I want to search for...
Permit #2022100312
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00040-0140 |
| CONDITIONED SPACE: 2692 sqft |
| OPENED PORCH (WITH ROOF) : 116 sqft |
| OPENED PORCH (WITH ROOF) : 306 sqft |
| GARAGE: 1048 sqft |
| Total Square Footage: 4162 sqft |
| Block: 00040 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 407-912-8154 |
| Location Address: 26 EMERALD LN |
| Type: DU - DUPLEX |
| Issue Date: 04/06/2023 |
| NOC: RECORDED |
| Applicant name: JUAN CARLOS HENAO-ARISTIZABAL |
| Owner: MOTYKA LISA A & RONALD A MOTYKA & JAMES R THRALL J |
|
Address UNIT B PALM COAST, FL 32164 |
|
Address 10 EMMONS LANE PALM COAST, FL 32164 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤390,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
QUEST ROOFING & CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
69 CARRIAGE CREEK WAY ORMOND BEACH, FL 32174 |
CGC1525988 (Exp: 08/31/2026) | 407-912-8154 |
Sub Contractors
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
JUAN CARLOS HENAO-ARISTIZABAL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
69 CARRIAGE CREEK WAY ORMOND BEACH, FL 32174 |
CCC1331523 (Exp: 08/31/2026) | 407-912-8154 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/10/2025 | APPROVED | CVANSTRAHLEN |
| BLD - BUILDING FINAL | 02/03/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: #1-NEC 210.8-NEEDS GFCI PROTECTION ,Unit A and B all exterior outlets recepticles need to be GFCI #2-NEC 210.8-NEEDS GFCI PROTECTION -Unit A and B refrigerator and microwave recepticle outlet need to be GFCI #3- Unit A and B , Ac and Heat E-cals model # umbers do not match what is install on the property , #4-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( low voltage wire AHU Plenum conduit ) | |||
| U -UTILITY RESIDENTIAL FINAL | 02/03/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 NO IRR. NO CC | |||
| ROW - FINAL INSPECTION | 01/31/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/31/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/31/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/31/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/30/2025 - PREVIOUS INSPECTION NOTES 1/30/25 LET CONTRACTOR KNOW THAT YOU CANNOT HAVE A FIELD SURVEY INSPECTION UNTIL AFTER A FINAL SURVEY HAS BEEN SUBMITTED AND PASSED. CACELING INSPECTION AT HIS REQUEST. HE WII SUBMIT FOR A FINAL SURVEY INSPECTION. ____________________________________________________________________________________________________________________________ 1/24/2025 - PREVIOUS INSPECTION NOTES | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/30/2025 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 1/30/25 LET CONTRACTOR KNOW THAT YOU CANNOT HAVE A FIELD SURVEY INSPECTION UNTIL AFTER A FINAL SURVEY HAS BEEN SUBMITTED AND PASSED. CACELING INSPECTION AT HIS REQUEST. HE WII SUBMIT FOR A FINAL SURVEY INSPECTION. ____________________________________________________________________________________________________________________________ 1/24/2025 - PREVIOUS INSPECTION NOTES | |||
| U-CROSS CONNECTION | 01/30/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: NO IRR. NO CC | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/24/2025 | CANCELLED BY APPLICANT | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 12/31/2024 | APPROVED | FSLADISH |
| Note: 12/31/24 PIPE ELEVATIONS GOOD AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9470 10/17/24 I AM APPROVING THIS AS NOTED THAT YOU WILL MAINTAIN THE SWALE TO KEEP IT OPEN, FLOWING AND FREE FROM OBSTRUCTION AS REQUIRED. _______________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 I HAVE READ YOUR NOTE AND WILL PARTIALLY APPROVE YOUR DRAINAGE AT THIS TIME. MAKE SURE THAT YOU KEEP THE SWALE OPEN AND FLOWING. I WILL REINSPECT ON 10/18/24 TO MAKE SURE IT IS STILL FLOWING WITHOUT OBSRTUCTION. __________________________________________________________________________________________________________________________ 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOU WILL NEED TO INSTALL A MINIMUM 12" DIAMETER TEMPORARY CULVERT PIPE AND/ OR KEEP YOUR SWALE GRADED DAILY OR A NECCESSARY TO MAINTIAN POSITIVE SWALE DRAINAGE FLOW. YOU NEED TO REMOVE PORTA POTTY FROM ROW AND PUT IT ON YOUR SITE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 10/11/24. | |||
| GRAVITY SEWER TEST | 12/10/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 4/25/2023 - PREVIOUS INSPECTION NOTES GOLDEN MAGNOILIA CALLED AND CANCELLED HAVE PORTABLE RESTROOM BY NEXT INSPECTION | |||
| U - SEWER TIE IN | 12/10/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 4/25/2023 - PREVIOUS INSPECTION NOTES GOLDEN MAGNOILIA CALLED AND CANCELLED HAVE PORTABLE RESTROOM BY NEXT INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 11/18/2024 | APPROVED | CBOWERMASTER |
| Note: 10/4/2024 3:33:59 PM- PREVIOUS INSPECTION NOTES temp power pole in the way | |||
| ELECTRIC - EARLY POWER | 11/07/2024 | APPROVED | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2170 5/22/24: FPL emailed at @ 14:45. Approved for Temporaray Pole power. 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Silt fence is incomplete and damaged. 3 sides minimum required. FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) 2). Need overgrowth throughout entire site along with, trash & debris removed to make site safe for inspections. 3). Dumpster required throughout build per City requirements. 4). Need a portable toilet on site throughout build. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. | |||
| ELECTRIC - EARLY POWER | 10/31/2024 | Disapproved - NO FEE | PKNAPIK |
| Note: 10/31/2024 1. Unit A lanai outlet missing plate. 2. Fix silt fence. FBC 3307.1 3. Overgrowth, trash, and debris needs to be cleaned up. Inspector Notes from Inspection 2170 5/22/24: FPL emailed at @ 14:45. Approved for Temporaray Pole power. 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Silt fence is incomplete and damaged. 3 sides minimum required. FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) 2). Need overgrowth throughout entire site along with, trash & debris removed to make site safe for inspections. 3). Dumpster required throughout build per City requirements. 4). Need a portable toilet on site throughout build. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. | |||
| INSULATION | 10/25/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2320 *** NOTES ADDED BY RSIMS 9/23/2024 2:22:20 PM *** 9/23/24: Window Nailing Inspection added for the interior garage doors that were not installed as of Lath/Brick/Water Barrier Inspection. Will need to be complete before scheduling Building Final Inspection. Inspector Notes from Inspection 2490 08-20-2024 Garage entry doors not installed. Please do not install casings on doors prior to final. The insulation in the jambs needs to be inspected. Also, proper nailing needs to be inspected. Inspector Notes from Inspection 2490 08-20-2024 Garage entry doors not installed. Please do not install casings on doors prior to final. The insulation in the jambs needs to be inspected. Also, proper nailing needs to be inspected. | |||
| ROW - DRAINAGE | 10/18/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/17/24 I AM APPROVING THIS AS NOTED THAT YOU WILL MAINTAIN THE SWALE TO KEEP IT OPEN, FLOWING AND FREE FROM OBSTRUCTION AS REQUIRED. _______________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 I HAVE READ YOUR NOTE AND WILL PARTIALLY APPROVE YOUR DRAINAGE AT THIS TIME. MAKE SURE THAT YOU KEEP THE SWALE OPEN AND FLOWING. I WILL REINSPECT ON 10/18/24 TO MAKE SURE IT IS STILL FLOWING WITHOUT OBSRTUCTION. __________________________________________________________________________________________________________________________ 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOU WILL NEED TO INSTALL A MINIMUM 12" DIAMETER TEMPORARY CULVERT PIPE AND/ OR KEEP YOUR SWALE GRADED DAILY OR A NECCESSARY TO MAINTIAN POSITIVE SWALE DRAINAGE FLOW. YOU NEED TO REMOVE PORTA POTTY FROM ROW AND PUT IT ON YOUR SITE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 10/11/24. | |||
| ROW - DRAINAGE | 10/11/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 10/14/24 I HAVE READ YOUR NOTE AND WILL PARTIALLY APPROVE YOUR DRAINAGE AT THIS TIME. MAKE SURE THAT YOU KEEP THE SWALE OPEN AND FLOWING. I WILL REINSPECT ON 10/18/24 TO MAKE SURE IT IS STILL FLOWING WITHOUT OBSRTUCTION. __________________________________________________________________________________________________________________________ 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOU WILL NEED TO INSTALL A MINIMUM 12" DIAMETER TEMPORARY CULVERT PIPE AND/ OR KEEP YOUR SWALE GRADED DAILY OR A NECCESSARY TO MAINTIAN POSITIVE SWALE DRAINAGE FLOW. YOU NEED TO REMOVE PORTA POTTY FROM ROW AND PUT IT ON YOUR SITE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 10/11/24. | |||
| ROW - DRAINAGE | 10/07/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 10/7/24 YOU WILL NEED TO INSTALL A MINIMUM 12" DIAMETER TEMPORARY CULVERT PIPE AND/ OR KEEP YOUR SWALE GRADED DAILY OR A NECCESSARY TO MAINTIAN POSITIVE SWALE DRAINAGE FLOW. YOU NEED TO REMOVE PORTA POTTY FROM ROW AND PUT IT ON YOUR SITE. I WILL BE BACK FOR COMPLIANCE REINSPECTION ON 10/11/24. | |||
| PEP TANK INSTALLATION REQUEST | 10/04/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: temp power pole in the way | |||
| LATH/BRICK/ WATER BARRIER | 09/23/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/23/2024 2:22:20 PM *** 9/23/24: Window Nailing Inspection added for the interior garage doors that were not installed as of Lath/Brick/Water Barrier Inspection. Will need to be complete before scheduling Building Final Inspection. Inspector Notes from Inspection 2490 08-20-2024 Garage entry doors not installed. Please do not install casings on doors prior to final. The insulation in the jambs needs to be inspected. Also, proper nailing needs to be inspected. Inspector Notes from Inspection 2490 08-20-2024 Garage entry doors not installed. Please do not install casings on doors prior to final. The insulation in the jambs needs to be inspected. Also, proper nailing needs to be inspected. | |||
| INSULATION | 08/20/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 08-20-2024 Garage entry doors not installed. Please do not install casings on doors prior to final. The insulation in the jambs needs to be inspected. Also, proper nailing needs to be inspected. | |||
| WALL SHEATHING | 08/19/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 08-15-2024 Firewall penetrations not sealed. Check at insulation inspection. | |||
| ALL ROUGH | 08/15/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 08-15-2024 Firewall penetrations not sealed. Check at insulation inspection. | |||
| ALL ROUGH | 08/14/2024 | CANCELLED BY APPLICANT | WEB |
| FIREWALL FINAL | 08/05/2024 | APPROVED | RSIMS |
| Note: 8/2/2024 - PREVIOUS INSPECTION NOTES 8/2/24: Incomplete Inspection. 1). No plans in box for inspection. FBC 107.3.1 | |||
| FIREWALL FINAL | 08/02/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 8/2/24: Incomplete Inspection. 1). No plans in box for inspection. FBC 107.3.1 | |||
| FIREWALL DRYWALL NAILING | 07/30/2024 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 07/25/2024 | APPROVED | AGAETANO |
| FIREWALL FRAMING | 07/19/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 7/2/2024 - PREVIOUS INSPECTION NOTES 7/2/24: Not Ready. Framers still working on truss engineering (bracing). ** Roof Sheathing & down Cell (only) checked and approved. Partial list only due to not being fully ready for inspection: 1). Entire site needs overgrowth removed to make site safe for inspections. 2). Over framing is missing hold down straps as required. 07-08-2024 Sheet 5 detail 5 Wall section indicates 2 x 4 wall on each side of truss. 2 X 4 not installed per plan. Please install per plan or submit a revision to the building department for review and have approved on site. Contractor can proceed at own risk. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/08/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 7/2/2024 - PREVIOUS INSPECTION NOTES 7/2/24: Not Ready. Framers still working on truss engineering (bracing). ** Roof Sheathing & down Cell (only) checked and approved. Partial list only due to not being fully ready for inspection: 1). Entire site needs overgrowth removed to make site safe for inspections. 2). Over framing is missing hold down straps as required. 07-08-2024 Sheet 5 detail 5 Wall section indicates 2 x 4 wall on each side of truss. 2 X 4 not installed per plan. Please install per plan or submit a revision to the building department for review and have approved on site. Contractor can proceed at own risk. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/02/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/2/24: Not Ready. Framers still working on truss engineering (bracing). ** Roof Sheathing & down Cell (only) checked and approved. Partial list only due to not being fully ready for inspection: 1). Entire site needs overgrowth removed to make site safe for inspections. 2). Over framing is missing hold down straps as required. | |||
| FIREWALL DRYWALL NAILING | 07/01/2024 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC TEMP POLE | 05/22/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 5/22/24: FPL emailed at @ 14:45. Approved for Temporaray Pole power. 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Silt fence is incomplete and damaged. 3 sides minimum required. FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) 2). Need overgrowth throughout entire site along with, trash & debris removed to make site safe for inspections. 3). Dumpster required throughout build per City requirements. 4). Need a portable toilet on site throughout build. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. | |||
| ELECTRIC TEMP POLE | 05/14/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/14/24: 1). Silt fence is incomplete and damaged. 3 sides minimum required. FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) 2). Need overgrowth throughout entire site along with, trash & debris removed to make site safe for inspections. 3). Dumpster required throughout build per City requirements. 4). Need a portable toilet on site throughout build. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. | |||
| TIE DOWN | 11/30/2023 | APPROVED | JWALKER |
| Note: Tie beam, and lintel approved 6/22/23. | |||
| TIE BEAM / LINTEL | 06/22/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 05/17/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/04/2023 | APPROVED | RSIMS |
| Note: 5/3/2023 - PREVIOUS INSPECTION NOTES 5/3/23: Still need relieving arches or sleeves where water lines cross through/over the footer as previously noted. 5/1/2023 - PREVIOUS INSPECTION NOTES Pressure low on PVC supply lines Where pipes pass through footings, there must be releiving arches or the pipes must be sleeved Due to rain, a few locations have washed in not allowing for the 3" distance from soil to rebar | |||
| MONOLITHIC SLAB | 05/03/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/3/23: Still need relieving arches or sleeves where water lines cross through/over the footer as previously noted. 5/1/2023 - PREVIOUS INSPECTION NOTES Pressure low on PVC supply lines Where pipes pass through footings, there must be releiving arches or the pipes must be sleeved Due to rain, a few locations have washed in not allowing for the 3" distance from soil to rebar | |||
| MONOLITHIC SLAB | 05/01/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Pressure low on PVC supply lines Where pipes pass through footings, there must be releiving arches or the pipes must be sleeved Due to rain, a few locations have washed in not allowing for the 3" distance from soil to rebar | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/28/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 4/25/2023 - PREVIOUS INSPECTION NOTES GOLDEN MAGNOILIA CALLED AND CANCELLED HAVE PORTABLE RESTROOM BY NEXT INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/25/2023 | CANCELLED BY APPLICANT | MGIBSON |
| Note: GOLDEN MAGNOILIA CALLED AND CANCELLED | |||
| WATER METER INSTALLATION REQUEST | 04/14/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/04/2025 | 02/07/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/11/2024 | 07/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/27/2023 | 11/27/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Permit extension denied. A valid reason justifying an extension has not been provided. Patrick Buckley Chief Building Official | |||
| ENGIN1 | COMPLETE | 05/17/2023 | 05/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/17/2023 | 05/17/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/01/2022 | 11/02/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/01/2022 | 11/02/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/01/2022 | 11/03/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/01/2022 | 11/04/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ZON | COMPLETE | 11/01/2022 | 11/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/12/2022 | 10/12/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| SWALE | COMPLETE | 10/07/2022 | 02/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/06/2022 | 10/11/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building PLAN REVIEW COMMENTS: 1. Note on Sheet 1 calls-out, the proposed is located within a wind-Borne Debris Region and all the exterior glazing shall be protected. Product approvals submitted are for non-impact rated glazing. A revision to the note or product approval I required. | |||
| CUSVC | HOLD | 10/06/2022 | 10/07/2022 |
| Note: Held By: HALEIGH HAND - - Please correct the utility application to reflect duplex instead of single family. | |||
| ELEC | HOLD | 10/06/2022 | 10/06/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs. 2. Need correct outlet spacing in all bedrooms. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 10/06/2022 | 10/07/2022 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/06/2022 | 10/11/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/06/2022 | 10/06/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition | |||
| SW1 | COMPLETE | 10/06/2022 | 10/10/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/06/2022 | 10/07/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/10/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/06/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/06/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/06/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/06/2025 |
| UTILITY PEP REINSPECTION | ¤40.00 | 02/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/24/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/24/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/24/2024 |
| CONNECTION FEES | ¤2,332.52 | 04/06/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 04/06/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 04/06/2023 |
| IMPACT FEE FIRE | ¤841.04 | 04/06/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤335.40 | 04/06/2023 |
| ADJUSTMENT 50% | (¤773.95) | 04/06/2023 |
| INSPECTION - RESIDENTIAL | ¤1,182.50 | 04/06/2023 |
| WATER- TURN ON | ¤50.00 | 04/06/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/06/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/06/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 04/06/2023 |
| SURCHARGE FS 533.721 | ¤4.81 | 04/06/2023 |
| SURCHARGE - FS 468.631 | ¤7.21 | 04/06/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 04/06/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 04/06/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 04/06/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 04/06/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 04/06/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/06/2023 |
| TRANS IMPACT FEE ADMIN | (¤82.14) | 04/06/2023 |
| SW ENG PRE APRON | ¤30.00 | 04/06/2023 |
| TRANS IMPACT FEE ADMIN | ¤82.14 | 04/06/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/06/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/06/2023 |
| SEWER CREDIT | (¤2,932.00) | 04/06/2023 |
| SEWER INSPECTION | ¤25.00 | 04/06/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 04/06/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 04/06/2023 |
| SITE PLAN 30 | ¤30.00 | 04/06/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 02/27/2023 |
| SITE PLAN 30 | ¤30.00 | 02/27/2023 |
| SITE PLAN 30 | (¤30.00) | 02/27/2023 |
| WATER CAPITAL FACILITY FEE | (¤7,847.76) | 02/27/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 02/27/2023 |
| SEWER CAPITAL FACILITY | (¤10,689.64) | 02/27/2023 |
| SEWER CREDIT | (¤2,932.00) | 02/27/2023 |
| SEWER INSPECTION | ¤25.00 | 02/27/2023 |
| SEWER INSPECTION | (¤25.00) | 02/27/2023 |
| TRANS IMPACT FEE ADMIN | ¤82.14 | 02/27/2023 |
| TRANS IMPACT FEE ADMIN | (¤82.14) | 02/27/2023 |
| TRANS IMPACT FEE ADMIN | (¤82.14) | 02/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/27/2023 |
| SW ENG RES REVIEW 200 | (¤200.00) | 02/27/2023 |
| TRANS IMPACT FEE ADMIN | ¤82.14 | 02/27/2023 |
| SW ENG - REVIEW 20 | (¤20.00) | 02/27/2023 |
| SEWER CREDIT | ¤2,932.00 | 02/27/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 02/27/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 02/27/2023 |
| SURCHARGE FS 533.721 | ¤4.81 | 02/27/2023 |
| SURCHARGE FS 533.721 | (¤4.81) | 02/27/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 02/27/2023 |
| IMPACT FEE TRANSPORTATION | (¤2,738.00) | 02/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 02/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 02/27/2023 |
| WATER -IRRIGATION INSPECTION | (¤50.00) | 02/27/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 02/27/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 02/27/2023 |
| IMPACT FEE SCHOOL | (¤10,900.00) | 02/27/2023 |
| SURCHARGE - FS 468.631 | ¤7.21 | 02/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/27/2023 |
| SW ENG - FOUNDATION SURVEY | (¤20.00) | 02/27/2023 |
| SURCHARGE - FS 468.631 | (¤7.21) | 02/27/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 02/27/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/27/2023 |
| SW ENG PRE APRON | (¤30.00) | 02/27/2023 |
| SW ENG INSPECTION 80 | (¤80.00) | 02/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/27/2023 |
| INSPECTION - RESIDENTIAL | ¤1,182.50 | 02/27/2023 |
| INSPECTION - RESIDENTIAL | (¤1,182.50) | 02/27/2023 |
| ADJUSTMENT 50% | (¤773.95) | 02/27/2023 |
| ADJUSTMENT 50% | ¤773.95 | 02/27/2023 |
| WATER- TURN ON | ¤50.00 | 02/27/2023 |
| WATER- TURN ON | (¤50.00) | 02/27/2023 |
| PLAN REVIEW - RESIDENTIAL | (¤335.40) | 02/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 02/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤335.40 | 02/27/2023 |
| IMPACT FEE PARKS | (¤3,538.30) | 02/27/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 02/27/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 02/27/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 02/27/2023 |
| IMPACT FEE FIRE | ¤841.04 | 02/27/2023 |
| IMPACT FEE FIRE | (¤841.04) | 02/27/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 02/27/2023 |
| CONNECTION FEES | ¤2,332.52 | 02/27/2023 |
| CONNECTION FEES | (¤2,332.52) | 02/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤37,611.23 |