I want to search for...

Permit #2022090718

Permit Details

Status: COED

Parcel Id: 42-10-31-5919-00000-0010
GARAGE: 572 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
OPENED PORCH (WITH ROOF) : 230 sqft
OPENED PORCH (WITH ROOF) : 866 sqft
CONDITIONED SPACE: 1483 sqft
CONDITIONED SPACE: 1325 sqft
Total Square Footage: 4529 sqft
Block: 00000
Subdivision: 2085 - TIDELANDS / VILLAGE AT PALM COAST PHASE II
Job Phone: 386-569-7882
Location Address: 34 RIVERVIEW BEND N
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/05/2022
NOC: RECORDED
Applicant name: VLADIMIR V PEREPECHKIN
Owner: NARA THET TIM & SORPHEA TUY H&W

Address

115 RIVERVIEW BEND S

PALM COAST, FL 32137

Address

UNIT 2121

PALM COAST, FL 32137

Lot: 0010
Contracted Stated Job Value: ¤500,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WISE CHOICE CUSTOM HOMES, INC.
Status Location Address State License Number Phone
ACTIVE

77 SOUTHLAKE DR

PALM COAST, FL 32137

CRC1328738 (Exp: 08/31/2026) 386-569-7882

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
VADIM V SHIPOVSKIY
Status Location Address State License Number Phone
INACTIVE

12 PRINCE PATRIC LANE

PALM COAST, FL 32164

ER13016223 (Exp: 08/31/2024) 509-761-8906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/21/2024 FINAL APPROVED BTAYLOR
Note: 6/18/2024 - PREVIOUS INSPECTION NOTES 6/14/2024 - PREVIOUS INSPECTION NOTES The 2 Items listed below from the previous inspection have not been corrected. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 15. The 2nd floor AHU requires a disconnect. A) Please note also the plans show an elevator to be installed. The elevator has not been installed. 6/7/2024 - PREVIOUS INSPECTION NOTES 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 13
BLD - BUILDING FINAL 06/18/2024 CANCELLED BY APPLICANT JWALKER
Note: 6/14/2024 - PREVIOUS INSPECTION NOTES The 2 Items listed below from the previous inspection have not been corrected. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 15. The 2nd floor AHU requires a disconnect. A) Please note also the plans show an elevator to be installed. The elevator has not been installed. 6/7/2024 - PREVIOUS INSPECTION NOTES 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 13
BLD - BUILDING FINAL 06/14/2024 Disapproved -FEE REQUIRED JWALKER
Note: The 2 Items listed below from the previous inspection have not been corrected. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 15. The 2nd floor AHU requires a disconnect. A) Please note also the plans show an elevator to be installed. The elevator has not been installed. 6/7/2024 - PREVIOUS INSPECTION NOTES 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 13
BLD - BUILDING FINAL 06/07/2024 Disapproved -FEE REQUIRED JWALKER
Note: 1. The 2 20 amp breakers at the exterior disconnect electircal panel would not reset. 2. The exterior outlet under the disconnect would not reset. 3. All exterior outlets are to be GFI protected. 4. All hose bibs require a vacuum breaker. 5. 2 water pipes sticking out of the ground at the rear right corner of the home. 6. The disconnects at the heat pump is to be accessible. 7. Flex duct penetrating the garage ceiling is not a fire resistant material and will need to be removed. Duct board is approved. 8. Right side garge AHU is missing a cap for the unused punch out. 9. Lable the AHU and The heat pumps to corespond with the breaker panel. Check breaker sizes at the reinspection. 10. Please have the approved energy calculations on site at the reinspection. 11. The dining room outlet have not power. 12. The outlet for the toilet are to be accessible. Unable to test for GFI protection. These outlets will need to be moved to an accessible location. 13. 1st floor bed room is the have a switched light of and outlet at the bedroom entrance. 14. The 2nd floor switches at the two balcony doors would not operate the exterior light. 15. The 2nd floor AHU requires a disconnect. 16. No fall protection installed at the 2nd floor windows.
ROW - FINAL APRON (AFTER POUR) 06/06/2024 APPROVED EMADISON
ROW - STORMWATER FINAL 06/06/2024 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 06/06/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/20/2024 2:25:06 PM *** well irrigation-no cross connection-NOTE IF IRRIGATION METER IS NOT NEEDED PLEASE CONTACT CITY AT CUSTOMER-SERVICE.COM TOREMOVE SO NEW OWNER DOESNT PAY A MONTHLY FEE FOR SOMETHING NOT BEING USED 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 3:15:08 PM *** has potable irrigation -irrigation meter not connected-no PVB installed
ROW - FINAL APRON (AFTER POUR) 06/05/2024 Disapproved - NO FEE EMADISON
Note: ** 06/05/24 CHIPPED CONCRETE ALONG TOP EDGE OF CURB NEED TO BE REPAIRED
ELEVATION CERTIFICATE-FINAL APPROVAL 06/04/2024 APPROVED JMYERS
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/30/2024 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 05/30/2024 APPROVED EMADISON
U-CROSS CONNECTION 05/20/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/20/2024 2:25:06 PM *** well irrigation-no cross connection-NOTE IF IRRIGATION METER IS NOT NEEDED PLEASE CONTACT CITY AT CUSTOMER-SERVICE.COM TOREMOVE SO NEW OWNER DOESNT PAY A MONTHLY FEE FOR SOMETHING NOT BEING USED 5/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/17/2024 3:15:08 PM *** has potable irrigation -irrigation meter not connected-no PVB installed
U-CROSS CONNECTION 05/17/2024 Disapproved -FEE REQUIRED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/17/2024 3:15:08 PM *** has potable irrigation -irrigation meter not connected-no PVB installed
ROW- PRE-APRON (PRE-POUR) 04/17/2024 APPROVED - AS NOTED FSLADISH
Note: 4/17/24 YOU ARE APPROVED TO LAY PAVERS AT THIS TIME. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 4/10/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR PAVER RESTRAINTS. ***** DO NOT LAY ANY PAVERS UNTIL A SECONDARY PREPOUR FOR SPREAD AND COMPACTION HAS BEEN PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PAVER RESTRAINTS 04/10/2024 APPROVED - AS NOTED FSLADISH
Note: 4/10/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR PAVER RESTRAINTS. ***** DO NOT LAY ANY PAVERS UNTIL A SECONDARY PREPOUR FOR SPREAD AND COMPACTION HAS BEEN PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 04/10/2024 PARTIALLY APPROVED FSLADISH
Note: 4/10/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR DIVEWAY APRONS AND PAVER RESTRAINTS. ***** DO NOT LAY ANY PAVERS UNTIL A SECONDARY PREPOUR FOR SPREAD AND COMPACTION HAS BEEN PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 4/9/2024 - PREVIOUS INSPECTION NOTES 4/9/24 YOU WILL NEED TO DIG A PAVER RESTRAINT FOOTER FROM GARAGE TO GARAGE IN THE REAR OF THE DRIVEWAY ABUTTING THE FRONT ENTRANCE. I WILL NOT FEE YOU PLEASE MAKE CORRECTION.
ROW- PRE-APRON (PRE-POUR) 04/09/2024 Disapproved - NO FEE FSLADISH
Note: 4/9/24 YOU WILL NEED TO DIG A PAVER RESTRAINT FOOTER FROM GARAGE TO GARAGE IN THE REAR OF THE DRIVEWAY ABUTTING THE FRONT ENTRANCE. I WILL NOT FEE YOU PLEASE MAKE CORRECTION.
ELECTRIC - EARLY POWER 04/08/2024 APPROVED - AS NOTED BTAYLOR
Note: 4/5/2024 - PREVIOUS INSPECTION NOTES 2/12/2024 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1. need to safe off both power supplies at a/c units 2. need to safe off all wire prodtruding from house 3. need to safe off eve lights 4. need to safe off all exterior outlets Inspection stopped, not ready for inspection, did not enter house, reinspect all 4-8-24 1. Emailed FPL at 11:16.
ELECTRIC - EARLY POWER 04/05/2024 CANCELLED BY APPLICANT BTAYLOR
Note: 2/12/2024 - PREVIOUS INSPECTION NOTES Not ready for inspection. 1. need to safe off both power supplies at a/c units 2. need to safe off all wire prodtruding from house 3. need to safe off eve lights 4. need to safe off all exterior outlets Inspection stopped, not ready for inspection, did not enter house, reinspect all
ELECTRIC - EARLY POWER 02/12/2024 Disapproved -FEE REQUIRED LMILLER
Note: Not ready for inspection. 1. need to safe off both power supplies at a/c units 2. need to safe off all wire prodtruding from house 3. need to safe off eve lights 4. need to safe off all exterior outlets Inspection stopped, not ready for inspection, did not enter house, reinspect all
LATH/BRICK/ WATER BARRIER 01/30/2024 APPROVED AGAETANO
Note: 10/25/2023 - PREVIOUS INSPECTION NOTES 10-25-2023 Front entry door not installed. Window/door nailing will be added. All other areas are approved except for front entry area.
GRAVITY SEWER TEST 12/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 12/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 10/25/2023 PARTIALLY APPROVED AGAETANO
Note: 10-25-2023 Front entry door not installed. Window/door nailing will be added. All other areas are approved except for front entry area.
INSULATION 10/10/2023 APPROVED BTAYLOR
ALL ROUGH 10/06/2023 APPROVED BTAYLOR
ROOF VALLEY & METAL 09/06/2023 APPROVED BTAYLOR
Note: 9/1/2023 - PREVIOUS INSPECTION NOTES Need to have Approved documents on site for inspection FBC 107.3
ROOF VALLEY & METAL 09/01/2023 Disapproved -FEE REQUIRED LMILLER
Note: Need to have Approved documents on site for inspection FBC 107.3
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/11/2023 APPROVED BTAYLOR
Note: 7/6/2023 - PREVIOUS INSPECTION NOTES 07/06/2023 Please provide second floor to post detail on back porch and expose strapping Please expose front header between entry column so attachment can be verified Provide tiedown detail for wood frame front wall to girders below, currently nailed only Missing stud plate ties and straps at headers per detail on last page Truss T18 Missing t-back bracing per plans ( 2 of them at middle of house) 6/22/2023 - PREVIOUS INSPECTION NOTES Job not ready: Multiple tie downs not installed Complete steps prior to calling in Install safety gaurds on second floor prior to calling back in.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/06/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 07/06/2023 Please provide second floor to post detail on back porch and expose strapping Please expose front header between entry column so attachment can be verified Provide tiedown detail for wood frame front wall to girders below, currently nailed only Missing stud plate ties and straps at headers per detail on last page Truss T18 Missing t-back bracing per plans ( 2 of them at middle of house) 6/22/2023 - PREVIOUS INSPECTION NOTES Job not ready: Multiple tie downs not installed Complete steps prior to calling in Install safety gaurds on second floor prior to calling back in.
WALL SHEATHING 07/06/2023 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/22/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Job not ready: Multiple tie downs not installed Complete steps prior to calling in Install safety gaurds on second floor prior to calling back in.
TIE BEAM / LINTEL 05/09/2023 APPROVED LMILLER
TIE BEAM / LINTEL 04/26/2023 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 04/14/2023 APPROVED TBAKER
ELEV CERT-FOUNDATION APPROVAL 04/12/2023 APPROVED JMYERS
MONOLITHIC SLAB 03/23/2023 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 03/20/2023 APPROVED MGIBSON
STEM WALL FOUNDATION 02/28/2023 APPROVED TSTAUFFACHER
Note: Inspector Notes from Inspection 2280 1/24/2023 - PREVIOUS INSPECTION NOTES 1/18/2023 - PREVIOUS INSPECTION NOTES missing footings (see detail 4 footings) (Highlighted on plans) 02-14-2023 On foundation page-Plans call for full depth footings to match exterior walls- if you wish to change to "interior load bearing footing" detail you must submit a revision to the building department for approval. Otherwise, please dig footings per plans as existing.
STEM WALL FOUNDATION 02/14/2023 APPROVED - AS NOTED AGAETANO
Note: 1/24/2023 - PREVIOUS INSPECTION NOTES 1/18/2023 - PREVIOUS INSPECTION NOTES missing footings (see detail 4 footings) (Highlighted on plans) 02-14-2023 On foundation page-Plans call for full depth footings to match exterior walls- if you wish to change to "interior load bearing footing" detail you must submit a revision to the building department for approval. Otherwise, please dig footings per plans as existing.
STEM WALL FOUNDATION 01/24/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 01/24/2023-On foundation page-Plans call for full depth footings to match exterior walls- if you wish to change to "interior load bearing footing" detail you must submit a revision to the building department for approval. Otherwise, please dig footings per plans as existing 1/18/2023 - PREVIOUS INSPECTION NOTES missing footings (see detail 4 footings) (Highlighted on plans)
STEM WALL FOUNDATION 01/18/2023 Disapproved -FEE REQUIRED LMILLER
Note: missing footings (see detail 4 footings) (Highlighted on plans)
WATER METER INSTALLATION REQUEST 01/10/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 05/29/2024 06/04/2024
Note: Released By: JERRY REITER - - JREITER@PALMCOASTGOV.COM The final elevation certificate has been approved.
ZON COMPLETE 05/20/2024 05/20/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/20/2024 05/21/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/20/2024 05/23/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 05/16/2024 05/17/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please specify on revision sheet what was revised.
ENGIN1 COMPLETE 10/26/2023 10/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/26/2023 11/07/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 10/26/2023 10/27/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Retaining wall does not meet the 25ft rear setback and it encroaches in the buffer area Plans must state that the retaining wall will be finished to match the house
BLD COMPLETE 10/16/2023 10/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 10/05/2023 10/10/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. REPEAT COMMENT. Submit manufacturers specs of the dry lock block 2. PARTIAL REPEAT COMMENT. MAXIMUM MOUNTING HEIGHT OF HANDRAIL IS NOT 42 INCHES AS SHOWN IN DETAIL. HANDRAIL MOUNTING HEIGHT MUST BE BETWEEN 34 INCHES AND 38 INCHES MEASURED ABOVE THE SLOPED PLANE ABOVE THE STAIR NOSINGS. (REMOVE MAX HEIGHT OF HANDRAIL 42 INCHES ON SHEET 5 /HANDRAIL DETAIL INSIDE BOX)
BLD HOLD 08/29/2023 09/07/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM 1. REPEAT COMMENT. Submit manufacturers specs of the dry lock block 2. REPEAT COMMENT. MAXIMUM MOUNTING HEIGHT OF HANDRAIL IS NOT 42 INCHES AS SHOWN IN DETAIL. HANDRAIL MOUNTING HEIGHT MUST BE BETWEEN 34 INCHES AND 38 INCHES MEASURED ABOVE THE SLOPED PLANE ABOVE THE STAIR NOSINGS. Need to show the height of the handrail height. FRC 2020 R311.7.8.1 Height. 3. OK. 4. OK. 5.. REPEAT COMMENT. STAIRS ARE PROPOSED TO BE CONSTRUCTED OF CONCRETE. A NOSING PROJECTION IS SHOWN ON STAIRS BUT CANNOT BE CONSTRUCTED USING CONCRETE. STAIR TREADS WITHOUT NOSING PROJECTIONS MUST BE 11 INCHES. FRC R311.7.5.3 EXCEPETION Show rise and run of stairs. R311.7.5.1 Risers 6. REPEAT COMMENT Show dimeson of landing in the direction of travel. R311.7.6 7. OK. 8. REPEAT COMMENT Provide deminson of mid point landing in direction of trave MINIMUM 36 INCHESl. R311.7.6 9. . REPEAT COMMENT. Provide retaining wall design criteria. FBC-Building Section 1605.1.1, 1610.2, 1807.2.1, 1807.2.2, 1807.2.3. Design to be based on full hydrostatic pressure of undrained backfill unless a drainage system is installed in accordance with Section 1805.4.2 and 1805.4.3. Provide drainage details.
BLD CANCEL 08/18/2023 08/18/2023
Note: cancel revision per contractor
MECH COMPLETE 08/10/2023 08/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 07/14/2023 07/21/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit manufacture specs of the dry lock block 2. Need to show the height of the handrail height. FRC 2020 R311.7.8.1 Height. 3. Need to show the hand rail type. FRC 2020 R311.7.8.3 Grip-size. 4. Provide hand rail mounting detail 5.. Show rise and run of stairs. R311.7.5.1 Risers 6. Show dimeson of landing in the direction of travel. R311.7.6 7. Provide landing at top of stairs 8 feet min in the direction of travel. R311.7.6 8. Provide deminson of mid point landing in direction of travel. R311.7.6 9. . Provide retaining wall design criteria. FBC-Building Section 1605.1.1, 1610.2, 1807.2.1, 1807.2.2, 1807.2.3. Design to be based on full hydrostatic pressure of undrained backfill unless a drainage system is installed in accordance with Section 1805.4.2 and 1805.4.3. Provide drainage details.
ENGIN1 COMPLETE 04/05/2023 04/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/05/2023 04/05/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM COMPLETE 04/05/2023 04/12/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
BLD COMPLETE 02/08/2023 02/10/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 02/06/2023 02/07/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Revised plan calls-out footer F/10 and 4/10. Provide wall detail for correct footer to be installed.
BLD HOLD 01/30/2023 01/31/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide revision clouds around the footing changes.
BLD HOLD 01/24/2023 01/26/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Engineer to provide revision clouds to show revised Footer Detail per the Building Inspectors comments.
ELEC COMPLETE 11/21/2022 11/28/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 11/08/2022 11/08/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Still need correct outlet spacing in bed 2. NEC 2017 210.52
ZON COMPLETE 11/08/2022 11/08/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/08/2022 11/08/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 11/08/2022 11/08/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/08/2022 11/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/08/2022 11/18/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD HOLD 11/02/2022 11/07/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. OK 2. OK 3. Product Approval Specification Sheet; a. Provide Product Approval for sliding glass door. Previous submitted Product Approval Sheet referenced the incorrect door. b. Provide Product Approval for the single hung windows as shown on the elevations. c. Properly identify ALL Florida Product Approval Number (i.e. 7849.#); there are various types of approved tiles under this approval number. d. Provide approval numbers for Wood Connectors Per F.S. 471.025 and F.A.C. 61 G15-23.005.0
ZON HOLD 11/02/2022 11/03/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway arc for the circular driveway must be completely located above the 11ft utility easement. Please give driveway dimensions of the circular at the widest point. it cannot exceed 18ft.
PLFM COMPLETE 11/02/2022 11/02/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. Please provide Foundation and Final prior to receiving CO.
ENGIN1 COMPLETE 11/02/2022 11/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 11/02/2022 11/03/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/02/2022 11/08/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ELEC HOLD 11/02/2022 11/02/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit new electric plan
PLFM HOLD 09/20/2022 09/20/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the site plan submitted on 9/15/22 the structure does fall within the SFHA. Elevation certificates are required at construction drawings, foundation, and final.
URB COMPLETE 09/20/2022 09/28/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD HOLD 09/15/2022 09/20/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Product Approval for the Boral roofing tiles differs on the roofing worksheet and the product approval sheet. Revise to reflect the correct tiles to be installed. 2. Caste-Crete lintels are called-out on sheet 7/7. Product Approval sheet is for Pre-Crete 3. Product Approval Specification Sheet; a. FL 11908.1 is for a sliding door. Provide product approval for swing doors. b. FL 28643.1 is sliding glass door and is noted as an overhead door. Which is correct? c. FL 1758 is not current or valid approval number d. FL 415-0229 is not current or valid approval number Per F.S. 471.025 and F.A.C. 61 G15-23.005.
CUSVC COMPLETE 09/15/2022 09/19/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 09/15/2022 09/19/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarms outside of all bedrooms. FRC 2020 314 & 315 2. Need correct outlet spacing in bed 2,3,4 NEC 2017 210.52
ENGIN1 COMPLETE 09/15/2022 09/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/15/2022 09/21/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 09/15/2022 09/16/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Plans show R4.1 on CMU walls. Energy Calcs say R5. Revise to match
SW1 COMPLETE 09/15/2022 09/21/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/15/2022 09/20/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveway and front entry layout on landscape plan doesn't match site plan Driveways must be a minimum 16ft in width Driveway arc for the circular driveway must be located above the 11ft utility easement Screen enclosure doesn't meet the minimum 25ft rear setback Please provide the setback on site plan from the left front corner to the side property line

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/21/2024
PLAN REVIEW - REVISION ¤32.50 06/21/2024
PLAN REVIEW - REVISION ¤32.50 06/21/2024
REINSPECTION RESIDENTIAL ¤40.00 06/21/2024
REINSPECTION RESIDENTIAL ¤40.00 06/21/2024
REINSPECTION RESIDENTIAL ¤40.00 06/21/2024
REINSPECTION RESIDENTIAL ¤40.00 06/21/2024
REINSPECTION RESIDENTIAL ¤40.00 06/21/2024
CONTRACTOR CHANGE ¤20.00 06/21/2024
CONTRACTOR CHANGE ¤20.00 06/21/2024
CONTRACTOR CHANGE ¤20.00 06/21/2024
REINSPECTION FEE ¤40.00 06/21/2024
SURCHARGE FS 533.721 ¤5.51 12/05/2022
SURCHARGE - FS 468.631 ¤8.27 12/05/2022
SW ENG - FOUNDATION SURVEY ¤20.00 12/05/2022
SW ENG INSPECTION 80 ¤80.00 12/05/2022
SW ENG PRE APRON ¤30.00 12/05/2022
SW ENG - REVIEW 20 ¤20.00 12/05/2022
SW ENG RES REVIEW 200 ¤200.00 12/05/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 12/05/2022
SEWER INSPECTION ¤25.00 12/05/2022
SITE PLAN 30 ¤30.00 12/05/2022
WATER-METER ¤467.09 12/05/2022
ADJUSTMENT 50% (¤897.50) 12/05/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/05/2022
INSPECTION - RESIDENTIAL ¤1,375.00 12/05/2022
PLAN REVIEW - RESIDENTIAL ¤390.00 12/05/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 12/05/2022
IMPACT FEE FIRE ¤388.65 12/05/2022
IMPACT FEE PARKS ¤1,455.13 12/05/2022
IMPACT FEE SCHOOL ¤5,450.00 12/05/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 12/05/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 12/05/2022
CONNECTION FEES ¤25.00 12/05/2022
Fees Total Due: ¤0.00 Total Paid: ¤12,571.62