Permit #2022090961
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00410-0010 |
| CONDITIONED SPACE: 1293 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| CONDITIONED SPACE: 1293 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 150 sqft |
| OPENED PORCH (WITH ROOF) : 150 sqft |
| Total Square Footage: 3926 sqft |
| Block: 00410 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-569-7882 |
| Location Address: 8 EASTON PL |
| Type: DU - DUPLEX |
| Issue Date: 11/16/2022 |
| NOC: RECORDED |
| Applicant name: VLADIMIR V PEREPECHKIN |
| Owner: SHMAKOV ANDREY & MARINA SHMAKOVA JTWROS |
|
Address 17 ZEPHYR LILY PL PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
WISE CHOICE CUSTOM HOMES, INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
77 SOUTHLAKE DR PALM COAST, FL 32137 |
CRC1328738 (Exp: 08/31/2026) | 386-569-7882 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/10/2024 | FINAL APPROVED | BTAYLOR |
| Note: 12/27/2023 - PREVIOUS INSPECTION NOTES 3/29/23: Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard). 4/19/23: As noted at All Rough Inspection: Need revision for different windows installed (FL20100) than what was originally submitted. (FL#17676.8). Along with different doors than what was originally submitted - SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6). 12-27-23 1. Energy cals do not match. 2. Right side unite no heat strip. 3. Anti tip for stove not installed. 4. Switch for garbage disposal not installed. | |||
| BLD - BUILDING FINAL | 12/27/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3/29/23: Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard). 4/19/23: As noted at All Rough Inspection: Need revision for different windows installed (FL20100) than what was originally submitted. (FL#17676.8). Along with different doors than what was originally submitted - SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6). 12-27-23 1. Energy cals do not match. 2. Right side unite no heat strip. 3. Anti tip for stove not installed. 4. Switch for garbage disposal not installed. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/22/2023 | APPROVED | TPOLACEK |
| Note: 12/22/23 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 12/14/23 UPON WALKING THE PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. FRONT SWALES WILL REQUIRE CORRECTIONS TO OBTAIN POSITIVE DRAINAGE FLOW BEFORE ROW FINAL PASSES. APPROVING AS NOTED AS A CURTIOUSY TO MOVE FORWARD. ADDITIONAL CORRECTIONS MAY BE REQUIRED. | |||
| ROW - FINAL INSPECTION | 12/22/2023 | APPROVED | TPOLACEK |
| Note: 12/22/23 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 12/14/23 UPON WALKING THE PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. FRONT SWALES WILL REQUIRE CORRECTIONS TO OBTAIN POSITIVE DRAINAGE FLOW BEFORE ROW FINAL PASSES. APPROVING AS NOTED AS A CURTIOUSY TO MOVE FORWARD. ADDITIONAL CORRECTIONS MAY BE REQUIRED. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/21/2023 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 12/21/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/14/2023 | APPROVED | TPOLACEK |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/14/2023 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12/14/23 UPON WALKING THE PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. FRONT SWALES WILL REQUIRE CORRECTIONS TO OBTAIN POSITIVE DRAINAGE FLOW BEFORE ROW FINAL PASSES. APPROVING AS NOTED AS A CURTIOUSY TO MOVE FORWARD. ADDITIONAL CORRECTIONS MAY BE REQUIRED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/21/2023 | APPROVED | GBERTOLA |
| Note: 11/21/23=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/20/2023 - PREVIOUS INSPECTION NOTES 11/20/23 YOU WILL NEED TO LINE UP YOUR FORMBOARDS ABOVE THE ROW TO YOUR DRIVEWAY APRON FORMS THEY ARE OFFSET, WHICH WOULD CAUSE SOMEONE TO POTENTIALLY DRIVE OVER THE CULVERT PIPE EXITING THE DRIVEWAY WHILE BACKING OU. PIPE IS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY, PLEASE MAKE CORRECTIONS. SEE PHOTO FOR REFERENCE. 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23=NEED TO REPAIR THE WASH OUT AROUND THE CULVERT PIPE AND REMOVE THE WATER FROM THE APRON AND MITER ENDS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/20/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 11/20/23 YOU WILL NEED TO LINE UP YOUR FORMBOARDS ABOVE THE ROW TO YOUR DRIVEWAY APRON FORMS THEY ARE OFFSET, WHICH WOULD CAUSE SOMEONE TO POTENTIALLY DRIVE OVER THE CULVERT PIPE EXITING THE DRIVEWAY WHILE BACKING OU. PIPE IS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY, PLEASE MAKE CORRECTIONS. SEE PHOTO FOR REFERENCE. 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23=NEED TO REPAIR THE WASH OUT AROUND THE CULVERT PIPE AND REMOVE THE WATER FROM THE APRON AND MITER ENDS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/16/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 11/16/23=NEED TO REPAIR THE WASH OUT AROUND THE CULVERT PIPE AND REMOVE THE WATER FROM THE APRON AND MITER ENDS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/21/2023 | CANCELLED BY APPLICANT | BBEMBRY |
| ROW- PROJECT STATUS | 09/11/2023 | APPROVED | PFLANAGAN |
| Note: MEET FOR CULVERT PLACEMENT | |||
| ELECTRIC - EARLY POWER | 08/08/2023 | APPROVED | RSIMS |
| Note: 8/8/23: FPL emailed to release power. 8/4/2023 - PREVIOUS INSPECTION NOTES Ground rods inspected at all rough TS- 05/01/2023 8/4/23: Unit A: (Right Side) - Microwave feed is not safed off. (Contractor working in units?) Unit B: Dead front for Meter Panel has the wrong screws installed. Panel is not secured at all. * Back porch has 2 recessed cans that do not have covers or the light lens. | |||
| ELECTRIC - EARLY POWER | 08/04/2023 | Disapproved - NO FEE | RSIMS |
| Note: Ground rods inspected at all rough TS- 05/01/2023 8/4/23: Unit A: (Right Side) - Microwave feed is not safed off. (Contractor working in units?) Unit B: Dead front for Meter Panel has the wrong screws installed. Panel is not secured at all. * Back porch has 2 recessed cans that do not have covers or the light lens. | |||
| GRAVITY SEWER TEST | 07/10/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WHERE 3'' PIPE EXITS THE FOOTER ON BOTH ''A'' AND ''B'' SIDE NEED A SLEEVE 2X THE DIAMETER OF DRAIN OR RELIEVING ARCH WILL CHECK AT MONO SLAB INSPECTION | |||
| U - SEWER TIE IN | 07/10/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/22/2023 | APPROVED | CSTONE |
| INSULATION | 06/08/2023 | APPROVED | RMARTIN |
| Note: 6/7/2023 - PREVIOUS INSPECTION NOTES 6/7/23: Both Units (Call Inspector with any questions). *** Garage above electrical panels will (still) require blocking & firestop where build out box for breaker panel is open to the attic space. *** Previuosly listed item #3 remains unresolved. (Now marked on studs with FS where firestop is needed). 6/5/2023 - PREVIOUS INSPECTION NOTES 6/5/23: INSPECTION STOPPED! --- Firestop/Fire blocking missing (or incomplete) in multiple areas in both units. Examples: (Some areas marked with FS on studs below - check all) 1). Garage - above breaker panel / Dryer exhaust at top plate area / Top plate penetrations for wires. 2). Bathroom: at top plate between pack outs walls, etc. 3). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). | |||
| INSULATION | 06/07/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/7/23: Both Units (Call Inspector with any questions). *** Garage above electrical panels will (still) require blocking & firestop where build out box for breaker panel is open to the attic space. *** Previuosly listed item #3 remains unresolved. (Now marked on studs with FS where firestop is needed). 6/5/2023 - PREVIOUS INSPECTION NOTES 6/5/23: INSPECTION STOPPED! --- Firestop/Fire blocking missing (or incomplete) in multiple areas in both units. Examples: (Some areas marked with FS on studs below - check all) 1). Garage - above breaker panel / Dryer exhaust at top plate area / Top plate penetrations for wires. 2). Bathroom: at top plate between pack outs walls, etc. 3). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). | |||
| INSULATION | 06/05/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/5/23: INSPECTION STOPPED! --- Firestop/Fire blocking missing (or incomplete) in multiple areas in both units. Examples: (Some areas marked with FS on studs below - check all) 1). Garage - above breaker panel / Dryer exhaust at top plate area / Top plate penetrations for wires. 2). Bathroom: at top plate between pack outs walls, etc. 3). Missing Firestop at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). | |||
| FIREWALL FINAL | 06/01/2023 | APPROVED | RSIMS |
| Note: 5/30/2023 - PREVIOUS INSPECTION NOTES 5/30/23: Unit B: (Left side) has many areas that are not sealed properly at the base of the trusses, screws not sealed, back lanai area where 2" x 4" scab runs along the firewall, tape seams peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter firewall. Unit A: multiple areas not sealed properly at base of trusses, tape peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter the firewall. | |||
| LATH/BRICK/ WATER BARRIER | 06/01/2023 | APPROVED | RSIMS |
| Note: 5/30/23: Holes in CMU walls on sides & back porch area along with oversized holes for wire penetrations require wire lath installed. | |||
| LATH/BRICK/ WATER BARRIER | 05/30/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/30/23: Holes in CMU walls on sides & back porch area along with oversized holes for wire penetrations require wire lath installed. | |||
| FIREWALL FINAL | 05/30/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/30/23: Unit B: (Left side) has many areas that are not sealed properly at the base of the trusses, screws not sealed, back lanai area where 2" x 4" scab runs along the firewall, tape seams peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter firewall. Unit A: multiple areas not sealed properly at base of trusses, tape peeling up, etc. Wires for range & Microwave/exhaust not sealed at all where they enter the firewall. | |||
| FIREWALL DRYWALL NAILING | 05/25/2023 | APPROVED | RSIMS |
| Note: 5/23/2023 - PREVIOUS INSPECTION NOTES 5/23/23: Revision submitted to & approved by the City clearly states 6"OC spread for screws throughout. Both Units Firewall screw pattern does not match the required specifications. Also, the firewall separation at the soffit area on the back of the house has a broken piece of drywall that will need to be replaced (cannot be repaired). 5/5/2023 - PREVIOUS INSPECTION NOTES 5/5/23: The deficiences exist in bot units. 1). Plans call for galvanized nails at maximum 8" OC spacing. FBC allows screws at 6" OC max per Table 702.3.5 If using FBC spacing you will need to have a revision submitted to & approved by the City for the change in specifications. 2). Missing 5/8" fire rated drywall on top of ledger board as required. 3). fire rated drywall is not installed correctly at the front & back soffit areas. 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . | |||
| FIREWALL DRYWALL NAILING | 05/23/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/23/23: Revision submitted to & approved by the City clearly states 6"OC spread for screws throughout. Both Units Firewall screw pattern does not match the required specifications. Also, the firewall separation at the soffit area on the back of the house has a broken piece of drywall that will need to be replaced (cannot be repaired). 5/5/2023 - PREVIOUS INSPECTION NOTES 5/5/23: The deficiences exist in bot units. 1). Plans call for galvanized nails at maximum 8" OC spacing. FBC allows screws at 6" OC max per Table 702.3.5 If using FBC spacing you will need to have a revision submitted to & approved by the City for the change in specifications. 2). Missing 5/8" fire rated drywall on top of ledger board as required. 3). fire rated drywall is not installed correctly at the front & back soffit areas. 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . | |||
| FIREWALL DRYWALL NAILING | 05/05/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/5/23: The deficiences exist in bot units. 1). Plans call for galvanized nails at maximum 8" OC spacing. FBC allows screws at 6" OC max per Table 702.3.5 If using FBC spacing you will need to have a revision submitted to & approved by the City for the change in specifications. 2). Missing 5/8" fire rated drywall on top of ledger board as required. 3). fire rated drywall is not installed correctly at the front & back soffit areas. 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . | |||
| ALL ROUGH | 05/02/2023 | APPROVED | RSIMS |
| Note: 5/1/2023 - PREVIOUS INSPECTION NOTES 4/26/2023 - PREVIOUS INSPECTION NOTES 4/26/23: Previously listed items 2, 4, 5 and 7 remian unresolved. NOTE: Lineset sleeve will not be visible at Building Final Inspection so items 2 & 5 cannot be pushed past All Rough. 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23. | |||
| ALL ROUGH | 05/01/2023 | CANCELLED BY APPLICANT | TSTAUFFACHER |
| Note: 4/26/2023 - PREVIOUS INSPECTION NOTES 4/26/23: Previously listed items 2, 4, 5 and 7 remian unresolved. NOTE: Lineset sleeve will not be visible at Building Final Inspection so items 2 & 5 cannot be pushed past All Rough. 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23. | |||
| ALL ROUGH | 04/26/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/26/23: Previously listed items 2, 4, 5 and 7 remian unresolved. NOTE: Lineset sleeve will not be visible at Building Final Inspection so items 2 & 5 cannot be pushed past All Rough. 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23. | |||
| ALL ROUGH | 04/19/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/19/23: Need revision for different windows installed (FL20100) than what was originally submitted (FL#17676.8) and different SGD (FL11646) than submitted (FL# 15332.1) and Front door (20867.3) than submitted (FL# 22363-R6) Side B (Left): 1). Wires not phased out in breaker panel & service feeds not tied in. 2). Linset not installed through sleeve (& sleeve not sealed). 3). Bedroom 2 - window missing an anchor on left side. 4). Hall bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off truss & strapped as required. Side A: (Right) 5). Lineset is not installed through sleeve (& sleeve is not sealed) 6). Bedroom 2 - window is too tight and not operating properly. 7). Master bathroom exhaust fan duct is not supported at 4ft intervals. Needs to be lifted off trusses & strapped as required. 4/5/23: *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . - Approved on 4/19/23. | |||
| ROOF VALLEY & METAL | 04/11/2023 | APPROVED | RSIMS |
| Note: 4/5/2023 - PREVIOUS INSPECTION NOTES 4/5/23: **** Back of house - The top 5 rows of underlayment are still missing field nails as required. (6" along edges & 12" in the field). 905.1.1.1(5) 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: Incomplete plans in permit box for inspection. Missing MiTek, etc. 1). Underlayment nailing pattern does not match Manufacturer's or Florida Building code requirements. Missing field nails in many places. Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard). | |||
| WALL SHEATHING | 04/05/2023 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 04/05/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/5/23: **** Back of house - The top 5 rows of underlayment are still missing field nails as required. (6" along edges & 12" in the field). 905.1.1.1(5) 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23: Incomplete plans in permit box for inspection. Missing MiTek, etc. 1). Underlayment nailing pattern does not match Manufacturer's or Florida Building code requirements. Missing field nails in many places. Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard). | |||
| FIREWALL DRYWALL NAILING | 04/05/2023 | PARTIALLY APPROVED | RSIMS |
| Note: 4/5/23: Fire rated drywall is only installed above the CMU wall. ** Firewall detail calls for entire Partition wall to be covered from slab to Roof sheathing. *** Holes in Firerock made for Service Cable feed will need to be patched with Firerock and sealed before Firewall Final and/or ceiling is covered. Check at next inspection or by All Rough Inspection . | |||
| ROOF VALLEY & METAL | 03/29/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/29/23: Incomplete plans in permit box for inspection. Missing MiTek, etc. 1). Underlayment nailing pattern does not match Manufacturer's or Florida Building code requirements. Missing field nails in many places. Need revision submitted for two different underlayments (Epilay Plasfelt & Barricade) than what was originally submitted. (ABC Proguard). | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/24/2023 | APPROVED | BTAYLOR |
| Note: 3/20/2023 - PREVIOUS INSPECTION NOTES 3/20/23: Need dumpster on site and trash piles cleaned up before continuing work! Side B (Left side as marked on Plan): 1). Loose plywood in garage between C3 & C5 trusses - 2nd sheet up from subfascia. 2). Truss A01 not repaired per MiTek requirements. 3). Truss A04 is missing web bracing. Circled on MiTek. Side A (Right side): 4). Loose sheathing on lanai between 4th & 6th E7P trusses. 1st sheet up fron subfascia. Both Units: 5). Installed & stamped A11 truss does not match MiTek profile so bracing could not be verified. (Revision submitted to & approved by the City or truss change needed) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/20/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/20/23: Need dumpster on site and trash piles cleaned up before continuing work! Side B (Left side as marked on Plan): 1). Loose plywood in garage between C3 & C5 trusses - 2nd sheet up from subfascia. 2). Truss A01 not repaired per MiTek requirements. 3). Truss A04 is missing web bracing. Circled on MiTek. Side A (Right side): 4). Loose sheathing on lanai between 4th & 6th E7P trusses. 1st sheet up fron subfascia. Both Units: 5). Installed & stamped A11 truss does not match MiTek profile so bracing could not be verified. (Revision submitted to & approved by the City or truss change needed) | |||
| TIE BEAM / LINTEL | 02/28/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 02/15/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/30/2023 | APPROVED | RSIMS |
| Note: 1/27/2023 - PREVIOUS INSPECTION NOTES 1/127/23: Protective covering for PEX tubing is insufficient. Must be fully covered until outside of contact with concrete. | |||
| MONOLITHIC SLAB | 01/27/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/127/23: Protective covering for PEX tubing is insufficient. Must be fully covered until outside of contact with concrete. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/25/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: WHERE 3'' PIPE EXITS THE FOOTER ON BOTH ''A'' AND ''B'' SIDE NEED A SLEEVE 2X THE DIAMETER OF DRAIN OR RELIEVING ARCH WILL CHECK AT MONO SLAB INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 12/16/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/04/2024 | 01/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/20/2023 | 09/20/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | CANCEL | 09/20/2023 | 09/25/2023 |
| SW1 | COMPLETE | 09/20/2023 | 09/21/2023 |
| Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/18/2023 | 09/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/18/2023 | 09/21/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/18/2023 | 09/18/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provide the new width of the driveway as the driveway now goes all the way to the walk ways | |||
| BLD | COMPLETE | 05/09/2023 | 05/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/20/2023 | 04/25/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/29/2023 | 04/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/14/2023 | 02/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/14/2023 | 02/14/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/08/2022 | 11/08/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Going forward please make sure that your landscape plans match your site plan,. your excluding the patio areas on the landscape plans and all plans must match. | |||
| ZON | HOLD | 11/07/2022 | 11/07/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide a new landscape plan to match your changes to the site plan. Also please tak a look at the floor plan shows 20 on each side please amke sure they match your changes | |||
| ELEC | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/07/2022 | 11/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/07/2022 | 11/15/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/07/2022 | 11/07/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plans still do not match the site plan | |||
| ELEC | COMPLETE | 11/01/2022 | 11/02/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/01/2022 | 11/01/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: not addressed 1.Garage depth cannot exceed 30ft max. 2.Driveway minimum is 16 ft width as per Land Dev Code:as noted below Garages must have a driveway extending for a minimum of 20 feet in front of each garage door. The driveway shall be at least the width of the garage door(s), with a minimum width of ten feet, to allow for safe access. For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet, and driveways for three-car or larger garages shall have a minimum width of 24 feet. | |||
| BLD | COMPLETE | 11/01/2022 | 11/03/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Properly identify ALL Florida Product Approval Number (i.e. 22363.# ); there are various types of approved doors under these numbers provided. b. Provide Product Approval numbers for Wood Anchors and Wood Connectors. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| ENGIN1 | COMPLETE | 11/01/2022 | 11/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/01/2022 | 11/04/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/31/2022 | 10/31/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM CORRECTIONS MUST BE SUBMITTED IN OFFICE. PERMIT HAS NOT BEEN APPROVED. | |||
| BLD | HOLD | 09/21/2022 | 09/27/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Properly identify ALL Florida Product Approval Number (i.e. 22363.# & 15332.#); there are various types of approved doors under these numbers provided. b. Provide Product Approval numbers for Wood Anchors and Lintels. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 09/21/2022 | 09/22/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 09/21/2022 | 09/22/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need outlet on the back of the houses. NEC 2017 210.52 (e) 2. Need correct outlet spacing on the back wall of the house. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 09/21/2022 | 09/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/21/2022 | 09/26/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/21/2022 | 09/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/21/2022 | 10/03/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/21/2022 | 09/23/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Garage depth: Garage depth cannot exceed 30ft max. Driveway minimum is 16 ft width as per Land Dev Code: 2.Garages must have a driveway extending for a minimum of 20 feet in front of each garage door. The driveway shall be at least the width of the garage door(s), with a minimum width of ten feet, to allow for safe access. For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet, and driveways for three-car or larger garages shall have a minimum width of 24 feet. Duplexes with Living area square feet 1300 and over require a two car garage. | |||
| SWALE | COMPLETE | 09/21/2022 | 01/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/11/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/11/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/16/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/16/2022 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 11/16/2022 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 11/16/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 11/16/2022 |
| SEWER CREDIT | (¤4,782.75) | 11/16/2022 |
| SEWER INSPECTION | ¤25.00 | 11/16/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 11/16/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 11/16/2022 |
| SITE PLAN 30 | ¤30.00 | 11/16/2022 |
| WATER- TURN ON | ¤50.00 | 11/16/2022 |
| ADJUSTMENT 50% | (¤655.70) | 11/16/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/16/2022 |
| INSPECTION - RESIDENTIAL | ¤998.25 | 11/16/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤283.14 | 11/16/2022 |
| CONNECTION FEES | ¤2,155.76 | 11/16/2022 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 11/16/2022 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 11/16/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 11/16/2022 |
| IMPACT FEE FIRE | ¤777.30 | 11/16/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 11/16/2022 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 11/16/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 11/16/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 11/16/2022 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 11/16/2022 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 11/16/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 11/16/2022 |
| SURCHARGE FS 533.721 | ¤4.13 | 11/16/2022 |
| SURCHARGE - FS 468.631 | ¤6.19 | 11/16/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/16/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/16/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/16/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤33,221.83 |