Permit #2022090961

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00410-0010
CONDITIONED SPACE: 1293 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
CONDITIONED SPACE: 1293 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
OPENED PORCH (WITH ROOF) : 150 sqft
Total Square Footage: 3926 sqft
Block: 00410
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-569-7882
Location Address: 8 EASTON PL
Type: DU - DUPLEX
Issue Date: 11/16/2022
NOC: RECORDED
Applicant name: VLADIMIR V PEREPECHKIN
Owner: SHMAKOV ANDREY & MARINA SHMAKOVA JTWROS

Address

17 ZEPHYR LILY PL

PALM COAST, FL 32164

Lot: 0010
Contracted Stated Job Value: ¤350,000.00
Job Description: DUPLEX
Type: CN

Contractor

WISE CHOICE CUSTOM HOMES, INC.
Status Location Address State License Number Phone
ACTIVE

77 SOUTHLAKE DR

PALM COAST, FL 32137

CRC1328738 (Exp: 08/31/2026) 386-569-7882

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
MAXIM BUDNIK
Status Location Address State License Number
ACTIVE

3 WAVECREST PL

PALM COAST, FL 32164

CAC1818445 (Exp: 08/31/2026)
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/10/2024 FINAL APPROVED BTAYLOR
Note: 12/27/2023 - PREVIOUS INSPECTION NOTES 3/29/23: Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard). 4/19/23: As noted at All Rough Inspection: Need revision for different windows installed (FL20100) than what was originally submitted. (FL#17676.8). Along with different doors than what was originally submitted - SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6). 12-27-23 1. Energy cals do not match. 2. Right side unite no heat strip. 3. Anti tip for stove not installed. 4. Switch for garbage disposal not installed.
BLD - BUILDING FINAL 12/27/2023 Disapproved - NO FEE BTAYLOR
Note: 3/29/23: Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard). 4/19/23: As noted at All Rough Inspection: Need revision for different windows installed (FL20100) than what was originally submitted. (FL#17676.8). Along with different doors than what was originally submitted - SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6). 12-27-23 1. Energy cals do not match. 2. Right side unite no heat strip. 3. Anti tip for stove not installed. 4. Switch for garbage disposal not installed.
ROW - FINAL APRON (AFTER POUR) 12/22/2023 APPROVED TPOLACEK
Note: 12/22/23 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 12/14/23 UPON WALKING THE PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. FRONT SWALES WILL REQUIRE CORRECTIONS TO OBTAIN POSITIVE DRAINAGE FLOW BEFORE ROW FINAL PASSES. APPROVING AS NOTED AS A CURTIOUSY TO MOVE FORWARD. ADDITIONAL CORRECTIONS MAY BE REQUIRED.
ROW - FINAL INSPECTION 12/22/2023 APPROVED TPOLACEK
Note: 12/22/23 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 12/14/23 UPON WALKING THE PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. FRONT SWALES WILL REQUIRE CORRECTIONS TO OBTAIN POSITIVE DRAINAGE FLOW BEFORE ROW FINAL PASSES. APPROVING AS NOTED AS A CURTIOUSY TO MOVE FORWARD. ADDITIONAL CORRECTIONS MAY BE REQUIRED.
U -UTILITY RESIDENTIAL FINAL 12/21/2023 FINAL APPROVED JHARDING
U-CROSS CONNECTION 12/21/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/14/2023 APPROVED TPOLACEK
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 12/14/2023 APPROVED - AS NOTED TPOLACEK
Note: 12/14/23 UPON WALKING THE PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. FRONT SWALES WILL REQUIRE CORRECTIONS TO OBTAIN POSITIVE DRAINAGE FLOW BEFORE ROW FINAL PASSES. APPROVING AS NOTED AS A CURTIOUSY TO MOVE FORWARD. ADDITIONAL CORRECTIONS MAY BE REQUIRED.
ROW- PRE-APRON (PRE-POUR) 11/21/2023 APPROVED GBERTOLA
Note: 11/21/23=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/20/2023 - PREVIOUS INSPECTION NOTES 11/20/23 YOU WILL NEED TO LINE UP YOUR FORMBOARDS ABOVE THE ROW TO YOUR DRIVEWAY APRON FORMS THEY ARE OFFSET, WHICH WOULD CAUSE SOMEONE TO POTENTIALLY DRIVE OVER THE CULVERT PIPE EXITING THE DRIVEWAY WHILE BACKING OU. PIPE IS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY, PLEASE MAKE CORRECTIONS. SEE PHOTO FOR REFERENCE. 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23=NEED TO REPAIR THE WASH OUT AROUND THE CULVERT PIPE AND REMOVE THE WATER FROM THE APRON AND MITER ENDS
ROW- PRE-APRON (PRE-POUR) 11/20/2023 Disapproved - NO FEE FSLADISH
Note: 11/20/23 YOU WILL NEED TO LINE UP YOUR FORMBOARDS ABOVE THE ROW TO YOUR DRIVEWAY APRON FORMS THEY ARE OFFSET, WHICH WOULD CAUSE SOMEONE TO POTENTIALLY DRIVE OVER THE CULVERT PIPE EXITING THE DRIVEWAY WHILE BACKING OU. PIPE IS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY, PLEASE MAKE CORRECTIONS. SEE PHOTO FOR REFERENCE. 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23=NEED TO REPAIR THE WASH OUT AROUND THE CULVERT PIPE AND REMOVE THE WATER FROM THE APRON AND MITER ENDS
ROW- PRE-APRON (PRE-POUR) 11/16/2023 Disapproved - NO FEE GBERTOLA
Note: 11/16/23=NEED TO REPAIR THE WASH OUT AROUND THE CULVERT PIPE AND REMOVE THE WATER FROM THE APRON AND MITER ENDS
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/21/2023 CANCELLED BY APPLICANT BBEMBRY
ROW- PROJECT STATUS 09/11/2023 APPROVED PFLANAGAN
Note: MEET FOR CULVERT PLACEMENT
ELECTRIC - EARLY POWER 08/08/2023 APPROVED RSIMS
Note: 8/8/23: FPL emailed to release power. 8/4/2023 - PREVIOUS INSPECTION NOTES Ground rods inspected at all rough TS- 05/01/2023 8/4/23: Unit A: (Right Side) - Microwave feed is not safed off. (Contractor working in units?) Unit B: Dead front for Meter Panel has the wrong screws installed. Panel is not secured at all. * Back porch has 2 recessed cans that do not have covers or the light lens.
ELECTRIC - EARLY POWER 08/04/2023 Disapproved - NO FEE RSIMS
Note: Ground rods inspected at all rough TS- 05/01/2023 8/4/23: Unit A: (Right Side) - Microwave feed is not safed off. (Contractor working in units?) Unit B: Dead front for Meter Panel has the wrong screws installed. Panel is not secured at all. * Back porch has 2 recessed cans that do not have covers or the light lens.
GRAVITY SEWER TEST 07/10/2023 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 WHERE 3'' PIPE EXITS THE FOOTER ON BOTH ''A'' AND ''B'' SIDE NEED A SLEEVE 2X THE DIAMETER OF DRAIN OR RELIEVING ARCH WILL CHECK AT MONO SLAB INSPECTION
U - SEWER TIE IN 07/10/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 06/22/2023 APPROVED CSTONE
INSULATION 06/08/2023 APPROVED RMARTIN
Note: 6/7/2023 - PREVIOUS INSPECTION NOTES 6/7/23: Both Units (Call Inspector with any questions). *** Garage above electrical panels will (still) require blocking & firestop where build out box for breaker panel is open to the attic space. *** Previuosly listed item #3 remains unresolved. (Now marked on studs with FS where firestop is needed). 6/5/2023 - PREVIOUS INSPECTION NOTES 6/5/23: INSPECTION STOPPED! --- Firestop/Fire blocking missing (or incomplete) in multiple areas in both units. Examples: (Some areas marked with FS on studs below - check all) 1). Garage - above breaker panel / Dryer exhaust at top plate area / Top plate penetrations for wires. 2). Bathroom: at top plate between pack outs walls, etc. 3). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)).
INSULATION 06/07/2023 Disapproved -FEE REQUIRED RSIMS
Note: 6/7/23: Both Units (Call Inspector with any questions). *** Garage above electrical panels will (still) require blocking & firestop where build out box for breaker panel is open to the attic space. *** Previuosly listed item #3 remains unresolved. (Now marked on studs with FS where firestop is needed). 6/5/2023 - PREVIOUS INSPECTION NOTES 6/5/23: INSPECTION STOPPED! --- Firestop/Fire blocking missing (or incomplete) in multiple areas in both units. Examples: (Some areas marked with FS on studs below - check all) 1). Garage - above breaker panel / Dryer exhaust at top plate area / Top plate penetrations for wires. 2). Bathroom: at top plate between pack outs walls, etc. 3). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)).
INSULATION 06/05/2023 Disapproved -FEE REQUIRED RSIMS
Note: 6/5/23: INSPECTION STOPPED! --- Firestop/Fire blocking missing (or incomplete) in multiple areas in both units. Examples: (Some areas marked with FS on studs below - check all) 1). Garage - above breaker panel / Dryer exhaust at top plate area / Top plate penetrations for wires. 2). Bathroom: at top plate between pack outs walls, etc. 3). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)).
FIREWALL FINAL 06/01/2023 APPROVED RSIMS
Note: 5/30/2023 - PREVIOUS INSPECTION NOTES 5/30/23: Unit B: (Left side) has many areas that are not sealed properly at the base of the trusses, screws not sealed, back lanai area where 2" x 4" scab runs along the firewall, tape seams peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter firewall. Unit A: multiple areas not sealed properly at base of trusses, tape peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter the firewall.
LATH/BRICK/ WATER BARRIER 06/01/2023 APPROVED RSIMS
Note: 5/30/23: Holes in CMU walls on sides & back porch area along with oversized holes for wire penetrations require wire lath installed.
LATH/BRICK/ WATER BARRIER 05/30/2023 Disapproved -FEE REQUIRED RSIMS
Note: 5/30/23: Holes in CMU walls on sides & back porch area along with oversized holes for wire penetrations require wire lath installed.
FIREWALL FINAL 05/30/2023 Disapproved -FEE REQUIRED RSIMS
Note: 5/30/23: Unit B: (Left side) has many areas that are not sealed properly at the base of the trusses, screws not sealed, back lanai area where 2" x 4" scab runs along the firewall, tape seams peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter firewall. Unit A: multiple areas not sealed properly at base of trusses, tape peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter the firewall.
FIREWALL DRYWALL NAILING 05/25/2023 APPROVED RSIMS
Note: 5/23/2023 - PREVIOUS INSPECTION NOTES 5/23/23: Revision submitted to & approved by the City clearly states 6"OC spread for screws throughout. Both Units Firewall screw pattern does not match the required specifications. Also, the firewall separation at the soffit area on the back of the house has a broken piece of drywall that will need to be replaced (cannot be repaired). 5/5/2023 - PREVIOUS INSPECTION NOTES 5/5/23: The deficiences exist in bot units. 1). Plans call for galvanized nails at maximum 8" OC spacing. FBC allows screws at 6" OC max per Table 702.3.5 If using FBC spacing you will need to have a revision submitted to & approved by the City for the change in specifications. 2). Missing 5/8" fire rated drywall on top of ledger board as required. 3). fire rated drywall is not installed correctly at the front & back soffit areas. 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection .
FIREWALL DRYWALL NAILING 05/23/2023 Disapproved -FEE REQUIRED RSIMS
Note: 5/23/23: Revision submitted to & approved by the City clearly states 6"OC spread for screws throughout. Both Units Firewall screw pattern does not match the required specifications. Also, the firewall separation at the soffit area on the back of the house has a broken piece of drywall that will need to be replaced (cannot be repaired). 5/5/2023 - PREVIOUS INSPECTION NOTES 5/5/23: The deficiences exist in bot units. 1). Plans call for galvanized nails at maximum 8" OC spacing. FBC allows screws at 6" OC max per Table 702.3.5 If using FBC spacing you will need to have a revision submitted to & approved by the City for the change in specifications. 2). Missing 5/8" fire rated drywall on top of ledger board as required. 3). fire rated drywall is not installed correctly at the front & back soffit areas. 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection .
FIREWALL DRYWALL NAILING 05/05/2023 Disapproved -FEE REQUIRED RSIMS
Note: 5/5/23: The deficiences exist in bot units. 1). Plans call for galvanized nails at maximum 8" OC spacing. FBC allows screws at 6" OC max per Table 702.3.5 If using FBC spacing you will need to have a revision submitted to & approved by the City for the change in specifications. 2). Missing 5/8" fire rated drywall on top of ledger board as required. 3). fire rated drywall is not installed correctly at the front & back soffit areas. 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection .
ALL ROUGH 05/02/2023 APPROVED RSIMS
Note: 5/1/2023 - PREVIOUS INSPECTION NOTES 4/26/2023 - PREVIOUS INSPECTION NOTES 4/26/23: Previously listed items 2, 4, 5 and 7 remian unresolved. NOTE: Lineset sleeve will not be visible at Building Final Inspection so items 2 & 5 cannot be pushed past All Rough. 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23.
ALL ROUGH 05/01/2023 CANCELLED BY APPLICANT TSTAUFFACHER
Note: 4/26/2023 - PREVIOUS INSPECTION NOTES 4/26/23: Previously listed items 2, 4, 5 and 7 remian unresolved. NOTE: Lineset sleeve will not be visible at Building Final Inspection so items 2 & 5 cannot be pushed past All Rough. 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23.
ALL ROUGH 04/26/2023 Disapproved -FEE REQUIRED RSIMS
Note: 4/26/23: Previously listed items 2, 4, 5 and 7 remian unresolved. NOTE: Lineset sleeve will not be visible at Building Final Inspection so items 2 & 5 cannot be pushed past All Rough. 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23.
ALL ROUGH 04/19/2023 Disapproved -FEE REQUIRED RSIMS
Note: 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23.
ROOF VALLEY & METAL 04/11/2023 APPROVED RSIMS
Note: 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: **** Back of house - The top 5 rows of underlayment are still missing field nails as required. (6" along edges & 12" in the field). 905.1.1.1(5) 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: Incomplete plans in permit box for inspection. Missing MiTek, etc. 1). Underlayment nailing pattern does not match Manufacturer's or Florida Building code requirements. Missing field nails in many places. Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard).
WALL SHEATHING 04/05/2023 APPROVED RSIMS
ROOF VALLEY & METAL 04/05/2023 Disapproved -FEE REQUIRED RSIMS
Note: 4/5/23: **** Back of house - The top 5 rows of underlayment are still missing field nails as required. (6" along edges & 12" in the field). 905.1.1.1(5) 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: Incomplete plans in permit box for inspection. Missing MiTek, etc. 1). Underlayment nailing pattern does not match Manufacturer's or Florida Building code requirements. Missing field nails in many places. Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard).
FIREWALL DRYWALL NAILING 04/05/2023 PARTIALLY APPROVED RSIMS
Note: 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection .
ROOF VALLEY & METAL 03/29/2023 Disapproved - NO FEE RSIMS
Note: 3/29/23: Incomplete plans in permit box for inspection. Missing MiTek, etc. 1). Underlayment nailing pattern does not match Manufacturer's or Florida Building code requirements. Missing field nails in many places. Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard).
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/24/2023 APPROVED BTAYLOR
Note: 3/20/2023 - PREVIOUS INSPECTION NOTES 3/20/23: Need dumpster on site and trash piles cleaned up before continuing work! Side B (Left side as marked on Plan): 1). Loose plywood in garage between C3 & C5 trusses - 2nd sheet up from subfascia. 2). Truss A01 not repaired per MiTek requirements. 3). Truss A04 is missing web bracing. Circled on MiTek. Side A (Right side): 4). Loose sheathing on lanai between 4th & 6th E7P trusses. 1st sheet up fron subfascia. Both Units: 5). Installed & stamped A11 truss does not match MiTek profile so bracing could not be verified. (Revision submitted to & approved by the City or truss change needed)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/20/2023 Disapproved -FEE REQUIRED RSIMS
Note: 3/20/23: Need dumpster on site and trash piles cleaned up before continuing work! Side B (Left side as marked on Plan): 1). Loose plywood in garage between C3 & C5 trusses - 2nd sheet up from subfascia. 2). Truss A01 not repaired per MiTek requirements. 3). Truss A04 is missing web bracing. Circled on MiTek. Side A (Right side): 4). Loose sheathing on lanai between 4th & 6th E7P trusses. 1st sheet up fron subfascia. Both Units: 5). Installed & stamped A11 truss does not match MiTek profile so bracing could not be verified. (Revision submitted to & approved by the City or truss change needed)
TIE BEAM / LINTEL 02/28/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 02/15/2023 APPROVED TBAKER
MONOLITHIC SLAB 01/30/2023 APPROVED RSIMS
Note: 1/27/2023 - PREVIOUS INSPECTION NOTES 1/127/23: Protective covering for PEX tubing is insufficient. Must be fully covered until outside of contact with concrete.
MONOLITHIC SLAB 01/27/2023 Disapproved - NO FEE RSIMS
Note: 1/127/23: Protective covering for PEX tubing is insufficient. Must be fully covered until outside of contact with concrete.
PLUMBING 1ST ROUGH UNDERGROUND 01/25/2023 APPROVED - AS NOTED MGIBSON
Note: WHERE 3'' PIPE EXITS THE FOOTER ON BOTH ''A'' AND ''B'' SIDE NEED A SLEEVE 2X THE DIAMETER OF DRAIN OR RELIEVING ARCH WILL CHECK AT MONO SLAB INSPECTION
WATER METER INSTALLATION REQUEST 12/16/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/04/2024 01/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 09/20/2023 09/20/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC CANCEL 09/20/2023 09/25/2023
SW1 COMPLETE 09/20/2023 09/21/2023
Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/18/2023 09/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/18/2023 09/21/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 09/18/2023 09/18/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provide the new width of the driveway as the driveway now goes all the way to the walk ways
BLD COMPLETE 05/09/2023 05/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/20/2023 04/25/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/29/2023 04/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/14/2023 02/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/14/2023 02/14/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 11/08/2022 11/08/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Going forward please make sure that your landscape plans match your site plan,. your excluding the patio areas on the landscape plans and all plans must match.
ZON HOLD 11/07/2022 11/07/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide a new landscape plan to match your changes to the site plan. Also please tak a look at the floor plan shows 20 on each side please amke sure they match your changes
ELEC COMPLETE 11/07/2022 11/07/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 11/07/2022 11/09/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 COMPLETE 11/07/2022 11/15/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/07/2022 11/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 11/07/2022 11/07/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plans still do not match the site plan
ELEC COMPLETE 11/01/2022 11/02/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 11/01/2022 11/01/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: not addressed 1.Garage depth cannot exceed 30ft max. 2.Driveway minimum is 16 ft width as per Land Dev Code:as noted below Garages must have a driveway extending for a minimum of 20 feet in front of each garage door. The driveway shall be at least the width of the garage door(s), with a minimum width of ten feet, to allow for safe access. For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet, and driveways for three-car or larger garages shall have a minimum width of 24 feet.
BLD COMPLETE 11/01/2022 11/03/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Properly identify ALL Florida Product Approval Number (i.e. 22363.# ); there are various types of approved doors under these numbers provided. b. Provide Product Approval numbers for Wood Anchors and Wood Connectors. Per F.S. 471.025 and F.A.C. 61 G15-23.005.
ENGIN1 COMPLETE 11/01/2022 11/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/01/2022 11/04/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BADMIN INFORMATION 10/31/2022 10/31/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CORRECTIONS MUST BE SUBMITTED IN OFFICE. PERMIT HAS NOT BEEN APPROVED.
BLD HOLD 09/21/2022 09/27/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Properly identify ALL Florida Product Approval Number (i.e. 22363.# & 15332.#); there are various types of approved doors under these numbers provided. b. Provide Product Approval numbers for Wood Anchors and Lintels. Per F.S. 471.025 and F.A.C. 61 G15-23.005.
CUSVC COMPLETE 09/21/2022 09/22/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 09/21/2022 09/22/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need outlet on the back of the houses. NEC 2017 210.52 (e) 2. Need correct outlet spacing on the back wall of the house. NEC 2017 210.52
ENGIN1 COMPLETE 09/21/2022 09/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/21/2022 09/26/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/21/2022 09/22/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/21/2022 10/03/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 09/21/2022 09/23/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Garage depth: Garage depth cannot exceed 30ft max. Driveway minimum is 16 ft width as per Land Dev Code: 2.Garages must have a driveway extending for a minimum of 20 feet in front of each garage door. The driveway shall be at least the width of the garage door(s), with a minimum width of ten feet, to allow for safe access. For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet, and driveways for three-car or larger garages shall have a minimum width of 24 feet. Duplexes with Living area square feet 1300 and over require a two car garage.
SWALE COMPLETE 09/21/2022 01/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
REINSPECTION RESIDENTIAL ¤40.00 01/11/2024
SW ENG REINSPECTION 20 ¤20.00 01/11/2024
SW ENG - REVIEW 20 ¤20.00 11/16/2022
SW ENG RES REVIEW 200 ¤200.00 11/16/2022
TRANS IMPACT FEE ADMIN ¤52.92 11/16/2022
TRANS IMPACT FEE ADMIN (¤52.92) 11/16/2022
3% TRANS IMPACT FEE CREDIT (¤82.14) 11/16/2022
SEWER CREDIT (¤4,782.75) 11/16/2022
SEWER INSPECTION ¤25.00 11/16/2022
SEWER CAPITAL FACILITY ¤9,879.52 11/16/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 11/16/2022
SITE PLAN 30 ¤30.00 11/16/2022
WATER- TURN ON ¤50.00 11/16/2022
ADJUSTMENT 50% (¤655.70) 11/16/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/16/2022
INSPECTION - RESIDENTIAL ¤998.25 11/16/2022
PLAN REVIEW - RESIDENTIAL ¤283.14 11/16/2022
CONNECTION FEES ¤2,155.76 11/16/2022
FIRE IMPACT FEE ADMIN ¤12.62 11/16/2022
FIRE IMPACT FEE ADMIN (¤12.62) 11/16/2022
3% FIRE IMPACT FEE CREDIT (¤23.32) 11/16/2022
IMPACT FEE FIRE ¤777.30 11/16/2022
IMPACT FEE PARKS ¤2,910.26 11/16/2022
IMPACT FEE SCHOOL ¤10,900.00 11/16/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 11/16/2022
WATER -IRRIGATION INSPECTION ¤50.00 11/16/2022
PARKS IMPACT FEE ADMIN ¤53.07 11/16/2022
PARKS IMPACT FEE ADMIN (¤53.07) 11/16/2022
3% PARKS IMPACT FEE CREDIT (¤87.31) 11/16/2022
SURCHARGE FS 533.721 ¤4.13 11/16/2022
SURCHARGE - FS 468.631 ¤6.19 11/16/2022
SW ENG - FOUNDATION SURVEY ¤20.00 11/16/2022
SW ENG INSPECTION 80 ¤80.00 11/16/2022
SW ENG PRE APRON ¤30.00 11/16/2022
Fees Total Due: ¤0.00 Total Paid: ¤33,221.83