Permit #2022090338
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00140-0050 |
| CONDITIONED SPACE: 2298 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| OPENED PORCH (WITH ROOF) : 365 sqft |
| GARAGE: 626 sqft |
| Total Square Footage: 3377 sqft |
| Block: 00140 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 386-931-5935 |
| Location Address: 8 WHITAKER PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/05/2022 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: ELKINYUK MARINA & EDVARD PANAMARENKA |
|
Address 632 MARINA POINTE DR EAST ROCKAWAY, NY 11518 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤440,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PROJECT STATUS | 11/20/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------ rjg. Please check this grade to verify that the water will flow from back to front. This project status is pending that this be checked. 10/16/2023 - PREVIOUS INSPECTION NOTES Met on site with grade constractor on Friday 10/13/23 who had to remove sod and bring in fill to raise the back property grade at least a foot higher. Home in the rear would flood as graded. Inspector Notes from Inspection 9270 09/19/23 pipe in tolerance ready to pour.At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 9/18/2023 - PREVIOUS INSPECTION NOTES 09/18/23 CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. PLEASE RESET PIPE WITHIN TOLERANCE ALLOWED. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| U - SEWER TIE IN | 11/20/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW - STORMWATER FINAL | 11/17/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. --------------------------------------------------------------------------- 11/16/2023 - PREVIOUS INSPECTION NOTES THE LEFT SIDE OF ROADSIDE SWALE STILL NEEDS TO MATCH THE EXISTING GRADE ADJACENT TO YOUR SO THE WATER DON'T BACK UP. ------------------------------------------------------------------------------------------ 11/13/2023 - PREVIOUS INSPECTION NOTES ROADSIDE SWALE STILL NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS PLEASE PHOTOS FROM THE INSPECTION ON 11/9/23 ------------------------------------------------------------------------------- 11/9/2023 - PREVIOUS INSPECTION NOTES PLEASE READ ALL NOTES FRO THE LAST INSPECTION ALL STILL NEED TO BE ADDRESSED BEFORE PASSING -------------------------------------------------------------------------------- 11/6/2023 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS 2) ALL BARE AREAS ON THE ADJACENT LOTS NEED TO HAVE SOD ON ALL AREAS 3) THE BARE AREAS IN THE VACANT NEED TO HAVE SEED AND STRAW 4) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT | |||
| ROW - STORMWATER FINAL | 11/16/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE LEFT SIDE OF ROADSIDE SWALE STILL NEEDS TO MATCH THE EXISTING GRADE ADJACENT TO YOUR SO THE WATER DON'T BACK UP. ------------------------------------------------------------------------------------------ 11/13/2023 - PREVIOUS INSPECTION NOTES ROADSIDE SWALE STILL NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS PLEASE PHOTOS FROM THE INSPECTION ON 11/9/23 ------------------------------------------------------------------------------- 11/9/2023 - PREVIOUS INSPECTION NOTES PLEASE READ ALL NOTES FRO THE LAST INSPECTION ALL STILL NEED TO BE ADDRESSED BEFORE PASSING -------------------------------------------------------------------------------- 11/6/2023 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS 2) ALL BARE AREAS ON THE ADJACENT LOTS NEED TO HAVE SOD ON ALL AREAS 3) THE BARE AREAS IN THE VACANT NEED TO HAVE SEED AND STRAW 4) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT | |||
| BLD - BUILDING FINAL | 11/14/2023 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 11/13/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: ROADSIDE SWALE STILL NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS PLEASE PHOTOS FROM THE INSPECTION ON 11/9/23 ------------------------------------------------------------------------------- 11/9/2023 - PREVIOUS INSPECTION NOTES PLEASE READ ALL NOTES FRO THE LAST INSPECTION ALL STILL NEED TO BE ADDRESSED BEFORE PASSING -------------------------------------------------------------------------------- 11/6/2023 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS 2) ALL BARE AREAS ON THE ADJACENT LOTS NEED TO HAVE SOD ON ALL AREAS 3) THE BARE AREAS IN THE VACANT NEED TO HAVE SEED AND STRAW 4) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT | |||
| ROW - STORMWATER FINAL | 11/09/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: PLEASE READ ALL NOTES FRO THE LAST INSPECTION ALL STILL NEED TO BE ADDRESSED BEFORE PASSING -------------------------------------------------------------------------------- 11/6/2023 - PREVIOUS INSPECTION NOTES 1) THE ROADSIDE SWALE NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS 2) ALL BARE AREAS ON THE ADJACENT LOTS NEED TO HAVE SOD ON ALL AREAS 3) THE BARE AREAS IN THE VACANT NEED TO HAVE SEED AND STRAW 4) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT | |||
| U -UTILITY RESIDENTIAL FINAL | 11/09/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 11/6/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9500 sewer clean out needs lowering/need access to check pep circuit breaker Inspector Notes from Inspection 9035 bldg insp. to ensure 20 amp breaker for pep tank since door was locked/sewer riser pipe needs lowering no irrigation-no cross connection | |||
| ROW - STORMWATER FINAL | 11/06/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE ROADSIDE SWALE NEEDS TO MATCH THE SURROUNDING GRADE AT THE ADJACENT LOTS 2) ALL BARE AREAS ON THE ADJACENT LOTS NEED TO HAVE SOD ON ALL AREAS 3) THE BARE AREAS IN THE VACANT NEED TO HAVE SEED AND STRAW 4) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT | |||
| U -UTILITY RESIDENTIAL FINAL | 11/06/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 bldg insp. to ensure 20 amp breaker for pep tank since door was locked/sewer riser pipe needs lowering no irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 11/06/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9500 sewer clean out needs lowering/need access to check pep circuit breaker(initial inspection resulted incorrectly) Inspector Notes from Inspection 9035 bldg insp. to ensure 20 amp breaker for pep tank since door was locked/sewer riser pipe needs lowering no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 10/31/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/31/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. --------------------------------------------------------------------------------- 10/30/2023 - PREVIOUS INSPECTION NOTES DRAINAGE CONVEYANCE ON THE LEFT AND RIGHT SIDE IS NOT CONSISTENT.I LEFT THE AREA THAT WAS PAINTED WITH WHITE SPRAY PAINT. IT IS NECESSARY TO FIX THE SWALE ON THE RIGHT SIDE OF THE NEIGHBORING PROPERTY. rjg. Please ensure the rear of this property is clearly flowing to the front. Homeowner directly behind is very insistant that his house is draining onto his lot. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/30/2023 | APPROVED | GBERTOLA |
| Note: DRAINAGE CONVEYANCE ON THE LEFT AND RIGHT SIDE IS NOT CONSISTENT.I LEFT THE AREA THAT WAS PAINTED WITH WHITE SPRAY PAINT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/30/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: DRAINAGE CONVEYANCE ON THE LEFT AND RIGHT SIDE IS NOT CONSISTENT.I LEFT THE AREA THAT WAS PAINTED WITH WHITE SPRAY PAINT. IT IS NECESSARY TO FIX THE SWALE ON THE RIGHT SIDE OF THE NEIGHBORING PROPERTY. rjg. Please ensure the rear of this property is clearly flowing to the front. Homeowner directly behind is very insistant that his house is draining onto his lot. | |||
| U-CROSS CONNECTION | 10/30/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 10/18/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PROJECT STATUS | 10/16/2023 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Met on site with grade constractor on Friday 10/13/23 who had to remove sod and bring in fill to raise the back property grade at least a foot higher. Home in the rear would flood as graded. Inspector Notes from Inspection 9270 09/19/23 pipe in tolerance ready to pour.At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 9/18/2023 - PREVIOUS INSPECTION NOTES 09/18/23 CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. PLEASE RESET PIPE WITHIN TOLERANCE ALLOWED. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/19/23 pipe in tolerance ready to pour.At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 9/18/2023 - PREVIOUS INSPECTION NOTES 09/18/23 CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. PLEASE RESET PIPE WITHIN TOLERANCE ALLOWED. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 09/18/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 09/18/23 CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. PLEASE RESET PIPE WITHIN TOLERANCE ALLOWED. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| SEWER SERVICE | 08/21/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 08/17/2023 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 07/26/2023 | APPROVED | CSTONE |
| Note: 6/13/2023 8:06:44 AM- PREVIOUS INSPECTION NOTES exterior is not done | |||
| ELECTRIC-TUG | 07/12/2023 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 06/12/2023 | Disapproved -FEE REQUIRED | CSTONE |
| Note: exterior is not done | |||
| LATH/BRICK/ WATER BARRIER | 06/09/2023 | Approval - Private Provider | PPROVIDER |
| INSULATION | 05/01/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 04/24/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 04/20/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 03/13/2023 | Approval - Private Provider | PPROVIDER |
| TIE DOWN | 03/06/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/06/2023 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 02/21/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 01/17/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/06/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/02/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/15/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/17/2023 | 01/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/17/2023 | 01/17/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/04/2022 | 10/04/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have a total of 16 foundation plantings planted within 2 1/2-8ft of the homes foundation. Minimum eight in the front and four along each side. Must be 3 gallon to be counted. The one gallons are not credit as foundation plantings. | |||
| ZON | COMPLETE | 10/04/2022 | 10/04/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/19/2022 | 09/19/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/09/2022 | 01/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/08/2022 | 09/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/08/2022 | 09/12/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/08/2022 | 09/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/08/2022 | 09/15/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE BOTH PROPERTY LINES A COMMON SWALE | |||
| ZON | HOLD | 09/08/2022 | 09/14/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Bedrooms labeled incorrectly on floor plan. There are two bedrooms labeled Bedroom 2 Please provide gallon sizes of all the shrubs on landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 11/17/2023 |
| IMPACT FEE SCHOOL | ¤1,850.00 | 11/17/2023 |
| REINSPECTION FEE | ¤40.00 | 11/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/17/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/17/2023 |
| UTILITY PEP REINSPECTION | ¤40.00 | 11/17/2023 |
| SEWER CREDIT | (¤1,147.00) | 10/05/2022 |
| SEWER INSPECTION | ¤25.00 | 10/05/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/05/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/05/2022 |
| SITE PLAN 30 | ¤30.00 | 10/05/2022 |
| WATER- TURN ON | ¤25.00 | 10/05/2022 |
| ADJUSTMENT 50% | (¤791.60) | 10/05/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/05/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/05/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/05/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/05/2022 |
| SURCHARGE FS 533.721 | ¤4.91 | 10/05/2022 |
| SURCHARGE - FS 468.631 | ¤7.36 | 10/05/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/05/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/05/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/05/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/05/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/05/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/05/2022 |
| INSPECTION - RESIDENTIAL | ¤1,210.00 | 10/05/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤343.20 | 10/05/2022 |
| CONNECTION FEES | ¤1,077.88 | 10/05/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/05/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/05/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/05/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/05/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,160.56 |