I want to search for...
Permit #2022100228
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00490-0160 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00490 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 631-929-5500 |
| Location Address: 17 RALPH PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/14/2023 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: 96 TRUST PALM COAST RESI A LLC |
|
Address 505 N FLAGLER DR STE 210 WEST PALM BEACH, FL 33401 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/15/2023 | FINAL APPROVED | JWALKER |
| U-CROSS CONNECTION | 09/14/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 09/14/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- PROJECT STATUS | 09/13/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 09/13/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/13/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: MEET WITH CONTRACTOR ABOUT GRADE ON THE RIGHT AND IT WORKING ------------------------------------------------------------------- 8/25/2023 - PREVIOUS INSPECTION NOTES THE RIGHT SIDE DRAINAGE CONVAYANCE DONT MATCH WHATS ON THE SITE PLAN SITE PLAN SHOWS A COMMON SWALE AND FINAL SURVEY SHOWS A W SWALE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/13/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 09/13/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE RIGHT SIDE DRAINAGE CONVAYANCE DONT MATCH WHATS ON THE SITE PLAN SITE PLAN SHOWS A COMMON SWALE AND FINAL SURVEY SHOWS A W SWALE. | |||
| ELECTRIC - EARLY POWER | 07/20/2023 | APPROVED | JWALKER |
| GRAVITY SEWER TEST | 06/15/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 06/15/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U - SEWER TIE IN | 06/15/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/05/2023 | APPROVED | FSLADISH |
| Note: 06/05/23 PIPE IS GOOD. LOOKED GOOD AT TIME OF INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 05/23/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 1. 5' head test is not holding water. 2. Water distribution lines are not under pressure test. 3. The miro wave exhaust duct is not sloped to correct way. Check for corrections at insulation inspection. | |||
| PEP TANK INSTALLATION REQUEST | 05/22/2023 | APPROVED | CSTONE |
| ALL ROUGH | 05/17/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. 5' head test is not holding water. 2. Water distribution lines are not under pressure test. 3. The miro wave exhaust duct is not sloped to correct way. Check for corrections at insulation inspection. | |||
| LATH/BRICK/ WATER BARRIER | 05/17/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 Missing meta anchor at truss A17 and AO4 rear porch wall 2' o.c. Check for corrections at ALL rough inspection | |||
| WALL SHEATHING | 04/26/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2023 | APPROVED - AS NOTED | JWALKER |
| Note: Missing meta anchor at truss A17 and AO4 rear porch wall 2' o.c. Check for corrections at ALL rough inspection | |||
| ROOF VALLEY & METAL | 04/26/2023 | APPROVED | JWALKER |
| ELECTRIC-TUG | 04/04/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 04/03/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/31/2023 | APPROVED | JWALKER |
| Note: 3/30/2023 - PREVIOUS INSPECTION NOTES Missed down cell at the right side front column rear. | |||
| TIE BEAM / LINTEL | 03/30/2023 | Disapproved - NO FEE | JWALKER |
| Note: Missed down cell at the right side front column rear. | |||
| MONOLITHIC SLAB | 03/22/2023 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/20/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 03/15/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/28/2023 | 04/28/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/31/2023 | 04/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/31/2023 | 03/31/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/12/2022 | 10/12/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| BLD | COMPLETE | 10/05/2022 | 10/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 10/05/2022 | 10/06/2022 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 10/05/2022 | 10/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/05/2022 | 10/05/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/05/2022 | 10/11/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/05/2022 | 10/05/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/05/2022 | 10/10/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/05/2022 | 10/06/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/05/2022 | 02/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 09/15/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/15/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/14/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/14/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 03/14/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 03/14/2023 |
| SEWER CREDIT | (¤1,146.50) | 03/14/2023 |
| SEWER INSPECTION | ¤25.00 | 03/14/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/14/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/14/2023 |
| SITE PLAN 30 | ¤30.00 | 03/14/2023 |
| WATER- TURN ON | ¤25.00 | 03/14/2023 |
| ADJUSTMENT 50% | (¤405.07) | 03/14/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/14/2023 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 03/14/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 03/14/2023 |
| CONNECTION FEES | ¤1,166.26 | 03/14/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/14/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/14/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/14/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/14/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/14/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 03/14/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/14/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/14/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/14/2023 |
| SURCHARGE FS 533.721 | ¤2.69 | 03/14/2023 |
| SURCHARGE - FS 468.631 | ¤4.04 | 03/14/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/14/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/14/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/14/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,611.42 |