I want to search for...
Permit #2022101219
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-0940 |
| CONDITIONED SPACE: 2425 sqft |
| OPENED PORCH (WITH ROOF) : 317 sqft |
| GARAGE: 567 sqft |
| Total Square Footage: 3309 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 863-647-5815 |
| Location Address: 53 DEL PALMA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/06/2023 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: FLORES FRANCINE & LARRY COURT TIC |
|
Address 28 CINNAMON GROVE LANE PALM COAST, FL 32137 |
| Lot: 0940 |
| Contracted Stated Job Value: ¤573,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
BOB BELL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3200 PARKER DRIVE ST AUGUSTINE, FL 32084 |
LG35711 (Exp: 08/31/2027) | 904-417-6470 | 877-566-4016 |
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/26/2024 | FINAL APPROVED | BTAYLOR |
| Note: 2/22/2024 - PREVIOUS INSPECTION NOTES 2/21/2024 - PREVIOUS INSPECTION NOTES 2-21-24 1. Energy cals do not match. 2. No water in kitchen. 3. Bathroom in living room has no hot water. 4. Bathroom in living room needs weather stripping. 5. Need sticker on electrical panel stating that air handler is in attic. 2-22-24 1. Need sticker on electrical panel stating that air handler is in attic. 2. Energy cals do not match. | |||
| BLD - BUILDING FINAL | 02/22/2024 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 2/21/2024 - PREVIOUS INSPECTION NOTES 2-21-24 1. Energy cals do not match. 2. No water in kitchen. 3. Bathroom in living room has no hot water. 4. Bathroom in living room needs weather stripping. 5. Need sticker on electrical panel stating that air handler is in attic. 2-22-24 1. Need sticker on electrical panel stating that air handler is in attic. 2. Energy cals do not match. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/21/2024 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 02/21/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/21/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/21/24 Pavers glued. No cracks or damage. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. Inspector Notes from Inspection 9471 2/20/24 AT THE TIME OF THIS INSPECTION THERE IS NO ROW DAMAGE IN THE CONSTUCTION AREA. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/20/24 CORRECTIONS REQUIRED MADE. SLOPE ON RIGHT REAR AT POOL DECK HAS BEEN SODDED AND STABILIZED. LEFT SIDE NOW HAS THE REQUIRED ONE ROW OF SOD. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 2/16/2024 - PREVIOUS INSPECTION NOTES WHEN FACING THE HOUSE FROM THE ROAD, WE NEED TO TAKE MEASURES TO PROTECT THE SLOPE ON THE RIGHT SIDE THAT EXTENDS FROM THE POOL DECK. THIS INCLUDES PREVENTING DIRT FROM ERODING AND MAINTAINING ITS POSITION NEED TO REMOVE THE MULCH AND REPLACE WITH SOD. ON THE LEFT SIDE, ADJACENT TO THE PROPERTY LINE, WE NEED TO ADD A LINE TO THE SOD. | |||
| BLD - BUILDING FINAL | 02/21/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-21-24 1. Energy cals do not match. 2. No water in kitchen. 3. Bathroom in living room has no hot water. 4. Bathroom in living room needs weather stripping. 5. Need sticker on electrical panel stating that air handler is in attic. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/20/24 CORRECTIONS REQUIRED MADE. SLOPE ON RIGHT REAR AT POOL DECK HAS BEEN SODDED AND STABILIZED. LEFT SIDE NOW HAS THE REQUIRED ONE ROW OF SOD. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 2/16/2024 - PREVIOUS INSPECTION NOTES WHEN FACING THE HOUSE FROM THE ROAD, WE NEED TO TAKE MEASURES TO PROTECT THE SLOPE ON THE RIGHT SIDE THAT EXTENDS FROM THE POOL DECK. THIS INCLUDES PREVENTING DIRT FROM ERODING AND MAINTAINING ITS POSITION NEED TO REMOVE THE MULCH AND REPLACE WITH SOD. ON THE LEFT SIDE, ADJACENT TO THE PROPERTY LINE, WE NEED TO ADD A LINE TO THE SOD. | |||
| ROW - STORMWATER FINAL | 02/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/20/24 AT THE TIME OF THIS INSPECTION THERE IS NO ROW DAMAGE IN THE CONSTUCTION AREA. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/20/24 CORRECTIONS REQUIRED MADE. SLOPE ON RIGHT REAR AT POOL DECK HAS BEEN SODDED AND STABILIZED. LEFT SIDE NOW HAS THE REQUIRED ONE ROW OF SOD. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 2/16/2024 - PREVIOUS INSPECTION NOTES WHEN FACING THE HOUSE FROM THE ROAD, WE NEED TO TAKE MEASURES TO PROTECT THE SLOPE ON THE RIGHT SIDE THAT EXTENDS FROM THE POOL DECK. THIS INCLUDES PREVENTING DIRT FROM ERODING AND MAINTAINING ITS POSITION NEED TO REMOVE THE MULCH AND REPLACE WITH SOD. ON THE LEFT SIDE, ADJACENT TO THE PROPERTY LINE, WE NEED TO ADD A LINE TO THE SOD. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/16/2024 | Disapproved - NO FEE | GBERTOLA |
| Note: WHEN FACING THE HOUSE FROM THE ROAD, WE NEED TO TAKE MEASURES TO PROTECT THE SLOPE ON THE RIGHT SIDE THAT EXTENDS FROM THE POOL DECK. THIS INCLUDES PREVENTING DIRT FROM ERODING AND MAINTAINING ITS POSITION NEED TO REMOVE THE MULCH AND REPLACE WITH SOD. ON THE LEFT SIDE, ADJACENT TO THE PROPERTY LINE, WE NEED TO ADD A LINE TO THE SOD. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/15/2024 | APPROVED | FSLADISH |
| ELECTRIC - EARLY POWER | 11/16/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 4-14-23 1. Emailed FPL at 11:03. 11-16-23 1. Emailed FPL at 10:49. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/17/2023 | APPROVED | FSLADISH |
| Note: 10/17/23 COMPACTION GOOD. FOOTERS AND APRON POURED. READY FOR PAVERS AT THE TIME OF THIS INSPECTION. _______________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 AT THE TIME OF THIS INSPECTION READY TO POUR APRON AND PAVER RESTRAINTS. YOU ARE NOW PARTIALLY APPROVED TO SPREAD AND COMPACT PAVER BASE. DO NOT LAY ANY PAVERS UNTIL YOUR NEXT PREPOUR INSPECTION IS APPROVED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PAVER RESTRAINTS | 10/06/2023 | APPROVED | FSLADISH |
| Note: 10/06/23 READY TO POUR PAVER RESTRAINTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/06/2023 | PARTIALLY APPROVED | FSLADISH |
| Note: 10/06/23 AT THE TIME OF THIS INSPECTION READY TO POUR APRON AND PAVER RESTRAINTS. YOU ARE NOW PARTIALLY APPROVED TO SPREAD AND COMPACT PAVER BASE. DO NOT LAY ANY PAVERS UNTIL YOUR NEXT PREPOUR INSPECTION IS APPROVED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| LATH/BRICK/ WATER BARRIER | 09/18/2023 | APPROVED | BTAYLOR |
| GRAVITY SEWER TEST | 09/13/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 09/13/2023 | APPROVED | MGIBSON |
| INSULATION | 09/07/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 08/28/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 04/28/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/28/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 04/28/2023 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 04/27/2023 | APPROVED | BTAYLOR |
| Note: 3/31/2023 - PREVIOUS INSPECTION NOTES 3-31-23 1. Down cells already poured. Need to perform x-ray scan with inspector present. | |||
| ELECTRIC-TUG | 04/14/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-14-23 1. Emailed FPL at 11:03. | |||
| TIE BEAM / LINTEL | 03/31/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-31-23 1. Down cells already poured. Need to perform x-ray scan with inspector present. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/21/2023 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 02/21/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/13/2023 | APPROVED | MGIBSON |
| FOOTER | 01/12/2023 | APPROVED | BTAYLOR |
| WATER METER INSTALLATION REQUEST | 01/12/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/22/2024 | 02/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from listed subcontractor | |||
| BLD | COMPLETE | 12/14/2023 | 12/15/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/05/2023 | 12/11/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to highlight or show what numbers are changing. | |||
| ENGIN1 | COMPLETE | 03/21/2023 | 03/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/21/2023 | 03/21/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/03/2023 | 03/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/19/2022 | 12/19/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/19/2022 | 12/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/19/2022 | 12/19/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/09/2022 | 12/12/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM foundation planting along the home have to be at least 3 gallons not 1 gallon please correct that. Foundation plantings should be along the foundation. The landscape plan needs to match the site plan show all pads you are adding a side entry please show all that and the walkway. Planting should wrap that corner as well. Repeat comment not addressed: Banding around Windows and doors All windows and doors facing public right of way must have banding. Garages must have banding all around | |||
| ENGIN1 | COMPLETE | 12/09/2022 | 12/09/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/09/2022 | 12/16/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/22/2022 | 11/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/22/2022 | 11/22/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan and survey show the sq ft as 6740.9 plat shows 6755 please correct that. Map panel # in correct should be 0232E Foundation plantings should be along the foundation. The landscape plan needs to match the site plan show all pads you are adding a side entry please show all that and the walkway. Planting ahoud wrap that corner as well. Banding around Windows and doors All windows and doors facing public right of way must have banding. Land development code does not allow two doors to face the ROW. | |||
| BLD | COMPLETE | 11/22/2022 | 12/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 10/26/2022 | 10/28/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 10/24/2022 | 10/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/24/2022 | 10/27/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 10/24/2022 | 10/25/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/24/2022 | 10/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/24/2022 | 10/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/24/2022 | 10/25/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition | |||
| SW1 | COMPLETE | 10/24/2022 | 11/01/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/24/2022 | 10/26/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan and survey show the sq ft as 6740.9 plat shows 6755 please correct that. Map panel # in correct should be 0232E Walkways have a max with of 6 ft. this looks more like a porch or patio and does not meet the front setbacks. Foundation plantings should be along the foundation ( with the porch area being 8.5' this needs to be rearranged accordingly. Banding around Windows and doors All windows and doors facing public right of way must have banding. Land development code does not allow two doors to face the ROW. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/27/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/27/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 02/27/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/06/2023 |
| CONNECTION FEES | ¤25.00 | 01/06/2023 |
| WATER-METER | ¤505.39 | 01/06/2023 |
| ADJUSTMENT 50% | (¤1,026.35) | 01/06/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/06/2023 |
| INSPECTION - RESIDENTIAL | ¤1,575.75 | 01/06/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤446.94 | 01/06/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/06/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/06/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/06/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/06/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/06/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 01/06/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/06/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/06/2023 |
| SURCHARGE FS 533.721 | ¤6.25 | 01/06/2023 |
| SURCHARGE - FS 468.631 | ¤9.38 | 01/06/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/06/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/06/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/06/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/06/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/06/2023 |
| TRANS IMPACT FEE ADMIN | ¤96.72 | 01/06/2023 |
| TRANS IMPACT FEE ADMIN | (¤96.72) | 01/06/2023 |
| SEWER INSPECTION | ¤25.00 | 01/06/2023 |
| SEWER CAPITAL FACILITY | ¤2,863.63 | 01/06/2023 |
| WATER CAPITAL FACILITY FEE | ¤2,675.20 | 01/06/2023 |
| SITE PLAN 30 | ¤30.00 | 01/06/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,512.36 |