I want to search for...
Permit #2022100372
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00740-0070 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00740 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 631-929-5500 |
| Location Address: 26 ROLLINS LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/01/2023 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICKAPOGUE RE DEVELOPMENT LLC |
|
Address SUITE 300 ORLANDO, FL 32819 |
|
Address 7450 DR PHILLIPS BLVD ORLANDO, FL 32819 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/17/2023 | FINAL APPROVED | JWALKER |
| Note: 7/10/2023 - PREVIOUS INSPECTION NOTES 1. Microwave exhaust duct has been damaged and no longer connected to the vent termination in the attic. 2. Seal the garage ceiling at the AHU supply plenum. 3. Please post the insulation placard. Common place is stapled to the truss at the attic access. 4. The attic access light fixture is not installed. Hanging down. | |||
| BLD - BUILDING FINAL | 07/10/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Microwave exhaust duct has been damaged and no longer connected to the vent termination in the attic. 2. Seal the garage ceiling at the AHU supply plenum. 3. Please post the insulation placard. Common place is stapled to the truss at the attic access. 4. The attic access light fixture is not installed. Hanging down. | |||
| ROW - STORMWATER FINAL | 07/10/2023 | APPROVED | FSLADISH |
| Note: 07/10/23 MEETS THE MINIMUM CITY STANDARDS. LOOKED OK AT THE TIME OF THIS FINAL INSPECTION. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/10/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- PROJECT STATUS | 06/13/2023 | CANCELLED BY INSPECTOR | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 06/12/2023 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/12/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/12/2023 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 05/19/2023 | APPROVED | JWALKER |
| Note: 5/16/2023 - PREVIOUS INSPECTION NOTES Kitchen counter top outlets are not safed off. | |||
| ELECTRIC - EARLY POWER | 05/16/2023 | Disapproved - NO FEE | JWALKER |
| Note: Kitchen counter top outlets are not safed off. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2023 | APPROVED | FSLADISH |
| Note: 04/26/23 READY TO POUR AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| LATH/BRICK/ WATER BARRIER | 04/05/2023 | APPROVED | JWALKER |
| Note: 3/30/2023 - PREVIOUS INSPECTION NOTES Metal lath above the garage and the front entry has not been completed. Metal lath is to be fastened a minimum of 16" o.c. vertically and 7" o.c. horizontally. | |||
| LATH/BRICK/ WATER BARRIER | 03/30/2023 | Disapproved - NO FEE | JWALKER |
| Note: Metal lath above the garage and the front entry has not been completed. Metal lath is to be fastened a minimum of 16" o.c. vertically and 7" o.c. horizontally. | |||
| GRAVITY SEWER TEST | 03/28/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 03/28/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 03/28/2023 | APPROVED - AS NOTED | JHARDING |
| Note: Nn irrigation, no cross connections. | |||
| INSULATION | 03/27/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 1. The 18" flex needs to be lifted off the ceiling chord to allow for proper insulation fill. 2. Rear slider has not been installed. 3. Set the head jamb screws at the front door. 4. Tub drain needs to be sealed. Check for corrections at insulation inspection. | |||
| ALL ROUGH | 03/23/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. The 18" flex needs to be lifted off the ceiling chord to allow for proper insulation fill. 2. Rear slider has not been installed. 3. Set the head jamb screws at the front door. 4. Tub drain needs to be sealed. Check for corrections at insulation inspection. | |||
| ROOF VALLEY & METAL | 03/08/2023 | APPROVED | JWALKER |
| Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3/2/233 Plywood at truss T12 not corrected. Underlayment fastening not corrected. 2/28/2023 - PREVIOUS INSPECTION NOTES 1. Missed roof deck nailing at truss T-12 4th row up. Truss CJ05 front left bedroom first row above the window. 2. Underlayment is to be fastened a minimum of 6" o.c. at the laps and ends. | |||
| ROOF VALLEY & METAL | 03/02/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 3/2/233 Plywood at truss T12 not corrected. Underlayment fastening not corrected. 2/28/2023 - PREVIOUS INSPECTION NOTES 1. Missed roof deck nailing at truss T-12 4th row up. Truss CJ05 front left bedroom first row above the window. 2. Underlayment is to be fastened a minimum of 6" o.c. at the laps and ends. | |||
| WALL SHEATHING | 02/28/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/28/2023 | APPROVED - AS NOTED | JWALKER |
| Note: Missed roof deck nailing at truss T-12 4th row up. Truss CJ05 front left bedroom first row above the window. | |||
| ROOF VALLEY & METAL | 02/28/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Missed roof deck nailing at truss T-12 4th row up. Truss CJ05 front left bedroom first row above the window. 2. Underlayment is to be fastened a minimum of 6" o.c. at the laps and ends. | |||
| ELECTRIC-TUG | 02/28/2023 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 02/17/2023 | APPROVED | JWALKER |
| Note: 2/16/2023 - PREVIOUS INSPECTION NOTES 2/16/23: Block is not repaired as required. Identified in previous inspection. 2/14/2023 - PREVIOUS INSPECTION NOTES Right side wall where the plumbing is, block has been removed and filled with motar. Reinstall block and grout corretly. Block are already starting to sag. | |||
| TIE BEAM / LINTEL | 02/16/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/16/23: Block is not repaired as required. Identified in previous inspection. 2/14/2023 - PREVIOUS INSPECTION NOTES Right side wall where the plumbing is, block has been removed and filled with motar. Reinstall block and grout corretly. Block are already starting to sag. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/16/2023 | APPROVED | AMOBLEY |
| TIE BEAM / LINTEL | 02/14/2023 | Disapproved - NO FEE | JWALKER |
| Note: Right side wall where the plumbing is, block has been removed and filled with motar. Reinstall block and grout corretly. Block are already starting to sag. | |||
| MONOLITHIC SLAB | 02/09/2023 | APPROVED | RSIMS |
| Note: 2/8/2023 - PREVIOUS INSPECTION NOTES 2/8/23: 1). Remove roots from slab areas as highlighted on plan. 2). Back left side of garage footer has dirt cave in. (highlighted on plan) 3). Left side of entry the rebar needs to be centered in the footer better. 4). Electrical conduit for kitchen island needs to be buried in the dirt & not above plastic within the slab. 2/7/2023 - PREVIOUS INSPECTION NOTES No rebar has been installed. Please ensure work is complete before scheduling inspections. | |||
| MONOLITHIC SLAB | 02/08/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/8/23: 1). Remove roots from slab areas as highlighted on plan. 2). Back left side of garage footer has dirt cave in. (highlighted on plan) 3). Left side of entry the rebar needs to be centered in the footer better. 4). Electrical conduit for kitchen island needs to be buried in the dirt & not above plastic within the slab. 2/7/2023 - PREVIOUS INSPECTION NOTES No rebar has been installed. Please ensure work is complete before scheduling inspections. | |||
| MONOLITHIC SLAB | 02/07/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: No rebar has been installed. Please ensure work is complete before scheduling inspections. | |||
| MONOLITHIC SLAB | 02/06/2023 | CANCELLED BY APPLICANT | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/02/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/02/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/20/2023 | 06/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/27/2023 | 02/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/16/2023 | 02/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/16/2023 | 02/16/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/19/2022 | 10/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/19/2022 | 10/19/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/07/2022 | 10/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/07/2022 | 10/12/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 10/07/2022 | 10/10/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/07/2022 | 10/07/2022 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/07/2022 | 10/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/07/2022 | 10/10/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/07/2022 | 10/10/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE BOTH PROPERTY LINE A COMMON SWALE | |||
| ZON | COMPLETE | 10/07/2022 | 10/10/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/07/2022 | 02/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/28/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/28/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 06/28/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/28/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/01/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/01/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 02/01/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 02/01/2023 |
| SEWER CREDIT | (¤934.92) | 02/01/2023 |
| SEWER INSPECTION | ¤25.00 | 02/01/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 02/01/2023 |
| WATER CREDIT | (¤345.89) | 02/01/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 02/01/2023 |
| SITE PLAN 30 | ¤30.00 | 02/01/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 02/01/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 02/01/2023 |
| IMPACT FEE FIRE | ¤420.52 | 02/01/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 02/01/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/01/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 02/01/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/01/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 02/01/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 02/01/2023 |
| SURCHARGE FS 533.721 | ¤2.69 | 02/01/2023 |
| SURCHARGE - FS 468.631 | ¤4.04 | 02/01/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/01/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/01/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/01/2023 |
| CONNECTION FEES | ¤1,166.26 | 02/01/2023 |
| WATER- TURN ON | ¤25.00 | 02/01/2023 |
| ADJUSTMENT 50% | (¤405.07) | 02/01/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/01/2023 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 02/01/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 02/01/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,689.61 |