I want to search for...
Permit #2022090866
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-0820 |
| CONDITIONED SPACE: 2419 sqft |
| GARAGE: 419 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| OPENED PORCH (WITH ROOF) : 347 sqft |
| Total Square Footage: 3225 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 863-647-5815 |
| Location Address: 29 DEL PALMA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/27/2022 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: BIONDINO ROBERT |
|
Address SUITE 620 ENGLEWOOD, CO 80110 |
|
Address 333 W HAMPDEN ENGLEWOOD, CO 80110 |
| Lot: 0820 |
| Contracted Stated Job Value: ¤553,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/07/2024 | FINAL APPROVED | BTAYLOR |
| Note: 3/4/2024 - PREVIOUS INSPECTION NOTES 3/1/2024 - PREVIOUS INSPECTION NOTES 3-1-24 1. Outlet in living room has hot and groung reversed. 2. Outlets along back wall in living room have no power. 3. Fire wall in attic between garage and main house has been cut down need to replace and be sure its fire proof. 4. Air handler sticker in attic needs to be on panel box. 03-04-2024 Above issues have not been addressed. 1. Loose outlet in lanai wall living room. 2. Garage wall above attic and living space not a 1 hour fire rating. Attic space not protected. 3. AHU duct in attic above garage has gaps and not sealed properly. 4. Please provide specifications on foam plastic used at garage wall above attic. 5. Garage wall foam at attic has been painted. Please provide specifications of paint used. 3. Please provide | |||
| BLD - BUILDING FINAL | 03/04/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 3/1/2024 - PREVIOUS INSPECTION NOTES 3-1-24 1. Outlet in living room has hot and groung reversed. 2. Outlets along back wall in living room have no power. 3. Fire wall in attic between garage and main house has been cut down need to replace and be sure its fire proof. 4. Air handler sticker in attic needs to be on panel box. 03-04-2024 Above issues have not been addressed. 1. Loose outlet in lanai wall living room. 2. Garage wall above attic and living space not a 1 hour fire rating. Attic space not protected. 3. AHU duct in attic above garage has gaps and not sealed properly. 4. Please provide specifications on foam plastic used at garage wall above attic. 5. Garage wall foam at attic has been painted. Please provide specifications of paint used. 3. Please provide | |||
| BLD - BUILDING FINAL | 03/01/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-1-24 1. Outlet in living room has hot and groung reversed. 2. Outlets along back wall in living room have no power. 3. Fire wall in attic between garage and main house has been cut down need to replace and be sure its fire proof. 4. Air handler sticker in attic needs to be on panel box. | |||
| BLD - BUILDING FINAL | 02/29/2024 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 02/28/2024 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 01/17/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/17/2024 | APPROVED | FSLADISH |
| Note: 1/17/24 ALL PAVERS GLUED. NO CRACKS OR BREAKS, DRIVEWAY AND SIDEWALK GOOD AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 01/17/2024 | APPROVED | FSLADISH |
| Note: 1/17/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/17/2024 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/29/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/29/2023 | APPROVED | FSLADISH |
| Note: 11/29/23 drainage will work. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/17/2023 | APPROVED | FSLADISH |
| Note: 10/17/23 COMPACTION GOOD. FOOTERS AND APRON POURED. READY FOR PAVERS AT THE TIME OF THIS INSPECTION. __________________________________________________________________________________________________________________________ 10/9/2023 - PREVIOUS INSPECTION NOTES 10/09/23 Ready to pour apron and paver restraints at the time of this inspection. Partially approving. You may now spread and compact paver base. Do not lay any pavers until next prepour inspection is completed and passed. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 NEED TO DIG PAVER FOOTER ALL THE WAY ACROSS CANNOT HAVE A BREAK IN THE PAVER RESTAINT. YOU ALSO NEED TO CHIP ALL THE CONCRETE OUT FROM IN FRONT OF THE GARAGE, IT DOES NOT GIVE YOU MINIMUM CONCRETE COVERAGE REQUIRED. SEE PHOTOS FOR REFERENCE. | |||
| ROW- PAVER RESTRAINTS | 10/17/2023 | APPROVED | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 10/09/2023 | PARTIALLY APPROVED | FSLADISH |
| Note: 10/09/23 Ready to pour apron and paver restraints at the time of this inspection. Partially approving. You may now spread and compact paver base. Do not lay any pavers until next prepour inspection is completed and passed. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 NEED TO DIG PAVER FOOTER ALL THE WAY ACROSS CANNOT HAVE A BREAK IN THE PAVER RESTAINT. YOU ALSO NEED TO CHIP ALL THE CONCRETE OUT FROM IN FRONT OF THE GARAGE, IT DOES NOT GIVE YOU MINIMUM CONCRETE COVERAGE REQUIRED. SEE PHOTOS FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/06/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 10/06/23 NEED TO DIG PAVER FOOTER ALL THE WAY ACROSS CANNOT HAVE A BREAK IN THE PAVER RESTAINT. YOU ALSO NEED TO CHIP ALL THE CONCRETE OUT FROM IN FRONT OF THE GARAGE, IT DOES NOT GIVE YOU MINIMUM CONCRETE COVERAGE REQUIRED. SEE PHOTOS FOR REFERENCE. | |||
| ELECTRIC - EARLY POWER | 09/18/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 3-31-23 1. Emailed FPL at 10:14. 9-18-23 1. Emailed FPL at 1:10. | |||
| INSULATION | 08/25/2023 | APPROVED | BTAYLOR |
| GRAVITY SEWER TEST | 08/23/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 12/27/2022 - PREVIOUS INSPECTION NOTES PROVIDE PORTABLE RESTROOM BEFORE SLAB INSPECTION | |||
| U - SEWER TIE IN | 08/23/2023 | APPROVED | MGIBSON |
| ALL ROUGH | 08/17/2023 | APPROVED | BTAYLOR |
| Note: 8/11/2023 - PREVIOUS INSPECTION NOTES 8-11-23 1. Inspection was for duct work so house could be spray foamed. | |||
| ALL ROUGH | 08/11/2023 | PARTIALLY APPROVED | BTAYLOR |
| Note: 8-11-23 1. Inspection was for duct work so house could be spray foamed. | |||
| LATH/BRICK/ WATER BARRIER | 08/03/2023 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 03/31/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-31-23 1. Emailed FPL at 10:14. | |||
| WALL SHEATHING | 03/28/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 03/22/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2460 3/21/2023 - PREVIOUS INSPECTION NOTES 3/22/23: Must be complete by All Rough! Check at next inspection or at All Rough. 1). A10 Truss - 1st in the series of 3 (towards back of house) is missing one piece of web bracing as required. Marked on MiTek. 2). Permanent staircase is not installed. Only a temporary 2"x4" wood ladder is in place. 3/17/2023 - PREVIOUS INSPECTION NOTES 3-17-23 still need plans on site for inspection, (need all documents alomng with engineering pakage on site) 3/16/2023 - PREVIOUS INSPECTION NOTES 3-16-23 1. Need full set of plans on site. 2. Need engineering packet on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/22/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 3/21/2023 - PREVIOUS INSPECTION NOTES 3/22/23: Must be complete by All Rough! Check at next inspection or at All Rough. 1). A10 Truss - 1st in the series of 3 (towards back of house) is missing one piece of web bracing as required. Marked on MiTek. 2). Permanent staircase is not installed. Only a temporary 2"x4" wood ladder is in place. 3/17/2023 - PREVIOUS INSPECTION NOTES 3-17-23 still need plans on site for inspection, (need all documents alomng with engineering pakage on site) 3/16/2023 - PREVIOUS INSPECTION NOTES 3-16-23 1. Need full set of plans on site. 2. Need engineering packet on site. | |||
| WATER METER INSTALLATION REQUEST | 03/22/2023 | APPROVED | CSTONE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/21/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 3/17/2023 - PREVIOUS INSPECTION NOTES 3-17-23 still need plans on site for inspection, (need all documents alomng with engineering pakage on site) 3/16/2023 - PREVIOUS INSPECTION NOTES 3-16-23 1. Need full set of plans on site. 2. Need engineering packet on site. | |||
| ROOF VALLEY & METAL | 03/21/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 3/17/2023 - PREVIOUS INSPECTION NOTES need to pass roof sheathing/braces/ties/down cells prior | |||
| ROOF VALLEY & METAL | 03/17/2023 | Disapproved - NO FEE | LMILLER |
| Note: need to pass roof sheathing/braces/ties/down cells prior | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/17/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 3-17-23 still need plans on site for inspection, (need all documents alomng with engineering pakage on site) 3/16/2023 - PREVIOUS INSPECTION NOTES 3-16-23 1. Need full set of plans on site. 2. Need engineering packet on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/16/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-16-23 1. Need full set of plans on site. 2. Need engineering packet on site. | |||
| TIE BEAM / LINTEL | 02/10/2023 | APPROVED | BTAYLOR |
| Note: 2/7/2023 - PREVIOUS INSPECTION NOTES 2-7-23 1. Dowel not tied top and bottom (marked on plan) 2. CLEARANCE FROM MASONRY R606.13.4 (marked on plan) 2/6/2023 - PREVIOUS INSPECTION NOTES 2/3/2023 - PREVIOUS INSPECTION NOTES Cancelled per Codey 2-6-23 1. Missing dowels at front entryway on both sides. | |||
| TIE BEAM / LINTEL | 02/07/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 2-7-23 1. Dowel not tied top and bottom (marked on plan) 2. CLEARANCE FROM MASONRY R606.13.4 (marked on plan) 2/6/2023 - PREVIOUS INSPECTION NOTES 2/3/2023 - PREVIOUS INSPECTION NOTES Cancelled per Codey 2-6-23 1. Missing dowels at front entryway on both sides. | |||
| TIE BEAM / LINTEL | 02/06/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 2/3/2023 - PREVIOUS INSPECTION NOTES Cancelled per Codey 2-6-23 1. Missing dowels at front entryway on both sides. | |||
| TIE BEAM / LINTEL | 02/03/2023 | CANCELLED BY APPLICANT | LMILLER |
| Note: Cancelled per Codey | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/03/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/09/2023 | APPROVED | BTAYLOR |
| Note: 1/6/2023 - PREVIOUS INSPECTION NOTES NEED COMPACTION TEST IN JOB BOX | |||
| MONOLITHIC SLAB | 01/06/2023 | Disapproved - NO FEE | RMARTIN |
| Note: NEED COMPACTION TEST IN JOB BOX | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/29/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: 12/27/2022 - PREVIOUS INSPECTION NOTES PROVIDE PORTABLE RESTROOM BEFORE SLAB INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/27/2022 | CANCELLED BY APPLICANT | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/04/2024 | 03/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/14/2023 | 12/15/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/05/2023 | 12/11/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to highlight or show what numbers are changing. | |||
| BLD | COMPLETE | 05/04/2023 | 05/08/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/19/2023 | 04/25/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to show the height of the handrail height. FRC 2020 R311.7.8.1 Height. 2. Need to show the hand rail type. FRC 2020 R311.7.8.3 Grip-size. 3. Show guard height on second floor. FRC 2020 R312.1.2 Height 4. Show stair tread loads and concentrated loads. FRC 2020 R301.5 Live load & TABLE R301.5 5. Show guard loads and guard infill loads. FRC 2020 R301.5 Live load & TABLE R301.5 | |||
| BLD | COMPLETE | 02/21/2023 | 02/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/03/2023 | 02/07/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Various changes are noted on the revision form. Only truss layout plays where submitted for review. Revise the Plans to match all structural changes. | |||
| ENGIN1 | COMPLETE | 02/03/2023 | 02/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/03/2023 | 02/03/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/31/2023 | 02/01/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Various changes are noted on the revision form. Only truss layout plays where submitted for review. Revise the Plans to match all structural changes. | |||
| BLD | COMPLETE | 01/24/2023 | 01/26/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/11/2022 | 10/13/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/04/2022 | 10/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/04/2022 | 10/04/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/04/2022 | 10/05/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/04/2022 | 10/10/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Stair Detail on sheet 1 calls out guards to comply with spec. Provide how the guards comply with R312.1. 2. Provide under stair protection per R302.6 3. Product Approval Specification Sheet; a. Roofing materials on the Roofing Worksheet doesn’t match the Product Approval Sheet. Revise to reflect the materials to be used. b. Provide Product Approval for the proposed garage door. No product approval number submitted. c. Properly identify Florida Product Approval Number (i.e. 7473.#); there are various types of approvals under these numbers provided. | |||
| SW1 | COMPLETE | 10/04/2022 | 10/10/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/04/2022 | 10/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 09/22/2022 | 10/03/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 09/20/2022 | 09/27/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Stair Detail on sheet 1 calls out guards to comply with spec. Provide how the guards comply with R312.1. 2. Provide under stair protection per R302.6 3. Product Approval Specification Sheet; a. Roofing materials on the Roofing Worksheet doesn’t match the Product Approval Sheet. Revise to reflect the materials to be used. b. Provide Product Approval for the proposed garage door. No product approval number submitted. c. Properly identify Florida Product Approval Number (i.e. 7473.#); there are various types of approvals under these numbers provided. | |||
| CUSVC | COMPLETE | 09/20/2022 | 09/21/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 09/20/2022 | 09/20/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed2,3 2. Need to reference the 2017 NEC not the 2020 | |||
| ENGIN1 | COMPLETE | 09/20/2022 | 09/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/20/2022 | 09/26/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/20/2022 | 09/21/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calc, heatload and ductlayout | |||
| SW1 | HOLD | 09/20/2022 | 10/03/2022 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Site plan includes a Culvert Pipe. This is a Curb and Gutter Sub-division. | |||
| ZON | HOLD | 09/20/2022 | 09/22/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Please include all platted eassements on this property. please add that this is a 2 story home on site plan Elevation plans: Please make sure the banding around the corners continues for 2 ft and label that on the elevation plan. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/07/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/07/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/07/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/07/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/07/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/07/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/27/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/27/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 10/27/2022 |
| SEWER INSPECTION | ¤25.00 | 10/27/2022 |
| SEWER CAPITAL FACILITY | ¤2,607.06 | 10/27/2022 |
| WATER CAPITAL FACILITY FEE | ¤2,436.75 | 10/27/2022 |
| SITE PLAN 30 | ¤30.00 | 10/27/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 10/27/2022 |
| IMPACT FEE FIRE | ¤388.65 | 10/27/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 10/27/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/27/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 10/27/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 10/27/2022 |
| SURCHARGE FS 533.721 | ¤6.05 | 10/27/2022 |
| SURCHARGE - FS 468.631 | ¤9.07 | 10/27/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/27/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/27/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/27/2022 |
| CONNECTION FEES | ¤25.00 | 10/27/2022 |
| WATER-METER | ¤467.09 | 10/27/2022 |
| ADJUSTMENT 50% | (¤991.05) | 10/27/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/27/2022 |
| INSPECTION - RESIDENTIAL | ¤1,520.75 | 10/27/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤431.34 | 10/27/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,507.81 |