Permit #2022091059
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-0130 |
| CONDITIONED SPACE: 3096 sqft |
| GARAGE: 845 sqft |
| OPENED PORCH (WITH ROOF) : 526 sqft |
| OPENED PORCH (WITH ROOF) : 55 sqft |
| Total Square Footage: 4522 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-447-4400 |
| Location Address: 811 LOBLOLLY CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/07/2022 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: COLLINS ANTHONY & JENNIFER GAIL H&W |
|
Address 1029 PRYSE FARM BLVD FARRAGUT, TN 37934 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤732,250.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
KEN DEPRINZIO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
325 WALKER STREET HOLLY HILL, FL 32117 |
11351 (Exp: 08/31/2026) | 386-672-8494 | 386-673-7856 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/14/2024 | FINAL APPROVED | JSTEWART |
| Note: 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24- 1. Please raise ODU for 3" clearence from surrounding ground. FBCM 304.10 Clearances from grade 2. Please label exterior breaker panel. NEC 408.4. 3. Please seal exterior Cat5, RG6 wall Penetration. R402.4, 4. Outdoor Kitchen sink not installed. (Faucet and water supply installed). P2705.1General. 5. Please seal dryer duct interior (unless dryer installed). • M1502.4.7 Exhaust duct required 6. Please seal all ceiling penetrations at AHU. R402.4, 7. Bedroom Missing outlet faceplate. 8. Refriderator Breaker is tripping, (trips after reset). | |||
| U-CROSS CONNECTION | 02/14/2024 | APPROVED | DHANEY |
| Note: 2/13/2024 - PREVIOUS INSPECTION NOTES Need Water meter pit located for Insp. . | |||
| U -UTILITY RESIDENTIAL FINAL | 02/14/2024 | APPROVED | DHANEY |
| Note: 2/13/2024 - PREVIOUS INSPECTION NOTES Need water meter pit located . | |||
| ROW - STORMWATER FINAL | 02/13/2024 | APPROVED | EMADISON |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/13/2024 | Disapproved - NO FEE | DHANEY |
| Note: Need water meter pit located . | |||
| ROW - FINAL APRON (AFTER POUR) | 02/13/2024 | APPROVED | EMADISON |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| BLD - BUILDING FINAL | 02/13/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 2/13/24- 1. Please raise ODU for 3" clearence from surrounding ground. FBCM 304.10 Clearances from grade 2. Please label exterior breaker panel. NEC 408.4. 3. Please seal exterior Cat5, RG6 wall Penetration. R402.4, 4. Outdoor Kitchen sink not installed. (Faucet and water supply installed). P2705.1General. 5. Please seal dryer duct interior (unless dryer installed). • M1502.4.7 Exhaust duct required 6. Please seal all ceiling penetrations at AHU. R402.4, 7. Bedroom Missing outlet faceplate. 8. Refriderator Breaker is tripping, (trips after reset). | |||
| U-CROSS CONNECTION | 02/13/2024 | Disapproved - NO FEE | DHANEY |
| Note: Need Water meter pit located for Insp. . | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/12/2024 | APPROVED | EMADISON |
| Note: . | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/12/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/25/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/25/25 YOU A HIGH SPOT ON THE LEFT SIDE I OUTLINED WITH WHITE PAINT YOU WILL PUSH WATER BACK TOWARDS THE STRUCTURE ** ON RIGHT SIDE NEAR BURIED PROPANE TANK LOW SPOT WILL HOLD WATER NOT MOVING ** REFLECTIVE WHEN VIEWING FINAL SURVEY I PUT EYES ON IT TO VERIFY.. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/26/2023 | APPROVED | GBERTOLA |
| Note: 10/26/23 READY FOR PAVERS 10/18/2023 - PREVIOUS INSPECTION NOTES ** 10/18/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTIONS ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________________________ 10/16/2023 - PREVIOUS INSPECTION NOTES ** 10/16/23 BUILDER NEEDS TO PROVIDE THE RESIDENTIAL PAVER DRIVEWAY DETAIL EITHER ON SITE IN PERMIT BOX OR UP LOAD INTO THE ATTACHMENTS OF THE PERMIT ROUTE SYSTEM SO INSPECTOR KNOWS WHAT IS BEING INSPECTED AND HOW THE BUILDER PROPSES TO BUILD DRIVEWAY ** APRON WINGS NEED TO BE A MINIMUM OF 36 INCHES | |||
| ROW- PRE-APRON (PRE-POUR) | 10/18/2023 | PARTIALLY APPROVED | EMADISON |
| Note: ** 10/18/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTIONS ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ___________________________________________________________________________________________________________________ 10/16/2023 - PREVIOUS INSPECTION NOTES ** 10/16/23 BUILDER NEEDS TO PROVIDE THE RESIDENTIAL PAVER DRIVEWAY DETAIL EITHER ON SITE IN PERMIT BOX OR UP LOAD INTO THE ATTACHMENTS OF THE PERMIT ROUTE SYSTEM SO INSPECTOR KNOWS WHAT IS BEING INSPECTED AND HOW THE BUILDER PROPSES TO BUILD DRIVEWAY ** APRON WINGS NEED TO BE A MINIMUM OF 36 INCHES | |||
| ROW- PAVER RESTRAINTS | 10/18/2023 | APPROVED | EMADISON |
| Note: ** 10/18/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ________________________________________________________________________________________________________________________ 10/16/2023 - PREVIOUS INSPECTION NOTES ** 10/16/23 BUILDER NEEDS TO PROVIDE THE RESIDENTIAL PAVER DRIVEWAY DETAIL EITHER ON SITE IN PERMIT BOX OR UP LOAD INTO THE ATTACHMENTS OF THE PERMIT ROUTE SYSTEM SO INSPECTOR KNOWS WHAT IS BEING INSPECTED AND HOW THE BUILDER PROPOSES TO BUILD DRIVEWAY AND PAVER RESTRAINTS | |||
| ROW- PAVER RESTRAINTS | 10/16/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/16/23 BUILDER NEEDS TO PROVIDE THE RESIDENTIAL PAVER DRIVEWAY DETAIL EITHER ON SITE IN PERMIT BOX OR UP LOAD INTO THE ATTACHMENTS OF THE PERMIT ROUTE SYSTEM SO INSPECTOR KNOWS WHAT IS BEING INSPECTED AND HOW THE BUILDER PROPOSES TO BUILD DRIVEWAY AND PAVER RESTRAINTS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/16/23 BUILDER NEEDS TO PROVIDE THE RESIDENTIAL PAVER DRIVEWAY DETAIL EITHER ON SITE IN PERMIT BOX OR UP LOAD INTO THE ATTACHMENTS OF THE PERMIT ROUTE SYSTEM SO INSPECTOR KNOWS WHAT IS BEING INSPECTED AND HOW THE BUILDER PROPSES TO BUILD DRIVEWAY ** APRON WINGS NEED TO BE A MINIMUM OF 36 INCHES | |||
| U - SEWER TIE IN | 08/29/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 08/29/2023 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 08/22/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2200 Approved-07/07/2023- Release to FPL at 12:17 PM | |||
| LATH/BRICK/ WATER BARRIER | 07/27/2023 | APPROVED | AGAETANO |
| INSULATION | 07/20/2023 | APPROVED | AGAETANO |
| ALL ROUGH | 07/07/2023 | APPROVED | TSTAUFFACHER |
| ELECTRIC-TUG | 07/07/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Approved-07/07/2023- Release to FPL at 12:17 PM | |||
| GAS ROUGH | 07/07/2023 | APPROVED | TSTAUFFACHER |
| WALL SHEATHING | 07/06/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2023 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 07/06/2023 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 07/05/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/22/2023 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 02/02/2023 | APPROVED | AGAETANO |
| Note: 2/1/2023 - PREVIOUS INSPECTION NOTES 02-01-2023 Compaction test not on site. | |||
| MONOLITHIC SLAB | 02/01/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 02-01-2023 Compaction test not on site. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/26/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/08/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/16/2023 | 10/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/29/2023 | 07/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/29/2023 | 06/29/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/12/2022 | 12/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/05/2022 | 12/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/27/2022 | 10/27/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/19/2022 | 10/19/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM It is prohibited to paint faux features or elements of a structure such as, but not limited to, windows, doors, shutters, or flower boxes. Elevation Page still shows faux windows | |||
| BLD | COMPLETE | 10/19/2022 | 10/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/19/2022 | 10/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 09/26/2022 | 10/05/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 09/22/2022 | 09/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM PLAN REVIEW COMMENTS: 1. Following comment are from the Product Approval Sheet; a. Underlayment called-out on the Roofing Worksheet doesn’t match the Product Approval Sheet. | |||
| CUSVC | COMPLETE | 09/22/2022 | 09/27/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 09/22/2022 | 09/26/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/22/2022 | 09/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/22/2022 | 10/03/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/22/2022 | 09/26/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/22/2022 | 10/03/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/22/2022 | 09/26/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the width of driveway at the widest point in front of the garage doors and house. It cannot exceed the maximum 42ft width for a three car garage It is prohibited to paint faux features or elements of a structure such as, but not limited to, windows, doors, shutters, or flower boxes. Shutters function as an accent to windows as well as weather protection. Accent shutters. Accent shutters are designed as a visual detail for windows Shutters shall match the height of the window. Your decorative shutters do not meet the definition in the code for shutters please change the verbiage on plans to louvers. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/14/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/14/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/14/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/14/2024 |
| CONNECTION FEES | ¤25.00 | 11/07/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/07/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/07/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 11/07/2022 |
| SEWER INSPECTION | ¤25.00 | 11/07/2022 |
| SITE PLAN 30 | ¤30.00 | 11/07/2022 |
| WATER-METER | ¤467.09 | 11/07/2022 |
| ADJUSTMENT 50% | (¤1,308.75) | 11/07/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/07/2022 |
| INSPECTION - RESIDENTIAL | ¤2,015.75 | 11/07/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤571.74 | 11/07/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/07/2022 |
| IMPACT FEE FIRE | ¤388.65 | 11/07/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/07/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/07/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 11/07/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/07/2022 |
| SURCHARGE FS 533.721 | ¤7.87 | 11/07/2022 |
| SURCHARGE - FS 468.631 | ¤11.80 | 11/07/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/07/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/07/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/07/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,713.75 |