I want to search for...
Permit #2022110280
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00050-0210 |
| GARAGE: 455 sqft |
| CONDITIONED SPACE: 2062 sqft |
| Total Square Footage: 2517 sqft |
| Block: 00050 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 904-888-6443 |
| Location Address: 34 BANNBURY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/04/2023 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: YRI PALMEX LLC |
|
Address 2345 ASHLAND AVENUE CINCINNATI, OH 45206 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JUSTIN JACKSON
| Status | Location Address | Phone |
| INACTIVE |
51 LLWELLYN TRAIL PALM COAST , FL 32164 |
386-338-1000 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/01/2024 | Approval - Private Provider | PPROVIDER |
| Note: 5/1/2024 8:53:29 AM- PREVIOUS INSPECTION NOTES 4/29/2024 1:21:54 PM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 04/30/2024 | Disapproved- Private Provider | PPROVIDER |
| Note: 4/29/2024 1:21:54 PM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 04/29/2024 | Disapproved- Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 03/27/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/27/24 ALL PREVIOUSLY NOTED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 3/22/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS IN THE LOT 2) NEED TO CLEAN ALL DIRT OUT OF THE CULVERT PIPE 3) NEED TO REMOVE THE PORTER JOHN OFF THE GRASS AND PLACE IT ON THE DRIVEWAY. Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/27/2024 | FINAL APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 03/26/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 03/22/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS IN THE LOT 2) NEED TO CLEAN ALL DIRT OUT OF THE CULVERT PIPE 3) NEED TO REMOVE THE PORTER JOHN OFF THE GRASS AND PLACE IT ON THE DRIVEWAY. Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/22/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/01/2024 | APPROVED - AS NOTED | GBERTOLA |
| Note: I WILL PASS THIS INSPECTION AND I WILL HOLD THE FINAL ROW 2/21/2024 - PREVIOUS INSPECTION NOTES THE SLOPE ON THE CITY DITCH LINE NEED TO BE 4/1 SOPE . THE HOMEOWNER WILL BE AVAILABLE TO MOW THE SLOPE WITHOUT FLIPPING THE MOWER. 2/16/2024 - PREVIOUS INSPECTION NOTES NEED TO FIX THE WASH OUT ON RIGHT SIDE OF LOT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/21/2024 | Disapproved - NO FEE | GBERTOLA |
| Note: THE SLOPE ON THE CITY DITCH LINE NEED TO BE 4/1 SOPE . THE HOMEOWNER WILL BE AVAILABLE TO MOW THE SLOPE WITHOUT FLIPPING THE MOWER. 2/16/2024 - PREVIOUS INSPECTION NOTES NEED TO FIX THE WASH OUT ON RIGHT SIDE OF LOT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/16/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/16/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO FIX THE WASH OUT ON RIGHT SIDE OF LOT | |||
| U-CROSS CONNECTION | 02/08/2024 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 01/10/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 11/14/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------- 11/13/2023 - PREVIOUS INSPECTION NOTES ** 11/13/23 NEED TO REMOVE HIGH SPOT FROM CENTER OF DRIVEWAY IN FRONT OF GARAGE OPENING OUTLINED WITH WHITE PAINT NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW | |||
| ROW- PRE-APRON (PRE-POUR) | 11/13/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 11/13/23 NEED TO REMOVE HIGH SPOT FROM CENTER OF DRIVEWAY IN FRONT OF GARAGE OPENING OUTLINED WITH WHITE PAINT NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY ABOVE THE ROW | |||
| INSULATION | 10/30/2023 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 10/30/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ALL ROUGH | 10/19/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 07/10/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 06/27/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/27/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 06/27/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 06/26/2023 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 05/26/2023 | Approval - Private Provider | MRAMOS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/22/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 05/22/2023 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 04/20/2023 | APPROVED | CSTONE |
| Note: 4/18/2023 2:41:36 PM- PREVIOUS INSPECTION NOTES STILL CLEARING | |||
| WATER METER INSTALLATION REQUEST | 04/17/2023 | Disapproved - NO FEE | CSTONE |
| Note: STILL CLEARING |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 01/05/2024 | 01/05/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC needs to be recorded at Flagler Clerk of Courts. | |||
| ENGIN1 | COMPLETE | 06/26/2023 | 06/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/26/2023 | 06/26/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/23/2023 | 06/23/2023 |
| Note: Marked INFORMATION By: TIANA BELGROVE - - TBELGROVE@PALMCOASTGOV.COM Please rename your files in accordance with the naming convention outline in our document requirements-http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf Please do not add any names to the file | |||
| ELEC | COMPLETE | 12/05/2022 | 12/05/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/05/2022 | 12/05/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/07/2022 | 11/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/07/2022 | 11/09/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 11/07/2022 | 11/07/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs have the wrong address on them and do not match the square footage of the house. | |||
| ENGIN1 | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/07/2022 | 11/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/07/2022 | 11/07/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R38 insulation in attic. Energy calcs say R30. Revise to match | |||
| SW1 | COMPLETE | 11/07/2022 | 11/15/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/07/2022 | 03/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/30/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/04/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/04/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/04/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/04/2023 |
| SEWER CREDIT | (¤550.00) | 01/04/2023 |
| SEWER INSPECTION | ¤25.00 | 01/04/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/04/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/04/2023 |
| SITE PLAN 30 | ¤30.00 | 01/04/2023 |
| WATER- TURN ON | ¤25.00 | 01/04/2023 |
| ADJUSTMENT 50% | (¤358.75) | 01/04/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/04/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 01/04/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/04/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/04/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/04/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/04/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/04/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/04/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/04/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/04/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/04/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/04/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/04/2023 |
| SURCHARGE FS 533.721 | ¤6.29 | 01/04/2023 |
| SURCHARGE - FS 468.631 | ¤9.44 | 01/04/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/04/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/04/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/04/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,695.61 |