I want to search for...
Permit #2022100778
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-01020-0140 |
| CONDITIONED SPACE: 1831 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 116 sqft |
| OPENED PORCH (WITH ROOF) : 245 sqft |
| OPENED PORCH (WITH ROOF) : 85 sqft |
| Total Square Footage: 2750 sqft |
| Block: 01020 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 31 SEA BREEZE TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/25/2022 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: SEAWAY UNITED LLC A FLORIDA LIMITED |
|
Address 1690 SEAGRA[E WAY HOLLYWOOD, FL 33019 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/17/2024 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL APRON (AFTER POUR) | 10/27/2023 | APPROVED | FSLADISH |
| Note: 10/27/23 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 10/27/2023 | APPROVED | FSLADISH |
| Note: 10/27/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/27/2023 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 10/26/2023 | APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/25/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/25/2023 | APPROVED | FSLADISH |
| Note: 10/25/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/07/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 08/25/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-25-23 1. Emailed FPL at 2:04. | |||
| GRAVITY SEWER TEST | 08/18/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 08/18/2023 | APPROVED | MGIBSON |
| INSULATION | 07/24/2023 | APPROVED | TSTAUFFACHER |
| PEP TANK INSTALLATION REQUEST | 07/24/2023 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 07/20/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 06/30/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 05/11/2023 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2460 5/11/23 need to check bucket at left side of front entry needs tap con to block and check truss at master bed room slidder on framed wall needs strap 5/8/2023 - PREVIOUS INSPECTION NOTES 5-8-23 1. No plans in box. 2. Engineering not started. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: 5/11/23 need to check bucket at left side of front entry needs tap con to block and check truss at master bed room slidder on framed wall needs strap 5/8/2023 - PREVIOUS INSPECTION NOTES 5-8-23 1. No plans in box. 2. Engineering not started. | |||
| ROOF VALLEY & METAL | 05/10/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-10-23 1. Can not perform this inspection until roof braces, down cell and ties has been approved. | |||
| WALL SHEATHING | 05/08/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/08/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-8-23 1. No plans in box. 2. Engineering not started. | |||
| TIE BEAM / LINTEL | 01/19/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 01/06/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/19/2022 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/14/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/30/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/10/2024 | 01/12/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/20/2023 | 10/20/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because expired NOC, please upload current NOC and final survey. | |||
| ENGIN1 | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/21/2022 | 10/21/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/14/2022 | 10/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/14/2022 | 10/17/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 10/14/2022 | 10/14/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/14/2022 | 10/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/14/2022 | 10/19/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/14/2022 | 10/17/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/14/2022 | 10/20/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/14/2022 | 10/14/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan : Please provide width of driveway. landscape plan: please add one more tree to the proposed. Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 5 trees please adjust the rear of home in the landscape plan as it does not match the site plan. | |||
| SWALE | COMPLETE | 10/14/2022 | 02/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/13/2024 |
| CONNECTION FEES | ¤1,077.88 | 10/25/2022 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 10/25/2022 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 10/25/2022 |
| IMPACT FEE FIRE | ¤420.52 | 10/25/2022 |
| IMPACT FEE PARKS | ¤1,769.15 | 10/25/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/25/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 10/25/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/25/2022 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 10/25/2022 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 10/25/2022 |
| SURCHARGE FS 533.721 | ¤2.99 | 10/25/2022 |
| SURCHARGE - FS 468.631 | ¤4.48 | 10/25/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/25/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/25/2022 |
| SW ENG PRE APRON | ¤30.00 | 10/25/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/25/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/25/2022 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 10/25/2022 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 10/25/2022 |
| SEWER CREDIT | (¤984.93) | 10/25/2022 |
| SEWER INSPECTION | ¤25.00 | 10/25/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 10/25/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 10/25/2022 |
| SITE PLAN 30 | ¤30.00 | 10/25/2022 |
| WATER- TURN ON | ¤25.00 | 10/25/2022 |
| ADJUSTMENT 50% | (¤456.25) | 10/25/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/25/2022 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 10/25/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 10/25/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,014.10 |