I want to search for...

Permit #2022110699

Permit Details

Status: COED

CONDITIONED SPACE: 3138 sqft
GARAGE: 822 sqft
OPENED PORCH (WITH ROOF) : 42 sqft
OPENED PORCH (WITH ROOF) : 691 sqft
Total Square Footage: 4693 sqft
Block: 01010
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-313-6221
Location Address: 104 HICKORY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/29/2022
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: BREWER, SHERRY & DAVID

Address

110 FRONT ST

PALM COAST, FL 32137

Lot: 108
Contracted Stated Job Value: ¤740,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
PATRICK FRANCIS MCADAMS
Status Location Address State License Number Phone Fax
ACTIVE

1201 South Flagler Ave

Flagler Beach, FL 32136

CFC057805 (Exp: 08/31/2026) 386-283-9236 321-248-0447
WILLIAM D ALLEN
Status Location Address State License Number Phone Fax
INACTIVE

546 S. SHELL ROAD

DEBARY, FL 32713

LQ27843 (Exp: 08/13/2024) 386-668-9592 (386)668-8577
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228
TODD MICHAEL ORIE
Status Location Address State License Number Phone Fax
ACTIVE

560 S. YONGE ST.

ORMOND BEACH, FL 32174

CBC036417 (Exp: 08/31/2026) (386)673-4589 (386)673-8045

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/19/2023 FINAL APPROVED AGAETANO
ROW - FINAL APRON (AFTER POUR) 12/19/2023 APPROVED EMADISON
ROW - STORMWATER FINAL 12/19/2023 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 12/19/2023 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/18/2023 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 12/18/2023 APPROVED EMADISON
U-CROSS CONNECTION 12/18/2023 APPROVED - AS NOTED LFITZGERALD
Note: sub division with master reclaim backflow-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/15/2023 Disapproved - NO FEE EMADISON
Note: ** 12/15/23 LEFT SIDE SHOWS WATER FLOWING BACK FROM PROPERTY LINE TO THE STRUCTURE FRON THE A/C UNIT TO THE FRONT LEFT CORNER
FOOTER 12/15/2023 APPROVED FWILLIS
Note: Footer inspection added for covered porch in rear. 12/15/23 - FOOTER FOR SCREENED IN LANAI.
GAS ROUGH 11/21/2023 APPROVED AGAETANO
Note: 11/20/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES TANK FLOATED NEED TO RESCHEDUAL GAS ROUGH INSPECTION WHEN COMPLETED
GAS ROUGH 11/20/2023 Disapproved - NO FEE MGIBSON
Note: 11/17/2023 - PREVIOUS INSPECTION NOTES TANK FLOATED NEED TO RESCHEDUAL GAS ROUGH INSPECTION WHEN COMPLETED
GAS ROUGH 11/17/2023 CANCELLED BY APPLICANT MGIBSON
ROW- PRE-APRON (PRE-POUR) 10/06/2023 APPROVED - AS NOTED EMADISON
Note: ** 10/06/23 READY TO SET PAVERS __________________________________________________________________________________________________________ New inspection due to canceled inspection 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 WHEN CHECKING COMPACTION WITH PROBE ROD BASE MATERIAL CAVES BACK IN ON ITSELF MAY SPOTS TESTED NO COMPACTION AT AL ** MATERIAL NEEDS TO BE COMPACTED AND STABLE TO SUPPORT DRIVEWAY PAVERS AND WEIGHT BEARING ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 6/1/2023 - PREVIOUS INSPECTION NOTES ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PRE-APRON (PRE-POUR) 10/05/2023 CANCELLED BY APPLICANT WEB
Note: 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 WHEN CHECKING COMPACTION WITH PROBE ROD BASE MATERIAL CAVES BACK IN ON ITSELF MAY SPOTS TESTED NO COMPACTION AT AL ** MATERIAL NEEDS TO BE COMPACTED AND STABLE TO SUPPORT DRIVEWAY PAVERS AND WEIGHT BEARING ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 6/1/2023 - PREVIOUS INSPECTION NOTES ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PRE-APRON (PRE-POUR) 09/20/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/20/23 WHEN CHECKING COMPACTION WITH PROBE ROD BASE MATERIAL CAVES BACK IN ON ITSELF MAY SPOTS TESTED NO COMPACTION AT AL ** MATERIAL NEEDS TO BE COMPACTED AND STABLE TO SUPPORT DRIVEWAY PAVERS AND WEIGHT BEARING ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 6/1/2023 - PREVIOUS INSPECTION NOTES ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ELECTRIC - EARLY POWER 09/14/2023 APPROVED AGAETANO
ROW- PRE-APRON (PRE-POUR) 06/01/2023 PARTIALLY APPROVED EMADISON
Note: ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 06/01/2023 APPROVED EMADISON
Note: ** 06/01/23 REAADY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
U - SEWER TIE IN 04/18/2023 APPROVED AGAETANO
GRAVITY SEWER TEST 04/18/2023 APPROVED AGAETANO
LATH/BRICK/ WATER BARRIER 04/18/2023 APPROVED AGAETANO
GAS ROUGH 04/10/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2225 03-31-2023 Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation. Test and bondiing approved.
INSULATION 04/10/2023 APPROVED AGAETANO
ALL ROUGH 04/04/2023 APPROVED AGAETANO
Note: 3/31/2023 - PREVIOUS INSPECTION NOTES 03-31-2023 1. Wires not phased out. 2. Dryer vent not sealed at exterior properly. 3. Guest bath vent piping not supported properly. 4. Duct next to garage not sealed at roof deck. 5. Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation.
ALL ROUGH 03/31/2023 Disapproved - NO FEE AGAETANO
Note: 03-31-2023 1. Wires not phased out. 2. Dryer vent not sealed at exterior properly. 3. Guest bath vent piping not supported properly. 4. Duct next to garage not sealed at roof deck. 5. Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation.
ELECTRIC-TUG 03/31/2023 APPROVED AGAETANO
GAS ROUGH 03/31/2023 APPROVED - AS NOTED AGAETANO
Note: 03-31-2023 Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation. Test and bondiing approved.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/27/2023 APPROVED AGAETANO
Note: 3/8/2023 - PREVIOUS INSPECTION NOTES 3/7/2023 - PREVIOUS INSPECTION NOTES 03-06-2023 1. Sheet 3.1 bearing wall not installed as per plans. 2. Truss layout does not match engineering. 3. Piggyback details not on site. 4. Roof sheathing missing nails. Check all. Inspection stopped. 03-08-2023 1. Engineering missed. Check all. 2. Piggyback trusses not installed as per details. Highlighted on details. 3. Sheet 3.1 bearing wall not installed as per plans.
ROOF VALLEY & METAL 03/27/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/08/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 3/7/2023 - PREVIOUS INSPECTION NOTES 03-06-2023 1. Sheet 3.1 bearing wall not installed as per plans. 2. Truss layout does not match engineering. 3. Piggyback details not on site. 4. Roof sheathing missing nails. Check all. Inspection stopped. 03-08-2023 1. Engineering missed. Check all. 2. Piggyback trusses not installed as per details. Highlighted on details. 3. Sheet 3.1 bearing wall not installed as per plans. Roof sheathing approved.
WALL SHEATHING 03/07/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/07/2023 Disapproved - NO FEE AGAETANO
Note: 03-06-2023 1. Sheet 3.1 bearing wall not installed as per plans. 2. Truss layout does not match engineering. 3. Piggyback details not on site. 4. Roof sheathing missing nails. Check all. Inspection stopped.
TIE BEAM / LINTEL 01/25/2023 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 01/13/2023 APPROVED TBAKER
MONOLITHIC SLAB 12/29/2022 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 12/29/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 12/27/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/09/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
BLD COMPLETE 11/30/2023 12/04/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 11/30/2023 11/30/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 11/27/2023 11/27/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The plans submitted are a copy of the digitally sealed plans, please upload the original verifiable plans.
BADMIN INFORMATION 11/19/2023 11/19/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please be specific on the revision sheet what you are submitting. Are you adding a screen porch? are you screening existing porch? Is it a revision to an existing approved screen porch? If the screen is not part of the original permit, please submit a site plans. Plans submitted online must contain a verifiable digital signature.
SW1 COMPLETE 06/01/2023 06/12/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 04/03/2023 04/06/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 02/15/2023 02/15/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 02/15/2023 02/16/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 02/13/2023 02/15/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide correct product approval number for underlayment on form and roofing worksheet also
ENGIN1 COMPLETE 01/13/2023 01/13/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/13/2023 01/13/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 11/23/2022 11/28/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
URB COMPLETE 11/17/2022 11/18/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 11/16/2022 11/21/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 11/16/2022 11/21/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 11/16/2022 11/16/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/16/2022 11/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/16/2022 11/17/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 11/16/2022 11/17/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout signed by the AC contractor
SW1 COMPLETE 11/16/2022 11/22/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 11/16/2022 11/17/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/12/2023
CONTRACTOR CHANGE ¤20.00 12/12/2023
PLAN REVIEW - REVISION ¤32.50 12/12/2023
PLAN REVIEW - REVISION ¤32.50 12/12/2023
REINSPECTION RESIDENTIAL ¤40.00 12/12/2023
SW ENG REINSPECTION 30 ¤30.00 12/12/2023
SW ENG - REVIEW 20 ¤20.00 11/29/2022
SW ENG RES REVIEW 200 ¤200.00 11/29/2022
TRANS IMPACT FEE ADMIN ¤96.72 11/29/2022
TRANS IMPACT FEE ADMIN (¤96.72) 11/29/2022
SEWER INSPECTION ¤25.00 11/29/2022
SITE PLAN 30 ¤30.00 11/29/2022
CONNECTION FEES ¤25.00 11/29/2022
WATER-METER ¤505.39 11/29/2022
ADJUSTMENT 50% (¤1,321.10) 11/29/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/29/2022
INSPECTION - RESIDENTIAL ¤2,035.00 11/29/2022
PLAN REVIEW - RESIDENTIAL ¤577.20 11/29/2022
FIRE IMPACT FEE ADMIN ¤12.62 11/29/2022
FIRE IMPACT FEE ADMIN (¤12.62) 11/29/2022
FC IMPACT FEE EMS ¤62.00 11/29/2022
IMPACT FEE FIRE ¤420.52 11/29/2022
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/29/2022
FC IMPACT FEE LIBRARY ¤268.00 11/29/2022
IMPACT FEE PARKS ¤1,769.15 11/29/2022
IMPACT FEE SCHOOL ¤5,450.00 11/29/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 11/29/2022
PARKS IMPACT FEE ADMIN ¤53.07 11/29/2022
PARKS IMPACT FEE ADMIN (¤53.07) 11/29/2022
SURCHARGE FS 533.721 ¤7.94 11/29/2022
SURCHARGE - FS 468.631 ¤11.91 11/29/2022
SW ENG - FOUNDATION SURVEY ¤20.00 11/29/2022
SW ENG INSPECTION 80 ¤80.00 11/29/2022
SW ENG PRE APRON ¤30.00 11/29/2022
Fees Total Due: ¤0.00 Total Paid: ¤13,863.01