I want to search for...
Permit #2022090718
Permit Details
Status: COED
| Parcel Id: 42-10-31-5919-00000-0010 |
| GARAGE: 572 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| OPENED PORCH (WITH ROOF) : 230 sqft |
| OPENED PORCH (WITH ROOF) : 866 sqft |
| CONDITIONED SPACE: 1483 sqft |
| CONDITIONED SPACE: 1325 sqft |
| Total Square Footage: 4529 sqft |
| Block: 00000 |
| Subdivision: 2085 - TIDELANDS / VILLAGE AT PALM COAST PHASE II |
| Job Phone: 386-569-7882 |
| Location Address: 34 RIVERVIEW BEND N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/05/2022 |
| NOC: RECORDED |
| Applicant name: VLADIMIR V PEREPECHKIN |
| Owner: NARA THET TIM & SORPHEA TUY H&W |
|
Address 115 RIVERVIEW BEND S PALM COAST, FL 32137 |
|
Address UNIT 2121 PALM COAST, FL 32137 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤500,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WISE CHOICE CUSTOM HOMES, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
77 SOUTHLAKE DR PALM COAST, FL 32137 |
CRC1328738 (Exp: 08/31/2026) | 386-569-7882 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
VADIM V SHIPOVSKIY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
12 PRINCE PATRIC LANE PALM COAST, FL 32164 |
ER13016223 (Exp: 08/31/2024) | 509-761-8906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/21/2024 | FINAL APPROVED | BTAYLOR |
| Note: 6/18/2024 - PREVIOUS INSPECTION NOTES 6/14/2024 - PREVIOUS INSPECTION NOTES The 2 Items listed below from the previous inspection have not been corrected. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 15. The 2nd floor AHU requires a disconnect. A) Please note also the plans show an elevator to be installed. The elevator has not been installed. 6/7/2024 - PREVIOUS INSPECTION NOTES 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 13 | |||
| BLD - BUILDING FINAL | 06/18/2024 | CANCELLED BY APPLICANT | JWALKER |
| Note: 6/14/2024 - PREVIOUS INSPECTION NOTES The 2 Items listed below from the previous inspection have not been corrected. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 15. The 2nd floor AHU requires a disconnect. A) Please note also the plans show an elevator to be installed. The elevator has not been installed. 6/7/2024 - PREVIOUS INSPECTION NOTES 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 13 | |||
| BLD - BUILDING FINAL | 06/14/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: The 2 Items listed below from the previous inspection have not been corrected. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 15. The 2nd floor AHU requires a disconnect. A) Please note also the plans show an elevator to be installed. The elevator has not been installed. 6/7/2024 - PREVIOUS INSPECTION NOTES 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 13 | |||
| BLD - BUILDING FINAL | 06/07/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 16. No fall protection installed at the 2nd floor windows. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/06/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 06/06/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 06/06/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/20/2024 2:25:06 PM *** well irrigation-no cross connection-NOTE IF IRRIGATION METER IS NOT NEEDED PLEASE CONTACT CITY AT CUSTOMER-SERVICE.COM TOREMOVE SO NEW OWNER DOESNT PAY A MONTHLY FEE FOR SOMETHING NOT BEING USED 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 3:15:08 PM *** has potable irrigation -irrigation meter not connected-no PVB installed | |||
| ROW - FINAL APRON (AFTER POUR) | 06/05/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/05/24 CHIPPED CONCRETE ALONG TOP EDGE OF CURB NEED TO BE REPAIRED | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 06/04/2024 | APPROVED | JMYERS |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/30/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/30/2024 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 05/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/20/2024 2:25:06 PM *** well irrigation-no cross connection-NOTE IF IRRIGATION METER IS NOT NEEDED PLEASE CONTACT CITY AT CUSTOMER-SERVICE.COM TOREMOVE SO NEW OWNER DOESNT PAY A MONTHLY FEE FOR SOMETHING NOT BEING USED 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 3:15:08 PM *** has potable irrigation -irrigation meter not connected-no PVB installed | |||
| U-CROSS CONNECTION | 05/17/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 3:15:08 PM *** has potable irrigation -irrigation meter not connected-no PVB installed | |||
| ROW- PRE-APRON (PRE-POUR) | 04/17/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/17/24 YOU ARE APPROVED TO LAY PAVERS AT THIS TIME. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 4/10/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR PAVER RESTRAINTS. ***** DO NOT LAY ANY PAVERS UNTIL A SECONDARY PREPOUR FOR SPREAD AND COMPACTION HAS BEEN PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PAVER RESTRAINTS | 04/10/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/10/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR PAVER RESTRAINTS. ***** DO NOT LAY ANY PAVERS UNTIL A SECONDARY PREPOUR FOR SPREAD AND COMPACTION HAS BEEN PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/10/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 4/10/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR DIVEWAY APRONS AND PAVER RESTRAINTS. ***** DO NOT LAY ANY PAVERS UNTIL A SECONDARY PREPOUR FOR SPREAD AND COMPACTION HAS BEEN PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 4/9/2024 - PREVIOUS INSPECTION NOTES 4/9/24 YOU WILL NEED TO DIG A PAVER RESTRAINT FOOTER FROM GARAGE TO GARAGE IN THE REAR OF THE DRIVEWAY ABUTTING THE FRONT ENTRANCE. I WILL NOT FEE YOU PLEASE MAKE CORRECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/09/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 4/9/24 YOU WILL NEED TO DIG A PAVER RESTRAINT FOOTER FROM GARAGE TO GARAGE IN THE REAR OF THE DRIVEWAY ABUTTING THE FRONT ENTRANCE. I WILL NOT FEE YOU PLEASE MAKE CORRECTION. | |||
| ELECTRIC - EARLY POWER | 04/08/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4/5/2024 - PREVIOUS INSPECTION NOTES 2/12/2024 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1. need to safe off both power supplies at a/c units 2. need to safe off all wire prodtruding from house 3. need to safe off eve lights 4. need to safe off all exterior outlets Inspection stopped, not ready for inspection, did not enter house, reinspect all 4-8-24 1. Emailed FPL at 11:16. | |||
| ELECTRIC - EARLY POWER | 04/05/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 2/12/2024 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1. need to safe off both power supplies at a/c units 2. need to safe off all wire prodtruding from house 3. need to safe off eve lights 4. need to safe off all exterior outlets Inspection stopped, not ready for inspection, did not enter house, reinspect all | |||
| ELECTRIC - EARLY POWER | 02/12/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Not ready for inspection. 1. need to safe off both power supplies at a/c units 2. need to safe off all wire prodtruding from house 3. need to safe off eve lights 4. need to safe off all exterior outlets Inspection stopped, not ready for inspection, did not enter house, reinspect all | |||
| LATH/BRICK/ WATER BARRIER | 01/30/2024 | APPROVED | AGAETANO |
| Note: 10/25/2023 - PREVIOUS INSPECTION NOTES 10-25-2023 Front entry door not installed. Window/door nailing will be added. All other areas are approved except for front entry area. | |||
| GRAVITY SEWER TEST | 12/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 12/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 10/25/2023 | PARTIALLY APPROVED | AGAETANO |
| Note: 10-25-2023 Front entry door not installed. Window/door nailing will be added. All other areas are approved except for front entry area. | |||
| INSULATION | 10/10/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 10/06/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 09/06/2023 | APPROVED | BTAYLOR |
| Note: 9/1/2023 - PREVIOUS INSPECTION NOTES Need to have Approved documents on site for inspection FBC 107.3 | |||
| ROOF VALLEY & METAL | 09/01/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Need to have Approved documents on site for inspection FBC 107.3 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/11/2023 | APPROVED | BTAYLOR |
| Note: 7/6/2023 - PREVIOUS INSPECTION NOTES 07/06/2023 Please provide second floor to post detail on back porch and expose strapping Please expose front header between entry column so attachment can be verified Provide tiedown detail for wood frame front wall to girders below, currently nailed only Missing stud plate ties and straps at headers per detail on last page Truss T18 Missing t-back bracing per plans ( 2 of them at middle of house) 6/22/2023 - PREVIOUS INSPECTION NOTES Job not ready: Multiple tie downs not installed Complete steps prior to calling in Install safety gaurds on second floor prior to calling back in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 07/06/2023 Please provide second floor to post detail on back porch and expose strapping Please expose front header between entry column so attachment can be verified Provide tiedown detail for wood frame front wall to girders below, currently nailed only Missing stud plate ties and straps at headers per detail on last page Truss T18 Missing t-back bracing per plans ( 2 of them at middle of house) 6/22/2023 - PREVIOUS INSPECTION NOTES Job not ready: Multiple tie downs not installed Complete steps prior to calling in Install safety gaurds on second floor prior to calling back in. | |||
| WALL SHEATHING | 07/06/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/22/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Job not ready: Multiple tie downs not installed Complete steps prior to calling in Install safety gaurds on second floor prior to calling back in. | |||
| TIE BEAM / LINTEL | 05/09/2023 | APPROVED | LMILLER |
| TIE BEAM / LINTEL | 04/26/2023 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 04/14/2023 | APPROVED | TBAKER |
| ELEV CERT-FOUNDATION APPROVAL | 04/12/2023 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 03/23/2023 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/20/2023 | APPROVED | MGIBSON |
| STEM WALL FOUNDATION | 02/28/2023 | APPROVED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2280 1/24/2023 - PREVIOUS INSPECTION NOTES 1/18/2023 - PREVIOUS INSPECTION NOTES missing footings (see detail 4 footings) (Highlighted on plans) 02-14-2023 On foundation page-Plans call for full depth footings to match exterior walls- if you wish to change to "interior load bearing footing" detail you must submit a revision to the building department for approval. Otherwise, please dig footings per plans as existing. | |||
| STEM WALL FOUNDATION | 02/14/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 1/24/2023 - PREVIOUS INSPECTION NOTES 1/18/2023 - PREVIOUS INSPECTION NOTES missing footings (see detail 4 footings) (Highlighted on plans) 02-14-2023 On foundation page-Plans call for full depth footings to match exterior walls- if you wish to change to "interior load bearing footing" detail you must submit a revision to the building department for approval. Otherwise, please dig footings per plans as existing. | |||
| STEM WALL FOUNDATION | 01/24/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: 01/24/2023-On foundation page-Plans call for full depth footings to match exterior walls- if you wish to change to "interior load bearing footing" detail you must submit a revision to the building department for approval. Otherwise, please dig footings per plans as existing 1/18/2023 - PREVIOUS INSPECTION NOTES missing footings (see detail 4 footings) (Highlighted on plans) | |||
| STEM WALL FOUNDATION | 01/18/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: missing footings (see detail 4 footings) (Highlighted on plans) | |||
| WATER METER INSTALLATION REQUEST | 01/10/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 05/29/2024 | 06/04/2024 |
| Note: Released By: JERRY REITER - - JREITER@PALMCOASTGOV.COM The final elevation certificate has been approved. | |||
| ZON | COMPLETE | 05/20/2024 | 05/20/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/20/2024 | 05/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/20/2024 | 05/23/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/16/2024 | 05/17/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please specify on revision sheet what was revised. | |||
| ENGIN1 | COMPLETE | 10/26/2023 | 10/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/26/2023 | 11/07/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/26/2023 | 10/27/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Retaining wall does not meet the 25ft rear setback and it encroaches in the buffer area Plans must state that the retaining wall will be finished to match the house | |||
| BLD | COMPLETE | 10/16/2023 | 10/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/05/2023 | 10/10/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. REPEAT COMMENT. Submit manufacturers specs of the dry lock block 2. PARTIAL REPEAT COMMENT. MAXIMUM MOUNTING HEIGHT OF HANDRAIL IS NOT 42 INCHES AS SHOWN IN DETAIL. HANDRAIL MOUNTING HEIGHT MUST BE BETWEEN 34 INCHES AND 38 INCHES MEASURED ABOVE THE SLOPED PLANE ABOVE THE STAIR NOSINGS. (REMOVE MAX HEIGHT OF HANDRAIL 42 INCHES ON SHEET 5 /HANDRAIL DETAIL INSIDE BOX) | |||
| BLD | HOLD | 08/29/2023 | 09/07/2023 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM 1. REPEAT COMMENT. Submit manufacturers specs of the dry lock block 2. REPEAT COMMENT. MAXIMUM MOUNTING HEIGHT OF HANDRAIL IS NOT 42 INCHES AS SHOWN IN DETAIL. HANDRAIL MOUNTING HEIGHT MUST BE BETWEEN 34 INCHES AND 38 INCHES MEASURED ABOVE THE SLOPED PLANE ABOVE THE STAIR NOSINGS. Need to show the height of the handrail height. FRC 2020 R311.7.8.1 Height. 3. OK. 4. OK. 5.. REPEAT COMMENT. STAIRS ARE PROPOSED TO BE CONSTRUCTED OF CONCRETE. A NOSING PROJECTION IS SHOWN ON STAIRS BUT CANNOT BE CONSTRUCTED USING CONCRETE. STAIR TREADS WITHOUT NOSING PROJECTIONS MUST BE 11 INCHES. FRC R311.7.5.3 EXCEPETION Show rise and run of stairs. R311.7.5.1 Risers 6. REPEAT COMMENT Show dimeson of landing in the direction of travel. R311.7.6 7. OK. 8. REPEAT COMMENT Provide deminson of mid point landing in direction of trave MINIMUM 36 INCHESl. R311.7.6 9. . REPEAT COMMENT. Provide retaining wall design criteria. FBC-Building Section 1605.1.1, 1610.2, 1807.2.1, 1807.2.2, 1807.2.3. Design to be based on full hydrostatic pressure of undrained backfill unless a drainage system is installed in accordance with Section 1805.4.2 and 1805.4.3. Provide drainage details. | |||
| BLD | CANCEL | 08/18/2023 | 08/18/2023 |
| Note: cancel revision per contractor | |||
| MECH | COMPLETE | 08/10/2023 | 08/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/14/2023 | 07/21/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit manufacture specs of the dry lock block 2. Need to show the height of the handrail height. FRC 2020 R311.7.8.1 Height. 3. Need to show the hand rail type. FRC 2020 R311.7.8.3 Grip-size. 4. Provide hand rail mounting detail 5.. Show rise and run of stairs. R311.7.5.1 Risers 6. Show dimeson of landing in the direction of travel. R311.7.6 7. Provide landing at top of stairs 8 feet min in the direction of travel. R311.7.6 8. Provide deminson of mid point landing in direction of travel. R311.7.6 9. . Provide retaining wall design criteria. FBC-Building Section 1605.1.1, 1610.2, 1807.2.1, 1807.2.2, 1807.2.3. Design to be based on full hydrostatic pressure of undrained backfill unless a drainage system is installed in accordance with Section 1805.4.2 and 1805.4.3. Provide drainage details. | |||
| ENGIN1 | COMPLETE | 04/05/2023 | 04/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/05/2023 | 04/05/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 04/05/2023 | 04/12/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| BLD | COMPLETE | 02/08/2023 | 02/10/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/06/2023 | 02/07/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Revised plan calls-out footer F/10 and 4/10. Provide wall detail for correct footer to be installed. | |||
| BLD | HOLD | 01/30/2023 | 01/31/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide revision clouds around the footing changes. | |||
| BLD | HOLD | 01/24/2023 | 01/26/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Engineer to provide revision clouds to show revised Footer Detail per the Building Inspectors comments. | |||
| ELEC | COMPLETE | 11/21/2022 | 11/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 11/08/2022 | 11/08/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Still need correct outlet spacing in bed 2. NEC 2017 210.52 | |||
| ZON | COMPLETE | 11/08/2022 | 11/08/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/08/2022 | 11/08/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/08/2022 | 11/08/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/08/2022 | 11/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/08/2022 | 11/18/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/02/2022 | 11/07/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. OK 2. OK 3. Product Approval Specification Sheet; a. Provide Product Approval for sliding glass door. Previous submitted Product Approval Sheet referenced the incorrect door. b. Provide Product Approval for the single hung windows as shown on the elevations. c. Properly identify ALL Florida Product Approval Number (i.e. 7849.#); there are various types of approved tiles under this approval number. d. Provide approval numbers for Wood Connectors Per F.S. 471.025 and F.A.C. 61 G15-23.005.0 | |||
| ZON | HOLD | 11/02/2022 | 11/03/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway arc for the circular driveway must be completely located above the 11ft utility easement. Please give driveway dimensions of the circular at the widest point. it cannot exceed 18ft. | |||
| PLFM | COMPLETE | 11/02/2022 | 11/02/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO. | |||
| ENGIN1 | COMPLETE | 11/02/2022 | 11/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/02/2022 | 11/03/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/02/2022 | 11/08/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 11/02/2022 | 11/02/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit new electric plan | |||
| PLFM | HOLD | 09/20/2022 | 09/20/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the site plan submitted on 9/15/22 the structure does fall within the SFHA. Elevation certificates are required at construction drawings, foundation, and final. | |||
| URB | COMPLETE | 09/20/2022 | 09/28/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 09/15/2022 | 09/20/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Product Approval for the Boral roofing tiles differs on the roofing worksheet and the product approval sheet. Revise to reflect the correct tiles to be installed. 2. Caste-Crete lintels are called-out on sheet 7/7. Product Approval sheet is for Pre-Crete 3. Product Approval Specification Sheet; a. FL 11908.1 is for a sliding door. Provide product approval for swing doors. b. FL 28643.1 is sliding glass door and is noted as an overhead door. Which is correct? c. FL 1758 is not current or valid approval number d. FL 415-0229 is not current or valid approval number Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 09/15/2022 | 09/19/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 09/15/2022 | 09/19/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarms outside of all bedrooms. FRC 2020 314 & 315 2. Need correct outlet spacing in bed 2,3,4 NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 09/15/2022 | 09/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/15/2022 | 09/21/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/15/2022 | 09/16/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Plans show R4.1 on CMU walls. Energy Calcs say R5. Revise to match | |||
| SW1 | COMPLETE | 09/15/2022 | 09/21/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/15/2022 | 09/20/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway and front entry layout on landscape plan doesn't match site plan Driveways must be a minimum 16ft in width Driveway arc for the circular driveway must be located above the 11ft utility easement Screen enclosure doesn't meet the minimum 25ft rear setback Please provide the setback on site plan from the left front corner to the side property line |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 06/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 06/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 06/21/2024 |
| REINSPECTION FEE | ¤40.00 | 06/21/2024 |
| SURCHARGE FS 533.721 | ¤5.51 | 12/05/2022 |
| SURCHARGE - FS 468.631 | ¤8.27 | 12/05/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/05/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/05/2022 |
| SW ENG PRE APRON | ¤30.00 | 12/05/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/05/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/05/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 12/05/2022 |
| SEWER INSPECTION | ¤25.00 | 12/05/2022 |
| SITE PLAN 30 | ¤30.00 | 12/05/2022 |
| WATER-METER | ¤467.09 | 12/05/2022 |
| ADJUSTMENT 50% | (¤897.50) | 12/05/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/05/2022 |
| INSPECTION - RESIDENTIAL | ¤1,375.00 | 12/05/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤390.00 | 12/05/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 12/05/2022 |
| IMPACT FEE FIRE | ¤388.65 | 12/05/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 12/05/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/05/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 12/05/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 12/05/2022 |
| CONNECTION FEES | ¤25.00 | 12/05/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,571.62 |