Permit #2022100279

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00060-0020
CONDITIONED SPACE: 2860 sqft
OPENED PORCH (WITH ROOF) : 348 sqft
GARAGE: 912 sqft
Total Square Footage: 4120 sqft
Block: 00060
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-237-8427
Location Address: 11 EMPIRE LN
Type: DU - DUPLEX
Issue Date: 11/30/2022
NOC: RECORDED
Applicant name: JAY DARREN CURBOW
Owner: BLUE WATER PROPERTIES II LLC

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0020
Contracted Stated Job Value: ¤245,250.00
Job Description: Duplex
Type: CN

Contractor

BLUE WATER HOMES INC
Status Location Address State License Number Phone
ACTIVE

4881 PALM COAST PARKWAY NW UNIT 1

PALM COAST, FL 32137

CBC1258679 (Exp: 08/31/2026) 386-445-3405

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/14/2024 FINAL APPROVED BTAYLOR
Note: 3/12/2024 - PREVIOUS INSPECTION NOTES 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) 11/2/23 Note to contractor: The 2 ODU's /Heat pump's at both units have been installed in front of the bedrooms emergency escape and rescue openings. A clear path to a yard or court are required. The 2 units will need to be relocated prior to final building inspection. 3-12-24 1. Unit A no hot water in kitchen. 2. Unit A middle bedroom window does not operate. 3. Unit A middle bathroom shower valves are reversed. 4. Unit A master bedroom window does not operate. 5. Unit B no energy cals. 6. Unit B no hot water in kitchen.
BLD - BUILDING FINAL 03/12/2024 Disapproved - NO FEE BTAYLOR
Note: 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) 11/2/23 Note to contractor: The 2 ODU's /Heat pump's at both units have been installed in front of the bedrooms emergency escape and rescue openings. A clear path to a yard or court are required. The 2 units will need to be relocated prior to final building inspection. 3-12-24 1. Unit A no hot water in kitchen. 2. Unit A middle bedroom window does not operate. 3. Unit A middle bathroom shower valves are reversed. 4. Unit A master bedroom window does not operate. 5. Unit B no energy cals. 6. Unit B no hot water in kitchen.
U-CROSS CONNECTION 12/06/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW - FINAL APRON (AFTER POUR) 12/06/2023 APPROVED TPOLACEK
Note: 12/6/23 ** PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETED
ROW - FINAL INSPECTION 12/06/2023 APPROVED - AS NOTED TPOLACEK
Note: 12/6/23 APPROVING THIS INSPECTION AS NOTED PLEASE CLEAN OUT CULVERT PIPE ENDS OF DIRT AND SILT.
U -UTILITY RESIDENTIAL FINAL 12/06/2023 FINAL APPROVED JHARDING
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/28/2023 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 11/28/2023 APPROVED FSLADISH
Note: 11/28/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 11/02/2023 APPROVED - AS NOTED JWALKER
Note: Note to contractor: The 2 ODU's /Heat pump's at both units have been installed in front of the bedrooms emergency escape and rescue openings. A clear path to a yard or court are required. The 2 units will need to be relocated prior to final building inspection. 11/1/2023 - PREVIOUS INSPECTION NOTES Left side unit is locked need access for inspection
ELECTRIC - EARLY POWER 11/01/2023 Disapproved - NO FEE MKRASKI
Note: Left side unit is locked need access for inspection
ROW- PRE-APRON (PRE-POUR) 10/30/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARTS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U - SEWER TIE IN 08/29/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
FIREWALL FINAL 08/29/2023 APPROVED RSIMS
Note: 8/24/2023 - PREVIOUS INSPECTION NOTES 8/24/23: Need trash cleaned up around full build site before any additional inspections will be approved. ** drywall anchoring Nails/screws are not consistently spaced at 7" OC intervals as required by R702.3.5.
FIREWALL FINAL 08/24/2023 Disapproved - NO FEE RSIMS
Note: 8/24/23: Need trash cleaned up around full build site before any additional inspections will be approved. ** drywall anchoring Nails/screws are not consistently spaced at 7" OC intervals as required by R702.3.5.
PEP TANK INSTALLATION REQUEST 08/10/2023 APPROVED CBOWERMASTER
INSULATION 08/08/2023 APPROVED RSIMS
Note: 8/7/2023 - PREVIOUS INSPECTION NOTES 8/7/23: Unit A: The wall at the bathroom entry has wires through the top plate that do not have sufficient FS. Previously marked on the inside of the bathroom side of the 2"x4" wall is now marked on the outside of the same wall. Call me with any questions. PVC conduit previously noted is not firestopped at the opening of the pipes on both sides creating a raceway for fire & smoke. Please fill the pipe area where wires enter. Unit B: PVC conduit same note as Unit A. Previously listed item 4 the firestop is not in the correct area. There is still a large gap (on both sides) that is unimpeded to the attic space. Marked it additionally. 8/3/2023 - PREVIOUS INSPECTION NOTES 8/3/23: Unit A: 1). Insufficient firestop at top plate penetration for wires into attic space - left room. Marked with FSI on studs below. 2). Firestop at bathtub pack out wall needs to be complete. Still open area into attic at end. 3). Please firestop electrical PVC conduit that goes under the concrete floor on both ends. 4). Firestop needed at top plate of pack out wall at entry to bedrooms/bathroom. Marked on studs below with FS. Unit B: 1). Firestop needed at top plate of pack out wall at entry to bedrooms/bathroom. Marked on the studs below with FS. 2). Please firestop electrical PVC pipe that goes under the concrete floor at both ends. 3). Firestop at bathtub pack out walls needs to be complete where open to the attic speace on the end. Marked with FS below. 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) RS - * Note added to Building Final Inspection.
INSULATION 08/07/2023 Disapproved - NO FEE RSIMS
Note: 8/7/23: Unit A: The wall at the bathroom entry has wires through the top plate that do not have sufficient FS. Previously marked on the inside of the bathroom side of the 2"x4" wall is now marked on the outside of the same wall. Call me with any questions. PVC conduit previously noted is not firestopped at the opening of the pipes on both sides creating a raceway for fire & smoke. Please fill the pipe area where wires enter. Unit B: PVC conduit same note as Unit A. Previously listed item 4 the firestop is not in the correct area. There is still a large gap (on both sides) that is unimpeded to the attic space. Marked it additionally. 8/3/2023 - PREVIOUS INSPECTION NOTES 8/3/23: Unit A: 1). Insufficient firestop at top plate penetration for wires into attic space - left room. Marked with FSI on studs below. 2). Firestop at bathtub pack out wall needs to be complete. Still open area into attic at end. 3). Please firestop electrical PVC conduit that goes under the concrete floor on both ends. 4). Firestop needed at top plate of pack out wall at entry to bedrooms/bathroom. Marked on studs below with FS. Unit B: 1). Firestop needed at top plate of pack out wall at entry to bedrooms/bathroom. Marked on the studs below with FS. 2). Please firestop electrical PVC pipe that goes under the concrete floor at both ends. 3). Firestop at bathtub pack out walls needs to be complete where open to the attic speace on the end. Marked with FS below. 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) RS - * Note added to Building Final Inspection.
INSULATION 08/03/2023 Disapproved - NO FEE RSIMS
Note: 8/3/23: Unit A: 1). Insufficient firestop at top plate penetration for wires into attic space - left room. Marked with FSI on studs below. 2). Firestop at bathtub pack out wall needs to be complete. Still open area into attic at end. 3). Please firestop electrical PVC conduit that goes under the concrete floor on both ends. 4). Firestop needed at top plate of pack out wall at entry to bedrooms/bathroom. Marked on studs below with FS. Unit B: 1). Firestop needed at top plate of pack out wall at entry to bedrooms/bathroom. Marked on the studs below with FS. 2). Please firestop electrical PVC pipe that goes under the concrete floor at both ends. 3). Firestop at bathtub pack out walls needs to be complete where open to the attic speace on the end. Marked with FS below. 8/2/23: Will need attic access in Master Bedroom closet (Both Units) to view blown in insulation at Building Final Inspection. We will not be able to verify from Garage Access Panel. (walking space is too low & filled with ductwork, etc.) RS - * Note added to Building Final Inspection.
INSULATION 08/02/2023 CANCELLED BY APPLICANT WEB
LATH/BRICK/ WATER BARRIER 07/31/2023 APPROVED RSIMS
Note: Inspector Notes from Inspection 2420 The electrical riser diagram on page E-1 of the prints does not match the riser installed. Please submit a revison to the building department for the change. Check for correction at early power inspection.
ALL ROUGH 07/27/2023 APPROVED - AS NOTED JWALKER
Note: The electrical riser diagram on page E-1 of the prints does not match the riser installed. Please submit a revison to the building department for the change. Check for correction at early power inspection.
ROOF VALLEY & METAL 07/26/2023 APPROVED RSIMS
Note: 7/10/2023 - PREVIOUS INSPECTION NOTES 7/10/23: This is only a partial inspection. Revision for 5" x 5" step flashing still needs to be submitted & approved before full inspection can be approved. We will also, need to see the 5" x 5" step flashing before the wall veneer is installed to check for proper installation & sealing to wall and step sealed to shingles. Roof sheathing is now approved. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460). Also, contractor will submit revision for step flashing to be installed versus 5" x 5" flashing. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460).
FIREWALL DRYWALL NAILING 07/24/2023 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/14/2023 APPROVED BTAYLOR
Note: 7/10/23: Roof sheathing (only) approved during Inspection 2470/Roof Valley Metal. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23: Previously noted loose roof sheathing still exists. Walked with PM. 1). Truss G05 is missing web bracing/engineering as required. Revision does not show plywood repair done. 2). Truss G03 is missing a splice plate at joint. Will require Mitek approved repair. Ties & down cell - approved 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: Inspection stopped! Incomplete Inspection. Walked with PM to discuss items needed. Straps missing and/or not fully nailed. Loose roof sheathing in multiple places, 3 ply girders not nailed properly, etc. Only Roof sheathing bump check complete. Areas marked on wall below.
ROOF VALLEY & METAL 07/10/2023 PARTIALLY APPROVED RSIMS
Note: 7/10/23: This is only a partial inspection. Revision for 5" x 5" step flashing still needs to be submitted & approved before full inspection can be approved. We will also, need to see trhe 5" x 5" step flashing before the wall veneer is installed to check for proper installation, proper sealing to wall and proper step sealing to shingles. Roof sheathing is now approved. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460). Also, contractor will submit revision for step flashing to be installed versus 5" x 5" flashing. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460).
ROOF VALLEY & METAL 07/07/2023 Disapproved - NO FEE RSIMS
Note: 7/7/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460). Also, contractor will submit revision for step flashing to be installed versus 5" x 5" flashing. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460).
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/07/2023 Disapproved -FEE REQUIRED RSIMS
Note: 7/7/23: Previously noted loose roof sheathing still exists. Walked with PM. 1). Truss G05 is missing web bracing/engineering as required. Revision does not show plywood repair done. 2). Truss G03 is missing a splice plate at joint. Will require Mitek approved repair. Ties & down cell - approved 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: Inspection stopped! Incomplete Inspection. Walked with PM to discuss items needed. Straps missing and/or not fully nailed. Loose roof sheathing in multiple places, 3 ply girders not nailed properly, etc. Only Roof sheathing bump check complete. Areas marked on wall below.
WALL SHEATHING 06/29/2023 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/29/2023 Disapproved - NO FEE RSIMS
Note: 6/29/23: Inspection stopped! Incomplete Inspection. Walked with PM to discuss items needed. Straps missing and/or not fully nailed. Loose roof sheathing in multiple places, 3 ply girders not nailed properly, etc. Only Roof sheathing bump check complete. Areas marked on wall below.
ROOF VALLEY & METAL 06/29/2023 Disapproved - NO FEE RSIMS
Note: 6/29/23: Cannot have Approved roof valley metal before approved roof sheathing (Inspection 2460).
ROOF VALLEY & METAL 06/28/2023 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 02/22/2023 APPROVED RSIMS
FOUND SURVEY APPROVED (OFFICE) 02/21/2023 APPROVED TDOAK
MONOLITHIC SLAB 02/06/2023 APPROVED RSIMS
Note: 2/3/2023 - PREVIOUS INSPECTION NOTES Footing beginning to collapse due to rain Chairs along front wall right side are crushed down, does not meet 3" clearance
MONOLITHIC SLAB 02/03/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Footing beginning to collapse due to rain Chairs along front wall right side are crushed down, does not meet 3" clearance
PLUMBING 1ST ROUGH UNDERGROUND 01/19/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 01/19/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/04/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
ELEC COMPLETE 07/31/2023 08/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 07/28/2023 07/31/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. 250 Is not big enough wire for the 300 amp service. NEC 2017 Table 310.15(B)(16)
BLD COMPLETE 07/18/2023 07/21/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 07/13/2023 07/13/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.)
BLD COMPLETE 07/13/2023 07/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/10/2023 07/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/28/2023 06/29/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 06/23/2023 06/26/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide location of draftstopping in wall section view above and along the wall assembly. Connect draftstopping comments to location using arrow indicator.
BLD HOLD 06/21/2023 06/23/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide plan revisions showing changes to existing firewall details as well as required draftstopping details per R302.12 and materials per R302.12.1 FBC Residential 2020 7Th Edition
BLD COMPLETE 05/02/2023 05/02/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 03/16/2023 03/16/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM INCORRECT # ON NOC
ENGIN1 COMPLETE 02/21/2023 02/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/21/2023 02/21/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 10/27/2022 10/27/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 10/20/2022 10/24/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 10/20/2022 10/20/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 10/20/2022 10/20/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide new landscape plan showing new AC pad locations
BLD COMPLETE 10/20/2022 10/24/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/20/2022 10/20/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/20/2022 10/27/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SWALE COMPLETE 10/07/2022 02/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 10/06/2022 10/11/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Repeat Comments 1. Not on Sheet A2 states, the building is located within a wind-borne debris region. The product approvals submitted are for non-impact rated windows and doors. Provide which is correct. 2. Door between garage and residence to be a 20 minute rated door R302.5.1.
CUSVC COMPLETE 10/06/2022 10/10/2022
Note: Released By: HALEIGH HAND - -
ELEC HOLD 10/06/2022 10/06/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs. 2. Need correct outlet spacing in Great room. NEC 2017 210.52
ENGIN1 COMPLETE 10/06/2022 10/07/2022
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 10/06/2022 10/11/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 10/06/2022 10/06/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calc for side A needs to have a design location of Daytona Beach
SW1 COMPLETE 10/06/2022 10/10/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 10/06/2022 10/07/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location on floor plan doesn't match site and landscape plan location

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/14/2024
REINSPECTION RESIDENTIAL ¤40.00 03/14/2024
CONNECTION FEES ¤2,155.76 11/30/2022
FIRE IMPACT FEE ADMIN ¤12.62 11/30/2022
FIRE IMPACT FEE ADMIN (¤12.62) 11/30/2022
IMPACT FEE FIRE ¤841.04 11/30/2022
IMPACT FEE PARKS ¤3,538.30 11/30/2022
IMPACT FEE SCHOOL ¤10,900.00 11/30/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 11/30/2022
WATER -IRRIGATION INSPECTION ¤50.00 11/30/2022
PARKS IMPACT FEE ADMIN ¤106.15 11/30/2022
PARKS IMPACT FEE ADMIN (¤106.15) 11/30/2022
SURCHARGE FS 533.721 ¤4.19 11/30/2022
SURCHARGE - FS 468.631 ¤6.29 11/30/2022
SW ENG - FOUNDATION SURVEY ¤20.00 11/30/2022
SW ENG INSPECTION 80 ¤80.00 11/30/2022
SW ENG PRE APRON ¤30.00 11/30/2022
SW ENG - REVIEW 20 ¤20.00 11/30/2022
SW ENG RES REVIEW 200 ¤200.00 11/30/2022
TRANS IMPACT FEE ADMIN ¤105.84 11/30/2022
TRANS IMPACT FEE ADMIN (¤105.84) 11/30/2022
SEWER CREDIT (¤1,700.00) 11/30/2022
SEWER INSPECTION ¤25.00 11/30/2022
SEWER CAPITAL FACILITY ¤9,879.52 11/30/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 11/30/2022
SITE PLAN 30 ¤30.00 11/30/2022
WATER- TURN ON ¤50.00 11/30/2022
ADJUSTMENT 50% (¤666.29) 11/30/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/30/2022
INSPECTION - RESIDENTIAL ¤1,014.75 11/30/2022
PLAN REVIEW - RESIDENTIAL ¤287.82 11/30/2022
Fees Total Due: ¤0.00 Total Paid: ¤36,859.88