I want to search for...
Permit #2022110699
Permit Details
Status: COED
| CONDITIONED SPACE: 3138 sqft |
| GARAGE: 822 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| OPENED PORCH (WITH ROOF) : 691 sqft |
| Total Square Footage: 4693 sqft |
| Block: 01010 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-313-6221 |
| Location Address: 104 HICKORY CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/29/2022 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: BREWER, SHERRY & DAVID |
|
Address 110 FRONT ST PALM COAST, FL 32137 |
| Lot: 108 |
| Contracted Stated Job Value: ¤740,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
WILLIAM D ALLEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
546 S. SHELL ROAD DEBARY, FL 32713 |
LQ27843 (Exp: 08/13/2024) | 386-668-9592 | (386)668-8577 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
TODD MICHAEL ORIE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
560 S. YONGE ST. ORMOND BEACH, FL 32174 |
CBC036417 (Exp: 08/31/2026) | (386)673-4589 | (386)673-8045 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/19/2023 | FINAL APPROVED | AGAETANO |
| ROW - FINAL APRON (AFTER POUR) | 12/19/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 12/19/2023 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 12/19/2023 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/18/2023 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/18/2023 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 12/18/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: sub division with master reclaim backflow-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/15/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/15/23 LEFT SIDE SHOWS WATER FLOWING BACK FROM PROPERTY LINE TO THE STRUCTURE FRON THE A/C UNIT TO THE FRONT LEFT CORNER | |||
| FOOTER | 12/15/2023 | APPROVED | FWILLIS |
| Note: Footer inspection added for covered porch in rear. 12/15/23 - FOOTER FOR SCREENED IN LANAI. | |||
| GAS ROUGH | 11/21/2023 | APPROVED | AGAETANO |
| Note: 11/20/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES TANK FLOATED NEED TO RESCHEDUAL GAS ROUGH INSPECTION WHEN COMPLETED | |||
| GAS ROUGH | 11/20/2023 | Disapproved - NO FEE | MGIBSON |
| Note: 11/17/2023 - PREVIOUS INSPECTION NOTES TANK FLOATED NEED TO RESCHEDUAL GAS ROUGH INSPECTION WHEN COMPLETED | |||
| GAS ROUGH | 11/17/2023 | CANCELLED BY APPLICANT | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 10/06/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/06/23 READY TO SET PAVERS __________________________________________________________________________________________________________ New inspection due to canceled inspection 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 WHEN CHECKING COMPACTION WITH PROBE ROD BASE MATERIAL CAVES BACK IN ON ITSELF MAY SPOTS TESTED NO COMPACTION AT AL ** MATERIAL NEEDS TO BE COMPACTED AND STABLE TO SUPPORT DRIVEWAY PAVERS AND WEIGHT BEARING ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 6/1/2023 - PREVIOUS INSPECTION NOTES ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 10/05/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 9/20/2023 - PREVIOUS INSPECTION NOTES ** 09/20/23 WHEN CHECKING COMPACTION WITH PROBE ROD BASE MATERIAL CAVES BACK IN ON ITSELF MAY SPOTS TESTED NO COMPACTION AT AL ** MATERIAL NEEDS TO BE COMPACTED AND STABLE TO SUPPORT DRIVEWAY PAVERS AND WEIGHT BEARING ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 6/1/2023 - PREVIOUS INSPECTION NOTES ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 09/20/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/20/23 WHEN CHECKING COMPACTION WITH PROBE ROD BASE MATERIAL CAVES BACK IN ON ITSELF MAY SPOTS TESTED NO COMPACTION AT AL ** MATERIAL NEEDS TO BE COMPACTED AND STABLE TO SUPPORT DRIVEWAY PAVERS AND WEIGHT BEARING ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 6/1/2023 - PREVIOUS INSPECTION NOTES ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ELECTRIC - EARLY POWER | 09/14/2023 | APPROVED | AGAETANO |
| ROW- PRE-APRON (PRE-POUR) | 06/01/2023 | PARTIALLY APPROVED | EMADISON |
| Note: ** 06/01/23 READY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 06/01/2023 | APPROVED | EMADISON |
| Note: ** 06/01/23 REAADY TO POUR **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 04/18/2023 | APPROVED | AGAETANO |
| GRAVITY SEWER TEST | 04/18/2023 | APPROVED | AGAETANO |
| LATH/BRICK/ WATER BARRIER | 04/18/2023 | APPROVED | AGAETANO |
| GAS ROUGH | 04/10/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2225 03-31-2023 Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation. Test and bondiing approved. | |||
| INSULATION | 04/10/2023 | APPROVED | AGAETANO |
| ALL ROUGH | 04/04/2023 | APPROVED | AGAETANO |
| Note: 3/31/2023 - PREVIOUS INSPECTION NOTES 03-31-2023 1. Wires not phased out. 2. Dryer vent not sealed at exterior properly. 3. Guest bath vent piping not supported properly. 4. Duct next to garage not sealed at roof deck. 5. Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation. | |||
| ALL ROUGH | 03/31/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 03-31-2023 1. Wires not phased out. 2. Dryer vent not sealed at exterior properly. 3. Guest bath vent piping not supported properly. 4. Duct next to garage not sealed at roof deck. 5. Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation. | |||
| ELECTRIC-TUG | 03/31/2023 | APPROVED | AGAETANO |
| GAS ROUGH | 03/31/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 03-31-2023 Gas rough added. Gas lines not supported properly. Check the gas rough lines at insulation. Test and bondiing approved. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2023 | APPROVED | AGAETANO |
| Note: 3/8/2023 - PREVIOUS INSPECTION NOTES 3/7/2023 - PREVIOUS INSPECTION NOTES 03-06-2023 1. Sheet 3.1 bearing wall not installed as per plans. 2. Truss layout does not match engineering. 3. Piggyback details not on site. 4. Roof sheathing missing nails. Check all. Inspection stopped. 03-08-2023 1. Engineering missed. Check all. 2. Piggyback trusses not installed as per details. Highlighted on details. 3. Sheet 3.1 bearing wall not installed as per plans. | |||
| ROOF VALLEY & METAL | 03/27/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 3/7/2023 - PREVIOUS INSPECTION NOTES 03-06-2023 1. Sheet 3.1 bearing wall not installed as per plans. 2. Truss layout does not match engineering. 3. Piggyback details not on site. 4. Roof sheathing missing nails. Check all. Inspection stopped. 03-08-2023 1. Engineering missed. Check all. 2. Piggyback trusses not installed as per details. Highlighted on details. 3. Sheet 3.1 bearing wall not installed as per plans. Roof sheathing approved. | |||
| WALL SHEATHING | 03/07/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/07/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 03-06-2023 1. Sheet 3.1 bearing wall not installed as per plans. 2. Truss layout does not match engineering. 3. Piggyback details not on site. 4. Roof sheathing missing nails. Check all. Inspection stopped. | |||
| TIE BEAM / LINTEL | 01/25/2023 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 01/13/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/29/2022 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 12/29/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/27/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/09/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/30/2023 | 12/04/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/30/2023 | 11/30/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/27/2023 | 11/27/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The plans submitted are a copy of the digitally sealed plans, please upload the original verifiable plans. | |||
| BADMIN | INFORMATION | 11/19/2023 | 11/19/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please be specific on the revision sheet what you are submitting. Are you adding a screen porch? are you screening existing porch? Is it a revision to an existing approved screen porch? If the screen is not part of the original permit, please submit a site plans. Plans submitted online must contain a verifiable digital signature. | |||
| SW1 | COMPLETE | 06/01/2023 | 06/12/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/03/2023 | 04/06/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/15/2023 | 02/15/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/15/2023 | 02/16/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/13/2023 | 02/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide correct product approval number for underlayment on form and roofing worksheet also | |||
| ENGIN1 | COMPLETE | 01/13/2023 | 01/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/13/2023 | 01/13/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/23/2022 | 11/28/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 11/17/2022 | 11/18/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 11/16/2022 | 11/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/16/2022 | 11/21/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 11/16/2022 | 11/16/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/16/2022 | 11/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/16/2022 | 11/17/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/16/2022 | 11/17/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout signed by the AC contractor | |||
| SW1 | COMPLETE | 11/16/2022 | 11/22/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/16/2022 | 11/17/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 12/12/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 12/12/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/12/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/29/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/29/2022 |
| TRANS IMPACT FEE ADMIN | ¤96.72 | 11/29/2022 |
| TRANS IMPACT FEE ADMIN | (¤96.72) | 11/29/2022 |
| SEWER INSPECTION | ¤25.00 | 11/29/2022 |
| SITE PLAN 30 | ¤30.00 | 11/29/2022 |
| CONNECTION FEES | ¤25.00 | 11/29/2022 |
| WATER-METER | ¤505.39 | 11/29/2022 |
| ADJUSTMENT 50% | (¤1,321.10) | 11/29/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/29/2022 |
| INSPECTION - RESIDENTIAL | ¤2,035.00 | 11/29/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤577.20 | 11/29/2022 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 11/29/2022 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 11/29/2022 |
| FC IMPACT FEE EMS | ¤62.00 | 11/29/2022 |
| IMPACT FEE FIRE | ¤420.52 | 11/29/2022 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/29/2022 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/29/2022 |
| IMPACT FEE PARKS | ¤1,769.15 | 11/29/2022 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/29/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 11/29/2022 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 11/29/2022 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 11/29/2022 |
| SURCHARGE FS 533.721 | ¤7.94 | 11/29/2022 |
| SURCHARGE - FS 468.631 | ¤11.91 | 11/29/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/29/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/29/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/29/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,863.01 |