I want to search for...
Permit #2022100274
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00420-0140 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00420 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 631-929-5500 |
| Location Address: 25 UNTERMEYER PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/07/2023 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: RESEA FL, LLC |
|
Address 5470 LA GORCE DR MIAMI BEACH, FL 33140 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/08/2023 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 09/08/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 09/07/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/07/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/07/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 09/07/2023 | FINAL APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 06/30/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 4-27-23 1. Emailed FPL at 1:42. 6-30-23 1. Emailed FPL at 10:11. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/23/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POUR CONCRETE FOR THE DRIVEWAY. | |||
| U-CROSS CONNECTION | 05/17/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| GRAVITY SEWER TEST | 05/17/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 05/17/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 05/03/2023 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 04/27/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-27-23 1. Emailed FPL at 1:42. | |||
| LATH/BRICK/ WATER BARRIER | 04/27/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 04/27/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 04/18/2023 | APPROVED | BTAYLOR |
| Note: 4/17/2023 - PREVIOUS INSPECTION NOTES 4/17/23: 1). No address on site: Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2). Missing field nails in underlayment on entire house. | |||
| ROOF VALLEY & METAL | 04/17/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/17/23: 1). No address on site: Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 2). Missing field nails in underlayment on entire house. | |||
| WALL SHEATHING | 04/10/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/10/2023 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 03/02/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 03/02/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/21/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/13/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/09/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/15/2023 | 06/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/02/2023 | 03/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/02/2023 | 03/02/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| SW1 | COMPLETE | 10/19/2022 | 10/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/11/2022 | 10/13/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| CUSVC | REJECT | 10/11/2022 | 10/11/2022 |
| Note: Rejected By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM PARCEL IS NOT MATCHING ADDRESS PLEASE UPDATE | |||
| SWALE | COMPLETE | 10/07/2022 | 02/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/06/2022 | 10/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 10/06/2022 | 10/07/2022 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect the correct parcel number. | |||
| ELEC | COMPLETE | 10/06/2022 | 10/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/06/2022 | 10/07/2022 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/06/2022 | 10/11/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/06/2022 | 10/06/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/06/2022 | 10/10/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE BOTH PROPERTY LINES A COMMON SWALE | |||
| ZON | COMPLETE | 10/06/2022 | 10/06/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 09/08/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/08/2023 |
| CONNECTION FEES | ¤1,166.26 | 02/07/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 02/07/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 02/07/2023 |
| IMPACT FEE FIRE | ¤420.52 | 02/07/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 02/07/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/07/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 02/07/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/07/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 02/07/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 02/07/2023 |
| SURCHARGE FS 533.721 | ¤2.69 | 02/07/2023 |
| SURCHARGE - FS 468.631 | ¤4.04 | 02/07/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/07/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/07/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/07/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/07/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/07/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 02/07/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 02/07/2023 |
| SEWER INSPECTION | ¤25.00 | 02/07/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 02/07/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 02/07/2023 |
| SITE PLAN 30 | ¤30.00 | 02/07/2023 |
| WATER- TURN ON | ¤25.00 | 02/07/2023 |
| ADJUSTMENT 50% | (¤405.07) | 02/07/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/07/2023 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 02/07/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 02/07/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,777.92 |