Permit #2022101389
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7063-00320-0060 |
| CONDITIONED SPACE: 323 sqft |
| Total Square Footage: 323 sqft |
| Block: 00320 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 813-418-0830 |
| Location Address: 4 ZAMMER CT |
| Type: BA - BUILDING ADDITION |
| Issue Date: 02/03/2023 |
| NOC: RECORDED |
| Applicant name: ELLA JOANN HEBBLEWHITE |
| Owner: RUBINO ANTHONY THOMAS |
|
Address 4 ZAMMER COURT PALM COAST, FL 32164 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤40,000.00 |
| Job Description: BEDROOM& BATHROOM ADDITION |
| Type: CN |
Contractor
A-TEAM EXTERIORS, INC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3750 GUNN HWY TAMPA, FL 33618 |
STE 103 TAMPA, FL 33618 |
CBC1254370 (Exp: 08/31/2026) | 813-418-0830 |
Sub Contractors
WADE SHAM GORDON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1302 PINE SONG DRIVE DELTONA, FL 32725 |
CFC1431281 (Exp: 08/31/2026) | 386-882-6101 |
IDELAYDIS CAMPOS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
96 SPRING GLEN DR , 0 |
CCC1334088 (Exp: 08/31/2026) | 888-309-9949 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/21/2025 | APPROVED | CVANSTRAHLEN |
| Note: 2/11/2025 - PREVIOUS INSPECTION NOTES 2-11-25 1. GFI outlet in bathroom does not work. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/21/2025 | FINAL APPROVED | BWRIGHT |
| BLD - BUILDING FINAL | 02/11/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-11-25 1. GFI outlet in bathroom does not work. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/07/2025 | APPROVED | FSLADISH |
| Note: 2/6/2025 - PREVIOUS INSPECTION NOTES 2/6/25-PLEASE SUBMIT A NEW FINAL SURVEY WHERE WE CAN READ THE NUMBERS CLEAR =A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17 2/4/2025 - PREVIOUS INSPECTION NOTES 2/4/25 SURVEY IS BLURRY AND HARD TO READ, PLEASE UPLOAD A CLEAR FINAL SURVEY COPY FOR INSPECTION. Can't read or is unclear Sec 300.02 B1 Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ___________________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25 THIS FINAL SURVEY DOES NOT SHOW THE BUILDING ADDITION OR THE ELEVATION CHANGES AFTER CONSTUCTION.. PLEASE SUBMIT A NEW FINAL SURVEY WITH REQUIRED INFORMATION AND ELEVATION SHOTS BEFORE RESUBMITTING FOR INSPECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/07/2025 | APPROVED | FSLADISH |
| Note: 2/7/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 02/07/2025 | APPROVED | FSLADISH |
| Note: 2/7/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/06/2025 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 2/6/25-PLEASE SUBMIT A NEW FINAL SURVEY WHERE WE CAN READ THE NUMBERS CLEAR =A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17 2/4/2025 - PREVIOUS INSPECTION NOTES 2/4/25 SURVEY IS BLURRY AND HARD TO READ, PLEASE UPLOAD A CLEAR FINAL SURVEY COPY FOR INSPECTION. Can't read or is unclear Sec 300.02 B1 Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ___________________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25 THIS FINAL SURVEY DOES NOT SHOW THE BUILDING ADDITION OR THE ELEVATION CHANGES AFTER CONSTUCTION.. PLEASE SUBMIT A NEW FINAL SURVEY WITH REQUIRED INFORMATION AND ELEVATION SHOTS BEFORE RESUBMITTING FOR INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/04/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 2/4/25 SURVEY IS BLURRY AND HARD TO READ, PLEASE UPLOAD A CLEAR FINAL SURVEY COPY FOR INSPECTION. Can't read or is unclear Sec 300.02 B1 Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ___________________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25 THIS FINAL SURVEY DOES NOT SHOW THE BUILDING ADDITION OR THE ELEVATION CHANGES AFTER CONSTUCTION.. PLEASE SUBMIT A NEW FINAL SURVEY WITH REQUIRED INFORMATION AND ELEVATION SHOTS BEFORE RESUBMITTING FOR INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/22/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 1/22/25 THIS FINAL SURVEY DOES NOT SHOW THE BUILDING ADDITION OR THE ELEVATION CHANGES AFTER CONSTUCTION.. PLEASE SUBMIT A NEW FINAL SURVEY WITH REQUIRED INFORMATION AND ELEVATION SHOTS BEFORE RESUBMITTING FOR INSPECTION. | |||
| INSULATION | 07/31/2024 | APPROVED | KSANDOE |
| Note: 7/30/2024 - PREVIOUS INSPECTION NOTES In all areas where plumbing and or electrical pass through the top plate of the framing or the smoke barrier into the above ceiling space, Those penetrations must be sealed witha fire rated foam or caulking meeting ASTME814 7/19/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). A combo detector is required outside (within 10ft). of new Master Bedroom. 07-19-2024 Insulation not complete. | |||
| INSULATION | 07/30/2024 | Disapproved - NO FEE | KSANDOE |
| Note: In all areas where plumbing and or electrical pass through the top plate of the framing or the smoke barrier into the above ceiling space, Those penetrations must be sealed witha fire rated foam or caulking meeting ASTME814 7/19/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). A combo detector is required outside (within 10ft). of new Master Bedroom. 07-19-2024 Insulation not complete. | |||
| INSULATION | 07/19/2024 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2420 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). A combo detector is required outside (within 10ft). of new Master Bedroom. 07-19-2024 Insulation not complete. 1F indicates batt. | |||
| ALL ROUGH | 04/15/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). A combo detector is required outside (within 10ft). of new Master Bedroom. | |||
| ROOF VALLEY & METAL | 05/04/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/17/2023 | APPROVED | RSIMS |
| TIE BEAM / LINTEL | 03/24/2023 | APPROVED | RSIMS |
| Note: 3/23/2023 - PREVIOUS INSPECTION NOTES 3/23/23: Please keep your documents/prints in order for inspection. 1). Missing tie wire at top of hook rod on right side against house. (Marked on exterior wall below) 2). Top course - both sides - first cinderblock at existing structure has mortar beds that well exceed the maximum 3/8" per FBC 606.3.1 | |||
| TIE BEAM / LINTEL | 03/23/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/23/23: Please keep your documents/prints in order for inspection. 1). Missing tie wire at top of hook rod on right side against house. (Marked on exterior wall below) 2). Top course - both sides - first cinderblock at existing structure has mortar beds that well exceed the maximum 3/8" per FBC 606.3.1 | |||
| MONOLITHIC SLAB | 02/21/2023 | APPROVED | RSIMS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO HAVE PLUMBING CONTRACTOR LISTED BEFORE MONOLITHIC SLAB INSPECTION, IF NOT IT WILL NOT PASS SLAB INSPECTION, ALSO HAVE PORTABLE RESTROOM ON SITE AS WELL BEFORE NEXT INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 02/09/2024 | 02/09/2024 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Plumber identfied. From: Nikki Gordon <certifiedeliteplumbing@yahoo.com> Sent: Friday, February 9, 2024 10:31 AM To: Building <BUILDINGDIVISION@PALMCOASTGOV.COM> Subject: Permit #2022101389 Hello, My husband (The Plumber) spoke with Patrick about a hold that I put on this permit. I did not recognize the name, but we are in fact doing the plumbing for this jobsite. I have attached the submission form that I found online. I believe this is the form that is needed to remove the hold, but if I am incorrect can you please forward me the correct document and I will get it back to you asap. Thank you and I apologize for any inconvenience. | |||
| BADMIN | HOLD | 11/03/2023 | 11/03/2023 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please verify who the plumber is for this permit. We have two identfied. | |||
| SW1 | COMPLETE | 01/26/2023 | 02/01/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/20/2023 | 01/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/20/2023 | 01/20/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/20/2023 | 01/25/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM STILL NEED TO HAVE FLOW ARROWS TO SHOW DRAINAGE | |||
| ZON | COMPLETE | 01/20/2023 | 01/20/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/20/2023 | 01/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/06/2023 | 01/09/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition | |||
| BLD | HOLD | 01/06/2023 | 01/09/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. OK 2. Provide Product Approval numbers for wood connectors, wood anchors and truss plates. 3. OK | |||
| SW1 | HOLD | 01/06/2023 | 01/13/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM STILL NEED TO HAVE FLOW ARROWS TO SHOW THE DRAINAGE OF THE LOT AFTER THE ADDITION IS FINISHED | |||
| BADMIN | INFORMATION | 12/08/2022 | 12/08/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM THIS PERMIT IS A MANUALLY PERMIT YOU SUBMITTED IN THE OFFICE YOU NEED TO BRING THE INFORMATION IN THE OFFICE. IF THIS PERMIT WAS ONLINE THEN YOU CAN SUBMITTED ONLINE. | |||
| BLD | HOLD | 10/28/2022 | 10/31/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide a completed City of Palm Coast Roofing Worksheet 2. Provide Product Approval numbers for all exterior components. Approval numbers to be submitted on a City of Palm Coast Approval Sheet. 3. Provide a Roof Framing Plan. | |||
| ELEC | COMPLETE | 10/28/2022 | 10/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/28/2022 | 10/28/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs, heatload and duct layout | |||
| PLUM | COMPLETE | 10/28/2022 | 10/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/28/2022 | 11/03/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROW TO DETERMIND THE NEW DRAINAGE OF LOT | |||
| ZON | COMPLETE | 10/28/2022 | 10/28/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 02/20/2025 |
| EXTENSION | ¤40.00 | 08/01/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 11/20/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 05/03/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/15/2023 |
| ADJUSTMENT 50% | (¤102.50) | 02/03/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/03/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/03/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/03/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/03/2023 |
| SITE PLAN 30 | ¤30.00 | 02/03/2023 |
| INSPECTION - RESIDENTIAL | ¤110.00 | 02/03/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 02/03/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤316.50 |