I want to search for...
Permit #2022110119
Permit Details
Status: FINAL
| Parcel Id: 42-10-30-3210-00000-1940 |
| Total Square Footage: 1162 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-679-5224 |
| Location Address: 451 SWEETGUM LN |
| Type: PO - POOL |
| Issue Date: 01/30/2023 |
| NOC: RECORDED |
| Applicant name: DONALD SHON MYRICK |
| Owner: ENGLESON JOSEPH & BARBARA H&W |
|
Address 1112 S PACIFIC STREET OCEANSIDE, CA 92054 |
| Lot: 1940 |
| Contracted Stated Job Value: ¤65,000.00 |
| Job Description: POOL |
| Type: CN |
Contractor
MYRICK POOLS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1457 N US 1 ORMOND BEACH, FL 32174 |
CPC052531 (Exp: 08/31/2026) | 386-334-9822 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
DONALD SHON MYRICK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1457 N US 1 ORMOND BEACH, FL 32174 |
CPC052531 (Exp: 08/31/2026) | 386-334-9822 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 01/23/2024 | FINAL APPROVED | AGAETANO |
| U -UTILITY RESIDENTIAL FINAL | 01/03/2024 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/29/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/29/2023 | APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 08/29/2023 | FINAL APPROVED | EMADISON |
| ELECTRIC AND ALARM | 08/23/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 08-23-2023 Screen enclosure steps not per code. Retaining wall at back of pool will not per code concernng guards. GUARDS AND WINDOW FALL PROTECTION R312.1 Guards. Guards shall be provided in accordance with Sections R312.1.1 through R312.1.4. R312.1.1 Where required. Guards shall be provided for those portions of open-sided walking surfaces, including stairs, ramps and landings, that are located more than 30 inches (762 mm) measured vertically to the floor or grade below at any point within 36 inches (914 mm) horizontally to the edge of the open side. Insect screening shall not be considered as a guard. R312.1.2 Height. Required guards at open-sided walking surfaces, including stairs, porches, balconies or landings, shall be not less than 36 inches (914 mm) in height as measured vertically above the adjacent walking surface or the line connecting the nosings. Check at final. | |||
| POOL DECK | 07/27/2023 | APPROVED | AGAETANO |
| Note: 6/15/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2270 6/5/2023 - PREVIOUS INSPECTION NOTES 06-01-2023 1. Contractor requested incorrect inspection. Retaining wall foundation and or retaining wall foundation needed. 2. Sheet 4 of 4 indicates one pour and #3 horizontal bars every 12". Bars not installed. Please provide engineering if this is to be a CMU wall. Please provide clarification on horizontal bars to be installed. These bars will need to be inspected when installed. 3. Plumbing pipe needs to be sleeved or provide engineering that plumbing pipe can be installed as such. 06-05-2023 Plumbing line not relocated. Step down footing revision not submitted to the building department. Please submit revision prior to pool deck inspection. Inspector spoke with Darlene on 06-02-2023. Bottom of step down footing is approximately 52" and footing is approximately 40". 06-07-2023 Please remove soil from bottom of footing prior to concrete pour. 06-15-2023 - Not ready for inspection. | |||
| POOL DECK | 06/15/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2270 6/5/2023 - PREVIOUS INSPECTION NOTES 06-01-2023 1. Contractor requested incorrect inspection. Retaining wall foundation and or retaining wall foundation needed. 2. Sheet 4 of 4 indicates one pour and #3 horizontal bars every 12". Bars not installed. Please provide engineering if this is to be a CMU wall. Please provide clarification on horizontal bars to be installed. These bars will need to be inspected when installed. 3. Plumbing pipe needs to be sleeved or provide engineering that plumbing pipe can be installed as such. 06-05-2023 Plumbing line not relocated. Step down footing revision not submitted to the building department. Please submit revision prior to pool deck inspection. Inspector spoke with Darlene on 06-02-2023. Bottom of step down footing is approximately 52" and footing is approximately 40". 06-07-2023 Please remove soil from bottom of footing prior to concrete pour. 06-15-2023 - Not ready for inspection. | |||
| STEM WALL FOUNDATION | 06/15/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2270 6/5/2023 - PREVIOUS INSPECTION NOTES 06-01-2023 1. Contractor requested incorrect inspection. Retaining wall foundation and or retaining wall foundation needed. 2. Sheet 4 of 4 indicates one pour and #3 horizontal bars every 12". Bars not installed. Please provide engineering if this is to be a CMU wall. Please provide clarification on horizontal bars to be installed. These bars will need to be inspected when installed. 3. Plumbing pipe needs to be sleeved or provide engineering that plumbing pipe can be installed as such. 06-05-2023 Plumbing line not relocated. Step down footing revision not submitted to the building department. Please submit revision prior to pool deck inspection. Inspector spoke with Darlene on 06-02-2023. Bottom of step down footing is approximately 52" and footing is approximately 40". 06-07-2023 Please remove soil from bottom of footing prior to concrete pour. | |||
| FOOTER | 06/07/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 6/5/2023 - PREVIOUS INSPECTION NOTES 06-01-2023 1. Contractor requested incorrect inspection. Retaining wall foundation and or retaining wall foundation needed. 2. Sheet 4 of 4 indicates one pour and #3 horizontal bars every 12". Bars not installed. Please provide engineering if this is to be a CMU wall. Please provide clarification on horizontal bars to be installed. These bars will need to be inspected when installed. 3. Plumbing pipe needs to be sleeved or provide engineering that plumbing pipe can be installed as such. 06-05-2023 Plumbing line not relocated. Step down footing revision not submitted to the building department. Please submit revision prior to pool deck inspection. Inspector spoke with Darlene on 06-02-2023. Bottom of step down footing is approximately 52" and footing is approximately 40". 06-07-2023 Please remove soil from bottom of footing prior to concrete pour. | |||
| FOOTER | 06/06/2023 | CANCELLED BY APPLICANT | WEB |
| FOOTER | 06/05/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 06-01-2023 1. Contractor requested incorrect inspection. Retaining wall foundation and or retaining wall foundation needed. 2. Sheet 4 of 4 indicates one pour and #3 horizontal bars every 12". Bars not installed. Please provide engineering if this is to be a CMU wall. Please provide clarification on horizontal bars to be installed. These bars will need to be inspected when installed. 3. Plumbing pipe needs to be sleeved or provide engineering that plumbing pipe can be installed as such. 06-05-2023 Plumbing line not relocated. Step down footing revision not submitted to the building department. Please submit revision prior to pool deck inspection. Inspector spoke with Darlene on 06-02-2023. Bottom of step down footing is approximately 52" and footing is approximately 40". | |||
| STEM WALL FOUNDATION | 06/02/2023 | CANCELLED BY APPLICANT | WEB |
| FOOTER | 06/02/2023 | CANCELLED BY APPLICANT | WEB |
| POOL DECK | 06/01/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 5/24/2023 - PREVIOUS INSPECTION NOTES 05-24-2023 Terminte bond not posted. Contractor not ready. 06-01-2023 1. Contractor requested incorrect inspection. Retaining wall foundation and or retaining wall foundation needed. 1. Sheet 4 of 4 indicates one pour and #3 horizontal bars every 12". Bars not installed. Please provide engineering if this is to be a CMU wall. Please provide clarification on horizontal bars to be installed. These bars will need to be inspected when installed. 2. Plumbing pipe needs to be sleeved or provide engineering that plumbing pipe can be installed as such. | |||
| POOL DECK | 05/24/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 05-24-2023 Terminte bond not posted. Contractor not ready. Stem wall not complete. Soil has collapsed into the footing area. Footing inspection and stem wall inspection will need to be added. | |||
| STEEL AND GROUND | 03/20/2023 | APPROVED | AGAETANO |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/30/2023 | 01/30/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/30/2023 | 01/30/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/21/2022 | 11/30/2022 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/02/2022 | 11/04/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/02/2022 | 11/02/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/02/2022 | 11/03/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/02/2022 | 11/07/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SHOW DRAINAGE OF THE LOT AFTER TE POOL IS BUILT BY HAVING FLOW ARROWS | |||
| ZON | COMPLETE | 11/02/2022 | 11/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/06/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/06/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/03/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/30/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/30/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 01/30/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/30/2023 |
| SITE PLAN 30 | ¤30.00 | 01/30/2023 |
| ADJUSTMENT 50% | (¤127.50) | 01/30/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/30/2023 |
| INSPECTION- POOL | ¤160.00 | 01/30/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 01/30/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤334.00 |