Permit #2022091051

Permit Details

Status: COED

Parcel Id: 27-10-30-4260-00000-0900
CONDITIONED SPACE: 1905 sqft
GARAGE: 477 sqft
SCREEN PORCH (SOLID ROOF) : 211 sqft
Total Square Footage: 2593 sqft
Block: 00000
Subdivision: 2294 - MATANZAS LAKE SUBDIVISION
Job Phone: 386-931-1633
Location Address: 37 LAGOON WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/04/2022
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

185 CYPRESS POINT PKWY STE 7

PALM COAST, FL 32164

Lot: 0900
Contracted Stated Job Value: ¤371,000.00
Job Description: single family home
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/22/2023 FINAL APPROVED JSTEWART
ROW - STORMWATER FINAL 08/11/2023 FINAL APPROVED EMADISON
Note: ** 08/11/23 CONTRACTOR ON SITE TO SWEEP ROADWAYS AND CURB AND GUTTER THIS IS DONE ON A WEEKLY BASIS ALSO CATCH BASIN FILTERS ARE TO BE REPLACED CATCH BASIN BOXES ARE SCHEDULED TO BE CLEANED IN THE ENTIRE COMMUNITY ALONG WITH THEIR DRAINAGE PIPES. _______________________________________________________________________________________________________________________ 8/10/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT AND SEDIMENT ON CURB AND GUTTER AND AROUND THE CATCH BASIN 2) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF THE CATCH BASIN BOX
U -UTILITY RESIDENTIAL FINAL 08/10/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 08/10/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 08/10/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO CLEAN ALL DIRT AND SEDIMENT ON CURB AND GUTTER AND AROUND THE CATCH BASIN 2) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF THE CATCH BASIN BOX
U-CROSS CONNECTION 08/10/2023 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/09/2023 APPROVED EMADISON
Note: 7/14/2023 - PREVIOUS INSPECTION NOTES 7/14/23= ON THE LEFT SIDE BACK PORCH CORNER IS 25.65 AND 10 FT FROM THE 25.70 WATER WILL BE RUNNING INTO THE BACK PORCH Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. I NEED ELEVATION ON THE RIGHT SIDE CORNER PORCH .
ROW FIELD SURVEY /GRADING CERTIFICATION 08/09/2023 APPROVED EMADISON
ROW- PROJECT STATUS 07/25/2023 APPROVED GBERTOLA
Note: MEETING WITH THE BUILDER FOR A GRADE IN THE BACK YARD
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/14/2023 Disapproved - NO FEE GBERTOLA
Note: 7/14/23= ON THE LEFT SIDE BACK PORCH CORNER IS 25.65 AND 10 FT FROM THE 25.70 WATER WILL BE RUNNING INTO THE BACK PORCH Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. I NEED ELEVATION ON THE RIGHT SIDE CORNER PORCH .
ROW- PRE-APRON (PRE-POUR) 06/20/2023 APPROVED - AS NOTED EMADISON
Note: ** 06/20/23 READY TO SET PAVERS BUILDER TAKE NOTE OF RAIN MAKE SURE AREA IS DRY ________________________________________________________________________________________________________________________ 5/2/2023 - PREVIOUS INSPECTION NOTES ** 05/02/23 READY TO POUR ** AKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _____________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES
ELECTRIC - EARLY POWER 05/12/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: Approved - Called FPL at 05/12/2023- 11:58 AM
ROW- PAVER RESTRAINTS 05/02/2023 APPROVED EMADISON
Note: ** 05/02/23 READY TO POUR ** AKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 05/02/2023 PARTIALLY APPROVED EMADISON
Note: ** 05/02/23 READY TO POUR ** AKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _____________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 04/26/2023 CANCELLED BY APPLICANT EMADISON
INSULATION 03/10/2023 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 2/28/2023- Missing anchor screws at slider and fron window. will check at insulation.
LATH/BRICK/ WATER BARRIER 03/10/2023 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 2/28/2023- Missing anchor screws at slider and fron window. will check at insulation.
ALL ROUGH 02/28/2023 APPROVED - AS NOTED JSTEWART
Note: 2/28/2023- Missing anchor screws at slider and fron window. will check at insulation.
ROOF VALLEY & METAL 01/24/2023 APPROVED FWILLIS
WALL SHEATHING 01/04/2023 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/04/2023 APPROVED FWILLIS
TIE BEAM / LINTEL 11/30/2022 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 11/18/2022 APPROVED TBAKER
MONOLITHIC SLAB 11/04/2022 APPROVED MKRASKI
PLUMBING 1ST ROUGH UNDERGROUND 11/01/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 11/01/2022 APPROVED MGIBSON
U - SEWER TIE IN 11/01/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/19/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 08/11/2023 08/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/17/2023 05/19/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 02/22/2023 02/23/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/17/2023 02/21/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 01/18/2023 01/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 01/17/2023 01/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/18/2022 11/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/18/2022 11/18/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
URB COMPLETE 09/26/2022 10/03/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 09/22/2022 09/26/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 09/22/2022 09/27/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 09/22/2022 09/26/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/22/2022 09/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/22/2022 10/03/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 09/22/2022 09/23/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/22/2022 10/03/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 09/22/2022 09/26/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 08/22/2023
CONTRACTOR CHANGE ¤20.00 08/22/2023
SW ENG REINSPECTION 20 ¤20.00 08/22/2023
SW ENG REINSPECTION 20 ¤20.00 08/22/2023
PLAN REVIEW - REVISION ¤32.50 08/22/2023
PLAN REVIEW - REVISION ¤32.50 08/22/2023
CONNECTION FEES ¤25.00 10/04/2022
WATER-METER ¤467.09 10/04/2022
ADJUSTMENT 50% (¤669.82) 10/04/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/04/2022
INSPECTION - RESIDENTIAL ¤1,020.25 10/04/2022
PLAN REVIEW - RESIDENTIAL ¤289.38 10/04/2022
SW ENG - REVIEW 20 ¤20.00 10/04/2022
SW ENG RES REVIEW 200 ¤200.00 10/04/2022
3% TRANS IMPACT FEE CREDIT (¤40.89) 10/04/2022
SEWER INSPECTION ¤25.00 10/04/2022
SEWER CAPITAL FACILITY ¤2,607.06 10/04/2022
WATER CAPITAL FACILITY FEE ¤2,436.75 10/04/2022
SITE PLAN 30 ¤30.00 10/04/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 10/04/2022
IMPACT FEE FIRE ¤388.65 10/04/2022
IMPACT FEE PARKS ¤1,455.13 10/04/2022
IMPACT FEE TRANSPORTATION ¤1,363.00 10/04/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 10/04/2022
SURCHARGE FS 533.721 ¤4.21 10/04/2022
SURCHARGE - FS 468.631 ¤6.32 10/04/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/04/2022
SW ENG INSPECTION 80 ¤80.00 10/04/2022
SW ENG PRE APRON ¤30.00 10/04/2022
Fees Total Due: ¤0.00 Total Paid: ¤9,876.82