Status: COED
| Parcel Id: 07-11-31-1090-00000-00B0 |
| Block: 00000 |
| Subdivision: 1228 - SOUTHWEST QUADRANT |
| Job Phone: 386-585-2654 |
| Location Address: 160 CYPRESS POINT PKWY |
| Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION |
| Issue Date: 11/29/2022 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: CYPRESS POINT 160 LLC |
|
Address SUITE 1015 PALM BEACH GARDENS, FL 33410 |
|
Address 3910 RCA BOULEVARD PALM BEACH GARDENS, FL 33410 |
| Lot: 00B0 |
| Contracted Stated Job Value: ¤16,000.00 |
| Job Description: UNIT A110 - BATHROOM ALTERATION |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
MISHA ROMANOVSKIY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
77 PEBBLE BEACH DRIVE PALM COAST, FL 32164 |
ER13015548 (Exp: 08/31/2024) | 386-793-5553 | 386-961-4388 |
DANIEL GOULDNER
| Status | Location Address | State License Number |
| ACTIVE |
400 OLD HAW CREEK RD BUNNELL, FL 32110 |
CAC1818907 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING FINAL | 04/06/2023 | FINAL APPROVED | FWILLIS |
| FIRE FINAL | 03/31/2023 | FINAL APPROVED | LMILLER |
| Note: Prior notes resolved 3/29/2023 - PREVIOUS INSPECTION NOTES 3/29/23 Front exit and middle emergency lights not working 3/22/2023 - PREVIOUS INSPECTION NOTES | |||
| FIRE FINAL | 03/29/2023 | Disapproved - NO FEE | RMARTIN |
| Note: 3/29/23 Front exit and middle emergency lights not working 3/22/2023 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC FINAL | 03/29/2023 | APPROVED | RMARTIN |
| Note: 2/27/2023 - PREVIOUS INSPECTION NOTES 2/27/23 No revisions submitted to the City of Palm Coast Inspector Notes from Inspection 3190 need revision by final on relocated items marked on print | |||
| FIRE FINAL | 03/22/2023 | CANCELLED BY APPLICANT | RMARTIN |
| HVAC FINAL | 03/22/2023 | FINAL APPROVED | CPISCITELLI |
| Note: 3/17/2023 - PREVIOUS INSPECTION NOTES Need to seal fresh air duct to metal sleeve. Need to seal around penetration in wall | |||
| HVAC FINAL | 03/17/2023 | Disapproved -FEE REQUIRED | CPISCITELLI |
| Note: Need to seal fresh air duct to metal sleeve. Need to seal around penetration in wall | |||
| ABOVE CEILING | 03/17/2023 | APPROVED | RMARTIN |
| Note: 2/27/2023 - PREVIOUS INSPECTION NOTES Mechanical: Need to run proper material for exhaust fan and support every 4 Feet. Need to support fresh air duct and Install larger cap on outside of building. Need to seal wall around bath fan penetration. Electrical and plumbing are good. | |||
| U - UTILITY COMMERCIAL FINAL | 03/17/2023 | FINAL APPROVED | LFITZGERALD |
| PLUMBING FINAL | 03/15/2023 | APPROVED | MGIBSON |
| Note: 2/27/2023 - PREVIOUS INSPECTION NOTES NEED OPEN FRONT LESS COVER SEAT, NEED TRAP WRAP ON ADA LAV, NEED ICE MAKEKER WITH SHOCK ARRESTOR AND SHOW ON PLANS FOR WATER TIE IN CONNECTION | |||
| HVAC ROUGH | 02/27/2023 | APPROVED | CPISCITELLI |
| HVAC FINAL | 02/27/2023 | CANCELLED BY APPLICANT | CPISCITELLI |
| PLUMBING FINAL | 02/27/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NEED OPEN FRONT LESS COVER SEAT, NEED TRAP WRAP ON ADA LAV, NEED ICE MAKEKER WITH SHOCK ARRESTOR AND SHOW ON PLANS FOR WATER TIE IN CONNECTION | |||
| ELECTRIC FINAL | 02/27/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 2/27/23 No revisions submitted to the City of Palm Coast Inspector Notes from Inspection 3190 need revision by final on relocated items marked on print | |||
| ABOVE CEILING | 02/27/2023 | Disapproved -FEE REQUIRED | CPISCITELLI |
| Note: Mechanical: Need to run proper material for exhaust fan and support every 4 Feet. Need to support fresh air duct and Install larger cap on outside of building. Need to seal wall around bath fan penetration. Electrical and plumbing are good. | |||
| ELECTRIC 2ND ROUGH | 01/05/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: need revision by final on relocated items marked on print | |||
| PLUMBING 2ND ROUGH | 01/05/2023 | APPROVED | MGIBSON |
| MONOLITHIC SLAB | 12/19/2022 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH | 12/08/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | CANCEL | 03/22/2023 | 03/23/2023 |
| ELEC | COMPLETE | 03/22/2023 | 03/23/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/21/2022 | 11/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 11/21/2022 | 11/28/2022 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/21/2022 | 11/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 11/21/2022 | 11/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/02/2022 | 11/07/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| PLUM | HOLD | 11/02/2022 | 11/07/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Proposed Service Sink is shown outside the building. Service Sink is required to be in the space that sink is supposed to serve. | |||
| MECH | HOLD | 11/02/2022 | 11/02/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. list mechanical subcontractor 2, Fresh air calls for 321CFM. Provide change on plans to show incresed size or added fresh air duct. 7" will not be suffient | |||
| ELEC | HOLD | 11/02/2022 | 11/02/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. List Electrical sub contractor | |||
| FI1 | HOLD | 11/02/2022 | 11/02/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. And or 2020 FBC Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. 1. Please include FFPC 7th edition in the code analysis 2. Please include FBC 7th edition in the code analysis 3. Plan sheet A-1 indicates the building is unprotected and has no sprinkler system however the building has sprinklers and alarms. Please revise the drawings to indicate the Sprinklers and alarm. The following note was added to the permit. Existing Sprinklers/Alarms: Any construction alterations having effect on the building fire sprinkler system and or fire alarm system layout and coverage, shall be addressed by a fire protection contractor under a separate permit prior to project completion and approval per FFPC, NFPA 1, Fire Code section 1.12.8 2nd REQUEST | |||
| BLD | HOLD | 10/03/2022 | 10/04/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Occupant Load shown on Sheet A-1 is incorrect. Revise to reflect Table 1004.5. Unconcentrated is 15 net not 21. Business area is 150 gross not 400 as shown. 2. A revision to reference Table 1004.5 not Table 1004.1.2. 3. Occupancy classification to be revised to the correct occupancy. Revised occupant load will be over 50. The previsions of 303.1.1 and 303.1.2 will not apply. | |||
| DSD | COMPLETE | 10/03/2022 | 10/04/2022 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 10/03/2022 | 10/06/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. List Electrical sub contractor 2. Submit Electric plan | |||
| FI1 | HOLD | 10/03/2022 | 10/11/2022 |
| Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM All comments below per the 2020 Florida Fire Prevention Code. And or 2020 FBC Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. 1. Please include FFPC 7th edition in the code analysis 2. Please include FBC 7th edition in the code analysis 3. Plan sheet A-1 indicates the building is unprotected and has no sprinkler system however the building has sprinklers and alarms. Please revise the drawings to indicate the Sprinklers and alarm. The following note was added to the permit. Existing Sprinklers/Alarms: Any construction alterations having effect on the building fire sprinkler system and or fire alarm system layout and coverage, shall be addressed by a fire protection contractor under a separate permit prior to project completion and approval per FFPC, NFPA 1, Fire Code section 1.12.8 | |||
| MECH | HOLD | 10/03/2022 | 10/06/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 2020 7Th edition 2. Provide Ventilation calculation per Table 403.3.1.1 FBC Mechanical 2020 7Th edition 3. Provide Duct layout showing supply, return, fresh air and exhaust with changes 4. Provide note on plan to show condensate drain for Ice machine needs to run to the outside of the building. Not allowed to run into sanitary sewer system per Municode Section 49-104 (12) | |||
| PLUM | HOLD | 10/03/2022 | 10/04/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Provide location of Service Sink per Table 403.1 | |||
| UD1 | COMPLETE | 10/03/2022 | 10/04/2022 |
| Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION - COMMERCIAL | ¤60.00 | 04/06/2023 |
| REINSPECTION - COMMERCIAL | ¤60.00 | 04/06/2023 |
| REINSPECTION - COMMERCIAL | ¤60.00 | 04/06/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 11/29/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 11/29/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/29/2022 |
| SURCHARGE - FS 468.631 | ¤2.41 | 11/29/2022 |
| SITE PLAN 30 | ¤30.00 | 11/29/2022 |
| ADJUSTMENT 50% | (¤126.00) | 11/29/2022 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 11/29/2022 |
| INSPECTION COMMERCIAL | ¤112.00 | 11/29/2022 |
| PLAN REVIEW - COMMERCIAL | ¤65.00 | 11/29/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤380.41 |