I want to search for...
Permit #2022110720
Permit Details
Status: COED
| Parcel Id: 07-11-31-7081-00150-0030 |
| Total Square Footage: 31 sqft |
| Block: 00150 |
| Subdivision: 2183 - SECTION 81-BERNARD MEADOWS-THE WOODLANDS |
| Job Phone: 763-219-7102 |
| Location Address: 53 BLARE DR |
| Type: RF - REROOF |
| Issue Date: 11/16/2022 |
| NOC: RECORDED |
| Applicant name: CHRISTOPHER RAY MCKINNEY |
| Owner: CRANE DAVID A |
|
Address 53 BLARE DRIVE PALM COAST, FL 32137 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤21,500.00 |
| Job Description: Roof Replacement |
| Type: CN |
Contractor
ROOF PROS STORM DIVISION INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
3501-B N PONCE DELEON BLVD ST. AUGUSTINE, FL 32084 |
UNIT 357 ST. AUGUSTINE , FL 32084 |
CCC1330201 (Exp: 08/31/2026) | 888-844-4245 | 888-487-8856 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 11/08/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2468 11/30/2022 - PREVIOUS INSPECTION NOTES 11/29/2022 - PREVIOUS INSPECTION NOTES NOT READY FOR MIDROOF INSPECTION. 3 WORKERS TEARING OFF. RENAILING NEEDS TO BE DONE BEFORE PAPER IS INSTALLED. SHINGLES HAVE TO BE HAND CARRIED UP A LADDER ONCE RENAILING, PAPER AND VALLEYS ARE INSTALLED. 11-30-22 Need revision for materials and method of application. The work does not match the approved proposed documents.. The documents call fo emtire roof deck seams to pe taped and then the entire roof to be covered with double coverage. This was not done, the roof has two rows of peel and stick at the bottom and the rest is covered with two layers of synthetic with no tap applied. 12-01-22 still Need revision for materials and method of application. (revision needed by final) The work does not match the approved proposed documents.. The documents call fo entire roof deck seams to be taped and then the entire roof to be covered with double coverage. This was not done, the roof has two rows of peel and stick at the bottom and the rest is covered with two layers of synthetic with no tap applied. (Must show both underlayments used)(procede at contractors risk). | |||
| ROOF AFFIDAVIT | 05/16/2023 | APPROVED | STHOMAS |
| ROOF IN PROGRESS- MIDROOF | 12/01/2022 | APPROVED - AS NOTED | LMILLER |
| Note: 11/30/2022 - PREVIOUS INSPECTION NOTES 11/29/2022 - PREVIOUS INSPECTION NOTES NOT READY FOR MIDROOF INSPECTION. 3 WORKERS TEARING OFF. RENAILING NEEDS TO BE DONE BEFORE PAPER IS INSTALLED. SHINGLES HAVE TO BE HAND CARRIED UP A LADDER ONCE RENAILING, PAPER AND VALLEYS ARE INSTALLED. 11-30-22 Need revision for materials and method of application. The work does not match the approved proposed documents.. The documents call fo emtire roof deck seams to pe taped and then the entire roof to be covered with double coverage. This was not done, the roof has two rows of peel and stick at the bottom and the rest is covered with two layers of synthetic with no tap applied. 12-01-22 still Need revision for materials and method of application. (revision needed by final) The work does not match the approved proposed documents.. The documents call fo entire roof deck seams to be taped and then the entire roof to be covered with double coverage. This was not done, the roof has two rows of peel and stick at the bottom and the rest is covered with two layers of synthetic with no tap applied. (Must show both underlayments used)(procede at contractors risk). | |||
| ROOF IN PROGRESS- MIDROOF | 11/30/2022 | Disapproved - NO FEE | LMILLER |
| Note: 11/29/2022 - PREVIOUS INSPECTION NOTES NOT READY FOR MIDROOF INSPECTION. 3 WORKERS TEARING OFF. RENAILING NEEDS TO BE DONE BEFORE PAPER IS INSTALLED. SHINGLES HAVE TO BE HAND CARRIED UP A LADDER ONCE RENAILING, PAPER AND VALLEYS ARE INSTALLED. 11-30-22 Need revision for materials and method of application. The work does not match the approved proposed documents.. The documents call fo emtire roof deck seams to pe taped and then the entire roof to be covered with double coverage. This was not done, the roof has two rows of peel and stick at the bottom and the rest is covered with two layers of synthetic with no tap applied. | |||
| ROOF IN PROGRESS- MIDROOF | 11/29/2022 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: NOT READY FOR MIDROOF INSPECTION. 3 WORKERS TEARING OFF. RENAILING NEEDS TO BE DONE BEFORE PAPER IS INSTALLED. SHINGLES HAVE TO BE HAND CARRIED UP A LADDER ONCE RENAILING, PAPER AND VALLEYS ARE INSTALLED. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/07/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 11/16/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/16/2022 |
| ADJUSTMENT 50% | (¤45.25) | 11/16/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/16/2022 |
| INSPECTION - RESIDENTIAL | ¤60.50 | 11/16/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤89.25 |