 JACKSONVILLE, FL 32257 |
EC13005820 (Exp: 08/31/2026) | 904-880-0333 |
NICHOLAS JOSEPH BRYAN GAY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1518 WHITLOCK AVENUE JACKSONVILLE, FL 32216 |
CFC1429377 (Exp: 08/31/2024) | 904-322-2301 |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING FINAL | 05/14/2024 | FINAL APPROVED | JWALKER |
| U - UTILITY COMMERCIAL FINAL | 05/14/2024 | FINAL APPROVED | LFITZGERALD |
| HVAC FINAL | 05/13/2024 | FINAL APPROVED | CPISCITELLI |
| Note: 3/26/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 Need to submit revision for the elimination of heaters in bathrooms | |||
| ELECTRIC 2ND ROUGH | 04/10/2024 | APPROVED | RMARTIN |
| Note: 11/9/2023 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC - EARLY POWER | 04/10/2024 | APPROVED | RMARTIN |
| FIRE FINAL | 04/05/2024 | APPROVED | JMUNSON |
| EXTERIOR ARCHITECTURAL FEATURES | 04/04/2024 | APPROVED | RPICATAGI |
| ELECTRIC FINAL | 04/02/2024 | APPROVED | RMARTIN |
| PLUMBING FINAL | 03/26/2024 | APPROVED | MGIBSON |
| HVAC FINAL | 03/26/2024 | CANCELLED BY APPLICANT | CPISCITELLI |
| Note: Inspector Notes from Inspection 3140 Need to submit revision for the elimination of heaters in bathrooms | |||
| PLUMBING 2ND ROUGH | 12/22/2023 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC 2ND ROUGH | 12/22/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 11/9/2023 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC 2ND ROUGH | 11/09/2023 | CANCELLED BY APPLICANT | MKRASKI |
| FRAMING | 11/09/2023 | CANCELLED BY APPLICANT | FWILLIS |
| Note: Inspector Notes from Inspection 3280 10/17/23 1. Contractor is approved to pour all footings. Shade awning footings are fully approved. 2. Contractor still needs to have the engineer submit a revison for the change of the mail kiosk footings from 3, shown on the print, to only 2 footings. This correction was request in the notes from the previous inspection listed below. Please have the revision submitted prior to scheduling further inspections. 9/18/2023 - PREVIOUS INSPECTION NOTES Mail kiosk footings 1. Submitted print shows (3) 7' x 7' x 3' footings, Only 2 have been dug. Please have the engineer submit a revision to the building department showing the change of the number of structual footings. 2. Print calls for 10- #5 rebar e.w. top and bottom, top have not been installed. 3. In the footing closest to the road the reclaimed water pipe has be damaged. Pipe will need to be rerouted around the footing. New inspection will need to be called in when piping has been completed. 4. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of ancho Pool Shade structure. 1. The top footing rebar #5 e.w. pads have not been installed. 2. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of anchor. | |||
| FOOTER | 10/17/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 10/17/23 1. Contractor is approved to pour all footings. Shade awning footings are fully approved. 2. Contractor still needs to have the engineer submit a revison for the change of the mail kiosk footings from 3, shown on the print, to only 2 footings. This correction was request in the notes from the previous inspection listed below. Please have the revision submitted prior to scheduling further inspections. 9/18/2023 - PREVIOUS INSPECTION NOTES Mail kiosk footings 1. Submitted print shows (3) 7' x 7' x 3' footings, Only 2 have been dug. Please have the engineer submit a revision to the building department showing the change of the number of structual footings. 2. Print calls for 10- #5 rebar e.w. top and bottom, top have not been installed. 3. In the footing closest to the road the reclaimed water pipe has be damaged. Pipe will need to be rerouted around the footing. New inspection will need to be called in when piping has been completed. 4. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of ancho Pool Shade structure. 1. The top footing rebar #5 e.w. pads have not been installed. 2. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of anchor. | |||
| FOOTER | 09/18/2023 | Disapproved - NO FEE | JWALKER |
| Note: Mail kiosk footings 1. Submitted print shows (3) 7' x 7' x 3' footings, Only 2 have been dug. Please have the engineer submit a revision to the building department showing the change of the number of structual footings. 2. Print calls for 10- #5 rebar e.w. top and bottom, top have not been installed. 3. In the footing closest to the road the reclaimed water pipe has be damaged. Pipe will need to be rerouted around the footing. New inspection will need to be called in when piping has been completed. 4. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of ancho Pool Shade structure. 1. The top footing rebar #5 e.w. pads have not been installed. 2. The SIMPSON PAB4H-24 anchors called for have are not installed on the form boards. Contractore stated these anchors will be dilled into place. Please provide simpson specs showing this application for this type of anchor. | |||
| GRAVITY SEWER | 06/30/2023 | APPROVED | JWALKER |
| Note: 6/29/2023 - PREVIOUS INSPECTION NOTES 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe. | |||
| BLD - SEWER TIE IN | 06/30/2023 | APPROVED | JWALKER |
| Note: 6/29/2023 - PREVIOUS INSPECTION NOTES 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe. | |||
| BLD - SEWER TIE IN | 06/29/2023 | Disapproved - NO FEE | JWALKER |
| Note: 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe. | |||
| GRAVITY SEWER | 06/29/2023 | Disapproved - NO FEE | JWALKER |
| Note: 4" sewer pipe is not of the approved type contractor used ASTM D2729 storm water pipe. | |||
| WALL SHEATHING | 06/20/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 3470 M.E.P's are done 6/14/2023 - PREVIOUS INSPECTION NOTES Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections. | |||
| INSULATION | 06/20/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 3470 M.E.P's are done 6/14/2023 - PREVIOUS INSPECTION NOTES Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections. | |||
| ABOVE CEILING | 06/15/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: M.E.P's are done 6/14/2023 - PREVIOUS INSPECTION NOTES Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections. | |||
| ELECTRIC 2ND ROUGH | 06/15/2023 | CANCELLED BY APPLICANT | RMARTIN |
| Note: 6/15/23 call back when grid is in 6/14/2023 - PREVIOUS INSPECTION NOTES 6/14/23 No electrical plans on site 6/12/2023 - PREVIOUS INSPECTION NOTES NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION | |||
| ELECTRIC 2ND ROUGH | 06/15/2023 | APPROVED | RMARTIN |
| Note: 6/15/2023 - PREVIOUS INSPECTION NOTES 6/15/23 call back when grid is in 6/14/2023 - PREVIOUS INSPECTION NOTES 6/14/23 No electrical plans on site 6/12/2023 - PREVIOUS INSPECTION NOTES NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION | |||
| ELECTRIC 2ND ROUGH | 06/14/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 6/14/23 No electrical plans on site 6/12/2023 - PREVIOUS INSPECTION NOTES NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION | |||
| ABOVE CEILING | 06/14/2023 | Disapproved -FEE REQUIRED | CPISCITELLI |
| Note: Need to have approved plans onsite for inspection 6/12/2023 - PREVIOUS INSPECTION NOTES Need to have the approved for code compliance set of prints onsite for all inspections. | |||
| ABOVE CEILING | 06/12/2023 | Disapproved - NO FEE | JWALKER |
| Note: Need to have the approved for code compliance set of prints onsite for all inspections. | |||
| STOREFRONT | 06/12/2023 | APPROVED | JWALKER |
| Note: No store front needed. | |||
| ELECTRIC 2ND ROUGH | 06/12/2023 | Disapproved - NO FEE | RMARTIN |
| Note: NEED THE APPROVED SET OF PLANS ON SITE FOR INSPECTION | |||
| HVAC ROUGH | 06/12/2023 | APPROVED - AS NOTED | CPISCITELLI |
| Note: Need to submit revision for the elimination of heaters in bathrooms | |||
| PLUMBING 2ND ROUGH | 06/12/2023 | CANCELLED BY APPLICANT | MGIBSON |
| PLUMBING 2ND ROUGH | 06/12/2023 | APPROVED | JWALKER |
| Note: 6/12/2023 - PREVIOUS INSPECTION NOTES | |||
| FRAMING | 06/12/2023 | APPROVED | JWALKER |
| FOUNDATION SURVEY - OFFICE USE ONLY | 06/09/2023 | APPROVED | TBAKER |
| ROOF VALLEY & METAL | 05/19/2023 | APPROVED | FWILLIS |
| WALL SHEATHING | 05/05/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACE / TIE DOWN | 05/05/2023 | APPROVED | FWILLIS |
| Note: 5/4/2023 - PREVIOUS INSPECTION NOTES 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23 1. Detail S-2.2 on page 4 . The clp system has not been installed as per the details. All threads drilled into the foundation and no bottom plate washers. Submitt a change to the building department showing as built for approval or installed the approved CLP system. 2. The trusses have not been installed as per the structual details on page S-1.1 The girder truss is shown running parrell to the shear wall below. Girder truss has been run perpedicular not allowing the anchor system show on the structual drawings.. Please have the drawings along with required anchors for the new truss layout revised and submitted to the building department showing as built. 3 Missing the simpson DSC2r- SDS3 anchors at the beam to shearwall. Inspection Stopped, 3/10/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints. 5/4/23 - ENGINEERING MISSING ON TRUSS T04 AND TO5. HIGHLIGHTED ON TRUSS PACKAGE PULLOUT. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 05/04/2023 | Disapproved - NO FEE | FWILLIS |
| Note: 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23 1. Detail S-2.2 on page 4 . The clp system has not been installed as per the details. All threads drilled into the foundation and no bottom plate washers. Submitt a change to the building department showing as built for approval or installed the approved CLP system. 2. The trusses have not been installed as per the structual details on page S-1.1 The girder truss is shown running parrell to the shear wall below. Girder truss has been run perpedicular not allowing the anchor system show on the structual drawings.. Please have the drawings along with required anchors for the new truss layout revised and submitted to the building department showing as built. 3 Missing the simpson DSC2r- SDS3 anchors at the beam to shearwall. Inspection Stopped, 3/10/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints. 5/4/23 - ENGINEERING MISSING ON TRUSS T04 AND TO5. HIGHLIGHTED ON TRUSS PACKAGE PULLOUT. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 03/14/2023 | Disapproved - NO FEE | JWALKER |
| Note: 3/14/23 1. Detail S-2.2 on page 4 . The clp system has not been installed as per the details. All threads drilled into the foundation and no bottom plate washers. Submitt a change to the building department showing as built for approval or installed the approved CLP system. 2. The trusses have not been installed as per the structual details on page S-1.1 The girder truss is shown running parrell to the shear wall below. Girder truss has been run perpedicular not allowing the anchor system show on the structual drawings.. Please have the drawings along with required anchors for the new truss layout revised and submitted to the building department showing as built. 3 Missing the simpson DSC2r- SDS3 anchors at the beam to shearwall. Inspection Stopped, 3/10/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 03/10/2023 | Disapproved - NO FEE | JWALKER |
| Note: Please have a full set of approved prints onsite for inspection. Truss engineering packet on site no prints. | |||
| MONOLITHIC SLAB | 02/13/2023 | APPROVED | FWILLIS |
| ELECTRIC 1ST ROUGH | 01/18/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH | 01/12/2023 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/13/2024 | 05/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/01/2024 | 05/13/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plan sheet needs to be digitally signed sealed and verifiable per F.S. 471.025 | |||
| BLD | HOLD | 04/04/2024 | 04/15/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide new plan sheets or engineer's letter signed, sealed and verfiable per F.S.471.025 | |||
| BADMIN | INFORMATION | 12/05/2023 | 12/05/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Already received NOC | |||
| BLD | COMPLETE | 08/16/2023 | 08/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/16/2023 | 08/16/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For any future submittal, please name your files in accordance with the 'document submittal requirements' that can be found on the permit portal page. We updated the file name for this one submitted. | |||
| ENGIN1 | COMPLETE | 06/08/2023 | 06/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 06/08/2023 | 06/13/2023 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/04/2023 | 05/17/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/31/2023 | 04/17/2023 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM ALL COMMENTS BELOW PER THE 2020 FLORIDA BUILDING CODE-BUILDING, FLORIDA STATUTES AND FLORIDA ADMINISTRATIVE CODE. 1. Truss layout plan prepared by ICG Innovative Construction Group must be marked / noted as being reviewed and approved and found to be in conformance with the structural design of the building by the design professional in responsible charge. In this case this means by J. Matthew Lowe, Florida PE No. 59027. FBCB Section 107.3.4.1. 2. Sheathing to Roof Deck plan sheet must be signed and sealed by the design professional in responsible charge. In this case this means by J. Matthew Lowe, Florida PE No. 59027. Florida Statute 471.025, Florida Administrative Code 61G15-23.004. | |||
| BLD | HOLD | 02/17/2023 | 03/07/2023 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building (FBCB). 1. Structural engineer of record to provide approval stamp, signature and date (not sealed) of the truss placement / layout plan and at least the cover sheet of the truss profile plans. FBCB Section 107.3.4.1. 2. Structural engineer of record to revise roof framing plan on Plan Sheet S1.1 reflecting the change from conventional framing to trusses. All loads and reactions shall be verified by engineer and where revised, any corresponding structural requirements as a result of revisions, if any, shall be so described on other structural plan sheets and detailed accordingly. | |||
| MECH | COMPLETE | 10/31/2022 | 10/31/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/31/2022 | 10/31/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 10/24/2022 | 10/31/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck. | |||
| MECH | HOLD | 10/24/2022 | 10/28/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck. (Second Request) | |||
| MECH | HOLD | 10/11/2022 | 10/13/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck. | |||
| ELEC | HOLD | 10/11/2022 | 10/13/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Inspection checklist needs to be 100 % addressed in COMcheck. | |||
| FI1 | COMPLETE | 10/11/2022 | 10/12/2022 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/11/2022 | 10/11/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 09/08/2022 | 09/12/2022 |
| Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/08/2022 | 09/12/2022 |
| Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM Resulted in error. | |||
| MECH | HOLD | 09/08/2022 | 09/12/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Resulted in error for original plan review entry. 1. Energy Calcs need to be from FBC 2020 7th edition. Not 2018 IECC 2. Energy Calcs need to be 100% addressed in comcheck | |||
| ARCHR | COMPLETE | 09/06/2022 | 09/07/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/06/2022 | 09/12/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Provide structural plans for review (Note: Full review was not completed due missing sheets). FBC [A]107.2 2. Provide Product Approvals for wood connectors and wood anchors. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| DSD | COMPLETE | 09/06/2022 | 09/07/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 09/06/2022 | 09/12/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Energy Calcs need to be from FBC 2020 7th edition. Not 2018 IECC 2. Energy Calcs need to be 100% addressed in comcheck | |||
| FI1 | HOLD | 09/06/2022 | 09/12/2022 |
| Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. And or 2020 FBC Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. PLEASE PROVIDE LOCATIONS FOR REQUIRED FIRE EXTINGUISHERS PER FFPC 1, 13.6.3.2.1.2.2, AND NFPA 10, SECTION 6.1.3 IN A CONSPICUOUSLY LOCATED AREA ALONG NORMAL PATHS OF TRAVEL INCLUDING EXITS FROM AREAS, WHERE THEY ARE READILY ACCESSIBLE AND IMMEDIATELY AVAILABLE FOR USE WHERE THEY ARE NOT OBSTRUCTED OR OBSCURED FROM VIEW. | |||
| MECH | HOLD | 09/06/2022 | 09/08/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide mechanical plans | |||
| PLUM | COMPLETE | 09/06/2022 | 09/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| UD1 | HOLD | 09/06/2022 | 09/07/2022 |
| Note: Held By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM 1. Utility fees, agreement and FDEP permit or Engineers Letter of determination shall be complete prior to issuance of the building permit. Contact Irma Velez (386-986-2355) or Candace Stone (386-986-2539) for required documents 2. Provide plumbing plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION - COMMERCIAL | ¤60.00 | 05/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 06/14/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 06/14/2023 |
| REINSPECTION - COMMERCIAL | ¤60.00 | 06/14/2023 |
| ADJUSTMENT 50% | (¤1,973.13) | 11/30/2022 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 11/30/2022 |
| INSPECTION COMMERCIAL | ¤3,325.00 | 11/30/2022 |
| PLAN REVIEW - COMMERCIAL | ¤546.25 | 11/30/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤21.41) | 11/30/2022 |
| IMPACT FEE FIRE | ¤713.62 | 11/30/2022 |
| SURCHARGE FS 533.721 | ¤20.55 | 11/30/2022 |
| SURCHARGE - FS 468.631 | ¤30.82 | 11/30/2022 |
| SITE PLAN 30 | ¤30.00 | 11/30/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤2,906.70 |