Permit #2022090340
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0700 |
| GARAGE: 1258 sqft |
| OPENED PORCH (WITH ROOF) : 284 sqft |
| SCREEN PORCH (SOLID ROOF) : 912 sqft |
| CONDITIONED SPACE: 4556 sqft |
| Total Square Footage: 7010 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 17 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/20/2022 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: SOLOMON JOSEPH W & TARYN L H&W |
|
Address 4839 WINTERSON COURT DOYLESTOWN, PA 18901 |
| Lot: 0700 |
| Contracted Stated Job Value: ¤993,903.00 |
| Job Description: Single family residence |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 02/15/2024 | APPROVED | MGIBSON |
| BLD - BUILDING FINAL | 02/15/2024 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 02/13/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 02/13/2024 | APPROVED | FSLADISH |
| Note: 2/13/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/12/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS FIELD SURVEY INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 02/13/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/13/24 at the time of this inspection everything was acceptable to COPC requirements. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/12/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS FIELD SURVEY INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/13/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: change out 6in sewer C/O coupling-it is broken and can easily become dislodged and allow dirt/debris intrusion to sewer line | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/12/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/12/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS FIELD SURVEY INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/28/2023 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ------------------------------------------------------------------------------------ 11/16/2023 - PREVIOUS INSPECTION NOTES WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED. READY TO POUR MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 11/27/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 11/16/2023 - PREVIOUS INSPECTION NOTES WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED. READY TO POUR MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL | |||
| ROW- PAVER RESTRAINTS | 11/16/2023 | APPROVED | GBERTOLA |
| Note: READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 11/16/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED. READY TO POUR MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC-TUG | 09/21/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2190 9-14-23 1. Emailed FPL at 10:45. 9-21-23 1. Emailed FPL at 11:43. | |||
| ELECTRIC - EARLY POWER | 09/14/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-14-23 1. Emailed FPL at 10:45. | |||
| GAS ROUGH | 09/01/2023 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 08/09/2023 | APPROVED | BTAYLOR |
| GAS ROUGH | 08/02/2023 | APPROVED | MGIBSON |
| Note: 7/20/2023 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 08/02/2023 | APPROVED | RSIMS |
| Note: 8/2/23: On hold waiting for virtual confirmation of 2 holes in top plate & fireblocking at entry. Completion confirmed through Facetime vidio/audio. | |||
| ALL ROUGH | 08/01/2023 | APPROVED | BTAYLOR |
| Note: New inspection due to canceled inspection 5/26/2023 - PREVIOUS INSPECTION NOTES 5-26-23 1. Slider frame and Duct work approved for insulation. | |||
| U - SEWER TIE IN | 07/26/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: did this virtual on 7/25/23 | |||
| GRAVITY SEWER TEST | 07/26/2023 | APPROVED | TSTAUFFACHER |
| GAS ROUGH | 07/20/2023 | CANCELLED BY APPLICANT | AGAETANO |
| ALL ROUGH | 07/20/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 5/26/2023 - PREVIOUS INSPECTION NOTES 5-26-23 1. Slider frame and Duct work approved for insulation. | |||
| LATH/BRICK/ WATER BARRIER | 07/19/2023 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 05/26/2023 | PARTIALLY APPROVED | BTAYLOR |
| Note: 5-26-23 1. Slider frame and Duct work approved for insulation. | |||
| WALL SHEATHING | 03/21/2023 | APPROVED | TSTAUFFACHER |
| Note: Approved with tie downs | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/21/2023 | APPROVED | TSTAUFFACHER |
| Note: 1/26/2023 - PREVIOUS INSPECTION NOTES Truss engineering not done Missing truss straps MGT not nailed Tie down page not in prints | |||
| ROOF VALLEY & METAL | 01/26/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Truss engineering not done Missing truss straps MGT not nailed Tie down page not in prints | |||
| TIE BEAM / LINTEL | 11/28/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 10/25/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/19/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/17/2022 | APPROVED | MGIBSON |
| Note: 10/14/2022 - PREVIOUS INSPECTION NOTES SPOKE TO JOHN | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/14/2022 | CANCELLED BY APPLICANT | MGIBSON |
| Note: SPOKE TO JOHN | |||
| WATER METER INSTALLATION REQUEST | 09/22/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/12/2024 | 02/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/12/2024 | 02/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 07/11/2023 | 07/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM spoke with Kevin who indicated they will provide correct outlet spacing in the entry area to the library per the electrical review hold comment. | |||
| BLD | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Spoke with Kevin who indicated the skylight covers specified on the product approval worksheet are the ones he intentds to use at each of the four "sun tunnels". There are no other skylights proposed and these covers do have an appropriate product approval number. | |||
| SW1 | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 09/14/2022 | 09/15/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 09/08/2022 | 09/13/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide product approval for the proposed sun tunnel. | |||
| CUSVC | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 09/08/2022 | 09/09/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in libray switch wall. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/08/2022 | 09/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/08/2022 | 09/15/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM The subject lots drainage must not negatively impact any adjacent property. | |||
| ZON | COMPLETE | 09/08/2022 | 09/14/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/15/2024 |
| IMPACT FEE SCHOOL | ¤1,850.00 | 10/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 09/20/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 09/20/2022 |
| SURCHARGE FS 533.721 | ¤10.50 | 09/20/2022 |
| SURCHARGE - FS 468.631 | ¤15.76 | 09/20/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/20/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/20/2022 |
| SW ENG PRE APRON | ¤30.00 | 09/20/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/20/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/20/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 09/20/2022 |
| SEWER INSPECTION | ¤25.00 | 09/20/2022 |
| SITE PLAN 30 | ¤30.00 | 09/20/2022 |
| CONNECTION FEES | ¤25.00 | 09/20/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 09/20/2022 |
| IMPACT FEE FIRE | ¤388.65 | 09/20/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 09/20/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/20/2022 |
| WATER-METER | ¤467.09 | 09/20/2022 |
| WATER-METER | ¤388.04 | 09/20/2022 |
| ADJUSTMENT 50% | (¤1,769.41) | 09/20/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/20/2022 |
| INSPECTION - RESIDENTIAL | ¤2,733.50 | 09/20/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤775.32 | 09/20/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,479.05 |