Permit #2022090279
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00680-0020 |
| CONDITIONED SPACE: 2628 sqft |
| GARAGE: 1004 sqft |
| OPENED PORCH (WITH ROOF) : 98 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 192 sqft |
| Total Square Footage: 3922 sqft |
| Block: 00680 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-283-7499 |
| Location Address: 100 BUTTONWORTH DR |
| Type: DU - DUPLEX |
| Issue Date: 09/16/2022 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: JMR III, LLC |
|
Address PO BOX 9 CISSNA, IL 60924 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤344,220.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
RBI ENTERPRISES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
10 WHITTINGTON DR PALM COAST, FL 32164 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
WILLIAM ROBERT BARRICK
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
50 LEANNI WAY PALM COAST, FL 32137 |
STE E2 PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2025) | 229-375-9123 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/22/2023 | FINAL APPROVED | JSTEWART |
| Note: 5/19/2023 - PREVIOUS INSPECTION NOTES 5/19/2023--Side A and B. Exit doors to Lanai need to have a Light. Everything else is good. | |||
| BLD - BUILDING FINAL | 05/19/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 5/19/2023--Side A and B. Exit doors to Lanai need to have a Light. Everything else is good. | |||
| U-CROSS CONNECTION | 05/11/2023 | APPROVED | DHANEY |
| ROW - FINAL INSPECTION | 05/11/2023 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 05/11/2023 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/09/2023 | APPROVED | EMADISON |
| Note: 5/4/2023 - PREVIOUS INSPECTION NOTES ** 05/04/23 Elevations on all adjacent properties at a minimum of 20-foot intervals, on a 10 foot offset, outside the property lines. (A)Land Development Code Technical Manual, Section 300.01 (D)(2) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/09/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/09/23 BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND FROM THE LEFT SIDE VACANT AND REAR VACANT AREA. ** NEED TO FINISH SOD ON LEFT SIDE INNTHE ROW ALL BARE AREAS NEED TO HAVE SOD | |||
| ROW - FINAL APRON (AFTER POUR) | 05/09/2023 | FINAL APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** 05/09/23 BUILDER NEEDS TO REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM PROPERTY AND FROM THE LEFT SIDE VACANT AND REAR VACANT AREA. ** NEED TO FINISH SOD ON LEFT SIDE INNTHE ROW ALL BARE AREAS NEED TO HAVE SOD | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/04/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/04/23 Elevations on all adjacent properties at a minimum of 20-foot intervals, on a 10 foot offset, outside the property lines. (A)Land Development Code Technical Manual, Section 300.01 (D)(2) | |||
| ROW- PRE-APRON (PRE-POUR) | 04/06/2023 | APPROVED | EMADISON |
| Note: ** 04/06/23 READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATIONS AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 03/29/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/29/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED SLEEVE ON LEFT SIDE WHERE 3'' OR RELIEIVING ARCH WITH FOOTER STEEL IS GOING TO MASTER BATH, ALSO NEED TO REMOVE ALL HARD PAN BEFORE BACKFILLING, AND NEED PORTABLE RESTROOM BEFORE SLAB INSPECTION | |||
| ELECTRIC - EARLY POWER | 03/22/2023 | APPROVED | JSTEWART |
| PEP TANK INSTALLATION REQUEST | 02/27/2023 | APPROVED | TSCHWEERS |
| Note: 2/22/2023 8:26:00 AM- PREVIOUS INSPECTION NOTES 2/21/2023 Dumpster in the way of tank. | |||
| PEP TANK INSTALLATION REQUEST | 02/21/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 2/21/2023 Dumpster in the way of tank. | |||
| LATH/BRICK/ WATER BARRIER | 02/13/2023 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 01/30/2023 | APPROVED | TSTAUFFACHER |
| Note: 1/6/2023 - PREVIOUS INSPECTION NOTES 1/6/23: Inspection called in too early. Not ready! Drywall not on firewall yet. Draft stop inspected. | |||
| FIREWALL FINAL | 01/30/2023 | APPROVED | TSTAUFFACHER |
| INSULATION | 01/17/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 1/10/2023 - PREVIOUS INSPECTION NOTES not ready for inspection 1. SER is against underside of roof deck for both units at ser entrance location nee to move off of roof deck and or place nail plates NEC 300.4 a 1 2. Plans call for 200 amp service alluminum must use 4/0 minimum size (need to place proper size wire for 200 amp service pr plans 3. Plumbing at water heater bottom plate needs nail plate P2603.2.1 INSPECTION STOPPED, Not Ready, all in side a nothing else looked at 1/12/22 need to have revision by early power on service change and cover in left meter main on ug side | |||
| ALL ROUGH | 01/12/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: 1/10/2023 - PREVIOUS INSPECTION NOTES not ready for inspection 1. SER is against underside of roof deck for both units at ser entrance location nee to move off of roof deck and or place nail plates NEC 300.4 a 1 2. Plans call for 200 amp service alluminum must use 4/0 minimum size (need to place proper size wire for 200 amp service pr plans 3. Plumbing at water heater bottom plate needs nail plate P2603.2.1 INSPECTION STOPPED, Not Ready, all in side a nothing else looked at 1/12/22 need to have revision by early power on service change and cover in left meter main on ug side | |||
| ALL ROUGH | 01/10/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: not ready for inspection 1. SER is against underside of roof deck for both units at ser entrance location nee to move off of roof deck and or place nail plates NEC 300.4 a 1 2. Plans call for 200 amp service alluminum must use 4/0 minimum size (need to place proper size wire for 200 amp service pr plans 3. Plumbing at water heater bottom plate needs nail plate P2603.2.1 INSPECTION STOPPED, Not Ready, all in side a nothing else looked at | |||
| FIREWALL DRYWALL NAILING | 01/06/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/6/23: Inspection called in too early. Not ready! Drywall not on firewall yet. Draft stop inspected. | |||
| ROOF VALLEY & METAL | 12/16/2022 | APPROVED | JWALKER |
| WALL SHEATHING | 12/08/2022 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/08/2022 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 11/15/2022 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/08/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/01/2022 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/26/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED SLEEVE ON LEFT SIDE WHERE 3'' OR RELIEIVING ARCH WITH FOOTER STEEL IS GOING TO MASTER BATH, ALSO NEED TO REMOVE ALL HARD PAN BEFORE BACKFILLING, AND NEED PORTABLE RESTROOM BEFORE SLAB INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 10/07/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/16/2023 | 03/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/15/2023 | 03/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 02/02/2023 | 02/02/2023 |
| Note: wrong doc uploaded | |||
| BLD | HOLD | 02/01/2023 | 02/01/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Revised Product Approval was submitted for the proposed underlayment. Please submit a revised City of Palm Coast Roofing Worksheet. | |||
| BLD | HOLD | 02/01/2023 | 02/02/2023 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Revised Product Approval was submitted for the proposed underlayment. Please submit a revised City of Palm Coast Roofing Worksheet. | |||
| BLD | COMPLETE | 01/31/2023 | 01/31/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/19/2022 | 12/21/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ENGIN1 | COMPLETE | 11/07/2022 | 11/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/14/2022 | 09/14/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/08/2022 | 01/04/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/07/2022 | 09/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/07/2022 | 09/09/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 09/07/2022 | 09/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/07/2022 | 09/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/07/2022 | 09/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/07/2022 | 09/08/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/07/2022 | 09/14/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE A COMMON SWALE ON LEFT SIDE PROPERTY LINE AT VACANT LOT | |||
| ZON | COMPLETE | 09/07/2022 | 09/13/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/07/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/07/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/07/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 10/10/2022 |
| IMPACT FEE SCHOOL | ¤3,700.00 | 10/10/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 09/16/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 09/16/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/16/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤130.96) | 09/16/2022 |
| SURCHARGE FS 533.721 | ¤4.00 | 09/16/2022 |
| SURCHARGE - FS 468.631 | ¤6.00 | 09/16/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/16/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/16/2022 |
| SW ENG PRE APRON | ¤30.00 | 09/16/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/16/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/16/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤135.06) | 09/16/2022 |
| SEWER CREDIT | (¤1,700.00) | 09/16/2022 |
| SEWER INSPECTION | ¤25.00 | 09/16/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 09/16/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 09/16/2022 |
| SITE PLAN 30 | ¤30.00 | 09/16/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤34.98) | 09/16/2022 |
| IMPACT FEE FIRE | ¤388.65 | 09/16/2022 |
| IMPACT FEE FIRE | ¤777.30 | 09/16/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 09/16/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 09/16/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 09/16/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/16/2022 |
| CONNECTION FEES | ¤1,077.88 | 09/16/2022 |
| WATER- TURN ON | ¤25.00 | 09/16/2022 |
| ADJUSTMENT 50% | (¤632.75) | 09/16/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/16/2022 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 09/16/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 09/16/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤33,399.23 |