Permit #2022090865

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0010
CONDITIONED SPACE: 2712 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
PATIO/DECK (NO ROOF) : 442 sqft
Total Square Footage: 4009 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 70 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/27/2022
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0010
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
CHRIS L JENKINS
Status Location Address State License Number Phone
INACTIVE

3975 FORRESTAL AVE SUITE 100

, 0

L145104 (Exp: 03/24/2027) 407-856-7770
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/07/2023 FINAL APPROVED BTAYLOR
Note: 12/6/2023 - PREVIOUS INSPECTION NOTES 12-6-23 1. No hot water. 2. No energy cals on site.
BLD - BUILDING FINAL 12/06/2023 Disapproved - NO FEE BTAYLOR
Note: 12-6-23 1. No hot water. 2. No energy cals on site.
U -UTILITY RESIDENTIAL FINAL 12/06/2023 FINAL APPROVED LFITZGERALD
Note: 12/5/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 unable to locate sewer clean out at tap reclaim irrigation-no cross connection
ROW - STORMWATER FINAL 12/05/2023 APPROVED TPOLACEK
Note: 12/5/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved Inspector Notes from Inspection 9465 12/4/23 **WALKED PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY ** INS0ECTORS NOT PLEASE REMOVE PORTA POTTY OFF SIDEWALK INTO PROPERTY
U -UTILITY RESIDENTIAL FINAL 12/05/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: Inspector Notes from Inspection 9035 unable to locate sewer clean out at tap reclaim irrigation-no cross connection
ROW - FINAL APRON (AFTER POUR) 12/05/2023 APPROVED TPOLACEK
Note: 12/5/23 ** PAVERS ARE SET AT THE TIME OF THIS INSPECTION ALL MINIMUM REQUIRMENTRS ARE MET Inspector Notes from Inspection 9465 12/4/23 **WALKED PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY ** INS0ECTORS NOT PLEASE REMOVE PORTA POTTY OFF SIDEWALK INTO PROPERTY
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/04/2023 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 12/04/2023 APPROVED - AS NOTED FSLADISH
Note: 12/4/23 **WALKED PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY ** INS0ECTORS NOT PLEASE REMOVE PORTA POTTY OFF SIDEWALK INTO PROPERTY
U-CROSS CONNECTION 11/29/2023 APPROVED - AS NOTED LFITZGERALD
Note: reclaim irrigation-no cross connection
ROW- PRE-APRON (PRE-POUR) 11/07/2023 APPROVED FSLADISH
Note: 11/07/23 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 11/2/2023 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, PAVER RESTRAINTS AND APRON ONLY ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH IN THE CONCRETE TO MEET CITY STANDARDS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PAVER RESTRAINTS 11/02/2023 APPROVED PFLANAGAN
Note: PAVER RESTRAINTS LOOK GOOD AT THIS TIME
ROW- PRE-APRON (PRE-POUR) 11/02/2023 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR SIDEWALK, PAVER RESTRAINTS AND APRON ONLY ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH IN THE CONCRETE TO MEET CITY STANDARDS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 10/19/2023 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 3-15-23 1. Emailed FPL at 12:07. 10-19-23 1. Emailer FPL at 9:19.
TIE BEAM / LINTEL 10/18/2023 APPROVED BTAYLOR
GRAVITY SEWER TEST 07/17/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 07/17/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 06/01/2023 APPROVED BTAYLOR
INSULATION 05/26/2023 APPROVED BTAYLOR
ALL ROUGH 05/22/2023 APPROVED BTAYLOR
ROOF VALLEY & METAL 04/25/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/19/2023 APPROVED BTAYLOR
Note: 4/12/2023 - PREVIOUS INSPECTION NOTES partial approval for roof sheathing only per notes from contractor on 4-12-23
WALL SHEATHING 04/19/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/12/2023 PARTIALLY APPROVED LMILLER
Note: partial approval for roof sheathing only per notes from contractor on 4-12-23
ELECTRIC-TUG 03/15/2023 APPROVED - AS NOTED BTAYLOR
Note: 3-15-23 1. Emailed FPL at 12:07.
FOUND SURVEY APPROVED (OFFICE) 03/08/2023 APPROVED TBAKER
TIE BEAM / LINTEL 03/07/2023 APPROVED BTAYLOR
MONOLITHIC SLAB 02/22/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/21/2023 APPROVED MGIBSON
FOOTER 02/02/2023 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 11/04/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
GAS COMPLETE 07/25/2023 07/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
GAS HOLD 04/20/2023 04/24/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1.Gas contractor needs to sign and have license number on riser diagram 2. Need to list gas subcontractor on permit
MECH COMPLETE 04/11/2023 04/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/08/2023 03/08/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/08/2023 03/08/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 02/22/2023 02/23/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 10/20/2022 10/20/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/20/2022 10/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/20/2022 10/27/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 10/13/2022 10/14/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment : Site plan has wrong address on top, again States this is for 72 New Leatherwood Drive permit is for 70 New Leatherwood Drive
BLD COMPLETE 10/13/2022 10/20/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/13/2022 10/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/13/2022 10/20/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
URB COMPLETE 09/22/2022 10/03/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 09/20/2022 09/27/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/20/2022 09/21/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 09/20/2022 09/20/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/20/2022 09/20/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/20/2022 10/03/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/20/2022 09/21/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/20/2022 10/03/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 09/20/2022 09/22/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan has wrong address on top Right elevation needs banding on windows and doors facing ROW

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/07/2023
CONTRACTOR CHANGE ¤20.00 12/07/2023
CONTRACTOR CHANGE ¤20.00 12/07/2023
REINSPECTION FEE ¤40.00 12/07/2023
PLAN REVIEW - REVISION ¤32.50 12/07/2023
PLAN REVIEW - REVISION ¤32.50 12/07/2023
CONNECTION FEES ¤25.00 10/27/2022
WATER-METER ¤467.09 10/27/2022
WATER-METER ¤388.04 10/27/2022
ADJUSTMENT 50% (¤639.81) 10/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/27/2022
INSPECTION - RESIDENTIAL ¤973.50 10/27/2022
PLAN REVIEW - RESIDENTIAL ¤276.12 10/27/2022
SURCHARGE FS 533.721 ¤4.04 10/27/2022
SURCHARGE - FS 468.631 ¤6.06 10/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/27/2022
SW ENG INSPECTION 80 ¤80.00 10/27/2022
SW ENG PRE APRON ¤30.00 10/27/2022
SW ENG - REVIEW 20 ¤20.00 10/27/2022
SW ENG RES REVIEW 200 ¤200.00 10/27/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 10/27/2022
SEWER INSPECTION ¤25.00 10/27/2022
SITE PLAN 30 ¤30.00 10/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/27/2022
IMPACT FEE FIRE ¤388.65 10/27/2022
IMPACT FEE PARKS ¤1,455.13 10/27/2022
IMPACT FEE SCHOOL ¤5,450.00 10/27/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 10/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤12,465.79