Permit #2022090750

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00140-0160
CONDITIONED SPACE: 2900 sqft
GARAGE: 1024 sqft
OPENED PORCH (WITH ROOF) : 120 sqft
Total Square Footage: 4044 sqft
Block: 00140
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 863-647-5815
Location Address: 96 RICKENBACKER DR
Type: DU - DUPLEX
Issue Date: 10/27/2022
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: CODEY AND SARAH YINGLING

Address

96 RICKENBACKER DRIVE

PALM COAST, FL 32164

Lot: 0160
Contracted Stated Job Value: ¤300,000.00
Job Description: Duplex
Type: CN

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
JEFFREY R OESCHGER
Status Location Address State License Number
INACTIVE

4237 HOLDEN ROAD

LAKELAND, FL 33811

CFC1429768 (Exp: 08/31/2024)

Inspection History

Type Request Date Result Inspector
FIREWALL FINAL 10/12/2023 FINAL APPROVED JWALKER
Note: 3/1/2023 - PREVIOUS INSPECTION NOTES This is for the attic space part of the firewall only. The lower part at the CMU wall Install 5/8" fire resistant rock at the lower part of the party wall. Will add a fire wall dry wall nailing inspection.
ROW - FINAL INSPECTION 10/12/2023 APPROVED - AS NOTED PFLANAGAN
Note: DO TO THE RAIN LAST NIGHT AND TODAY PLEASE CLEAN THE CULVERTS OUT AGAIN --------------------------------------------------------------------------------------------------------- NOTE TO INSPECTOR THERE WAS A SECTION OF DRIVEWAY CUT OUT WHEN I DID INSPECTION ON 6/9/23 NEED TO MAKE SURE WE INSPECT THE LEFT DRIVEWAY AGAIN. SEE NOTES ON SECOND PRE POUR INSPECTION FOR RIGHT DRIVEWAY. CONTACT PARREN FOR DETAILS
U -UTILITY RESIDENTIAL FINAL 10/12/2023 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/11/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------- 9/5/23= NEEDS TO CREATE A BERM WITH A 2-1 SLOPE AT THE BACK PROPERTY LINE AND REDEFINE THE DRAINAGE CONVEYANCE DUE TO POOLING WATER ON THE RIGHT SIDE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/23/2023 - PREVIOUS INSPECTION NOTES 1) Section 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. 2) THERE ARE PONDING ON RIGHT SIDE NEED TO REGRADE SO WATER DOES NOT SIT IN YARD --------------------------------------------------------------------------------------------------- 8/21/2023 - PREVIOUS INSPECTION NOTES the culvert pipe is still out of tolerance with the swale plan detail also the culvert pipe is pitch the worng way. ----------------------------------------------------------------------------------- 8/18/2023 11:09:03 AM- PREVIOUS INSPECTION NOTES 7/28/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale --------------------------------------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale 4) need to indecate adjacent lots are improved or vacant if they are improved need to have the ffe
ROW FIELD SURVEY /GRADING CERTIFICATION 10/11/2023 APPROVED PFLANAGAN
Note: NEEDS TO CREATE A BERM WITH A 2-1 SLOPE AT THE BACK PROPERTY LINE AND REDEFINE THE DRAINAGE CONVEYANCE DUE TO POOLING WATER ON THE RIGHT SIDE.
ROW - FINAL APRON (AFTER POUR) 10/11/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
BLD - BUILDING FINAL 10/10/2023 FINAL APPROVED JWALKER
Note: 10/6/2023 - PREVIOUS INSPECTION NOTES 10/6/23 Item 1 listed below has not been corrected. 9/21/2023 - PREVIOUS INSPECTION NOTES Units A and B 1. Garage attic is being used as storage. The spray foam that has been applied to the roof decking will need to have a Intumescent coating / fire barrier. Or be of the approved type of foam. R-316.5.3 attics 2. Expansion tank have not been installed at the water heaters. M1009 3. Enenergy calculations do not match the HVAC units installed. 4. The Heat appliance labels have not been marked off. 5. The returns are not sealed to the AHU's . Removal of the filter access doors breaks the seal. 6. No termite certs posted.
BLD - BUILDING FINAL 10/06/2023 Disapproved -FEE REQUIRED JWALKER
Note: 10/6/23 Item 1 listed below has not been corrected. 9/21/2023 - PREVIOUS INSPECTION NOTES Units A and B 1. Garage attic is being used as storage. The spray foam that has been applied to the roof decking will need to have a Intumescent coating / fire barrier. Or be of the approved type of foam. R-316.5.3 attics 2. Expansion tank have not been installed at the water heaters. M1009 3. Enenergy calculations do not match the HVAC units installed. 4. The Heat appliance labels have not been marked off. 5. The returns are not sealed to the AHU's . Removal of the filter access doors breaks the seal. 6. No termite certs posted.
BLD - BUILDING FINAL 09/21/2023 Disapproved - NO FEE JWALKER
Note: Units A and B 1. Garage attic is being used as storage. The spray foam that has been applied to the roof decking will need to have a Intumescent coating / fire barrier. Or be of the approved type of foam. R-316.5.3 attics 2. Expansion tank have not been installed at the water heaters. M1009 3. Enenergy calculations do not match the HVAC units installed. 4. The Heat appliance labels have not been marked off. 5. The returns are not sealed to the AHU's . Removal of the filter access doors breaks the seal. 6. No termite certs posted.
ROW- PROJECT STATUS 09/20/2023 APPROVED GBERTOLA
Note: THE GRADE LOOK GOOD AT THE TIME OF THE INSPECTION STIILL NEED TO CHECK THE FINAL SURVEY
U-CROSS CONNECTION 09/18/2023 APPROVED - AS NOTED LFITZGERALD
Note: both units have potable irrigation with PVB installed- nocross connection
BLD - BUILDING FINAL 09/15/2023 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 09/15/2023 CANCELLED BY APPLICANT WEB
ROW- PROJECT STATUS 09/06/2023 APPROVED GBERTOLA
Note: MEETING WITH THE CM DAVID WHELAN (941) 524-9111 NEEDS TO CREATE A BERM WITH A 2-1 SLOPE AT THE BACK PROPERTY LINE AND REDEFINE THE DRAINAGE CONVEYANCE DUE TO POOLING WATER ON THE RIGHT SIDE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/23/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) Section 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. 2) THERE ARE PONDING ON RIGHT SIDE NEED TO REGRADE SO WATER DOES NOT SIT IN YARD --------------------------------------------------------------------------------------------------- 8/21/2023 - PREVIOUS INSPECTION NOTES the culvert pipe is still out of tolerance with the swale plan detail also the culvert pipe is pitch the worng way. ----------------------------------------------------------------------------------- 8/18/2023 11:09:03 AM- PREVIOUS INSPECTION NOTES 7/28/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale --------------------------------------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale 4) need to indecate adjacent lots are improved or vacant if they are improved need to have the ffe
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/21/2023 Disapproved - NO FEE PFLANAGAN
Note: the culvert pipe is still out of tolerance with the swale plan detail also the culvert pipe is pitch the worng way. ----------------------------------------------------------------------------------- 8/18/2023 11:09:03 AM- PREVIOUS INSPECTION NOTES 7/28/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale --------------------------------------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale 4) need to indecate adjacent lots are improved or vacant if they are improved need to have the ffe
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/18/2023 CANCELLED BY APPLICANT JMYERS
Note: 7/28/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale --------------------------------------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale 4) need to indecate adjacent lots are improved or vacant if they are improved need to have the ffe
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/28/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale --------------------------------------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale 4) need to indecate adjacent lots are improved or vacant if they are improved need to have the ffe
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/21/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and need to fall in the right direction the water flows. 2) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. 3) Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale 4) need to indecate adjacent lots are improved or vacant if they are improved need to have the ffe
ROW- PRE-APRON (PRE-POUR) 07/20/2023 APPROVED - AS NOTED PFLANAGAN
Note: THIS INSPECTION SHOULD HAVE BEEN DONE BEFORE THE CONCRETE WAS POURED ON THIS CUT OUT. MADE CONTRACTOR DIG A HOLE NEXT TO AREA THAT WAS POURED WITH OUT INSPECTION AT THIS TIME ALL LOOKS GOOD FOR WHAT I CAN SEE AT THE EDGE OF DRIVEWAY IF ANYTHING HAPPENS IN THE MIDDLE OF DRIVEWAY THAT I CANT SEE IT IS UP TO THE CONTRACTOR TO FIX ALL ISSUES ------------------------------------------------------------------------------------------- 6/9/2023 - PREVIOUS INSPECTION NOTES READY TO POUR RIGHT DRIVEWAY ONLY IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH TO MEET CITY'S STANDARTS NEED TO CALL IN ANOTHER PRE POUR FOR LEFT DRIVEWAY WHERE SECTION WAS CUT OUT ----------------------------------------------------------------------------------------------------- 5/4/2023 - PREVIOUS INSPECTION NOTES 05/04/23 POUR AREA IS DRY. READY TO POUR. THIS INSPECTION IS ONLY FOR THE LEFT SIDE OF THE DUPLEX. WILL REQUIRE A NEW PREPOUR INSPECTION WHEN RIGHT SIDE IS READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES 05/03/23 MITERED ENDS ARE FULL OF WATER NEED TO BE PUMPED OUT. LEFT SIDE OF DUPLEX CULVERT PIPE IS GOOD. __________________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS ONLY FOR LEFT SIDE SINGLE DRIVEWAY THAT IS CURRENTLY FORMED AND PREPPED. 04/26/23 CULVERT PIPE MUST BE 8' FROM ROAD EDGE TO CENTER OF PIPE. CULVERT PIPE IS OUT OF TOLERANCE, IT IS FLOWING IN THE WRONG DIRECTION. PLEASE RESET CULVERT PIPE TO CORRECT DISTANCE FROM ROAD AND MATCH ELEVATION TOLERANCE OF SWALE DIAGRAM.
ELECTRIC - EARLY POWER 07/18/2023 APPROVED JWALKER
Note: 7/11/2023 - PREVIOUS INSPECTION NOTES 7/11/23 The new submitted electrical riser drawing does not match the as built riser. Print is showing underground feeder. 6/28/2023 - PREVIOUS INSPECTION NOTES 6/28/23 1. Unit B rear bath 12-2 wire for vanity outlet is not safed off. 2. Unit B range wire is not safed off. 3. The riser diagram shown on page GN of the prints does not match the installed meter cans and disconnects. Please have the engineer submit a revision to the building department showing the system as built. 6/26/2023 - PREVIOUS INSPECTION NOTES 6/26/23 Items listed below have not been installed. Meter cans and disconnect were not checked at all rough due to contractor having material problem. Service wire to 6/the interior were checked at are 4/0 awg.
ELECTRIC - EARLY POWER 07/11/2023 Disapproved - NO FEE JWALKER
Note: 7/11/23 The new submitted electrical riser drawing does not match the as built riser. Print is showing underground feeder. 6/28/2023 - PREVIOUS INSPECTION NOTES 6/28/23 1. Unit B rear bath 12-2 wire for vanity outlet is not safed off. 2. Unit B range wire is not safed off. 3. The riser diagram shown on page GN of the prints does not match the installed meter cans and disconnects. Please have the engineer submit a revision to the building department showing the system as built. 6/26/2023 - PREVIOUS INSPECTION NOTES 6/26/23 Items listed below have not been installed. Meter cans and disconnect were not checked at all rough due to contractor having material problem. Service wire to 6/the interior were checked at are 4/0 awg.
ELECTRIC - EARLY POWER 07/07/2023 CANCELLED BY APPLICANT WEB
Note: 6/28/2023 - PREVIOUS INSPECTION NOTES 6/28/23 1. Unit B rear bath 12-2 wire for vanity outlet is not safed off. 2. Unit B range wire is not safed off. 3. The riser diagram shown on page GN of the prints does not match the installed meter cans and disconnects. Please have the engineer submit a revision to the building department showing the system as built. 6/26/2023 - PREVIOUS INSPECTION NOTES 6/26/23 Items listed below have not been installed. Meter cans and disconnect were not checked at all rough due to contractor having material problem. Service wire to 6/the interior were checked at are 4/0 awg.
ELECTRIC - EARLY POWER 06/28/2023 Disapproved - NO FEE JWALKER
Note: 6/28/23 1. Unit B rear bath 12-2 wire for vanity outlet is not safed off. 2. Unit B range wire is not safed off. 3. The riser diagram shown on page GN of the prints does not match the installed meter cans and disconnects. Please have the engineer submit a revision to the building department showing the system as built. 6/26/2023 - PREVIOUS INSPECTION NOTES 6/26/23 Items listed below have not been installed. Meter cans and disconnect were not checked at all rough due to contractor having material problem. Service wire to 6/the interior were checked at are 4/0 awg.
ELECTRIC - EARLY POWER 06/26/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/26/23 Items listed below have not been installed. Meter cans and disconnect were not checked at all rough due to contractor having material problem. Service wire to 6/the interior were checked at are 4/0 awg.
ROW- PRE-APRON (PRE-POUR) 06/09/2023 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR RIGHT DRIVEWAY ONLY IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH TO MEET CITY'S STANDARTS NEED TO CALL IN ANOTHER PRE POUR FOR LEFT DRIVEWAY WHERE SECTION WAS CUT OUT ----------------------------------------------------------------------------------------------------- 5/4/2023 - PREVIOUS INSPECTION NOTES 05/04/23 POUR AREA IS DRY. READY TO POUR. THIS INSPECTION IS ONLY FOR THE LEFT SIDE OF THE DUPLEX. WILL REQUIRE A NEW PREPOUR INSPECTION WHEN RIGHT SIDE IS READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES 05/03/23 MITERED ENDS ARE FULL OF WATER NEED TO BE PUMPED OUT. LEFT SIDE OF DUPLEX CULVERT PIPE IS GOOD. __________________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS ONLY FOR LEFT SIDE SINGLE DRIVEWAY THAT IS CURRENTLY FORMED AND PREPPED. 04/26/23 CULVERT PIPE MUST BE 8' FROM ROAD EDGE TO CENTER OF PIPE. CULVERT PIPE IS OUT OF TOLERANCE, IT IS FLOWING IN THE WRONG DIRECTION. PLEASE RESET CULVERT PIPE TO CORRECT DISTANCE FROM ROAD AND MATCH ELEVATION TOLERANCE OF SWALE DIAGRAM.
GRAVITY SEWER TEST 05/31/2023 APPROVED MGIBSON
Note: 5/25/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2060 CHANGE PLUBMING SUB CONTRACTOR FROM ''ASAP'' TO PRO-TEAM RIGHT SIDE OF DUPLEX NOT HOLDING HEAD TEST
GRAVITY SEWER TEST 05/25/2023 Disapproved -FEE REQUIRED MGIBSON
Note: New inspection due to canceled inspection New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2060 CHANGE PLUBMING SUB CONTRACTOR FROM ''ASAP'' TO PRO-TEAM RIGHT SIDE OF DUPLEX NOT HOLDING HEAD TEST
U - SEWER TIE IN 05/25/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 05/05/2023 APPROVED CSTONE
ROW- PRE-APRON (PRE-POUR) 05/04/2023 PARTIALLY APPROVED FSLADISH
Note: 05/04/23 POUR AREA IS DRY. READY TO POUR. THIS INSPECTION IS ONLY FOR THE LEFT SIDE OF THE DUPLEX. WILL REQUIRE A NEW PREPOUR INSPECTION WHEN RIGHT SIDE IS READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES 05/03/23 MITERED ENDS ARE FULL OF WATER NEED TO BE PUMPED OUT. LEFT SIDE OF DUPLEX CULVERT PIPE IS GOOD. __________________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS ONLY FOR LEFT SIDE SINGLE DRIVEWAY THAT IS CURRENTLY FORMED AND PREPPED. 04/26/23 CULVERT PIPE MUST BE 8' FROM ROAD EDGE TO CENTER OF PIPE. CULVERT PIPE IS OUT OF TOLERANCE, IT IS FLOWING IN THE WRONG DIRECTION. PLEASE RESET CULVERT PIPE TO CORRECT DISTANCE FROM ROAD AND MATCH ELEVATION TOLERANCE OF SWALE DIAGRAM.
ROW- PRE-APRON (PRE-POUR) 05/03/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 05/03/23 MITERED ENDS ARE FULL OF WATER NEED TO BE PUMPED OUT. LEFT SIDE OF DUPLEX CULVERT PIPE IS GOOD. __________________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS ONLY FOR LEFT SIDE SINGLE DRIVEWAY THAT IS CURRENTLY FORMED AND PREPPED. 04/26/23 CULVERT PIPE MUST BE 8' FROM ROAD EDGE TO CENTER OF PIPE. CULVERT PIPE IS OUT OF TOLERANCE, IT IS FLOWING IN THE WRONG DIRECTION. PLEASE RESET CULVERT PIPE TO CORRECT DISTANCE FROM ROAD AND MATCH ELEVATION TOLERANCE OF SWALE DIAGRAM.
ROW- PRE-APRON (PRE-POUR) 04/26/2023 Disapproved -FEE REQUIRED FSLADISH
Note: THIS INSPECTION IS ONLY FOR LEFT SIDE SINGLE DRIVEWAY THAT IS CURRENTLY FORMED AND PREPPED. 04/26/23 CULVERT PIPE MUST BE 8' FROM ROAD EDGE TO CENTER OF PIPE. CULVERT PIPE IS OUT OF TOLERANCE, IT IS FLOWING IN THE WRONG DIRECTION. PLEASE RESET CULVERT PIPE TO CORRECT DISTANCE FROM ROAD AND MATCH ELEVATION TOLERANCE OF SWALE DIAGRAM.
FIREWALL DRYWALL NAILING 03/09/2023 APPROVED JWALKER
FIREWALL FINAL 03/01/2023 PARTIALLY APPROVED JWALKER
Note: This is for the attic space part of the firewall only. The lower part at the CMU wall Install 5/8" fire resistant rock at the lower part of the party wall. Will add a fire wall dry wall nailing inspection.
INSULATION 02/28/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 2/27/23 HVAC change has not currently been approved. Meter cans have not been installed Check above listed at insulation inspection. . 2/24/2023 - PREVIOUS INSPECTION NOTES 2/24/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! 1). Installed Spray foam insulation at roof deck is impeding the All Rough inspection. Cannot verify proper exhaust sealing at roof deck. 2). Installed windows do not match FPA codes submitted. 3). Unit A has 2 broken windows which also are missing FPA # sticker. 4).FPA # stickers have been removed from French style back doors in both units. 5). Insulation installed on walls, etc. are preventing inspection of required nail plates, etc. 6). Cannot verify proper window installation because windows are covered with stucco so we can only assume that they are nail fin style windows.
FIREWALL DRYWALL NAILING 02/28/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 2/27/23 HVAC change has not currently been approved. Meter cans have not been installed Check above listed at insulation inspection. . 2/24/2023 - PREVIOUS INSPECTION NOTES 2/24/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! 1). Installed Spray foam insulation at roof deck is impeding the All Rough inspection. Cannot verify proper exhaust sealing at roof deck. 2). Installed windows do not match FPA codes submitted. 3). Unit A has 2 broken windows which also are missing FPA # sticker. 4).FPA # stickers have been removed from French style back doors in both units. 5). Insulation installed on walls, etc. are preventing inspection of required nail plates, etc. 6). Cannot verify proper window installation because windows are covered with stucco so we can only assume that they are nail fin style windows.
FIREWALL DRYWALL NAILING 02/27/2023 Disapproved - NO FEE JWALKER
Note: 2/27/23 Due to contractor not calling in for a firewall dry wall nailing before spray foaming the underside of the roof decking a an inspection of the plywood to assure fire rating and size as well as the required 4' extension was never made. Contractor will need to remove the foam at the rated plywood areas for reinspection. 2/24/2023 - PREVIOUS INSPECTION NOTES 2/24/23: INSPECTION STOPPED! ** installed spray foam insulation at roof deck is impeding proper inspection. Cannot verify if firerock is tight to the roof deck as required. Also, cannot see and/or verify the fire rated plywood installed 4ft either side of the firewall as required on plans. Roof shingles are installed already.
ALL ROUGH 02/27/2023 APPROVED - AS NOTED JWALKER
Note: 2/27/23 HVAC change has not currently been approved. Meter cans have not been installed Check above listed at insulation inspection. . 2/24/2023 - PREVIOUS INSPECTION NOTES 2/24/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! 1). Installed Spray foam insulation at roof deck is impeding the All Rough inspection. Cannot verify proper exhaust sealing at roof deck. 2). Installed windows do not match FPA codes submitted. 3). Unit A has 2 broken windows which also are missing FPA # sticker. 4).FPA # stickers have been removed from French style back doors in both units. 5). Insulation installed on walls, etc. are preventing inspection of required nail plates, etc. 6). Cannot verify proper window installation because windows are covered with stucco so we can only assume that they are nail fin style windows.
FIREWALL DRYWALL NAILING 02/24/2023 Disapproved - NO FEE RSIMS
Note: 2/24/23: INSPECTION STOPPED! ** installed spray foam insulation at roof deck is impeding proper inspection. Cannot verify if firerock is tight to the roof deck as required. Also, cannot see and/or verify the fire rated plywood installed 4ft either side of the firewall as required on plans. Roof shingles are installed already.
ALL ROUGH 02/24/2023 Disapproved -FEE REQUIRED RSIMS
Note: 2/24/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! 1). Installed Spray foam insulation at roof deck is impeding the All Rough inspection. Cannot verify proper exhaust sealing at roof deck. 2). Installed windows do not match FPA codes submitted. 3). Unit A has 2 broken windows which also are missing FPA # sticker. 4).FPA # stickers have been removed from French style back doors in both units. 5). Insulation installed on walls, etc. are preventing inspection of required nail plates, etc. 6). Cannot verify proper window installation because windows are covered with stucco so we can only assume that they are nail fin style windows.
ALL ROUGH 02/23/2023 CANCELLED BY APPLICANT WEB
ALL ROUGH 02/22/2023 CANCELLED BY INSPECTOR JWALKER
Note: 2/22/23 The duct layouts have been accepected not currently approved. Contrator needs to wait till the doucuments have been approved before scheduling inspection. 2/17/2023 - PREVIOUS INSPECTION NOTES 2/17/23 Meter boxes will need to be installed for insulation inspection. Install or seal rear door opening in unit b. Insulator may procede with spray foam and insulation of the exterior walls. Unit A 1. 1 1/2 plumbing vent need to be secured 4' o.c. 2. Install a nail plate at the plumbing line. 3. Rear door has not been fasted as per the manufacturer instructions. Unit B 1. Rear door has not been installed Seal opening for insulation inspection or install door. Adding window nailing inspection. 2. Plumbing vent pipe needs to be secured. 3. The AHU has been relocted form the garage attic area to the above the bedrooms. Please submitt a revision to the building department showing the new HVAC layout. Plater was being installed at the exterior some had to be removed to view window nailing. Contractor did not call in for lath and brick inspection. 2/15/2023 - PREVIOUS INSPECTION NOTES 1. Meter box and dissconnects have not been installed. 2. Seal dryer duct fittings. 3. Entry door fasteners are to be located in the 1 1/4 part of the jamb or provide install specs for current fastener locations. 4. 5' head test not holding water. 5. Missing rear window 6 Install nail plate at the washing mashing drain pipe. 7. Rear door Unit b not installed. 8. Please have the approved duct layout drawing onsite for reinspection. INSPECTION stopped a full all rough will still be needed.
ELECTRIC TEMP POLE 02/22/2023 APPROVED JWALKER
ALL ROUGH 02/21/2023 CANCELLED BY APPLICANT WEB
Note: 2/17/2023 - PREVIOUS INSPECTION NOTES 2/17/23 Meter boxes will need to be installed for insulation inspection. Install or seal rear door opening in unit b. Insulator may procede with spray foam and insulation of the exterior walls. Unit A 1. 1 1/2 plumbing vent need to be secured 4' o.c. 2. Install a nail plate at the plumbing line. 3. Rear door has not been fasted as per the manufacturer instructions. Unit B 1. Rear door has not been installed Seal opening for insulation inspection or install door. Adding window nailing inspection. 2. Plumbing vent pipe needs to be secured. 3. The AHU has been relocted form the garage attic area to the above the bedrooms. Please submitt a revision to the building department showing the new HVAC layout. Plater was being installed at the exterior some had to be removed to view window nailing. Contractor did not call in for lath and brick inspection. 2/15/2023 - PREVIOUS INSPECTION NOTES 1. Meter box and dissconnects have not been installed. 2. Seal dryer duct fittings. 3. Entry door fasteners are to be located in the 1 1/4 part of the jamb or provide install specs for current fastener locations. 4. 5' head test not holding water. 5. Missing rear window 6 Install nail plate at the washing mashing drain pipe. 7. Rear door Unit b not installed. 8. Please have the approved duct layout drawing onsite for reinspection. INSPECTION stopped a full all rough will still be needed.
LATH/BRICK/ WATER BARRIER 02/17/2023 APPROVED JWALKER
ALL ROUGH 02/17/2023 Disapproved -FEE REQUIRED JWALKER
Note: 2/17/23 Meter boxes will need to be installed for insulation inspection. Install or seal rear door opening in unit b. Insulator may procede with spray foam and insulation of the exterior walls. Unit A 1. 1 1/2 plumbing vent need to be secured 4' o.c. 2. Install a nail plate at the plumbing line. 3. Rear door has not been fasted as per the manufacturer instructions. Unit B 1. Rear door has not been installed Seal opening for insulation inspection or install door. Adding window nailing inspection. 2. Plumbing vent pipe needs to be secured. 3. The AHU has been relocted form the garage attic area to the above the bedrooms. Please submitt a revision to the building department showing the new HVAC layout. Plater was being installed at the exterior some had to be removed to view window nailing. Contractor did not call in for lath and brick inspection. 2/15/2023 - PREVIOUS INSPECTION NOTES 1. Meter box and dissconnects have not been installed. 2. Seal dryer duct fittings. 3. Entry door fasteners are to be located in the 1 1/4 part of the jamb or provide install specs for current fastener locations. 4. 5' head test not holding water. 5. Missing rear window 6 Install nail plate at the washing mashing drain pipe. 7. Rear door Unit b not installed. 8. Please have the approved duct layout drawing onsite for reinspection. INSPECTION stopped a full all rough will still be needed.
ALL ROUGH 02/15/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. Meter box and dissconnects have not been installed. 2. Seal dryer duct fittings. 3. Entry door fasteners are to be located in the 1 1/4 part of the jamb or provide install specs for current fastener locations. 4. 5' head test not holding water. 5. Missing rear window 6 Install nail plate at the washing mashing drain pipe. 7. Rear door Unit b not installed. 8. Please have the approved duct layout drawing onsite for reinspection. INSPECTION stopped a full all rough will still be needed.
WALL SHEATHING 02/14/2023 APPROVED JWALKER
Note: New inspection due to canceled inspection Inspector Notes from Inspection 2460 New inspection due to canceled inspection 2/8/23 Below revison listed have been submitted not currently approved. Bearing wall bottom 2x4 pt fix has not been installed. Check for approved revisons and 2x4 install at the All rough ispection Contractor Please have the approved revised drawings along with engineer letters onsite at the All rough inspection to avoid delays and fees. 1/27/2023 - PREVIOUS INSPECTION NOTES Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection. 1/25/23 1. Above listed revision has not been submitted. 5. Unit B the garage bearing wall is not bearing on the concrete completely appx. 1 1/2 over hanging. Engineering fix will need to be submitted.
WALL SHEATHING 02/13/2023 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2460 New inspection due to canceled inspection 2/8/23 Below revison listed have been submitted not currently approved. Bearing wall bottom 2x4 pt fix has not been installed. Check for approved revisons and 2x4 install at the All rough ispection Contractor Please have the approved revised drawings along with engineer letters onsite at the All rough inspection to avoid delays and fees. 1/27/2023 - PREVIOUS INSPECTION NOTES Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection. 1/25/23 1. Above listed revision has not been submitted. 5. Unit B the garage bearing wall is not bearing on the concrete completely appx. 1 1/2 over hanging. Engineering fix will need to be submitted.
HVAC ROUGH 02/13/2023 CANCELLED BY INSPECTOR JWALKER
Note: 9/13/23 HVAC rough is included in the ALL ROUGH. New inspection due to canceled inspection 2/8/23 Below revison listed have been submitted not currently approved. Bearing wall bottom 2x4 pt fix has not been installed. Check for approved revisons and 2x4 install at the All rough ispection Contractor Please have the approved revised drawings along with engineer letters onsite at the All rough inspection to avoid delays and fees. 1/27/2023 - PREVIOUS INSPECTION NOTES Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection. 1/25/23 1. Above listed revision has not been submitted. 5. Unit B the garage bearing wall is not bearing on the concrete completely appx. 1 1/2 over hanging. Engineering fix will need to be submitted.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/08/2023 APPROVED - AS NOTED JWALKER
Note: New inspection due to canceled inspection 2/8/23 Below revison listed have been submitted not currently approved. Bearing wall bottom 2x4 pt fix has not been installed. Check for approved revisons and 2x4 install at the All rough ispection Contractor Please have the approved revised drawings along with engineer letters onsite at the All rough inspection to avoid delays and fees. 1/27/2023 - PREVIOUS INSPECTION NOTES Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection. 1/25/23 1. Above listed revision has not been submitted. 5. Unit B the garage bearing wall is not bearing on the concrete completely appx. 1 1/2 over hanging. Engineering fix will need to be submitted.
HVAC ROUGH 02/07/2023 CANCELLED BY APPLICANT WEB
Note: 2/1/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved drawings onsite for all inspections. Include for HVAC all rough UNIT A and UNIT B Duct layouts.
GRAVITY SEWER TEST 02/07/2023 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection Inspector Notes from Inspection 2060 CHANGE PLUBMING SUB CONTRACTOR FROM ''ASAP'' TO PRO-TEAM
GRAVITY SEWER TEST 02/07/2023 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2060 CHANGE PLUBMING SUB CONTRACTOR FROM ''ASAP'' TO PRO-TEAM
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/06/2023 CANCELLED BY APPLICANT WEB
Note: 1/27/2023 - PREVIOUS INSPECTION NOTES 1/25/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection. 1/25/23 1. Above listed revision has not been submitted. 2. Roof deck nailing, Nails have been sunk into sheating too deep, Renail and leave roof uncoved for reinspection 3. Garage bearing wall. Missing Sp4 and Sp1. 4. Trusses bearing on garage wall call for RT16 or H10 anchors. Contractor installed SDWC screws. Submitt a revision for the anchor change or install engineer specifed anchors. 5. Unit B the garage bearing wall is not bearing on the concrete completely appx. 1 1/2 over hanging. Engineering fix will need to be submitted. 6. Over framing above garage area the rafter into the ridge require H-3 anchors. 7. Remove form boards from rear wall down cells. Truss engineering passed. 1/27/12 Roof deck nailing has been corrected. Contractor may cover the roof. Other listed item still need to be addressed.
ROOF VALLEY & METAL 02/03/2023 APPROVED JWALKER
Note: 2/2/2023 - PREVIOUS INSPECTION NOTES 2/1/2023 - PREVIOUS INSPECTION NOTES 2/1/23 Shingle have been installed. Stopping workers. 2/2/23 Contractor called for a two hour window to do the Demo inspection. 9 to 11 was given on text. Showed up onsite at 9:06 Contractor not on site.
ROOF VALLEY & METAL 02/02/2023 Disapproved -FEE REQUIRED JWALKER
Note: 2/1/2023 - PREVIOUS INSPECTION NOTES 2/1/23 Shingle have been installed. Stopping workers. 2/2/23 Contractor called for a two hour window to do the Demo inspection. 9 to 11 was given on text. Showed up onsite at 9:06 Contractor not on site.
ROOF VALLEY & METAL 02/01/2023 Disapproved -FEE REQUIRED JWALKER
Note: 2/1/23 Shingle have been installed. Stopping workers. Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection.
TUB SET 02/01/2023 CANCELLED BY INSPECTOR MGIBSON
Note: SINGLE TRADE INSPECTIONS FOR NEW CONSTRUCTION IS NOT ALLOWED. NEED AN ALL-ROUGH INSPECTION WHEN ''MEP'' ARE COMPLETED
HVAC ROUGH 02/01/2023 Disapproved - NO FEE JWALKER
Note: Please have a full set of approved drawings onsite for all inspections. Include for HVAC all rough UNIT A and UNIT B Duct layouts.
TUB SET 01/27/2023 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/27/2023 PARTIALLY APPROVED JWALKER
Note: 1/25/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection. 1/25/23 1. Above listed revision has not been submitted. 2. Roof deck nailing, Nails have been sunk into sheating too deep, Renail and leave roof uncoved for reinspection 3. Garage bearing wall. Missing Sp4 and Sp1. 4. Trusses bearing on garage wall call for RT16 or H10 anchors. Contractor installed SDWC screws. Submitt a revision for the anchor change or install engineer specifed anchors. 5. Unit B the garage bearing wall is not bearing on the concrete completely appx. 1 1/2 over hanging. Engineering fix will need to be submitted. 6. Over framing above garage area the rafter into the ridge require H-3 anchors. 7. Remove form boards from rear wall down cells. Truss engineering passed. 1/27/12 Roof deck nailing has been corrected. Contractor may cover the roof. Other listed item still need to be addressed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/25/2023 Disapproved - NO FEE JWALKER
Note: Inspector Notes from Inspection 2340 Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection. 1/25/23 1. Above listed revision has not been submitted. 2. Roof deck nailing, Nails have been sunk into sheating too deep, Renail and leave roof uncoved for reinspection 3. Garage bearing wall. Missing Sp4 and Sp1. 4. Trusses bearing on garage wall call for RT16 or H10 anchors. Contractor installed SDWC screws. Submitt a revision for the anchor change or install engineer specifed anchors. 5. Unit B the garage bearing wall is not bearing on the concrete completely appx. 1 1/2 over hanging. Engineering fix will need to be submitted. 6. Over framing above garage area the rafter into the ridge require H-3 anchors. 7. Remove form boards from rear wall down cells. Truss engineering passed.
ROOF VALLEY & METAL 01/25/2023 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2340 Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection.
GRAVITY SEWER TEST 01/25/2023 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2060 CHANGE PLUBMING SUB CONTRACTOR FROM ''ASAP'' TO PRO-TEAM
FOUND SURVEY APPROVED (OFFICE) 01/23/2023 APPROVED TBAKER
TIE BEAM / LINTEL 12/19/2022 APPROVED - AS NOTED JWALKER
Note: Left and right side CMU walls. Window openings at the bathrooms have not been installed. New window openings right and left side CMU walls have been installed at the kitchen areas. Please have the engineer submitt a revision to the building department showing the wall opening changes. Contractor may pour the down cells and bond beams at contractors risk changes are not approved b the building department. Please have the revisions submitted and approved before roof brace inspection.
MONOLITHIC SLAB 12/06/2022 APPROVED - AS NOTED JWALKER
Note: 12/5/2022 - PREVIOUS INSPECTION NOTES Dowel rods are sitting in the bottom of the footings. Steel is to have 3" ground clearance. Exterior walls are not detailed on the foundation drawings. Please have engineer detail types of walls. The center bearing 2 hour fire wall footing is not installed as per the detail. See foundation drawing. 12/6/22 Contractor has submitted engineer letter to the building department in reference to the center bearing wall. Contractor is schudled for concrete and may procede with pour. At risk of revision approval.
MONOLITHIC SLAB 12/05/2022 Disapproved - NO FEE JWALKER
Note: Dowel rods are sitting in the bottom of the footings. Steel is to have 3" ground clearance. Exterior walls are not detailed on the foundation drawings. Please have engineer detail types of walls. The center bearing 2 hour fire wall footing is not installed as per the detail. See foundation drawing.
WATER METER INSTALLATION REQUEST 12/01/2022 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 11/28/2022 APPROVED - AS NOTED MGIBSON
Note: CHANGE PLUBMING SUB CONTRACTOR FROM ''ASAP'' TO PRO-TEAM

Review History

Department Status Date In Date Out
MECH COMPLETE 09/15/2023 09/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/18/2023 07/18/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PREPOUR INSPECTION NOT COMPLETE BEFORE FINAL SURVEY CAN BE SCHEDULED
ELEC COMPLETE 07/17/2023 07/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 07/10/2023 07/10/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey. There is an outstanding inspection required before.
ELEC HOLD 07/10/2023 07/13/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. This not a duplex riser. Submit exactly what was installed.
ELEC COMPLETE 06/29/2023 07/10/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/28/2023 02/28/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Marked complete on re-review of engineer's letter and plans examiners previious review comments.
MECH COMPLETE 02/28/2023 02/28/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 02/21/2023 02/22/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Engineer to clarify required footing fire wall. Drawings show a 1 x 20 footing. Engineers letter states a 10 x 20 block stem wall. Provide a revised footer for the proposed change. (Second Request)
BLD HOLD 02/07/2023 02/10/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Engineer to clarify required footing fire wall. Drawings show a 1 x 20 footing. Engineers letter states a 10 x 20 block stem wall. Provide a revised footer for the proposed change.
BLD HOLD 02/07/2023 02/10/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Engineer to clarify required footing fire wall. Drawings show a 1 x 20 footing. Engineers letter states a 10 x 20 block stem wall. Provide a revised footer for the proposed change.
ENGIN1 COMPLETE 01/23/2023 01/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/23/2023 01/23/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 01/09/2023 01/10/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
MECH COMPLETE 01/06/2023 01/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 12/12/2022 12/12/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs by listed subcontractor
MECH HOLD 12/09/2022 12/09/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Entire energy Calc with heatload and duct layout signed by the AC contractor for both sides of duplex. 2. Energy calcs need to be signed by the builder. 3. Design location on Energy calcs and heatload need to be daytona beach.
BLD COMPLETE 12/06/2022 12/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 10/10/2022 10/10/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 10/10/2022 10/11/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/10/2022 10/18/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/10/2022 10/10/2022
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
MECH HOLD 09/27/2022 09/27/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM THIS IS CORRECT REVIEW. DIRECTION WAS WRONG ON PREVOIOUS REVIEW 1. Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition Direction is E or NE. Heatload shows SW (Second Request) 2. Duct layout needs to be signed by the AC contractor
MECH HOLD 09/27/2022 09/27/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition Direction is W or NW. Heatload shows SW (Second Request) 2. Duct layout needs to be signed by the AC contractor
ZON HOLD 09/27/2022 09/27/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment: Site plan: show all platted easements on this property. I see the 20' easment on the right side but there is a platted easment around the entire property that must be shown on the survey/ site plan. Utility mechanical encroachment equipment: Site plan shows the A/C pad is in the 5' utility easement. Please remove from the easement. Internal note: F-25', R-10', LS-7.5' RS-20'
SW1 HOLD 09/27/2022 10/06/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM YOUR DRAINAGE CAN NOT IMPACT THE LOT BEHIND YOUR
ENGIN1 COMPLETE 09/27/2022 09/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 09/16/2022 09/21/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/16/2022 09/19/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 09/16/2022 09/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/16/2022 09/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/16/2022 09/21/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 09/16/2022 09/16/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition 2. Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition
SW1 HOLD 09/16/2022 09/23/2022
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See highlighted items on the SW1 Checklist dated 9/23/22 for corrections needed.
ZON HOLD 09/16/2022 09/21/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: show all platted easements on this property Please provide the setback from ac to property line Utility mechanical encroachment equipment: On site plan submitted the A/C pad is in the 5' utility easement. Please provide the 2 ft. encroachment license agreement for the mechanical equipment. Must be signed by all persons on the deed, witnessed and notarized. Internal note: F-25', R-10', LS-7.5' RS-20'
SWALE COMPLETE 09/16/2022 01/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 10/12/2023
REINSPECTION RESIDENTIAL ¤40.00 10/12/2023
REINSPECTION RESIDENTIAL ¤40.00 10/12/2023
REINSPECTION RESIDENTIAL ¤40.00 10/12/2023
SW ENG REINSPECTION 20 ¤20.00 10/12/2023
SW ENG REINSPECTION 20 ¤20.00 10/12/2023
SW ENG REINSPECTION 30 ¤30.00 10/12/2023
SW ENG REINSPECTION 30 ¤30.00 10/12/2023
REINSPECTION RESIDENTIAL ¤40.00 10/12/2023
REINSPECTION RESIDENTIAL ¤40.00 10/12/2023
REINSPECTION RESIDENTIAL ¤40.00 10/12/2023
PLAN REVIEW - REVISION ¤32.50 02/17/2023
PLAN REVIEW - REVISION ¤32.50 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
REINSPECTION RESIDENTIAL ¤40.00 02/17/2023
CONTRACTOR CHANGE ¤20.00 02/17/2023
CONTRACTOR CHANGE ¤20.00 02/17/2023
3% FIRE IMPACT FEE CREDIT (¤23.32) 10/27/2022
IMPACT FEE FIRE ¤777.30 10/27/2022
IMPACT FEE PARKS ¤2,910.26 10/27/2022
IMPACT FEE SCHOOL ¤10,900.00 10/27/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 10/27/2022
WATER -IRRIGATION INSPECTION ¤50.00 10/27/2022
3% PARKS IMPACT FEE CREDIT (¤87.31) 10/27/2022
SURCHARGE FS 533.721 ¤4.18 10/27/2022
SURCHARGE - FS 468.631 ¤6.27 10/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/27/2022
SW ENG INSPECTION 80 ¤80.00 10/27/2022
SW ENG PRE APRON ¤30.00 10/27/2022
WATER- TURN ON ¤50.00 10/27/2022
ADJUSTMENT 50% (¤664.52) 10/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/27/2022
INSPECTION - RESIDENTIAL ¤1,012.00 10/27/2022
PLAN REVIEW - RESIDENTIAL ¤287.04 10/27/2022
CONNECTION FEES ¤2,155.76 10/27/2022
SW ENG - REVIEW 20 ¤20.00 10/27/2022
SW ENG RES REVIEW 200 ¤200.00 10/27/2022
3% TRANS IMPACT FEE CREDIT (¤82.14) 10/27/2022
SEWER CREDIT (¤1,466.00) 10/27/2022
SEWER INSPECTION ¤25.00 10/27/2022
SEWER CAPITAL FACILITY ¤9,879.52 10/27/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 10/27/2022
SITE PLAN 30 ¤30.00 10/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤36,692.54