I want to search for...
Permit #2022090347
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00090-0210 |
| CONDITIONED SPACE: 1626 sqft |
| GARAGE: 632 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| OPENED PORCH (WITH ROOF) : 35 sqft |
| Total Square Footage: 2413 sqft |
| Block: 00090 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 386-283-7499 |
| Location Address: 63 WHISPERING PINE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/13/2022 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: JMR III LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤212,943.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
RBI ENTERPRISES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
10 WHITTINGTON DR PALM COAST, FL 32164 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
WILLIAM ROBERT BARRICK
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
50 LEANNI WAY PALM COAST, FL 32137 |
STE E2 PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2025) | 229-375-9123 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/14/2023 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 06/13/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Master shower does not drain 2. Suction line at AHU requires groumet for where line goes into unit 3. AHU has undersized breaker installed 4. All garage ceiling penitrations must be sealed before final | |||
| U-CROSS CONNECTION | 06/09/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| ROW - STORMWATER FINAL | 06/09/2023 | FINAL APPROVED | FSLADISH |
| Note: 06/09/23 AT THE TIME OF INSPECTION EVERYTHING LOOKED GOOD. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/09/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 06/07/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/07/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/07/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/11/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 05/11/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1 :30 PM | |||
| GRAVITY SEWER TEST | 04/27/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 04/27/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 03/23/2023 | APPROVED | TSCHWEERS |
| INSULATION | 03/17/2023 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 03/15/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Inspector Notes from Inspection 2420 1. Dryer vent seam needs to be sealed 2. Slab needs to be sealed @ kitchen island Check @ insualation 3/9/2023 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 03/10/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Dryer vent seam needs to be sealed 2. Slab needs to be sealed @ kitchen island Check @ insualation 3/9/2023 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 03/09/2023 | CANCELLED BY APPLICANT | MKRASKI |
| ROOF VALLEY & METAL | 01/18/2023 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 01/17/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/06/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 1/6/23 1. Over framing not per detail 2. Gable truss over front entry not attached properly (add MSTA24s) Check on all rough 1/4/2023 - PREVIOUS INSPECTION NOTES 1. Over framing not per detail 2. Unable to see attachment of gable truss 3. No gable x bracing 4. Missing MGT per detail, marked on print Stopped inspection didnt check engineering | |||
| WALL SHEATHING | 01/06/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/04/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Over framing not per detail 2. Unable to see attachment of gable truss 3. No gable x bracing 4. Missing MGT per detail, marked on print Stopped inspection didnt check engineering | |||
| WALL SHEATHING | 01/04/2023 | Disapproved - NO FEE | MKRASKI |
| Note: No nails in the feild Inspector Notes from Inspection 2340 Dumpster HAS to be ONSITE before next INSPECTIO N | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/03/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/13/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Dumpster HAS to be ONSITE before next INSPECTIO N | |||
| MONOLITHIC SLAB | 12/07/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Dumpster needs to be onsite before next inspection | |||
| MONOLITHIC SLAB | 12/06/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 12/1/2022 - PREVIOUS INSPECTION NOTES 12-6-22 lare collumn pad on left side of garage calls for 4 bars each way, only 3 were placed | |||
| MONOLITHIC SLAB | 12/01/2022 | CANCELLED BY APPLICANT | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/29/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/22/2022 | APPROVED | CSTONE |
| Note: 11/4/2022 8:27:11 AM- PREVIOUS INSPECTION NOTES lot not cleared | |||
| WATER METER INSTALLATION REQUEST | 11/02/2022 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/18/2023 | 05/19/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/26/2023 | 01/26/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/03/2023 | 01/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/03/2023 | 01/03/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/17/2022 | 11/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/15/2022 | 11/15/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM REVISION SHEET BLANK | |||
| ENGIN1 | COMPLETE | 10/05/2022 | 10/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/05/2022 | 10/10/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/05/2022 | 10/05/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/03/2022 | 10/04/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations are off by 10' +/- | |||
| SWALE | COMPLETE | 09/09/2022 | 01/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/08/2022 | 09/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/08/2022 | 09/12/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/08/2022 | 09/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/08/2022 | 09/09/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/08/2022 | 09/15/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/08/2022 | 09/14/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/14/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/14/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/14/2023 |
| CONNECTION FEES | ¤1,077.88 | 10/13/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/13/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/13/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/13/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/13/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/13/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/13/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/13/2022 |
| SURCHARGE FS 533.721 | ¤2.61 | 10/13/2022 |
| SURCHARGE - FS 468.631 | ¤3.92 | 10/13/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/13/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/13/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/13/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/13/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/13/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 10/13/2022 |
| SEWER CREDIT | (¤1,146.49) | 10/13/2022 |
| SEWER INSPECTION | ¤25.00 | 10/13/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/13/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/13/2022 |
| SITE PLAN 30 | ¤30.00 | 10/13/2022 |
| WATER- TURN ON | ¤25.00 | 10/13/2022 |
| ADJUSTMENT 50% | (¤390.95) | 10/13/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/13/2022 |
| INSPECTION - RESIDENTIAL | ¤585.75 | 10/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤166.14 | 10/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,404.67 |