Permit #2022101291

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00610-0020
CONDITIONED SPACE: 2628 sqft
GARAGE: 1004 sqft
ENCLOSE EXISTING PORCH TO LIVING : 192 sqft
OPENED PORCH (WITH ROOF) : 98 sqft
Total Square Footage: 3922 sqft
Block: 00610
Subdivision: -
Job Phone: 386-283-7499
Location Address: 13 KARAS TR
Type: DU - DUPLEX
Issue Date: 11/14/2022
NOC: RECORDED
Applicant name: WILLIAM ROBERT BARRICK
Owner: 13 KARAS TRAIL LLC

Address

134 AMBROSE LANE

FREDERICKSBURG, VA 22406

Lot: 0020
Contracted Stated Job Value: ¤289,842.00
Job Description: DUPLEX
Type: CN

Contractor

RBI ENTERPRISES INC
Status Location Address State License Number Phone
CANCEL

10 WHITTINGTON DR

PALM COAST, FL 32164

RB29003845 (Exp: 08/31/2025) 386-585-4097

Sub Contractors

WILLIAM ROBERT BARRICK
Status Location Address Mailing Address State License Number Phone
CANCEL

50 LEANNI WAY

PALM COAST, FL 32137

STE E2

PALM COAST, FL 32137

RC29027799 (Exp: 08/31/2025) 229-375-9123
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/29/2023 Disapproved - NO FEE RSIMS
Note: 6/29/23: Unit A is complete. / Unit B is locked up tight with no key on site. (Also, front door handle has a loose screw on the bottom part of the lock). 6/28/2023 - PREVIOUS INSPECTION NOTES 6/28/23: 1) Unit A: Hall bathroom vanity sink leaks from pop-up assembly 2). Unit B: Missing Number address / Master Bathroom right vanity leaks from the top of the pop-up assembly when filled to the overflow. 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23: Cancelled by Applicant via voicemail at @ 08:49. Stated not ready.
BLD - BUILDING FINAL 06/29/2023 FINAL APPROVED RSIMS
Note: 6/29/23: Virtual inspection complete via Facetime video call at @ 11:00. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23: Unit A is complete. / Unit B is locked up tight with no key on site. (Also, front door handle has a loose screw on the bottom part of the lock). 6/28/2023 - PREVIOUS INSPECTION NOTES 6/28/23: 1) Unit A: Hall bathroom vanity sink leaks from pop-up assembly 2). Unit B: Missing Number address / Master Bathroom right vanity leaks from the top of the pop-up assembly when filled to the overflow. 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23: Cancelled by Applicant via voicemail at @ 08:49. Stated not ready.
BLD - BUILDING FINAL 06/28/2023 Disapproved - NO FEE RSIMS
Note: 6/28/23: 1) Unit A: Hall bathroom vanity sink leaks from pop-up assembly 2). Unit B: Missing Number address / Master Bathroom right vanity leaks from the top of the pop-up assembly when filled to the overflow. 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23: Cancelled by Applicant via voicemail at @ 08:49. Stated not ready.
BLD - BUILDING FINAL 06/23/2023 CANCELLED BY APPLICANT RSIMS
Note: 6/23/23: Cancelled by Applicant via voicemail at @ 08:49. Stated not ready.
U-CROSS CONNECTION 06/22/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U -UTILITY RESIDENTIAL FINAL 06/22/2023 FINAL APPROVED JHARDING
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/21/2023 APPROVED RGROSS
Note: Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW FIELD SURVEY /GRADING CERTIFICATION 06/21/2023 APPROVED RGROSS
ROW - FINAL INSPECTION 06/21/2023 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 06/21/2023 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 06/01/2023 APPROVED - AS NOTED GBERTOLA
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ELECTRIC - EARLY POWER 05/24/2023 APPROVED RSIMS
Note: 5/24/23: Notified FPL - Release power. 5/23/2023 - PREVIOUS INSPECTION NOTES 5/23/23: *** Side A - Range outlet box is no longer secured to the wall. Romex is now in MC cable. 4/27/2023 - PREVIOUS INSPECTION NOTES 4/27/23: Need overflowing dumpster emptied and trash on property cleaned up as it is blowing into neighboring properties. 1). Side A: Range outlet - Romex wire needs to be fully in wall, in conduit or similar to protect from damage per NFPA 3802.3.2 / NEC 300.4
ELECTRIC - EARLY POWER 05/23/2023 Disapproved - NO FEE RSIMS
Note: 5/23/23: *** Side A - Range outlet box is no longer secured to the wall. Romex is now in MC cable. 4/27/2023 - PREVIOUS INSPECTION NOTES 4/27/23: Need overflowing dumpster emptied and trash on property cleaned up as it is blowing into neighboring properties. 1). Side A: Range outlet - Romex wire needs to be fully in wall, in conduit or similar to protect from damage per NFPA 3802.3.2 / NEC 300.4
GRAVITY SEWER TEST 05/12/2023 APPROVED MGIBSON
U - SEWER TIE IN 05/12/2023 APPROVED MGIBSON
ELECTRIC - EARLY POWER 04/27/2023 Disapproved - NO FEE RSIMS
Note: 4/27/23: Need overflowing dumpster emptied and trash on property cleaned up as it is blowing into neighboring properties. 1). Side A: Range outlet - Romex wire needs to be fully in wall, in conduit or similar to protect from damage per NFPA 3802.3.2 / NEC 300.4
ELECTRIC - EARLY POWER 04/26/2023 CANCELLED BY APPLICANT WEB
PEP TANK INSTALLATION REQUEST 04/05/2023 APPROVED TSCHWEERS
LATH/BRICK/ WATER BARRIER 03/28/2023 APPROVED RSIMS
FIREWALL FINAL 03/28/2023 APPROVED RSIMS
Note: 3/24/2023 - PREVIOUS INSPECTION NOTES 3/24/23: Both A and B units: All fastners on ceiling firerock need to be sealed as required. Garage: conduit penetrations into attic space need to be fully sealed for Firewall final. 3/21/2023 - PREVIOUS INSPECTION NOTES 3/21/23: Cancelled by applicant verbally. Called in too early.
FIREWALL FINAL 03/24/2023 Disapproved - NO FEE RSIMS
Note: 3/24/23: Both A and B units: All fastners on ceiling firerock need to be sealed as required. Garage: conduit penetrations into attic space need to be fully sealed for Firewall final. 3/21/2023 - PREVIOUS INSPECTION NOTES 3/21/23: Cancelled by applicant verbally. Called in too early.
FIREWALL DRYWALL NAILING 03/24/2023 APPROVED RSIMS
Note: 3/21/2023 - PREVIOUS INSPECTION NOTES 3/21/23: Need revision submitted to & approved by the City for the 1/2" drywall installed on either side of the Firewall. Plan detail for the Firewall requires 5/8" firerock. Ceiling firerock checked & approved. 3/14/23: Draft stop applied to truss on side A was checked & approved at Insulation Inspection. RS 1/30/2023 - PREVIOUS INSPECTION NOTES 1/30/23: NOT READY! **** There is no drywall installed on either side of firewall as required. Only the 1/2" drywall as a draft stop is installed.
FIREWALL FINAL 03/21/2023 CANCELLED BY APPLICANT RSIMS
Note: 3/21/23: Cancelled by applicant verbally. Called in too early.
FIREWALL DRYWALL NAILING 03/21/2023 PARTIALLY APPROVED RSIMS
Note: 3/21/23: Need revision submitted to & approved by the City for the 1/2" drywall installed on either side of the Firewall. Plan detail for the Firewall requires 5/8" firerock. Ceiling firerock checked & approved. 3/14/23: Draft stop applied to truss on side A was checked & approved at Insulation Inspection. RS 1/30/2023 - PREVIOUS INSPECTION NOTES 1/30/23: NOT READY! **** There is no drywall installed on either side of firewall as required. Only the 1/2" drywall as a draft stop is installed.
INSULATION 03/14/2023 APPROVED RSIMS
ALL ROUGH 03/08/2023 APPROVED BTAYLOR
Note: 3/7/2023 - PREVIOUS INSPECTION NOTES 3/7/23: Unit A has no UFER ground hooked up to the panel. Unit B the copper ground from UFER to meter box & to panel needs to be fully protected from the meter panel to where it exits the cinderblock wall. (NEC 250-92). Inspector Notes from Inspection 2467 2/2/23: Still need revision for Barricade synthethic underlayment used. Original was GAF self adhering. 1/31/2023 - PREVIOUS INSPECTION NOTES 1/31/23: 1). Underlayment nailing does not meet manufacturer's and/or FBC requirements. FBC905.1.1.1(5) (6" & 12" spacing with cap (simplex) nails). 2). Need revision submitted to and approved by the City for different undelayment installed.
ALL ROUGH 03/07/2023 PARTIALLY APPROVED RSIMS
Note: 3/7/23: Unit A has no UFER ground hooked up to the panel. Unit B the copper ground from UFER to meter box & to panel needs to be fully protected from the meter panel to where it exits the cinderblock wall. (NEC 250-92). Inspector Notes from Inspection 2467 2/2/23: Still need revision for Barricade synthethic underlayment used. Original was GAF self adhering. 1/31/2023 - PREVIOUS INSPECTION NOTES 1/31/23: 1). Underlayment nailing does not meet manufacturer's and/or FBC requirements. FBC905.1.1.1(5) (6" & 12" spacing with cap (simplex) nails). 2). Need revision submitted to and approved by the City for different undelayment installed.
ROOF VALLEY & METAL 02/02/2023 APPROVED - AS NOTED RSIMS
Note: 2/2/23: Still need revision for Barricade synthethic underlayment used. Original was GAF self adhering. 1/31/2023 - PREVIOUS INSPECTION NOTES 1/31/23: 1). Underlayment nailing does not meet manufacturer's and/or FBC requirements. FBC905.1.1.1(5) (6" & 12" spacing with cap (simplex) nails). 2). Need revision submitted to and approved by the City for different undelayment installed.
ROOF VALLEY & METAL 01/31/2023 Disapproved - NO FEE RSIMS
Note: 1/31/23: 1). Underlayment nailing does not meet manufacturer's and/or FBC requirements. FBC905.1.1.1(5) (6" & 12" spacing with cap (simplex) nails). 2). Need revision submitted to and approved by the City for different undelayment installed.
FIREWALL DRYWALL NAILING 01/30/2023 Disapproved - NO FEE RSIMS
Note: 1/30/23: NOT READY! **** There is no drywall installed on either side of firewall as required. Only the 1/2" drywall as a draft stop is installed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/27/2023 APPROVED RSIMS
Note: 1/25/2023 - PREVIOUS INSPECTION NOTES 1/25/23: Roof sheathing bump checked - Approved / Down cell - Approved / Ties - Approved Garage door bucks not installed yet. They will need to be installed before all rough inspection. Will be checked at all rough. 1). Firewall not built per plan detail in both A and B units. Detail calls for 2" x 4" PT over 3/4" insulation. 1" x 2" was used. 2). Trusses A04 in both units are missing web bracing as required in MiTech. (Marked on MiTek & Truss layout).
WALL SHEATHING 01/25/2023 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/25/2023 Disapproved - NO FEE RSIMS
Note: 1/25/23: Roof sheathing bump checked - Approved / Down cell - Approved / Ties - Approved Garage door bucks not installed yet. They will need to be installed before all rough inspection. Will be checked at all rough. 1). Firewall not built per plan detail in both A and B units. Detail calls for 2" x 4" PT over 3/4" insulation. 1" x 2" was used. 2). Trusses A04 in both units are missing web bracing as required in MiTech. (Marked on MiTek & Truss layout).
FOUND SURVEY APPROVED (OFFICE) 01/24/2023 APPROVED AMOBLEY
TIE BEAM / LINTEL 12/27/2022 APPROVED KSANDOE
Note: 12/22/2022 - PREVIOUS INSPECTION NOTES 12/22/22: FBC R606.3.1 Bed and head joints. Unless otherwise required or indicated on the project drawings, head and bedjoints shall be 3/8 inch (9.5 mm) thick, except that the thickness of the bed joint of the starting course placed over foundations shall be not less than 1/4 inch (6.4 mm) and not more than 3/4 inch (19.1 mm). Mortar joint thickness for loadbearing masonry shall be within the following tolerance from the specified dimensions: 1. Bed joint: + 1/8 inch (3.2 mm). 2. Head joint: - 1/4 inch (6.4 mm), + 3/8 inch (9.5 mm). 3. Collar joints: - 1/4 inch (6.4 mm), + 3/8 inch (9.5 mm). Left side unit: 1). 3 window sill are too short on width creating an excessive mortar joint. 2). The same three windows also have mortat beds that are too thick as shown in FBC above. Right side unit: 3). Missing rebar at concrete footer after garage. marked on wall. 4). window sill on the right is too short creating excessive mortar joint & mortar bed is too thick.
TIE BEAM / LINTEL 12/22/2022 Disapproved -FEE REQUIRED RSIMS
Note: 12/22/22: FBC R606.3.1 Bed and head joints. Unless otherwise required or indicated on the project drawings, head and bedjoints shall be 3/8 inch (9.5 mm) thick, except that the thickness of the bed joint of the starting course placed over foundations shall be not less than 1/4 inch (6.4 mm) and not more than 3/4 inch (19.1 mm). Mortar joint thickness for loadbearing masonry shall be within the following tolerance from the specified dimensions: 1. Bed joint: + 1/8 inch (3.2 mm). 2. Head joint: - 1/4 inch (6.4 mm), + 3/8 inch (9.5 mm). 3. Collar joints: - 1/4 inch (6.4 mm), + 3/8 inch (9.5 mm). Left side unit: 1). 3 window sill are too short on width creating an excessive mortar joint. 2). The same three windows also have mortat beds that are too thick as shown in FBC above. Right side unit: 3). Missing rebar at concrete footer after garage. marked on wall. 4). window sill on the right is too short creating excessive mortar joint & mortar bed is too thick.
MONOLITHIC SLAB 12/13/2022 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 12/12/2022 APPROVED TCHURCHILL
PLUMBING 1ST ROUGH UNDERGROUND 12/09/2022 APPROVED BTAYLOR

Review History

Department Status Date In Date Out
MECH COMPLETE 06/12/2023 06/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/21/2023 03/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 02/02/2023 02/07/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Underlayment on the revised Roofing Working Sheet calls for FL 16453. Product Approval Sheet calls for FL 22853. Please provide which underlayment will be installed.
BLD HOLD 02/01/2023 02/01/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Revised Product Approval was submitted for the proposed underlayment. Please submit a revised City of Palm Coast Roofing Worksheet.
BLD COMPLETE 01/26/2023 01/26/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/24/2023 01/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/24/2023 01/24/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 01/18/2023 01/18/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Foundation survey slab elevation is off from site plan by 2' - please revise appropriate drawing and resubmit.
ZON COMPLETE 01/18/2023 01/18/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes
MECH COMPLETE 11/07/2022 11/08/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 11/04/2022 11/04/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH HOLD 11/03/2022 11/03/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Entire energy calc and heatload for both sides of duplex.
ZON HOLD 11/03/2022 11/04/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM There must be 8 - 3gallon shrubs in the front along foundation and 4 on each side of home The Landscape plan shows the foundation plantings to be 1 gallon along the home and Land Development Code requires 3 gallons for medium screening to be planted. Please correct that on plan
SWALE COMPLETE 10/26/2022 03/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 10/25/2022 10/26/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 10/25/2022 10/26/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 10/25/2022 10/26/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/25/2022 10/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 10/25/2022 10/27/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 10/25/2022 10/26/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
SW1 COMPLETE 10/25/2022 11/01/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 10/25/2022 10/27/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM The Landscape plan shows the foundation plantings to be 1 gallon along the home and Land Development Code requires 3 gallons be planted. Please correct that on plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/29/2023
PLAN REVIEW - REVISION ¤32.50 06/29/2023
REINSPECTION RESIDENTIAL ¤40.00 06/29/2023
CONNECTION FEES ¤2,155.76 11/14/2022
FIRE IMPACT FEE ADMIN ¤25.23 11/14/2022
FIRE IMPACT FEE ADMIN (¤25.23) 11/14/2022
IMPACT FEE FIRE ¤841.04 11/14/2022
IMPACT FEE PARKS ¤3,538.30 11/14/2022
IMPACT FEE SCHOOL ¤10,900.00 11/14/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 11/14/2022
WATER -IRRIGATION INSPECTION ¤50.00 11/14/2022
PARKS IMPACT FEE ADMIN ¤106.15 11/14/2022
PARKS IMPACT FEE ADMIN (¤106.15) 11/14/2022
SURCHARGE FS 533.721 ¤4.00 11/14/2022
SURCHARGE - FS 468.631 ¤6.00 11/14/2022
SW ENG - FOUNDATION SURVEY ¤20.00 11/14/2022
SW ENG INSPECTION 80 ¤80.00 11/14/2022
SW ENG PRE APRON ¤30.00 11/14/2022
SW ENG - REVIEW 20 ¤20.00 11/14/2022
SW ENG RES REVIEW 200 ¤200.00 11/14/2022
TRANS IMPACT FEE ADMIN ¤82.14 11/14/2022
TRANS IMPACT FEE ADMIN (¤82.14) 11/14/2022
SEWER CREDIT (¤3,041.79) 11/14/2022
SEWER INSPECTION ¤25.00 11/14/2022
SEWER CAPITAL FACILITY ¤9,879.52 11/14/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 11/14/2022
SITE PLAN 30 ¤30.00 11/14/2022
WATER- TURN ON ¤50.00 11/14/2022
ADJUSTMENT 50% (¤632.75) 11/14/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/14/2022
INSPECTION - RESIDENTIAL ¤962.50 11/14/2022
PLAN REVIEW - RESIDENTIAL ¤273.00 11/14/2022
Fees Total Due: ¤0.00 Total Paid: ¤35,516.58