I want to search for...
Permit #2022110306
Permit Details
Status: COED
| Parcel Id: 15-11-31-2970-00000-0450 |
| CONDITIONED SPACE: 2840 sqft |
| GARAGE: 929 sqft |
| OPENED PORCH (WITH ROOF) : 452 sqft |
| Total Square Footage: 4221 sqft |
| Block: 00000 |
| Subdivision: 2070 - GRAND HAVEN NORTH PHASE 1 |
| Job Phone: 386-445-2012 |
| Location Address: 24 WATERVIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/01/2022 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: MORRISON DOUGLAS B & SANDRA C SANTOMENNO H&W |
|
Address 511 6TH AVENUE ASHBURY, NJ 07712 |
| Lot: 0450 |
| Contracted Stated Job Value: ¤680,511.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/02/2024 | FINAL APPROVED | BTAYLOR |
| GAS FINAL | 03/20/2024 | FINAL APPROVED | BTAYLOR |
| WINDOW NAILING | 03/20/2024 | APPROVED | BTAYLOR |
| Note: 7/17/2023 - PREVIOUS INSPECTION NOTES 07-17-2023 Front and rear swinging doors not installed. | |||
| U-CROSS CONNECTION | 03/19/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: irrigation meter wth PVB-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 03/19/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 03/15/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/15/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/15/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 03/15/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/14/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/14/24 YOU ARE READY AND APPROVED TO POUR THE SIDEWALK AT THIS TIME. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/15/2023 | APPROVED | TPOLACEK |
| Note: 12/15/23 ** SPREAD AND COMPACTED AS REQUIRED READY TO LAY PAVERS AT TIME OF THIS INSPECTION. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PAVER RESTRAINTS | 12/15/2023 | APPROVED | TPOLACEK |
| Note: 12/15/23 ready to pour paver restraints at time of this inspection 12/11/23 SPREAD AND COMPACTION COMPLETE READY FOR PAVERS ____________________________________________________________________________ 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23 READY TO POUR APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INPECTION. DO NOT LAY ANY PAVERS UNTIL AFTER THE NEXT INSPECTION FOR SPREAD AND COMPACTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. _________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 12/11/2023 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12/11/23 SPREAD AND COMPACTION COMPLETE READY FOR PAVERS ____________________________________________________________________________ 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23 READY TO POUR APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INPECTION. DO NOT LAY ANY PAVERS UNTIL AFTER THE NEXT INSPECTION FOR SPREAD AND COMPACTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. _________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 11/27/2023 | PARTIALLY APPROVED | FSLADISH |
| Note: 11/27/23 READY TO POUR APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INPECTION. DO NOT LAY ANY PAVERS UNTIL AFTER THE NEXT INSPECTION FOR SPREAD AND COMPACTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. _________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PAVER RESTRAINTS | 11/27/2023 | APPROVED | FSLADISH |
| Note: 11/27/23 PAVER RESTRAINTS ARE READY TO POUR AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL AFTER SPREAD AND COMPACTION INSPECTION HAS PASSED. ____________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PAVER RESTRAINTS | 11/22/2023 | CANCELLED BY APPLICANT | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 11/22/2023 | CANCELLED BY APPLICANT | FSLADISH |
| ELECTRIC - EARLY POWER | 09/14/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 5-15-23 1. Emailed FPL at 11:35. 9-14-23 1. Emailed Fpl at 11:01. | |||
| INSULATION | 07/18/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 Check screw pattern on swing doors and transom windows in rear of home | |||
| WINDOW NAILING | 07/17/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 07-17-2023 Front and rear swinging doors not installed. | |||
| LATH/BRICK/ WATER BARRIER | 07/17/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 Check screw pattern on swing doors and transom windows in rear of home | |||
| GRAVITY SEWER TEST | 06/22/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/22/2023 | APPROVED | MGIBSON |
| GAS ROUGH | 06/07/2023 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 06/07/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Check screw pattern on swing doors and transom windows in rear of home | |||
| ELECTRIC-TUG | 05/15/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-15-23 1. Emailed FPL at 11:35. | |||
| WALL SHEATHING | 03/13/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/13/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 03/13/2023 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 02/17/2023 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 02/13/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/24/2023 | APPROVED | TSTAUFFACHER |
| Note: 1/23/2023 - PREVIOUS INSPECTION NOTES Footings washed in after rain No certified plans in box No 5' head pressure on waste lines | |||
| MONOLITHIC SLAB | 01/23/2023 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Footings washed in after rain No certified plans in box No 5' head pressure on waste lines | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/19/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/05/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 03/22/2024 | 03/22/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Label descriptions correctly. product sheet is a site plan. | |||
| BLD | COMPLETE | 03/22/2024 | 03/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/14/2024 | 03/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/14/2024 | 03/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/12/2023 | 12/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/12/2023 | 12/19/2023 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/12/2023 | 12/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/12/2023 | 07/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/13/2023 | 02/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/13/2023 | 02/13/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/15/2022 | 11/15/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/15/2022 | 11/21/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/15/2022 | 11/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/07/2022 | 11/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/07/2022 | 11/09/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/07/2022 | 11/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/07/2022 | 11/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/07/2022 | 11/15/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE STORMWATER IS BEING TRAPTED IN THE BACK YARD NOT FLOW PASSED THE HIGHER NUMBERS | |||
| ZON | HOLD | 11/07/2022 | 11/07/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please also show setback on right side from the mater bath wall to property line on site plan for review | |||
| PLFM | COMPLETE | 11/07/2022 | 11/07/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan uploaded on 11/3/22, the structure does not fall inside the Special Flood Hazard Area. No elevation certificates will be required. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/03/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/03/2024 |
| CONNECTION FEES | ¤25.00 | 12/01/2022 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 12/01/2022 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 12/01/2022 |
| IMPACT FEE FIRE | ¤420.52 | 12/01/2022 |
| IMPACT FEE PARKS | ¤1,769.15 | 12/01/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 12/01/2022 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 12/01/2022 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 12/01/2022 |
| SURCHARGE FS 533.721 | ¤7.34 | 12/01/2022 |
| SURCHARGE - FS 468.631 | ¤11.01 | 12/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 12/01/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/01/2022 |
| TRANS IMPACT FEE ADMIN | ¤96.72 | 12/01/2022 |
| TRANS IMPACT FEE ADMIN | (¤96.72) | 12/01/2022 |
| SEWER INSPECTION | ¤25.00 | 12/01/2022 |
| SITE PLAN 30 | ¤30.00 | 12/01/2022 |
| WATER-METER | ¤467.09 | 12/01/2022 |
| ADJUSTMENT 50% | (¤1,216.97) | 12/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/01/2022 |
| INSPECTION - RESIDENTIAL | ¤1,872.75 | 12/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤531.18 | 12/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,068.57 |