Permit #2022101217
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00190-0060 |
| CONDITIONED SPACE: 2870 sqft |
| GARAGE: 1008 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| Total Square Footage: 3998 sqft |
| Block: 00190 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 863-647-5815 |
| Location Address: 42 REGENCY DR |
| Type: DU - DUPLEX |
| Issue Date: 03/22/2023 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: YINGLING, CASEY & COX, JULIANA |
|
Address 42 REGENCY DR PALM COAST, FL 32164 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 10/13/2023 | APPROVED | FSLADISH |
| Note: 10/12/23 PIPES OK. CUTS MADE. CULVERTS CLEAR. HOT PATCHES COMPLETED. LOOKED GOOD AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 09/06/23 THE CULVERT PIPES ARE BOTH ALMOST TOTALLY FULL OF DIRT AND SILT CAUSING HARDLY ANY WATER TO DRAIN. ON THE RIGHT SIDE YO WILL NEED TO SOD AND MATCH GRADE IN THE BARE AREA. I AM GOING TO APPROVE FIELD SURVEY AS NOTED. INPECTORS NOTE...... ***DO NOT PASS AFTERPOUR OR ROW FINAL TILL CULVERT PIPES ARE COMPLETELY CLEANED OUT*** _________________________________________________________________________________________________________________________ 9/5/2023 - PREVIOUS INSPECTION NOTES YOUR SOD IN YOUR ROAD SIDE SWALE DOES NOT MATCH THE GRADE AT HOUSE #40 SO ITS NOT ALLOWING THE WATER TO FLOW ------------------------------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THE ROAD SIDE SWALE IS HOLDING THE WATER FROM FLOWING TO OUT FALL --------------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 You must first pass the final survey before a field survey can be done. | |||
| ROW - FINAL INSPECTION | 10/13/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: Inspector Notes from Inspection 9465 09/06/23 THE CULVERT PIPES ARE BOTH ALMOST TOTALLY FULL OF DIRT AND SILT CAUSING HARDLY ANY WATER TO DRAIN. ON THE RIGHT SIDE YO WILL NEED TO SOD AND MATCH GRADE IN THE BARE AREA. I AM GOING TO APPROVE FIELD SURVEY AS NOTED. INPECTORS NOTE...... ***DO NOT PASS AFTERPOUR OR ROW FINAL TILL CULVERT PIPES ARE COMPLETELY CLEANED OUT*** _________________________________________________________________________________________________________________________ 9/5/2023 - PREVIOUS INSPECTION NOTES YOUR SOD IN YOUR ROAD SIDE SWALE DOES NOT MATCH THE GRADE AT HOUSE #40 SO ITS NOT ALLOWING THE WATER TO FLOW ------------------------------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THE ROAD SIDE SWALE IS HOLDING THE WATER FROM FLOWING TO OUT FALL --------------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 You must first pass the final survey before a field survey can be done. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/13/2023 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 well irrigation(out of unit B)-no cross connection | |||
| ROW - FINAL INSPECTION | 10/12/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/12/23 MAKE SURE ALL TRASH AND DEBRIS ARE PICKED UP. CULVERT PIPES HAVE BEEN CLEANED OUT AS REQUIRED PER PREVIOUS INSPECTION. APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 10/12/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9465 09/06/23 THE CULVERT PIPES ARE BOTH ALMOST TOTALLY FULL OF DIRT AND SILT CAUSING HARDLY ANY WATER TO DRAIN. ON THE RIGHT SIDE YO WILL NEED TO SOD AND MATCH GRADE IN THE BARE AREA. I AM GOING TO APPROVE FIELD SURVEY AS NOTED. INPECTORS NOTE...... ***DO NOT PASS AFTERPOUR OR ROW FINAL TILL CULVERT PIPES ARE COMPLETELY CLEANED OUT*** _________________________________________________________________________________________________________________________ 9/5/2023 - PREVIOUS INSPECTION NOTES YOUR SOD IN YOUR ROAD SIDE SWALE DOES NOT MATCH THE GRADE AT HOUSE #40 SO ITS NOT ALLOWING THE WATER TO FLOW ------------------------------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THE ROAD SIDE SWALE IS HOLDING THE WATER FROM FLOWING TO OUT FALL --------------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 You must first pass the final survey before a field survey can be done. | |||
| BLD - BUILDING FINAL | 10/12/2023 | FINAL APPROVED | JWALKER |
| Note: 10/6/2023 - PREVIOUS INSPECTION NOTES 10/6/23 Other inspections need to be completed prior to final being scheduled 10/4/2023 - PREVIOUS INSPECTION NOTES 1. The fire wall drywall nailing inspection will need to be passed before building final. 2. The garage attic space has been sprayed foamed the space is being used for storage. Spray foam is to have a thermal barrier when space is used for storage. R-316 3. Energy calculations do not match the units installed. 4. Outlet within 6' of the kitchen sink need to be GFI protected 5. The AHU heat appliance labels have not been marked off identifying the appliance installed. 6. Unit A shower tile floor is not completed. 7. The attic access lids need to be 5/8" sheet rock of 3/4 inch plywood minimum due to the ceiling being part of the fire barrier. | |||
| FIREWALL DRYWALL NAILING | 10/12/2023 | APPROVED | JWALKER |
| Note: 10/6/2023 - PREVIOUS INSPECTION NOTES 10/6/23 Revision is not approved 10/4/2023 - PREVIOUS INSPECTION NOTES 10/4/23 1.The letter submitted for the fire wall change mentions the ceilings it does not refer to the separating wall. The Print shows a 2 hour fire wall. with 5/8" sheet rock from floor to roof deck on both sides of the wall. 1/2" sheetrock has been used on the separating wall in the living space. Contractor will need to installed 5/8" as detailed or have the engineer submit a revision to the building department showing how to correct the living space area of the separating wall. Ceilings 5/8 fire resistant sheet rock passed inspection. and the 1/2" used as a draft stop in the attic area passes. 10/3/2023 - PREVIOUS INSPECTION NOTES 1. Print show a 2 hour fire wall. with 5/8" sheet rock from floor to roof deck on both sides of the wall. The contractor has sprayed foamed the attic part of the fire wall, and has finished painted the living space parts of the fire wall. Contractor will need to reschedule the inspection and contact the listed inspector the morning of the inspection from 7:30 am to 8:30am and set a time to meet for a deconstruction inspection to verify the fire walls have been done as per the plans. | |||
| FIREWALL FINAL | 10/12/2023 | FINAL APPROVED | JWALKER |
| Note: 10/6/2023 - PREVIOUS INSPECTION NOTES 10/6/23 Revision is not approved, can not schedule until the revision is approved 10/4/2023 - PREVIOUS INSPECTION NOTES 10/4/23 Fire wall final cannot be completed until the firewall drywall nailing has been approved. 10/3/2023 - PREVIOUS INSPECTION NOTES Fire wall final cannot be completed until the firewall drywall nailing has been approved. | |||
| FIREWALL FINAL | 10/06/2023 | Disapproved - NO FEE | RMARTIN |
| Note: 10/6/23 Revision is not approved, can not schedule until the revision is approved 10/4/2023 - PREVIOUS INSPECTION NOTES 10/4/23 Fire wall final cannot be completed until the firewall drywall nailing has been approved. 10/3/2023 - PREVIOUS INSPECTION NOTES Fire wall final cannot be completed until the firewall drywall nailing has been approved. | |||
| FIREWALL DRYWALL NAILING | 10/06/2023 | Disapproved - NO FEE | RMARTIN |
| Note: 10/6/23 Revision is not approved 10/4/2023 - PREVIOUS INSPECTION NOTES 10/4/23 1.The letter submitted for the fire wall change mentions the ceilings it does not refer to the separating wall. The Print shows a 2 hour fire wall. with 5/8" sheet rock from floor to roof deck on both sides of the wall. 1/2" sheetrock has been used on the separating wall in the living space. Contractor will need to installed 5/8" as detailed or have the engineer submit a revision to the building department showing how to correct the living space area of the separating wall. Ceilings 5/8 fire resistant sheet rock passed inspection. and the 1/2" used as a draft stop in the attic area passes. 10/3/2023 - PREVIOUS INSPECTION NOTES 1. Print show a 2 hour fire wall. with 5/8" sheet rock from floor to roof deck on both sides of the wall. The contractor has sprayed foamed the attic part of the fire wall, and has finished painted the living space parts of the fire wall. Contractor will need to reschedule the inspection and contact the listed inspector the morning of the inspection from 7:30 am to 8:30am and set a time to meet for a deconstruction inspection to verify the fire walls have been done as per the plans. | |||
| BLD - BUILDING FINAL | 10/06/2023 | Disapproved - NO FEE | RMARTIN |
| Note: 10/6/23 Other inspections need to be completed prior to final being scheduled 10/4/2023 - PREVIOUS INSPECTION NOTES 1. The fire wall drywall nailing inspection will need to be passed before building final. 2. The garage attic space has been sprayed foamed the space is being used for storage. Spray foam is to have a thermal barrier when space is used for storage. R-316 3. Energy calculations do not match the units installed. 4. Outlet within 6' of the kitchen sink need to be GFI protected 5. The AHU heat appliance labels have not been marked off identifying the appliance installed. 6. Unit A shower tile floor is not completed. 7. The attic access lids need to be 5/8" sheet rock of 3/4 inch plywood minimum due to the ceiling being part of the fire barrier. | |||
| BLD - BUILDING FINAL | 10/04/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The fire wall drywall nailing inspection will need to be passed before building final. 2. The garage attic space has been sprayed foamed the space is being used for storage. Spray foam is to have a thermal barrier when space is used for storage. R-316 3. Energy calculations do not match the units installed. 4. Outlet within 6' of the kitchen sink need to be GFI protected 5. The AHU heat appliance labels have not been marked off identifying the appliance installed. 6. Unit A shower tile floor is not completed. 7. The attic access lids need to be 5/8" sheet rock of 3/4 inch plywood minimum due to the ceiling being part of the fire barrier. | |||
| U-CROSS CONNECTION | 10/04/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation(out of unit B)-no cross connection | |||
| FIREWALL FINAL | 10/04/2023 | Disapproved - NO FEE | JWALKER |
| Note: 10/4/23 Fire wall final cannot be completed until the firewall drywall nailing has been approved. 10/3/2023 - PREVIOUS INSPECTION NOTES Fire wall final cannot be completed until the firewall drywall nailing has been approved. | |||
| WINDOW NAILING | 10/04/2023 | APPROVED | JWALKER |
| Note: 10/3/2023 - PREVIOUS INSPECTION NOTES 10/3/23 As listed below at the previous window nailing inspection. The product approval labels have not been supplied. If the windows and doors were changed from the products listed and approved on the product approval sheet please have the engineer submit a revision to the building department for the changes. Contractor will need to affix the labels to the doors and windows listed for reinspection. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23 Rear window and bathroom window for Unit B not installed. Product approval stickers not on the front doors, rear doors, or windows. Please provide product approval labels. Inspection for rear sliders, rear doors and front doors. | |||
| FIREWALL DRYWALL NAILING | 10/04/2023 | Disapproved - NO FEE | JWALKER |
| Note: 10/4/23 1.The letter submitted for the fire wall change mentions the ceilings it does not refer to the separating wall. The Print shows a 2 hour fire wall. with 5/8" sheet rock from floor to roof deck on both sides of the wall. 1/2" sheetrock has been used on the separating wall in the living space. Contractor will need to installed 5/8" as detailed or have the engineer submit a revision to the building department showing how to correct the living space area of the separating wall. Ceilings 5/8 fire resistant sheet rock passed inspection. and the 1/2" used as a draft stop in the attic area passes. 10/3/2023 - PREVIOUS INSPECTION NOTES 1. Print show a 2 hour fire wall. with 5/8" sheet rock from floor to roof deck on both sides of the wall. The contractor has sprayed foamed the attic part of the fire wall, and has finished painted the living space parts of the fire wall. Contractor will need to reschedule the inspection and contact the listed inspector the morning of the inspection from 7:30 am to 8:30am and set a time to meet for a deconstruction inspection to verify the fire walls have been done as per the plans. | |||
| WINDOW NAILING | 10/03/2023 | Disapproved - NO FEE | JWALKER |
| Note: 10/3/23 As listed below at the previous window nailing inspection. The product approval labels have not been supplied. If the windows and doors were changed from the products listed and approved on the product approval sheet please have the engineer submit a revision to the building department for the changes. Contractor will need to affix the labels to the doors and windows listed for reinspection. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23 Rear window and bathroom window for Unit B not installed. Product approval stickers not on the front doors, rear doors, or windows. Please provide product approval labels. Inspection for rear sliders, rear doors and front doors. | |||
| FIREWALL DRYWALL NAILING | 10/03/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Print show a 2 hour fire wall. with 5/8" sheet rock from floor to roof deck on both sides of the wall. The contractor has sprayed foamed the attic part of the fire wall, and has finished painted the living space parts of the fire wall. Contractor will need to reschedule the inspection and contact the listed inspector the morning of the inspection from 7:30 am to 8:30am and set a time to meet for a deconstruction inspection to verify the fire walls have been done as per the plans. | |||
| FIREWALL FINAL | 10/03/2023 | Disapproved - NO FEE | JWALKER |
| Note: Fire wall final cannot be completed until the firewall drywall nailing has been approved. | |||
| BLD - BUILDING FINAL | 10/02/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 7/12/23 CHECK FOR CORRECT REVISION OF THE ELECTRICAL RISER AT FINAL BUILDING INSPECTION. ENSURE THE REVISION IS APPROVED AND MATCHES THE AS BULIT ELECTRCIAL RISER INSTALLED. | |||
| BLD - BUILDING FINAL | 10/02/2023 | Disapproved - NO FEE | JWALKER |
| Note: There appears to be 3 open inspections, Fire wall nailing, fire wall final and window nailing. Builind final cannot be completed until these inspection have been done. Please contact the Rober Martin the cheif building inspection for further instructions. New inspection due to canceled inspection 7/12/23 CHECK FOR CORRECT REVISION OF THE ELECTRICAL RISER AT FINAL BUILDING INSPECTION. ENSURE THE REVISION IS APPROVED AND MATCHES THE AS BULIT ELECTRCIAL RISER INSTALLED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/06/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/06/23 THE CULVERT PIPES ARE BOTH ALMOST TOTALLY FULL OF DIRT AND SILT CAUSING HARDLY ANY WATER TO DRAIN. ON THE RIGHT SIDE YO WILL NEED TO SOD AND MATCH GRADE IN THE BARE AREA. I AM GOING TO APPROVE FIELD SURVEY AS NOTED. INPECTORS NOTE...... ***DO NOT PASS AFTERPOUR OR ROW FINAL TILL CULVERT PIPES ARE COMPLETELY CLEANED OUT*** _________________________________________________________________________________________________________________________ 9/5/2023 - PREVIOUS INSPECTION NOTES YOUR SOD IN YOUR ROAD SIDE SWALE DOES NOT MATCH THE GRADE AT HOUSE #40 SO ITS NOT ALLOWING THE WATER TO FLOW ------------------------------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THE ROAD SIDE SWALE IS HOLDING THE WATER FROM FLOWING TO OUT FALL --------------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 You must first pass the final survey before a field survey can be done. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/05/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: YOUR SOD IN YOUR ROAD SIDE SWALE DOES NOT MATCH THE GRADE AT HOUSE #40 SO ITS NOT ALLOWING THE WATER TO FLOW ------------------------------------------------------------------------------------------- 8/29/2023 - PREVIOUS INSPECTION NOTES THE ROAD SIDE SWALE IS HOLDING THE WATER FROM FLOWING TO OUT FALL --------------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 You must first pass the final survey before a field survey can be done. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/29/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE ROAD SIDE SWALE IS HOLDING THE WATER FROM FLOWING TO OUT FALL --------------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 You must first pass the final survey before a field survey can be done. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/29/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet ---------------------------------------------------------------------------------- 8/11/2023 - PREVIOUS INSPECTION NOTES 1) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet 2) NEED TO HAVE THE FFE ON ADJACENT PROPERTY TO THE LEFT OF YOURS ------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 we need to have the FFE and culvert pipe elevation for the home on the left that is under construction that was once vacant. Left side of the survey is showing at the property line 28.20 flat for more than 20' and then 27.80 flat for more than 20' also. right side is showing 28.30 flat for more than 20' and then goes 28.10 to a 28.2 back to 28.1. Finished Floor Elevations (FFE): Final Survey must include the FFE of the subjectproperty as well as the FFE of any adjacent developed properties. (A) Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3) Comment: 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet 7/27/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE SOD DOWN WHEN THE FINAL SURVEY IS SHOT FROM THE SURVEYORS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/29/2023 | APPROVED | PFLANAGAN |
| Note: LOOKED AT THE WRONG SURVEY PASSED 8/29/2023 - PREVIOUS INSPECTION NOTES 1) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet ---------------------------------------------------------------------------------- 8/11/2023 - PREVIOUS INSPECTION NOTES 1) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet 2) NEED TO HAVE THE FFE ON ADJACENT PROPERTY TO THE LEFT OF YOURS ------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 we need to have the FFE and culvert pipe elevation for the home on the left that is under construction that was once vacant. Left side of the survey is showing at the property line 28.20 flat for more than 20' and then 27.80 flat for more than 20' also. right side is showing 28.30 flat for more than 20' and then goes 28.10 to a 28.2 back to 28.1. Finished Floor Elevations (FFE): Final Survey must include the FFE of the subjectproperty as well as the FFE of any adjacent developed properties. (A) Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3) Comment: 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet 7/27/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE SOD DOWN WHEN THE FINAL SURVEY IS SHOT FROM THE SURVEYORS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/11/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet 2) NEED TO HAVE THE FFE ON ADJACENT PROPERTY TO THE LEFT OF YOURS ------------------------------------------------------------------------------------- 8/9/2023 - PREVIOUS INSPECTION NOTES 08/09/23 we need to have the FFE and culvert pipe elevation for the home on the left that is under construction that was once vacant. Left side of the survey is showing at the property line 28.20 flat for more than 20' and then 27.80 flat for more than 20' also. right side is showing 28.30 flat for more than 20' and then goes 28.10 to a 28.2 back to 28.1. Finished Floor Elevations (FFE): Final Survey must include the FFE of the subjectproperty as well as the FFE of any adjacent developed properties. (A) Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3) Comment: 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet 7/27/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE SOD DOWN WHEN THE FINAL SURVEY IS SHOT FROM THE SURVEYORS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/09/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 08/09/23 we need to have the FFE and culvert pipe elevation for the home on the left that is under construction that was once vacant. Left side of the survey is showing at the property line 28.20 flat for more than 20' and then 27.80 flat for more than 20' also. right side is showing 28.30 flat for more than 20' and then goes 28.10 to a 28.2 back to 28.1. Finished Floor Elevations (FFE): Final Survey must include the FFE of the subjectproperty as well as the FFE of any adjacent developed properties. (A) Adjacent driveway culverts and drainage features: Final Survey must include theinverts of adjacent developed property driveway culverts and any other drainage featureswithin 100 feet of the property lines. (A) Citation(s): A.Land Development Code Technical Manual, Section 300.01 (C)(3) Comment: 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet 7/27/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE SOD DOWN WHEN THE FINAL SURVEY IS SHOT FROM THE SURVEYORS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/09/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 08/09/23 You must first pass the final survey before a field survey can be done. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/27/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE SOD DOWN WHEN THE FINAL SURVEY IS SHOT FROM THE SURVEYORS | |||
| ROW- PRE-APRON (PRE-POUR) | 07/12/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 07/12/23 SPOKE WITH CM, LET HIM KNOW I AM APPROVING AS NOTED. IT IS A LITTLE SOFT BUT SHOULD BE DRY ENOUGH TO POUR. TOLD HIM IT IS HIS RESPONSINILITY TO DOUBLE CHECK THE PIPE ELEVATION BEFORE POURING AND MAKE SURE ANY RESIDUAL WATER IS OUT OF THE MITERED END FOOTERS AND THE ARE MAINTAINED TO CITY SPECS. PIPE IS GOOD AT THE TIME OF THIS INSPECTION. THIS INSPECTION WAS FOR THE LEFT SIDE CULVERT PIPE ONLY. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ___________________________________________________________________________________________________________________________ 6/27/2023 - PREVIOUS INSPECTION NOTES PLEASE NOTE THAT THIS IS FOR THE RIGHT DRIVEWAY ONLY DO NOT POUR LEFT DRIVEWAY. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER OR METYAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 07/12/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 7/12/23 CHECK FOR CORRECT REVISION OF THE ELECTRICAL RISER AT FINAL BUILDING INSPECTION. ENSURE THE REVISION IS APPROVED AND MATCHES THE AS BULIT ELECTRCIAL RISER INSTALLED. 7/11/2023 - PREVIOUS INSPECTION NOTES 7/11/23 Riser diagram submitted 7/10/23 to the building department has not yet been approved. It also does not appear to match the electrical riser installed. 7/10/2023 - PREVIOUS INSPECTION NOTES 1. The electrical riser diagram does not match the installed electrical riser diagram. Please have the engineer submitt a revision to the building department showing the as built riser. | |||
| ELECTRIC - EARLY POWER | 07/11/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 7/11/23 Riser diagram submitted 7/10/23 to the building department has not yet been approved. It also does not appear to match the electrical riser installed. 7/10/2023 - PREVIOUS INSPECTION NOTES 1. The electrical riser diagram does not match the installed electrical riser diagram. Please have the engineer submitt a revision to the building department showing the as built riser. | |||
| ELECTRIC - EARLY POWER | 07/10/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The electrical riser diagram does not match the installed electrical riser diagram. Please have the engineer submitt a revision to the building department showing the as built riser. | |||
| GRAVITY SEWER TEST | 07/06/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 07/06/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/27/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: PLEASE NOTE THAT THIS IS FOR THE RIGHT DRIVEWAY ONLY DO NOT POUR LEFT DRIVEWAY. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER OR METYAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| PEP TANK INSTALLATION REQUEST | 06/23/2023 | APPROVED | CSTONE |
| Note: 6/2/2023 4:24:20 PM- PREVIOUS INSPECTION NOTES exterior not complete and temp power in the way | |||
| LATH/BRICK/ WATER BARRIER | 06/06/2023 | APPROVED | JWALKER |
| WINDOW NAILING | 06/06/2023 | Disapproved - NO FEE | JWALKER |
| Note: 6/6/23 Rear window and bathroom window for Unit B not installed. Product approval stickers not on the front doors, rear doors, or windows. Please provide product approval labels. Inspection for rear sliders, rear doors and front doors. | |||
| PEP TANK INSTALLATION REQUEST | 06/02/2023 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 06/01/2023 | Disapproved - NO FEE | CSTONE |
| Note: exterior not complete and temp power in the way | |||
| INSULATION | 06/01/2023 | APPROVED | BTAYLOR |
| Note: 5/30/2023 - PREVIOUS INSPECTION NOTES duct layout still not matching approved drawings (there is an unapproved duct drawing on site FYI, it does not match the ductwork iether). Several top plate holes missing fire foam (check all) Inspector Notes from Inspection 2420 1.Check for approved duct layout at insulation inspection as the drawings have only been accepted. 2. Inspector adding window nailing inspection for rear sliders,,rear door and front doors. Contractor has sealed the openings and may insulate. 5/22/2023 - PREVIOUS INSPECTION NOTES 1. Both A and B Units the hvac AHU locations have been changed from the garage attic area to above the livings space of the house. Please submitt a revison to the building department showing the new locations. Include attic access also. 2. Horizontal plumbing vents are to be sloped downward toward the drain and supported at 4' o.c. 3. Unit A the UFB line to the kitchen kneewall has not been installed. 4. Rear sliders and rear doors have not been installed. 5. Seal the floor in Unit B kitchen at the UFB line. 6. Front entry doors are not installed. | |||
| INSULATION | 05/30/2023 | Disapproved - NO FEE | LMILLER |
| Note: duct layout still not matching approved drawings (there is an unapproved duct drawing on site FYI, it does not match the ductwork iether). Several top plate holes missing fire foam (check all) Inspector Notes from Inspection 2420 1.Check for approved duct layout at insulation inspection as the drawings have only been accepted. 2. Inspector adding window nailing inspection for rear sliders,,rear door and front doors. Contractor has sealed the openings and may insulate. 5/22/2023 - PREVIOUS INSPECTION NOTES 1. Both A and B Units the hvac AHU locations have been changed from the garage attic area to above the livings space of the house. Please submitt a revison to the building department showing the new locations. Include attic access also. 2. Horizontal plumbing vents are to be sloped downward toward the drain and supported at 4' o.c. 3. Unit A the UFB line to the kitchen kneewall has not been installed. 4. Rear sliders and rear doors have not been installed. 5. Seal the floor in Unit B kitchen at the UFB line. 6. Front entry doors are not installed. | |||
| ALL ROUGH | 05/23/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1.Check for approved duct layout at insulation inspection as the drawings have only been accepted. 2. Inspector adding window nailing inspection for rear sliders,,rear door and front doors. Contractor has sealed the openings and may insulate. 5/22/2023 - PREVIOUS INSPECTION NOTES 1. Both A and B Units the hvac AHU locations have been changed from the garage attic area to above the livings space of the house. Please submitt a revison to the building department showing the new locations. Include attic access also. 2. Horizontal plumbing vents are to be sloped downward toward the drain and supported at 4' o.c. 3. Unit A the UFB line to the kitchen kneewall has not been installed. 4. Rear sliders and rear doors have not been installed. 5. Seal the floor in Unit B kitchen at the UFB line. 6. Front entry doors are not installed. | |||
| ALL ROUGH | 05/22/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Both A and B Units the hvac AHU locations have been changed from the garage attic area to above the livings space of the house. Please submitt a revison to the building department showing the new locations. Include attic access also. 2. Horizontal plumbing vents are to be sloped downward toward the drain and supported at 4' o.c. 3. Unit A the UFB line to the kitchen kneewall has not been installed. 4. Rear sliders and rear doors have not been installed. 5. Seal the floor in Unit B kitchen at the UFB line. 6. Front entry doors are not installed. | |||
| ROOF VALLEY & METAL | 05/10/2023 | APPROVED | BTAYLOR |
| Note: 5/5/2023 - PREVIOUS INSPECTION NOTES Area's of nailed roof sheating will need to be corrected before roof valley can pass. See Truss drawing circled locations that need to be corrected. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2023 | APPROVED | BTAYLOR |
| Note: 5/5/2023 - PREVIOUS INSPECTION NOTES 1. The LTTS20's at the garage bearing wall post not installed. 2. Please provide a truss drawing that is number and letter to match the engineering. 3. Truss engineering packet is out of order and possible missing pages. 4. The fire wall has not been constructed as per the detail of Sheet #2 of the prints. Knee wall has not been framed. Two truss are installed above the block. Please submitt a revison to the building department showing the change of firewall constuction. 5. Where the over framing ridges meet the truss decking install blocking between the trusses below and strap ridge to blocking. 6. Roof sheating has missed nailing in 3 locations the unnumber/letter truss drawing has been circled to provide locations needed corrected. | |||
| ROOF VALLEY & METAL | 05/05/2023 | Disapproved - NO FEE | JWALKER |
| Note: Area's of nailed roof sheating will need to be corrected before roof valley can pass. See Truss drawing circled locations that need to be corrected. | |||
| WALL SHEATHING | 05/05/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/05/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The LTTS20's at the garage bearing wall post not installed. 2. Please provide a truss drawing that is number and letter to match the engineering. 3. Truss engineering packet is out of order and possible missing pages. 4. The fire wall has not been constructed as per the detail of Sheet #2 of the prints. Knee wall has not been framed. Two truss are installed above the block. Please submitt a revison to the building department showing the change of firewall constuction. 5. Where the over framing ridges meet the truss decking install blocking between the trusses below and strap ridge to blocking. 6. Roof sheating has missed nailing in 3 locations the unnumber/letter truss drawing has been circled to provide locations needed corrected. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/04/2023 | APPROVED | AMOBLEY |
| ELEV CERT-FOUNDATION APPROVAL | 05/02/2023 | APPROVED | AMOBLEY |
| TIE BEAM / LINTEL | 04/11/2023 | APPROVED | FWILLIS |
| Note: 4/10/2023 - PREVIOUS INSPECTION NOTES need approved documents on site for inspection (documents on site are not approved) FBC 107.3 | |||
| TIE BEAM / LINTEL | 04/10/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: need approved documents on site for inspection (documents on site are not approved) FBC 107.3 | |||
| ELECTRIC TEMP POLE | 04/05/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 04/03/2023 | APPROVED | JWALKER |
| Note: 3/31/2023 - PREVIOUS INSPECTION NOTES Address number needs to be posted. Compaction test results of the slab need to be posted. | |||
| WATER METER INSTALLATION REQUEST | 04/03/2023 | APPROVED | CSTONE |
| Note: 3/28/2023 10:55:01 AM- PREVIOUS INSPECTION NOTES not cleared rebar and block | |||
| MONOLITHIC SLAB | 03/31/2023 | Disapproved - NO FEE | JWALKER |
| Note: Address number needs to be posted. Compaction test results of the slab need to be posted. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/23/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 03/23/2023 | Disapproved - NO FEE | CSTONE |
| Note: not cleared rebar and block |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/11/2023 | 10/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/11/2023 | 10/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/10/2023 | 10/10/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The foundation plan submitted is blank. | |||
| MECH | HOLD | 10/09/2023 | 10/10/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Block wall insulation on Energy calcs says R10. Origional calcs shows R4.1. Provide plans showing R10 or revise calcs to R4.1 Third request | |||
| BLD | HOLD | 10/09/2023 | 10/10/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans and letter need to be digitally signed, sealed, and verifiable per F.S. 471.025 | |||
| MECH | HOLD | 10/05/2023 | 10/05/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Block wall insulation on Energy calcs says R10. Origional calcs shows R4.1. Provide plans showing R10 or revise calcs to R4.1 | |||
| MECH | HOLD | 10/05/2023 | 10/06/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Block wall insulation on Energy calcs says R10. Origional calcs shows R4.1. Provide plans showing R10 or revise calcs to R4.1 Second request | |||
| BLD | HOLD | 10/05/2023 | 10/06/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide correct UL number for firewall detail UL U309 calls for 5/8 inch Type X not 1/2 inch. Plans also call out 4ft of 1/2 fire rated plywood on either side of firewall on roof deck. An inspection will be added to confirm the fire rated sheathing. | |||
| BADMIN | INFORMATION | 08/10/2023 | 08/10/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file correctly - see the document submittal requirements on the permit portal page for instructions. | |||
| MECH | COMPLETE | 07/19/2023 | 07/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/13/2023 | 07/14/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout for both sides of duplex. The same document was submitted for both. Need correct garage orientation (Third Request) | |||
| ELEC | COMPLETE | 07/13/2023 | 07/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/13/2023 | 07/13/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM File name incorrect - Doc name and file name must match Example: site=site no extra names or numbers | |||
| MECH | HOLD | 07/10/2023 | 07/10/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout for both sides of duplex. The same document was submitted for both. Need correct garage orientation (Second Request) | |||
| ELEC | HOLD | 07/10/2023 | 07/13/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. This is not a duplex riser digram. Submit exactly what was installed. | |||
| MECH | HOLD | 06/03/2023 | 06/05/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout for both sides of duplex. The same document was submitted for both. Need correct garage orientation | |||
| BLD | COMPLETE | 06/03/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/03/2023 | 06/05/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/31/2023 | 05/31/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM PARTIAL REPEAT COMMENT: Provide revised floor plan showing service outlet. Provide notes showing details in compliance with M1305.1.3 | |||
| MECH | HOLD | 05/31/2023 | 06/01/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM PARTIAL REPEAT COMMENT: Provide revised floor plan showing service outlet. Provide notes showing details in compliance with M1305.1.3 Provide duct layout for each side with correct garage orientation | |||
| MECH | HOLD | 05/23/2023 | 05/23/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide revised floor plan showing new attic access location and service outlet with light. Provide notes showing details in compliance with M1305.1.3 | |||
| ENGIN1 | COMPLETE | 05/02/2023 | 05/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/02/2023 | 05/02/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/17/2023 | 04/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/12/2023 | 04/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/12/2023 | 04/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/30/2023 | 04/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/22/2023 | 03/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/01/2022 | 11/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/01/2022 | 11/01/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM YOU HAVE NOT SUBMITTED THE LANDSCAPE I DONT SEE IN THE ATTACHEMENTS JUST THE REVISION | |||
| SWALE | COMPLETE | 10/25/2022 | 03/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/24/2022 | 10/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/24/2022 | 10/27/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 10/24/2022 | 10/25/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/24/2022 | 10/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/24/2022 | 10/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/24/2022 | 10/25/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/24/2022 | 11/01/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/24/2022 | 10/25/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location do not match on plans,site and landscape plans Banding and stone must wrap both corners at least two foot |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤97.50 | 10/12/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/12/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/22/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/22/2023 |
| TRANS IMPACT FEE ADMIN | ¤82.14 | 03/22/2023 |
| TRANS IMPACT FEE ADMIN | (¤82.14) | 03/22/2023 |
| SEWER CREDIT | (¤1,806.00) | 03/22/2023 |
| SEWER INSPECTION | ¤25.00 | 03/22/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 03/22/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 03/22/2023 |
| SITE PLAN 30 | ¤30.00 | 03/22/2023 |
| WATER- TURN ON | ¤50.00 | 03/22/2023 |
| ADJUSTMENT 50% | (¤721.00) | 03/22/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/22/2023 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 03/22/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 03/22/2023 |
| CONNECTION FEES | ¤2,332.52 | 03/22/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 03/22/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 03/22/2023 |
| IMPACT FEE FIRE | ¤841.04 | 03/22/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 03/22/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 03/22/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 03/22/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 03/22/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 03/22/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 03/22/2023 |
| SURCHARGE FS 533.721 | ¤4.50 | 03/22/2023 |
| SURCHARGE - FS 468.631 | ¤6.75 | 03/22/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/22/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/22/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/22/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤38,581.01 |