Permit #2022101192
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00170-0260 |
| GARAGE: 455 sqft |
| CONDITIONED SPACE: 2062 sqft |
| Total Square Footage: 2517 sqft |
| Block: 00170 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 904-888-6443 |
| Location Address: 16 POPE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/06/2022 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: PCRE5 LLC |
|
Address 820 S EDENBRIDGE WAY ST AUGUSTINE, FL 32092 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
JUSTIN JACKSON
| Status | Location Address | Phone |
| INACTIVE |
51 LLWELLYN TRAIL PALM COAST , FL 32164 |
386-338-1000 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 09/27/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: AT THE TIME THERE IS STILL THE HUMP IN THE DRAINAGE PATTERN BUT AFTER ALL THE RAIN WE HAD LAST NIGHT PASSING AS NOTE THERE IS NO STANDING WATER IN THE AREA SO DRAINAGE IS WORKING --------------------------------------------------------------------- 9/19/2023 - PREVIOUS INSPECTION NOTES 09/19/23 AS I STATED IN MY PREVIOUS INSPECTION YOU NEED TO GRIND THE STUMP DOWN BELOW GRADE AND SET SOD AT MATCHING GRADE SO THAT THE YARD DRAINAGE MOVES FORWARD. YOUR SOD IS SITTING PROBABLY A FOOT OR MORE HIGHER THAN THE GRADE. SEE PHOTOS FOR REFERENCE. i AM NOT GOING TO FEE YOU TODAY. PLEASE MAKE CORRECTION. Inspector Notes from Inspection 9272 08/28/23 PIPE IS OK. CUTS MADE. HOT PATCH MADE. CULVERT NEEDS TO BE CLEANED OUT BEFORE ROW FINAL. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 08/25/23 PROPERTY CORNER CORRECTED. YOU WILL NEED TO GRIND THE LARGE STUMP DOWN ON THE LEFT SIDE PROPERTY LINE AND MATCH GRADE THAT WILL ALLOW POSITIVE FORWARD DRAINAGE. THIS WILL NOT PASS FINAL ROW UNTIL THIS IS CORRECTED. I WILL PASS YOUR FIELD SURVEY AS NOTED, BUT THE STUMP NEEDS TO BE GOUND DOWN AND SOD LAID MUST MATCH GRADE. SEE PHOTO. PLEASE REMOVE PORTA POTTY FROM THE SWALE AREA. 3 No Landscaping allowed in the ROW or Utility easement. Sec 300.03 C1f Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). 6/7/2023 - PREVIOUS INSPECTION NOTES 06/07/23 NEED TO PULL UP SOD IN THE REAR LEFT PROPERTY CONER WHERE IT IS WHITELINED AND RAISE AREA TO HAVE REAR TO FRONT PROPERTY DRAINAGE WITHOUT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. NEED TO GRIND DOWN LARGE STUMP ON LEFT PROPERTY LINE AS IT IS IMPEDING EASEMENT DRAINAGE CONVEYANCE. "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 06/07/23 NEED TO FIND OUT WHAT ANOMOLY IS CAUSING HIGH NUMBER ON LEFT SIDE FRONT AREA PROPERTY LINE. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/20/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 9/19/2023 - PREVIOUS INSPECTION NOTES need access to pep breaker | |||
| U -UTILITY RESIDENTIAL FINAL | 09/19/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: need access to pep breaker | |||
| ROW - STORMWATER FINAL | 09/19/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/19/23 AS I STATED IN MY PREVIOUS INSPECTION YOU NEED TO GRIND THE STUMP DOWN BELOW GRADE AND SET SOD AT MATCHING GRADE SO THAT THE YARD DRAINAGE MOVES FORWARD. YOUR SOD IS SITTING PROBABLY A FOOT OR MORE HIGHER THAN THE GRADE. SEE PHOTOS FOR REFERENCE. i AM NOT GOING TO FEE YOU TODAY. PLEASE MAKE CORRECTION. Inspector Notes from Inspection 9272 08/28/23 PIPE IS OK. CUTS MADE. HOT PATCH MADE. CULVERT NEEDS TO BE CLEANED OUT BEFORE ROW FINAL. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 08/25/23 PROPERTY CORNER CORRECTED. YOU WILL NEED TO GRIND THE LARGE STUMP DOWN ON THE LEFT SIDE PROPERTY LINE AND MATCH GRADE THAT WILL ALLOW POSITIVE FORWARD DRAINAGE. THIS WILL NOT PASS FINAL ROW UNTIL THIS IS CORRECTED. I WILL PASS YOUR FIELD SURVEY AS NOTED, BUT THE STUMP NEEDS TO BE GOUND DOWN AND SOD LAID MUST MATCH GRADE. SEE PHOTO. PLEASE REMOVE PORTA POTTY FROM THE SWALE AREA. 3 No Landscaping allowed in the ROW or Utility easement. Sec 300.03 C1f Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). 6/7/2023 - PREVIOUS INSPECTION NOTES 06/07/23 NEED TO PULL UP SOD IN THE REAR LEFT PROPERTY CONER WHERE IT IS WHITELINED AND RAISE AREA TO HAVE REAR TO FRONT PROPERTY DRAINAGE WITHOUT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. NEED TO GRIND DOWN LARGE STUMP ON LEFT PROPERTY LINE AS IT IS IMPEDING EASEMENT DRAINAGE CONVEYANCE. "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 06/07/23 NEED TO FIND OUT WHAT ANOMOLY IS CAUSING HIGH NUMBER ON LEFT SIDE FRONT AREA PROPERTY LINE. | |||
| BLD - BUILDING FINAL | 09/18/2023 | Approval - Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 08/28/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 08/28/23 PIPE IS OK. CUTS MADE. HOT PATCH MADE. CULVERT NEEDS TO BE CLEANED OUT BEFORE ROW FINAL. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 08/25/23 PROPERTY CORNER CORRECTED. YOU WILL NEED TO GRIND THE LARGE STUMP DOWN ON THE LEFT SIDE PROPERTY LINE AND MATCH GRADE THAT WILL ALLOW POSITIVE FORWARD DRAINAGE. THIS WILL NOT PASS FINAL ROW UNTIL THIS IS CORRECTED. I WILL PASS YOUR FIELD SURVEY AS NOTED, BUT THE STUMP NEEDS TO BE GOUND DOWN AND SOD LAID MUST MATCH GRADE. SEE PHOTO. PLEASE REMOVE PORTA POTTY FROM THE SWALE AREA. 3 No Landscaping allowed in the ROW or Utility easement. Sec 300.03 C1f Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). 6/7/2023 - PREVIOUS INSPECTION NOTES 06/07/23 NEED TO PULL UP SOD IN THE REAR LEFT PROPERTY CONER WHERE IT IS WHITELINED AND RAISE AREA TO HAVE REAR TO FRONT PROPERTY DRAINAGE WITHOUT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. NEED TO GRIND DOWN LARGE STUMP ON LEFT PROPERTY LINE AS IT IS IMPEDING EASEMENT DRAINAGE CONVEYANCE. "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 06/07/23 NEED TO FIND OUT WHAT ANOMOLY IS CAUSING HIGH NUMBER ON LEFT SIDE FRONT AREA PROPERTY LINE. | |||
| ROW - STORMWATER FINAL | 08/28/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 08/28/23 YOU NEED TO READ THE INSPECTORS NOTES. THIS WILL NOT PASS ROW FINAL TILL STUMP ON LEFT SIDE PROPERTY LINE IS GROUND DOWN AND SOD SET TO MATCH GRADE. PORTA POTTY STILL IN SWALE. CULVERTS FULL OF DIRT AND DEBRIS. SWALE SEE PHOTOS. Inspector Notes from Inspection 9465 08/25/23 PROPERTY CORNER CORRECTED. YOU WILL NEED TO GRIND THE LARGE STUMP DOWN ON THE LEFT SIDE PROPERTY LINE AND MATCH GRADE THAT WILL ALLOW POSITIVE FORWARD DRAINAGE. THIS WILL NOT PASS FINAL ROW UNTIL THIS IS CORRECTED. I WILL PASS YOUR FIELD SURVEY AS NOTED, BUT THE STUMP NEEDS TO BE GOUND DOWN AND SOD LAID MUST MATCH GRADE. SEE PHOTO. PLEASE REMOVE PORTA POTTY FROM THE SWALE AREA. 3 No Landscaping allowed in the ROW or Utility easement. Sec 300.03 C1f Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). 6/7/2023 - PREVIOUS INSPECTION NOTES 06/07/23 NEED TO PULL UP SOD IN THE REAR LEFT PROPERTY CONER WHERE IT IS WHITELINED AND RAISE AREA TO HAVE REAR TO FRONT PROPERTY DRAINAGE WITHOUT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. NEED TO GRIND DOWN LARGE STUMP ON LEFT PROPERTY LINE AS IT IS IMPEDING EASEMENT DRAINAGE CONVEYANCE. "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 06/07/23 NEED TO FIND OUT WHAT ANOMOLY IS CAUSING HIGH NUMBER ON LEFT SIDE FRONT AREA PROPERTY LINE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 08/25/23 PROPERTY CORNER CORRECTED. YOU WILL NEED TO GRIND THE LARGE STUMP DOWN ON THE LEFT SIDE PROPERTY LINE AND MATCH GRADE THAT WILL ALLOW POSITIVE FORWARD DRAINAGE. THIS WILL NOT PASS FINAL ROW UNTIL THIS IS CORRECTED. I WILL PASS YOUR FIELD SURVEY AS NOTED, BUT THE STUMP NEEDS TO BE GOUND DOWN AND SOD LAID MUST MATCH GRADE. SEE PHOTO. PLEASE REMOVE PORTA POTTY FROM THE SWALE AREA. 3 No Landscaping allowed in the ROW or Utility easement. Sec 300.03 C1f Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line). 6/7/2023 - PREVIOUS INSPECTION NOTES 06/07/23 NEED TO PULL UP SOD IN THE REAR LEFT PROPERTY CONER WHERE IT IS WHITELINED AND RAISE AREA TO HAVE REAR TO FRONT PROPERTY DRAINAGE WITHOUT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. NEED TO GRIND DOWN LARGE STUMP ON LEFT PROPERTY LINE AS IT IS IMPEDING EASEMENT DRAINAGE CONVEYANCE. "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 06/07/23 NEED TO FIND OUT WHAT ANOMOLY IS CAUSING HIGH NUMBER ON LEFT SIDE FRONT AREA PROPERTY LINE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/07/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 06/07/23 NEED TO FIND OUT WHAT ANOMOLY IS CAUSING HIGH NUMBER ON LEFT SIDE FRONT AREA PROPERTY LINE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/07/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/07/23 NEED TO PULL UP SOD IN THE REAR LEFT PROPERTY CONER WHERE IT IS WHITELINED AND RAISE AREA TO HAVE REAR TO FRONT PROPERTY DRAINAGE WITHOUT NEGATIVELY AFFECTING ADJOINING PROPERTY OWNER. NEED TO GRIND DOWN LARGE STUMP ON LEFT PROPERTY LINE AS IT IS IMPEDING EASEMENT DRAINAGE CONVEYANCE. "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 06/07/23 NEED TO FIND OUT WHAT ANOMOLY IS CAUSING HIGH NUMBER ON LEFT SIDE FRONT AREA PROPERTY LINE. | |||
| U-CROSS CONNECTION | 05/30/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 05/30/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 05/19/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 05/12/2023 | Approval - Private Provider | PPROVIDER |
| Note: partial pass | |||
| ROW- PRE-APRON (PRE-POUR) | 05/12/2023 | APPROVED | FSLADISH |
| Note: 05/12/23 PIPE IS GOOD. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 4/27/2023 - PREVIOUS INSPECTION NOTES CANCELLED VIA EMAIL. | |||
| U - SEWER TIE IN | 05/03/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 05/03/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 04/27/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: CANCELLED VIA EMAIL. | |||
| ROW - DRAINAGE | 04/27/2023 | APPROVED | GBERTOLA |
| Note: 4/27/23= SWALE IS OPEN CORRECTION WERE MADE ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/26/2023 - PREVIOUS INSPECTION NOTES 4/26 /23=ON 4/27/23 I WILL ADD STOP WORK ORDER ON SITE NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/24/2023 - PREVIOUS INSPECTION NOTES 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23= builder ask me for a couple more days inspector be back on 04/24/23 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/23 CORRECTIONS NOT MADE. SEE PHOTOS FOR REFERENCE. 4/17/2023 - PREVIOUS INSPECTION NOTES 04/17/23 DRAINAGE IN SWALE IS STILL BLOCKED AND NOT ALLOWING WATER TO FLOW. THIS HAS ALSO CAUSED THE PROPERTY OWNER ON THE LEFT'S CULVERT PIPE TO FILL WITH SEDIMENT. CONTRCTOR WILL BE RSPONSIBLE FOR CLEARING IT OUT. PER PREVIOUS INSPECTORS NOTES AND INSPECTION THERE WILL BE A STOP WORK ORDER PLACED ON THIS PROPERTY TOMORROW 04/18/23 IF THIS ISSUE IS NOT RESOLVED BY TODAY 04/17/23. PLEASE SEE ATTACHED PHOTO FOR REFERENCE. NEXT INSPECTION 04/18/23 4/14/2023 - PREVIOUS INSPECTION NOTES 4/14/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 4/17/23 IF THIS ISSUE IS RESOLVED BY 4/18/23 I WILL ADD A STOP WORK ORDER ON THIS CONSTRUCTION SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| ROW - DRAINAGE | 04/26/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 4/26 /23=ON 4/27/23 I WILL ADD STOP WORK ORDER ON SITE NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/24/2023 - PREVIOUS INSPECTION NOTES 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23= builder ask me for a couple more days inspector be back on 04/24/23 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/23 CORRECTIONS NOT MADE. SEE PHOTOS FOR REFERENCE. 4/17/2023 - PREVIOUS INSPECTION NOTES 04/17/23 DRAINAGE IN SWALE IS STILL BLOCKED AND NOT ALLOWING WATER TO FLOW. THIS HAS ALSO CAUSED THE PROPERTY OWNER ON THE LEFT'S CULVERT PIPE TO FILL WITH SEDIMENT. CONTRCTOR WILL BE RSPONSIBLE FOR CLEARING IT OUT. PER PREVIOUS INSPECTORS NOTES AND INSPECTION THERE WILL BE A STOP WORK ORDER PLACED ON THIS PROPERTY TOMORROW 04/18/23 IF THIS ISSUE IS NOT RESOLVED BY TODAY 04/17/23. PLEASE SEE ATTACHED PHOTO FOR REFERENCE. NEXT INSPECTION 04/18/23 4/14/2023 - PREVIOUS INSPECTION NOTES 4/14/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 4/17/23 IF THIS ISSUE IS RESOLVED BY 4/18/23 I WILL ADD A STOP WORK ORDER ON THIS CONSTRUCTION SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| ROW - DRAINAGE | 04/24/2023 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23= builder ask me for a couple more days inspector be back on 04/24/23 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/23 CORRECTIONS NOT MADE. SEE PHOTOS FOR REFERENCE. 4/17/2023 - PREVIOUS INSPECTION NOTES 04/17/23 DRAINAGE IN SWALE IS STILL BLOCKED AND NOT ALLOWING WATER TO FLOW. THIS HAS ALSO CAUSED THE PROPERTY OWNER ON THE LEFT'S CULVERT PIPE TO FILL WITH SEDIMENT. CONTRCTOR WILL BE RSPONSIBLE FOR CLEARING IT OUT. PER PREVIOUS INSPECTORS NOTES AND INSPECTION THERE WILL BE A STOP WORK ORDER PLACED ON THIS PROPERTY TOMORROW 04/18/23 IF THIS ISSUE IS NOT RESOLVED BY TODAY 04/17/23. PLEASE SEE ATTACHED PHOTO FOR REFERENCE. NEXT INSPECTION 04/18/23 4/14/2023 - PREVIOUS INSPECTION NOTES 4/14/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 4/17/23 IF THIS ISSUE IS RESOLVED BY 4/18/23 I WILL ADD A STOP WORK ORDER ON THIS CONSTRUCTION SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| ROW - DRAINAGE | 04/19/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 4/19/23= builder ask me for a couple more days inspector be back on 04/24/23 4/18/2023 - PREVIOUS INSPECTION NOTES 04/18/23 CORRECTIONS NOT MADE. SEE PHOTOS FOR REFERENCE. 4/17/2023 - PREVIOUS INSPECTION NOTES 04/17/23 DRAINAGE IN SWALE IS STILL BLOCKED AND NOT ALLOWING WATER TO FLOW. THIS HAS ALSO CAUSED THE PROPERTY OWNER ON THE LEFT'S CULVERT PIPE TO FILL WITH SEDIMENT. CONTRCTOR WILL BE RSPONSIBLE FOR CLEARING IT OUT. PER PREVIOUS INSPECTORS NOTES AND INSPECTION THERE WILL BE A STOP WORK ORDER PLACED ON THIS PROPERTY TOMORROW 04/18/23 IF THIS ISSUE IS NOT RESOLVED BY TODAY 04/17/23. PLEASE SEE ATTACHED PHOTO FOR REFERENCE. NEXT INSPECTION 04/18/23 4/14/2023 - PREVIOUS INSPECTION NOTES 4/14/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 4/17/23 IF THIS ISSUE IS RESOLVED BY 4/18/23 I WILL ADD A STOP WORK ORDER ON THIS CONSTRUCTION SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| ROW - DRAINAGE | 04/18/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 04/18/23 CORRECTIONS NOT MADE. SEE PHOTOS FOR REFERENCE. 4/17/2023 - PREVIOUS INSPECTION NOTES 04/17/23 DRAINAGE IN SWALE IS STILL BLOCKED AND NOT ALLOWING WATER TO FLOW. THIS HAS ALSO CAUSED THE PROPERTY OWNER ON THE LEFT'S CULVERT PIPE TO FILL WITH SEDIMENT. CONTRCTOR WILL BE RSPONSIBLE FOR CLEARING IT OUT. PER PREVIOUS INSPECTORS NOTES AND INSPECTION THERE WILL BE A STOP WORK ORDER PLACED ON THIS PROPERTY TOMORROW 04/18/23 IF THIS ISSUE IS NOT RESOLVED BY TODAY 04/17/23. PLEASE SEE ATTACHED PHOTO FOR REFERENCE. NEXT INSPECTION 04/18/23 4/14/2023 - PREVIOUS INSPECTION NOTES 4/14/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 4/17/23 IF THIS ISSUE IS RESOLVED BY 4/18/23 I WILL ADD A STOP WORK ORDER ON THIS CONSTRUCTION SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| ROW - DRAINAGE | 04/17/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 04/17/23 DRAINAGE IN SWALE IS STILL BLOCKED AND NOT ALLOWING WATER TO FLOW. THIS HAS ALSO CAUSED THE PROPERTY OWNER ON THE LEFT'S CULVERT PIPE TO FILL WITH SEDIMENT. CONTRCTOR WILL BE RSPONSIBLE FOR CLEARING IT OUT. PER PREVIOUS INSPECTORS NOTES AND INSPECTION THERE WILL BE A STOP WORK ORDER PLACED ON THIS PROPERTY TOMORROW 04/18/23 IF THIS ISSUE IS NOT RESOLVED BY TODAY 04/17/23. PLEASE SEE ATTACHED PHOTO FOR REFERENCE. NEXT INSPECTION 04/18/23 4/14/2023 - PREVIOUS INSPECTION NOTES 4/14/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 4/17/23 IF THIS ISSUE IS RESOLVED BY 4/18/23 I WILL ADD A STOP WORK ORDER ON THIS CONSTRUCTION SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| ROW - DRAINAGE | 04/14/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 4/14/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 4/17/23 IF THIS ISSUE IS RESOLVED BY 4/18/23 I WILL ADD A STOP WORK ORDER ON THIS CONSTRUCTION SITE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/10/2023 - PREVIOUS INSPECTION NOTES 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| ROW - DRAINAGE | 04/07/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 04/10/23 SWALE NEEDS TO BE GRADED TO MEET EXISTING SWALES OR TEMPORARY PIPE INSTALLED TO ALLOW SWALE TO DRAIN AND FLOW. WATER IS BEING HELD UP. WILL BE BACK TO REINSPECT 04/14/23 FOR COMPLIANCE. RG - Per Arthur. Please see if swale drainage is blocked at this address. | |||
| PEP TANK INSTALLATION REQUEST | 03/31/2023 | APPROVED | TSCHWEERS |
| PEP TANK INSTALLATION REQUEST | 03/21/2023 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 03/17/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 03/16/2023 | CANCELLED BY INSPECTOR | BBEMBRY |
| ALL ROUGH | 03/07/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 02/20/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/20/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 02/09/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/24/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/19/2023 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 12/16/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 03/17/2023 | 03/17/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Private provider inspections need to be requested by 2PM the previous day. | |||
| ENGIN1 | COMPLETE | 02/07/2023 | 02/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/07/2023 | 02/07/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/03/2022 | 11/03/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition . Direction is SW (Third Request) | |||
| MECH | COMPLETE | 11/03/2022 | 11/03/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/03/2022 | 11/03/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The Notice to Building Official needs to have the printed name of the corporation where the signature block is. | |||
| MECH | HOLD | 11/01/2022 | 11/01/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition . Direction is SW (Second Request) | |||
| BLD | COMPLETE | 10/24/2022 | 10/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/24/2022 | 10/25/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 10/24/2022 | 10/24/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/24/2022 | 10/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/24/2022 | 10/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/24/2022 | 10/24/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 10/24/2022 | 11/01/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/24/2022 | 10/25/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 10/24/2022 | 10/24/2022 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The Notice to Building Official needs to have the printed name of the corporation where the signature block is. | |||
| SWALE | COMPLETE | 10/24/2022 | 03/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 09/27/2023 |
| REINSPECTION FEE | ¤40.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/06/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/06/2022 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 12/06/2022 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 12/06/2022 |
| SEWER CREDIT | (¤2,465.75) | 12/06/2022 |
| SEWER INSPECTION | ¤25.00 | 12/06/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 12/06/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 12/06/2022 |
| SITE PLAN 30 | ¤30.00 | 12/06/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/06/2022 |
| SW ENG PRE APRON | ¤30.00 | 12/06/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/06/2022 |
| SURCHARGE - FS 468.631 | ¤2.66 | 12/06/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/06/2022 |
| WATER- TURN ON | ¤25.00 | 12/06/2022 |
| ADJUSTMENT 50% | (¤112.50) | 12/06/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/06/2022 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 12/06/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 12/06/2022 |
| CONNECTION FEES | ¤1,077.88 | 12/06/2022 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 12/06/2022 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 12/06/2022 |
| IMPACT FEE FIRE | ¤420.52 | 12/06/2022 |
| IMPACT FEE PARKS | ¤1,769.15 | 12/06/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/06/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 12/06/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/06/2022 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 12/06/2022 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 12/06/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,725.36 |