Permit #2022100276
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00060-0010 |
| CONDITIONED SPACE: 2860 sqft |
| OPENED PORCH (WITH ROOF) : 348 sqft |
| GARAGE: 912 sqft |
| Total Square Footage: 4120 sqft |
| Block: 00060 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-237-8427 |
| Location Address: 9 EMPIRE LN |
| Type: DU - DUPLEX |
| Issue Date: 11/30/2022 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER PROPERTIES II LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤245,250.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/06/2024 | FINAL APPROVED | BTAYLOR |
| Note: 1/30/2024 - PREVIOUS INSPECTION NOTES 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24: Unit A: 1). Still no Insulation certificate posted or on site. 2). Garage ceiling is still not repaired/sealed properly. Material must be fire retardent or meet the minimum thickness to act as fireblock & be sealed along edges as required. (R302.11.1). Please also seal ceiling at low voltage line (as previously stated in item 5). 3). Previously listed item 6 is still not resolved properly. Unit B: 1). Garage ceiling is still not repaired/sealed properly. Material must be fire retardent or meet the minimum thickness to act as fireblock & be sealed along edges as required. (R302.11.1). 2). Previously listed item 6 is still not resolved properly. 1/17/2024 - PREVIOUS INSPECTION NOTES 1/17/24: Unit A: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). AHU: Heater core installed is not identified as required. FBC-M1303.1 9). Left side: Meter Panel Main cover is missing nuts on bottom bolts. 10). Lanai outlet cover is painted shut. Could not test outlet. Unit B: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). Garage door opener is not plugged in. Could not be safety tested or GFCI tested. 9). Garbage disposal is not plugged in. Could not be tested. 10). AHU breaker is too big. 35amp installed. (30amp required). 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) | |||
| BLD - BUILDING FINAL | 01/30/2024 | CANCELLED BY APPLICANT | JWALKER |
| Note: 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24: Unit A: 1). Still no Insulation certificate posted or on site. 2). Garage ceiling is still not repaired/sealed properly. Material must be fire retardent or meet the minimum thickness to act as fireblock & be sealed along edges as required. (R302.11.1). Please also seal ceiling at low voltage line (as previously stated in item 5). 3). Previously listed item 6 is still not resolved properly. Unit B: 1). Garage ceiling is still not repaired/sealed properly. Material must be fire retardent or meet the minimum thickness to act as fireblock & be sealed along edges as required. (R302.11.1). 2). Previously listed item 6 is still not resolved properly. 1/17/2024 - PREVIOUS INSPECTION NOTES 1/17/24: Unit A: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). AHU: Heater core installed is not identified as required. FBC-M1303.1 9). Left side: Meter Panel Main cover is missing nuts on bottom bolts. 10). Lanai outlet cover is painted shut. Could not test outlet. Unit B: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). Garage door opener is not plugged in. Could not be safety tested or GFCI tested. 9). Garbage disposal is not plugged in. Could not be tested. 10). AHU breaker is too big. 35amp installed. (30amp required). 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) | |||
| BLD - BUILDING FINAL | 01/23/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/23/24: Unit A: 1). Still no Insulation certificate posted or on site. 2). Garage ceiling is still not repaired/sealed properly. Material must be fire retardent or meet the minimum thickness to act as fireblock & be sealed along edges as required. (R302.11.1). Please also seal ceiling at low voltage line (as previously stated in item 5). 3). Previously listed item 6 is still not resolved properly. Unit B: 1). Garage ceiling is still not repaired/sealed properly. Material must be fire retardent or meet the minimum thickness to act as fireblock & be sealed along edges as required. (R302.11.1). 2). Previously listed item 6 is still not resolved properly. 1/17/2024 - PREVIOUS INSPECTION NOTES 1/17/24: Unit A: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). AHU: Heater core installed is not identified as required. FBC-M1303.1 9). Left side: Meter Panel Main cover is missing nuts on bottom bolts. 10). Lanai outlet cover is painted shut. Could not test outlet. Unit B: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). Garage door opener is not plugged in. Could not be safety tested or GFCI tested. 9). Garbage disposal is not plugged in. Could not be tested. 10). AHU breaker is too big. 35amp installed. (30amp required). 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) | |||
| BLD - BUILDING FINAL | 01/17/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/17/24: Unit A: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). AHU: Heater core installed is not identified as required. FBC-M1303.1 9). Left side: Meter Panel Main cover is missing nuts on bottom bolts. 10). Lanai outlet cover is painted shut. Could not test outlet. Unit B: 1). Hall smoke detector needs temporary dust cover removed. (smokes tested & approved for operation only). 2). Range anti-tip device is not protecting Range from tip over as required. (possibly due to backsplash keeping range from wall). 3). No Insulation Certificate posted in attic space or on site. 4). Guest bath tub spout not sealed as required. FBC-P2705.1(3) 5). Holes in garage ceiling along with wall to ceiling seam behind AHU need to be sealed properly. (fire retardent product such as mastic or joint compound - no caulk). 6). Master bedroom smokes are too close to the peak of the vaulted ceiling per NFPA 29.11.3.1(Smoke alarms or smoke detectors mounted on a peaked ceiling shall be located within 36 in. (910 mm) horizontally of the peak, but not closer than 4 in. (100 mm) vertically to the peak). 7). Anti-siphon device at hose bibbs are missing the set screw and are not secured as required. P2902.4.3 8). Garage door opener is not plugged in. Could not be safety tested or GFCI tested. 9). Garbage disposal is not plugged in. Could not be tested. 10). AHU breaker is too big. 35amp installed. (30amp required). 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) | |||
| ROW - FINAL INSPECTION | 12/08/2023 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12/8/23 ** CORRECTIONS MADE TREE RELOCATED DRAINAGE CONVEYANCE CLEAR 12/6/2023 - PREVIOUS INSPECTION NOTES 12/6/23 ** CORRECTIONS HAVE NOT BEEN MADE STILL NEED TO REMOVE TREE INBETWEEN #9 & #11 AS TREE IS IN COMMON SWALE CONVEYANCE. PLEASE CHECK PREVIOUS NOTES. PLEASE MAKE SURE ALL DIRT AND SILT ARE OUT OF CULVERT ENDS. NOT GOING TO FEE YOU FOR THIS INSPECTION TODAY PLEASE MAKE CORRECTIONS BEFORE PUTTING IN FOR STORM WATER FINALInspector Notes from Inspection 9465 11/28/23 THE TREES IN THE COMMON SWALE AREA WILL NEED TO BE REMOVED OR RELOCATED AS THEY CAN NOT BE IN THE DRAINAGE CONVEYANCE. THEY TOO CLOSE TO THE MIDDLE OF THE COMMON SWALE. APPROVING THIS INSPECTION AS NOTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/06/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 12/06/2023 | Disapproved - NO FEE | TPOLACEK |
| Note: 12/6/23 ** CORRECTIONS HAVE NOT BEEN MADE STILL NEED TO REMOVE TREE INBETWEEN #9 & #11 AS TREE IS IN COMMON SWALE CONVEYANCE. PLEASE CHECK PREVIOUS NOTES. PLEASE MAKE SURE ALL DIRT AND SILT ARE OUT OF CULVERT ENDS. NOT GOING TO FEE YOU FOR THIS INSPECTION TODAY PLEASE MAKE CORRECTIONS BEFORE PUTTING IN FOR STORM WATER FINALInspector Notes from Inspection 9465 11/28/23 THE TREES IN THE COMMON SWALE AREA WILL NEED TO BE REMOVED OR RELOCATED AS THEY CAN NOT BE IN THE DRAINAGE CONVEYANCE. THEY TOO CLOSE TO THE MIDDLE OF THE COMMON SWALE. APPROVING THIS INSPECTION AS NOTED. | |||
| U-CROSS CONNECTION | 12/06/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/06/2023 | APPROVED | TPOLACEK |
| Note: 12/6/23 ** PIPE GOOD, CUTS MADE, HOT PATCH GOOD. CULVERT CLEAR ____________________________________________________________________________________ Inspector Notes from Inspection 9465 11/28/23 THE TREES IN THE COMMON SWALE AREA WILL NEED TO BE REMOVED OR RELOCATED AS THEY CAN NOT BE IN THE DRAINAGE CONVEYANCE. THEY TOO CLOSE TO THE MIDDLE OF THE COMMON SWALE. APPROVING THIS INSPECTION AS NOTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/28/2023 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 10/19/23 BOTH PIPES GOOD. LOOKED GOOD AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/28/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/28/23 THE TREES IN THE COMMON SWALE AREA WILL NEED TO BE REMOVED OR RELOCATED AS THEY CAN NOT BE IN THE DRAINAGE CONVEYANCE. THEY TOO CLOSE TO THE MIDDLE OF THE COMMON SWALE. APPROVING THIS INSPECTION AS NOTED. | |||
| ELECTRIC - EARLY POWER | 11/01/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 3pm | |||
| ROW- PRE-APRON (PRE-POUR) | 10/19/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/19/23 BOTH PIPES GOOD. LOOKED GOOD AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U - SEWER TIE IN | 08/29/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| FIREWALL FINAL | 08/18/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2490 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) * Note added to Building Final Inspection. | |||
| PEP TANK INSTALLATION REQUEST | 08/10/2023 | APPROVED | CBOWERMASTER |
| INSULATION | 08/02/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) * Note added to Building Final Inspection. | |||
| LATH/BRICK/ WATER BARRIER | 07/31/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2420 1. Unit A fill the concrete cut out for the drain pipe. 2. Unit B water distribution pipe not under test. 3. The electrical Riser diagram on Page E-1 of the prints does not match the installed riser. Please submit a revision to the building department for the change. Check for correction at early power inspection. | |||
| ALL ROUGH | 07/27/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Unit A fill the concrete cut out for the drain pipe. 2. Unit B water distribution pipe not under test. 3. The electrical Riser diagram on Page E-1 of the prints does not match the installed riser. Please submit a revision to the building department for the change. Check for correction at early power inspection. | |||
| ROOF VALLEY & METAL | 07/26/2023 | APPROVED | RSIMS |
| Note: 7/10/2023 - PREVIOUS INSPECTION NOTES 7/10/23: This is only a partial inspection. Revision for 5" x 5" step flashing still needs to be submitted & approved before full inspection can be approved. We will also, need to see the 5" x 5" step flashing before the wall veneer is installed to check for proper installation, properly sealed to wall and properly step sealed to shingles. Roof sheathing is now approved. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460). Also, contractor will submit revision for step flashing to be installed versus 5" x 5" flashing. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: INSPECTION STOPPED! NOT READY! Cannot have approved roof & valley metal before Approved Roof Sheathing. I bump checked unit B while there and found over three areas of loose roof sheathing. You will need to check all before scheduling Inspections 2460 or 2467. Some areas marked with LS & blue arrow on wall below. Loose plywood at overhang. Unit A not complete. Also, missing all 5" x 5" flashing. | |||
| FIREWALL DRYWALL NAILING | 07/24/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/14/2023 | APPROVED | BTAYLOR |
| Note: 7/10/23: Roof sheathing (only) is now approved through Inspection 2467/Roof Valley Metal. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23: Inspection stopped. Incomplete inspection. 1). No plans in box for Inspection. 2). Previously listed loose roof sheathing checked during inspection 2467 still exists. Bump check now complete and there is additional loose roof sheathing. (Marked with LS below the area). Showed PM. Down cell - approved New inspection due to canceled inspection 3/23/2023 - PREVIOUS INSPECTION NOTES 3/23/23: Inspection Stopped! Not Ready! Framing contractor is in the process of installing truss web bracing/engineering. | |||
| ROOF VALLEY & METAL | 07/10/2023 | PARTIALLY APPROVED | RSIMS |
| Note: 7/10/23: This is only a partial inspection. Revision for 5" x 5" step flashing still needs to be submitted & approved before full inspection can be approved. We will also, need to see the 5" x 5" step flashing before the wall veneer is installed to check for proper installation, properly sealed to wall and properly step sealed to shingles. Roof sheathing is now approved. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460). Also, contractor will submit revision for step flashing to be installed versus 5" x 5" flashing. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: INSPECTION STOPPED! NOT READY! Cannot have approved roof & valley metal before Approved Roof Sheathing. I bump checked unit B while there and found over three areas of loose roof sheathing. You will need to check all before scheduling Inspections 2460 or 2467. Some areas marked with LS & blue arrow on wall below. Loose plywood at overhang. Unit A not complete. Also, missing all 5" x 5" flashing. | |||
| ROOF VALLEY & METAL | 07/07/2023 | Disapproved - NO FEE | RSIMS |
| Note: 7/7/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460). Previously noted loose plywood still exists along with additional areas after completing Roof sheathing bump check. Contractor will submit revision for proposed Step Flashing versus 5" x 5" flashing. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: INSPECTION STOPPED! NOT READY! Cannot have approved roof & valley metal before Approved Roof Sheathing. I bump checked unit B while there and found over three areas of loose roof sheathing. You will need to check all before scheduling Inspections 2460 or 2467. Some areas marked with LS & blue arrow on wall below. Loose plywood at overhang. Unit A not complete. Also, missing all 5" x 5" flashing. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 7/7/23: Inspection stopped. Incomplete inspection. 1). No plans in box for Inspection. 2). Previously listed loose roof sheathing checked during inspection 2467 still exists. Bump check now complete and there is additional loose roof sheathing. (Marked with LS below the area). Showed PM. Down cell - approved New inspection due to canceled inspection 3/23/2023 - PREVIOUS INSPECTION NOTES 3/23/23: Inspection Stopped! Not Ready! Framing contractor is in the process of installing truss web bracing/engineering. | |||
| WALL SHEATHING | 07/07/2023 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 06/29/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/29/23: INSPECTION STOPPED! NOT READY! Cannot have approved roof & valley metal before Approved Roof Sheathing. I bump checked unit B while there and found over three areas of loose roof sheathing. You will need to check all before scheduling Inspections 2460 or 2467. Some areas marked with LS & blue arrow on wall below. Loose plywood at overhang. Unit A not complete. Also, missing all 5" x 5" flashing. | |||
| ROOF VALLEY & METAL | 06/28/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 3/23/2023 - PREVIOUS INSPECTION NOTES 3/23/23: Inspection Stopped! Not Ready! Framing contractor is in the process of installing truss web bracing/engineering. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/23/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/23/23: Inspection Stopped! Not Ready! Framing contractor is in the process of installing truss web bracing/engineering. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/22/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/14/2023 | APPROVED | JWALKER |
| Note: 2/13/2023 - PREVIOUS INSPECTION NOTES 2/13/23: 1). Window mortar beds in both units are too thick per FBC R606.3.1 (1/2" max) marked with an 'X' on ther inside. (all in unit B and all but 2 in unit A) 2). Unit B at entry down rod is not tight to dowel rod allowing movement during down cell fill. | |||
| TIE BEAM / LINTEL | 02/13/2023 | Disapproved - NO FEE | RSIMS |
| Note: 2/13/23: 1). Window mortar beds in both units are too thick per FBC R606.3.1 (1/2" max) marked with an 'X' on ther inside. (all in unit B and all but 2 in unit A) 2). Unit B at entry down rod is not tight to dowel rod allowing movement during down cell fill. | |||
| MONOLITHIC SLAB | 01/25/2023 | APPROVED | TSTAUFFACHER |
| Note: 1/24/2023 - PREVIOUS INSPECTION NOTES Slab and footings passed termite notification passed Compaction test results are not posted in the job box. | |||
| MONOLITHIC SLAB | 01/24/2023 | Disapproved - NO FEE | JWALKER |
| Note: Slab and footings passed termite notification passed Compaction test results are not posted in the job box. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/19/2023 | APPROVED | MGIBSON |
| Note: 1/18/2023 - PREVIOUS INSPECTION NOTES ''B'' UNIT NOT HOLDING 5' HEAD TES | |||
| GRAVITY SEWER TEST | 01/19/2023 | APPROVED | MGIBSON |
| Note: 1/18/2023 - PREVIOUS INSPECTION NOTES SEE FIRTST ROUGH NOTES | |||
| GRAVITY SEWER TEST | 01/18/2023 | Disapproved - NO FEE | MGIBSON |
| Note: SEE FIRTST ROUGH NOTES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/18/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: ''B'' UNIT NOT HOLDING 5' HEAD TEST | |||
| WATER METER INSTALLATION REQUEST | 01/04/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/31/2023 | 08/01/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Upload new riser diagram. | |||
| ELEC | HOLD | 07/28/2023 | 07/31/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. 250 is not big enough wire for the 300 amp service. NEC 2017 Table 310.15(B)(16) | |||
| BLD | COMPLETE | 07/18/2023 | 07/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/13/2023 | 07/13/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| BLD | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/10/2023 | 07/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/28/2023 | 06/29/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/23/2023 | 06/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide location of draftstopping in wall section view above and along the wall assembly. Connect draftstopping comments to location using arrow indicator. | |||
| BLD | HOLD | 06/21/2023 | 06/23/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide plan revisions showing changes to existing firewall details as well as required draftstopping details per R302.12 and materials per R302.12.1 FBC Residential 2020 7Th Edition | |||
| BLD | COMPLETE | 05/02/2023 | 05/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/22/2023 | 03/22/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/22/2023 | 03/22/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/16/2023 | 03/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM INCORRECT PERMIT # ON NOC | |||
| ZON | COMPLETE | 11/04/2022 | 11/04/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/04/2022 | 11/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/04/2022 | 11/15/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/27/2022 | 10/27/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the setback from AC pad on the left side to property line so we can review that it is not encroaching in the easement | |||
| ELEC | COMPLETE | 10/27/2022 | 10/27/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/27/2022 | 10/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/27/2022 | 11/03/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/19/2022 | 10/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See additional notes comment. | |||
| BLD | COMPLETE | 10/19/2022 | 10/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/19/2022 | 10/20/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the setback from AC pads to property lines so we can review that they are not encroaching in the easements Please provide new landscape plan showing the new AC locations with screening | |||
| ENGIN1 | COMPLETE | 10/19/2022 | 10/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 10/19/2022 | 10/24/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in Great room. NEC 2017 210.52 2nd REQUEST | |||
| MECH | COMPLETE | 10/19/2022 | 10/20/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/07/2022 | 02/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/06/2022 | 10/11/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Not on Sheet A2 states, the building is located within a wind-borne debris region. The product approvals submitted are for non-impact rated windows and doors. Provide which is correct. 2. Door between garage and residence to be a 20 minute rated door R302.5.1. | |||
| CUSVC | COMPLETE | 10/06/2022 | 10/10/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 10/06/2022 | 10/06/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs. 2. Need correct outlet spacing in Great room. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 10/06/2022 | 10/07/2022 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/06/2022 | 10/11/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/06/2022 | 10/06/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calc for side A needs to have a design location of Daytona Beach | |||
| SW1 | HOLD | 10/06/2022 | 10/10/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE PROPOSED ELEVATIONS BETWEEN BACK OF HOUSE AND BACK PROPERTY LINE AS OF NOW THE ELEVATION AT THE HOUSE IS THE SAME AS THE PROPERTY LINE IS SO ALL WATER WILL RUN IN PATIOS NEED TO HAVE A SWALE BETWEEN THE HOUSE AND THE PROPERTY LINE | |||
| ZON | COMPLETE | 10/06/2022 | 10/07/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2024 |
| CONNECTION FEES | ¤2,155.76 | 11/30/2022 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 11/30/2022 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 11/30/2022 |
| IMPACT FEE FIRE | ¤841.04 | 11/30/2022 |
| IMPACT FEE PARKS | ¤3,538.30 | 11/30/2022 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 11/30/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 11/30/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 11/30/2022 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 11/30/2022 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 11/30/2022 |
| SURCHARGE FS 533.721 | ¤4.19 | 11/30/2022 |
| SURCHARGE - FS 468.631 | ¤6.29 | 11/30/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/30/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/30/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/30/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/30/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/30/2022 |
| TRANS IMPACT FEE ADMIN | (¤82.14) | 11/30/2022 |
| TRANS IMPACT FEE ADMIN | ¤82.14 | 11/30/2022 |
| SEWER CREDIT | (¤1,700.00) | 11/30/2022 |
| SEWER INSPECTION | ¤25.00 | 11/30/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 11/30/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 11/30/2022 |
| SITE PLAN 30 | ¤30.00 | 11/30/2022 |
| WATER- TURN ON | ¤50.00 | 11/30/2022 |
| ADJUSTMENT 50% | (¤666.29) | 11/30/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/30/2022 |
| INSPECTION - RESIDENTIAL | ¤1,014.75 | 11/30/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤287.82 | 11/30/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤37,019.88 |