I want to search for...

Permit #2022100367

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-0720
GARAGE: 593 sqft
CONDITIONED SPACE: 2500 sqft
OPENED PORCH (WITH ROOF) : 92 sqft
OPENED PORCH (WITH ROOF) : 365 sqft
Total Square Footage: 3550 sqft
Block: 00000
Subdivision: 1005 - SANCTUARY SUBDIVISION
Job Phone: 386-931-5935
Location Address: 3 MALLORY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/25/2022
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: HOTTOWE MICHAEL & KYM H&W

Address

112 BRIDGEHAVEN DRIVE

PALM COAST, FL 32137

Lot: 0720
Contracted Stated Job Value: ¤540,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

DILLON CARRERAS
Status Location Address State License Number
ACTIVE

3504 LUNDY ROAD

PALATKA, FL 32177

EC13010133 (Exp: 08/31/2026)
MARK B SOWERS
Status Location Address State License Number Phone
ACTIVE

609 FOURTH ST

BUNNELL, FL 32110

35616 (Exp: 08/31/2026) 386-225-1753
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
RYAN JAMES PERRY
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/14/2024 Approval - Private Provider PPROVIDER
Note: 3/12/2024 9:00:42 AM- PREVIOUS INSPECTION NOTES 3/8/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 03/12/2024 Disapproved- Private Provider PPROVIDER
Note: 3/8/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 03/08/2024 CANCELLED BY APPLICANT BTAYLOR
ROW - STORMWATER FINAL 03/01/2024 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 03/01/2024 FINAL APPROVED DHANEY
U-CROSS CONNECTION 03/01/2024 APPROVED DHANEY
Note: 2/29/2024 - PREVIOUS INSPECTION NOTES 2/21/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES Water meter pit full of dirt - needs cleaned for Insp. . Water meter pit still full of dirt - needs cleaned . 2/21 Water Meter Pit half full of Dirt - can not see Double cheek Back Flows for cross CN. Insp. . 2/29
ROW - FINAL APRON (AFTER POUR) 03/01/2024 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ELEVATION CERTIFICATE-FINAL APPROVAL 02/29/2024 APPROVED JMYERS
U-CROSS CONNECTION 02/29/2024 Disapproved -FEE REQUIRED DHANEY
Note: 2/21/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES Water meter pit full of dirt - needs cleaned for Insp. . Water meter pit still full of dirt - needs cleaned . 2/21 Water Meter Pit half full of Dirt - can not see Double cheek Back Flows for cross CN. Insp. . 2/29
ROW FIELD SURVEY /GRADING CERTIFICATION 02/26/2024 APPROVED - AS NOTED EMADISON
Note: ** 02/26/24 BEFORE THE FINAL ROW IS APPROVED NEED TO HAVE SOD ON BARE EARTH ALONG SIDE A/C UNIT WALL AND FENCE AT PROPERTY LINE
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/26/2024 APPROVED EMADISON
Note: 2/23/2024 - PREVIOUS INSPECTION NOTES 2/22/2024 - PREVIOUS INSPECTION NOTES ** 02/22/24 BUILDER NEEDS TO RE-SUBMIT A CLEAN CLEAR FINAL SURVEY . YOUR PRINT IS BLURRY NUMBERS NEED TO BE CLEAR FOR INSPECTOR TO REVIEW
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/23/2024 CANCELLED BY APPLICANT EMADISON
Note: 2/22/2024 - PREVIOUS INSPECTION NOTES ** 02/22/24 BUILDER NEEDS TO RE-SUBMIT A CLEAN CLEAR FINAL SURVEY . YOUR PRINT IS BLURRY NUMBERS NEED TO BE CLEAR FOR INSPECTOR TO REVIEW
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/22/2024 Disapproved - NO FEE EMADISON
Note: ** 02/22/24 BUILDER NEEDS TO RE-SUBMIT A CLEAN CLEAR FINAL SURVEY . YOUR PRINT IS BLURRY NUMBERS NEED TO BE CLEAR FOR INSPECTOR TO REVIEW
U-CROSS CONNECTION 02/21/2024 Disapproved -FEE REQUIRED DHANEY
Note: 2/6/2024 - PREVIOUS INSPECTION NOTES Water meter pit full of dirt - needs cleaned for Insp. . Water meter pit still full of dirt - needs cleaned . 2/21
U-CROSS CONNECTION 02/06/2024 Disapproved - NO FEE DHANEY
Note: Water meter pit full of dirt - needs cleaned for Insp. .
GRAVITY SEWER TEST 02/06/2024 Approval - Private Provider PPROVIDER
Note: 2/6/2024 7:29:32 AM- PREVIOUS INSPECTION NOTES
ELECTRIC - EARLY POWER 02/05/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 01/25/2024 APPROVED - AS NOTED EMADISON
Note: ** 01/25/24 READY TO SET ALL PAVERS BACK IN PLACE _______________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES 1/8/2024 - PREVIOUS INSPECTION NOTES ALL PAVERS DOWN AT THE TIME OF THE INSPECTION YOU ARE NOT ALLOWED TO LAY ANY PAVERS AT THIS INSPECTION NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE UNDER THE PAVERS AND THE COMPACTION OF THE BASE AND THE THICKNESS OF THE BASE. SEE PHOTO OF THE INSPECTION ---------------------------------------------------------------------------------------------------------- 12/27/2023 - PREVIOUS INSPECTION NOTES Approved for the concrete Apron and paver restraints only. Paver Driveway.
ROW- PRE-APRON (PRE-POUR) 01/25/2024 CANCELLED BY APPLICANT WEB
Note: 1/18/2024 - PREVIOUS INSPECTION NOTES 1/8/2024 - PREVIOUS INSPECTION NOTES ALL PAVERS DOWN AT THE TIME OF THE INSPECTION YOU ARE NOT ALLOWED TO LAY ANY PAVERS AT THIS INSPECTION NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE UNDER THE PAVERS AND THE COMPACTION OF THE BASE AND THE THICKNESS OF THE BASE. SEE PHOTO OF THE INSPECTION ---------------------------------------------------------------------------------------------------------- 12/27/2023 - PREVIOUS INSPECTION NOTES Approved for the concrete Apron and paver restraints only. Paver Driveway.
GRAVITY SEWER TEST 01/23/2024 CANCELLED BY APPLICANT PPROVIDER
U - SEWER TIE IN 01/23/2024 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 01/18/2024 Disapproved - NO FEE EMADISON
Note: 1/8/2024 - PREVIOUS INSPECTION NOTES ALL PAVERS DOWN AT THE TIME OF THE INSPECTION YOU ARE NOT ALLOWED TO LAY ANY PAVERS AT THIS INSPECTION NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE UNDER THE PAVERS AND THE COMPACTION OF THE BASE AND THE THICKNESS OF THE BASE. SEE PHOTO OF THE INSPECTION ---------------------------------------------------------------------------------------------------------- 12/27/2023 - PREVIOUS INSPECTION NOTES Approved for the concrete Apron and paver restraints only. Paver Driveway.
ROW- PRE-APRON (PRE-POUR) 01/08/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: ALL PAVERS DOWN AT THE TIME OF THE INSPECTION YOU ARE NOT ALLOWED TO LAY ANY PAVERS AT THIS INSPECTION NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE UNDER THE PAVERS AND THE COMPACTION OF THE BASE AND THE THICKNESS OF THE BASE. SEE PHOTO OF THE INSPECTION ---------------------------------------------------------------------------------------------------------- 12/27/2023 - PREVIOUS INSPECTION NOTES Approved for the concrete Apron and paver restraints only. Paver Driveway.
ROW- PAVER RESTRAINTS 12/27/2023 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 12/27/2023 PARTIALLY APPROVED RGROSS
Note: Approved for the concrete Apron and paver restraints only. Paver Driveway.
LATH/BRICK/ WATER BARRIER 08/11/2023 Approval - Private Provider PPROVIDER
GAS ROUGH 08/03/2023 Approval - Private Provider PPROVIDER
Note: 8/2/2023 12:45:24 PM- PREVIOUS INSPECTION NOTES
INSULATION 08/03/2023 Approval - Private Provider PPROVIDER
GAS ROUGH 07/27/2023 Disapproved- Private Provider PPROVIDER
ELECTRIC-TUG 07/27/2023 Approval - Private Provider PPROVIDER
ALL ROUGH 07/27/2023 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 05/17/2023 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/17/2023 Approval - Private Provider PPROVIDER
WALL SHEATHING 05/17/2023 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 05/02/2023 APPROVED EMADISON
Note: ** 05/02/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN EROSION CONTROL AND DRAINAGE THROUGH OUT THE CONSTRUCTION OF THE PROPERTY ______________________________________________________________________________________________________________________ 4/28/2023 - PREVIOUS INSPECTION NOTES ** 04/28/23 BUILDER NEEDS TO INSTALL SILT FENCE IN FAR RIGHT CORNER AT POINT ALONG SEAWALL AROUND PALM TREES ** SILT FENCE INSTALLED ALONG SEAWALL AND PROPERTY LINES ** FOLLOW UP 05/02/23 _____________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 NO CORRECTIONS MADES BUILDER WILL HAVE INTIL 05/03/23 TO CORRECT ISSUES NOTED OR A STOP WORK ORDER WILL BE IMPOSED ON THE JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/28/23 _______________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES ** 04/26/23 NO CORRECTIONS MADES BUILDER WILL HAVE INTIL 05/03/23 TO CORRECT ISSUES NOTED OR A STOP WORK ORDER WILL BE IMPOSED ON THE JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/27/23 _____________________________________________________________________________________________________________________ ** 04/21/23 BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/26/23
ROW - DRAINAGE 04/28/2023 PARTIALLY APPROVED EMADISON
Note: ** 04/28/23 BUILDER NEEDS TO INSTALL SILT FENCE IN FAR RIGHT CORNER AT POINT ALONG SEAWALL AROUND PALM TREES ** SILT FENCE INSTALLED ALONG SEAWALL AND PROPERTY LINES ** FOLLOW UP 05/02/23 _____________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES ** 04/27/23 NO CORRECTIONS MADES BUILDER WILL HAVE INTIL 05/03/23 TO CORRECT ISSUES NOTED OR A STOP WORK ORDER WILL BE IMPOSED ON THE JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/28/23 _______________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES ** 04/26/23 NO CORRECTIONS MADES BUILDER WILL HAVE INTIL 05/03/23 TO CORRECT ISSUES NOTED OR A STOP WORK ORDER WILL BE IMPOSED ON THE JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/27/23 _____________________________________________________________________________________________________________________ ** 04/21/23 BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/26/23
ROW - DRAINAGE 04/27/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/27/23 NO CORRECTIONS MADES BUILDER WILL HAVE INTIL 05/03/23 TO CORRECT ISSUES NOTED OR A STOP WORK ORDER WILL BE IMPOSED ON THE JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/28/23 _______________________________________________________________________________________________________________________ 4/26/2023 - PREVIOUS INSPECTION NOTES ** 04/26/23 NO CORRECTIONS MADES BUILDER WILL HAVE INTIL 05/03/23 TO CORRECT ISSUES NOTED OR A STOP WORK ORDER WILL BE IMPOSED ON THE JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/27/23 _____________________________________________________________________________________________________________________ ** 04/21/23 BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/26/23
ROW - DRAINAGE 04/26/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/26/23 NO CORRECTIONS MADES BUILDER WILL HAVE INTIL 05/03/23 TO CORRECT ISSUES NOTED OR A STOP WORK ORDER WILL BE IMPOSED ON THE JOB SITE. ** BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/27/23 _____________________________________________________________________________________________________________________ ** 04/21/23 BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/26/23
ROW - DRAINAGE 04/21/2023 CANCELLED BY INSPECTOR EMADISON
Note: 4/21/2023 - PREVIOUS INSPECTION NOTES ** 04/21/23 BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/26/23 rjg. Please inspect for fallen silt fence. Homeowner says sediment is going into the canal.
ROW - DRAINAGE 04/21/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/21/23 BUILDER NEEDS TO INSTALL SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND FROM THE FAR RIGHT CORNER OF SEAWALL BY FENCE AND PALM TREES TO TH LEFT SIDE PROPERTY LINE. SILT FENCE NEEDS TO BE BURIED 4 INCHES INTO THE GROUND TO PREVENTY EROSION FROM PASSING UNDER ** BUILDER WILL ALSO BE RESPONSIBLE FOR REMOVE ERODED SEDIMENT FROM THE CANAL PRIOR TO THE STORMWATER ROW FINAL BEING APPROVED. ** SEE ATTACHED PHOTOS ** FOLLOW UP ISPECTIO ON 04/26/23 rjg. Please inspect for fallen silt fence. Homeowner says sediment is going into the canal.
ELEV CERT-FOUNDATION APPROVAL 03/16/2023 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 03/15/2023 APPROVED TDOAK
TIE BEAM / LINTEL 03/07/2023 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 02/21/2023 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 02/14/2023 Approval - Private Provider PPROVIDER
STEM WALL FOUNDATION 01/23/2023 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 01/13/2023 APPROVED CSTONE
WILDLIFE CHECK - ENVIRONMENTAL 01/09/2023 APPROVED JMYERS

Review History

Department Status Date In Date Out
BADMIN INFORMATION 03/04/2024 03/04/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator Revisions and corrections should follow the same criteria and should use the same name as the original originally identified. (no – new, revised, second submittal, updated)
PLFM COMPLETE 02/28/2024 02/29/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 02/26/2024 02/28/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A7 needs to have a stem wall diagram rather than a monoslab.
ZON COMPLETE 03/15/2023 03/15/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM COMPLETE 03/15/2023 03/16/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. However, at Final A7 needs to have diagram 1B as this is a stem wall construction.
ENGIN1 COMPLETE 03/15/2023 03/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 03/14/2023 03/15/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Foundation survey is unreadable. Please resubmit.
ZON HOLD 03/14/2023 03/14/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit foundation survey with legible setback dimensions.
PLFM HOLD 03/14/2023 03/14/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff cannot read the Foundation Survey to confirm elevations on the elevation certificate. Please upload legible survey.
BLD COMPLETE 01/06/2023 01/06/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 10/21/2022 10/21/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 10/19/2022 10/19/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Color sheet must state that siding color will match stucco color Need one additional tree to total 7 for this lot size
PLFM COMPLETE 10/19/2022 10/21/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 10/18/2022 10/18/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
URB COMPLETE 10/10/2022 10/11/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 - complete pending zoning hold.
PLFM HOLD 10/10/2022 10/10/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan and Survey, the structure does fall within the SFHA. Elevation certificates are required at construction drawings, foundation, and final.
BLD HOLD 10/07/2022 10/11/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building PLAN REVIEW COMMENTS: 1. Note on Sheet A2 calls-out, the proposed is located within a wind-Borne Debris Region and all the exterior glazing shall be protected. Product approvals submitted are for non-impact rated glazing. A revision to the note or product approval I required.
CUSVC COMPLETE 10/07/2022 10/11/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 10/07/2022 10/10/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/07/2022 10/07/2022
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
LOCATE COMPLETE 10/07/2022 10/13/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 10/07/2022 10/10/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/07/2022 10/10/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 10/07/2022 10/10/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Color sheet must state that siding color will match stucco color Ac pad must be screened with 7 gallon shrubs Foundation Plantings a. Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four (4) shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls. The shrubs must be 3 gallon to be counted as the foundation plantings
PLENV COMPLETE 10/07/2022 10/14/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 10/14/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE - RESID PP ¤225.00 03/21/2024
PLAN REVIEW - REVISION ¤32.50 03/21/2024
CONTRACTOR CHANGE ¤20.00 03/21/2024
SW ENG - INSPECTION 20 ¤20.00 03/21/2024
SW ENG - INSPECTION 20 ¤20.00 03/21/2024
SW ENG - INSPECTION 20 ¤20.00 03/21/2024
SW ENG - INSPECTION 20 ¤20.00 03/21/2024
SW ENG - INSPECTION 20 ¤20.00 03/21/2024
SW ENG - INSPECTION 20 ¤20.00 03/21/2024
SW ENG REINSPECTION 30 ¤30.00 03/21/2024
REINSPECTION FEE ¤40.00 03/21/2024
REINSPECTION FEE ¤40.00 03/21/2024
SURCHARGE FS 533.721 ¤5.92 10/25/2022
SURCHARGE - FS 468.631 ¤8.88 10/25/2022
SW ENG - FOUNDATION SURVEY ¤20.00 10/25/2022
SW ENG - REVIEW 20 ¤20.00 10/25/2022
SW ENG RES REVIEW 200 ¤200.00 10/25/2022
TRANS IMPACT FEE ADMIN ¤96.72 10/25/2022
TRANS IMPACT FEE ADMIN (¤96.72) 10/25/2022
SEWER INSPECTION ¤25.00 10/25/2022
SEWER CAPITAL FACILITY ¤4,939.76 10/25/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 10/25/2022
SITE PLAN 30 ¤30.00 10/25/2022
SW ENG INSPECTION 80 ¤80.00 10/25/2022
SW ENG PRE APRON ¤30.00 10/25/2022
FIRE IMPACT FEE ADMIN ¤12.62 10/25/2022
FIRE IMPACT FEE ADMIN (¤12.62) 10/25/2022
IMPACT FEE FIRE ¤420.52 10/25/2022
IMPACT FEE PARKS ¤1,769.15 10/25/2022
IMPACT FEE SCHOOL ¤5,450.00 10/25/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 10/25/2022
WATER -IRRIGATION INSPECTION ¤25.00 10/25/2022
PARKS IMPACT FEE ADMIN ¤53.07 10/25/2022
PARKS IMPACT FEE ADMIN (¤5,307.00) 10/25/2022
PARKS IMPACT FEE ADMIN (¤53.07) 10/25/2022
CONNECTION FEES ¤25.00 10/25/2022
INSPECTION - RESIDENTIAL ¤1,485.00 10/25/2022
PLAN REVIEW - RESIDENTIAL ¤421.20 10/25/2022
WATER-METER ¤467.09 10/25/2022
WATER-METER ¤467.09 10/25/2022
WATER- TURN ON ¤25.00 10/25/2022
ADJUSTMENT 50% (¤968.10) 10/25/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/25/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,027.51