I want to search for...
Permit #2022110733
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00090-0210 |
| CONDITIONED SPACE: 2712 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| PATIO/DECK (NO ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00090 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 407-808-8155 |
| Location Address: 118 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/22/2023 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
NICHOLAS KEITH REX
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1408 HAMLIN UNIT B SAINT CLOUD, FL 34771 |
EC13006779 (Exp: 08/31/2026) | 407-873-2231 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/16/2024 | FINAL APPROVED | BTAYLOR |
| Note: 2/2/24: Additional breakers in Main Service panel need to be identified per NEC 408.4 (A). Please complete prior to Building Final Inspection. | |||
| U-CROSS CONNECTION | 05/10/2024 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 05/10/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/01/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 05/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/27/2024 | APPROVED | TPOLACEK |
| Note: 03/27/24 PAVER RESTRAINTS AND BASE ARE SET. READY TO LAY PAVERS ---------------------------------------------------------------------------------------------------------- 3/14/2024 - PREVIOUS INSPECTION NOTES READY TO POUR CONCRETE FOR THE PAVER RESTRAINTS AND THE SIDEWALK AND APRON ONLY. ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS BEFORE NEXT PRE POUR. YOU NEED TO HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION IF THERE ARE PAVERS YOU WILL NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| ROW- PAVER RESTRAINTS | 03/14/2024 | APPROVED | PFLANAGAN |
| Note: ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/14/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR CONCRETE FOR THE PAVER RESTRAINTS AND THE SIDEWALK AND APRON ONLY. ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS BEFORE NEXT PRE POUR. YOU NEED TO HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION IF THERE ARE PAVERS YOU WILL NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| TIE BEAM / LINTEL | 03/05/2024 | APPROVED | BTAYLOR |
| ELECTRIC - EARLY POWER | 02/02/2024 | APPROVED | RSIMS |
| Note: 2/2/24: FPL emailed - Ok to release power. Additional breakers in Main Service panel need to be identified per NEC 408.4 (A). Please complete prior to Building Final Inspection. Inspector Notes from Inspection 2200 8-14-23 1. Emailed FPL at 2:40. | |||
| GRAVITY SEWER TEST | 12/04/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 12/04/2023 | APPROVED - AS NOTED | CBOWERMASTER |
| Note: 6/29/2023 2:06:35 PM- PREVIOUS INSPECTION NOTES Utility fees will need to be paid first. Please contact customer service. installed | |||
| U - SEWER TIE IN | 12/04/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 10/20/2023 | APPROVED | BTAYLOR |
| INSULATION | 10/13/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 10/10/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 09/08/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 09/07/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/22/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 08/21/2023 | APPROVED | TBAKER |
| ELECTRIC-TUG | 08/14/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-14-23 1. Emailed FPL at 2:40. | |||
| TIE BEAM / LINTEL | 08/07/2023 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 07/25/2023 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/20/2023 | APPROVED | BTAYLOR |
| FOOTER | 07/10/2023 | APPROVED | BTAYLOR |
| WATER METER INSTALLATION REQUEST | 06/29/2023 | Disapproved - NO FEE | CSTONE |
| Note: Utility fees will need to be paid first. Please contact customer service. |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 05/21/2024 | 05/21/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM blower test has no pass or fail | |||
| ENGIN1 | COMPLETE | 08/21/2023 | 08/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/21/2023 | 08/21/2023 |
| Note: Released By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/15/2023 | 05/15/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes only locate survey | |||
| LOCATE | COMPLETE | 05/15/2023 | 05/17/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/12/2023 | 05/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | HOLD | 01/16/2023 | 01/18/2023 |
| Note: Held By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/16/2023 | 01/17/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM 114 and 118 new leatherwood are Identical house next to or across the street: 13.03.01. Architectural styles. Within residential developments, an identical house can only repeat every four lots when fronting the same right-of-way including both sides of the street. However, no two identical houses of the same style may be built adjacent to each other. Please have one hip or one gable roof or change the shapes of the windows. | |||
| CUSVC | COMPLETE | 01/16/2023 | 01/18/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| CUSVC | HOLD | 01/05/2023 | 01/05/2023 |
| Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM Not approved yet on the Utility side. | |||
| MECH | COMPLETE | 01/03/2023 | 01/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 12/29/2022 | 12/29/2022 |
| Note: Held By: HALEIGH HAND - - Utility agreements have not been accepted yet. | |||
| URB | COMPLETE | 11/17/2022 | 11/18/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 11/16/2022 | 11/23/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/16/2022 | 11/21/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 11/16/2022 | 11/16/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/16/2022 | 11/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | HOLD | 11/16/2022 | 11/16/2022 |
| Note: Held By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM project had not been completed | |||
| MECH | COMPLETE | 11/16/2022 | 11/17/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/16/2022 | 11/22/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/16/2022 | 11/18/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation Plan: 114 and 118 are identical homes Identical house next to or across the street: 13.03.01. Architectural styles. Within residential developments, an identical house can only repeat every four lots when fronting the same right-of-way including both sides of the street. However, no two identical houses of the same style may be built adjacent to each other. Please have one hip or one gable roof or change the shapes of the windows. Landscape plan : The plan looks blurry cant see the sod being proposed. please resubmit a clear copy |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/21/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/29/2023 |
| SEWER CAPITAL FACILITY | ¤1,682.11 | 06/29/2023 |
| WATER CAPITAL FACILITY FEE | ¤1,398.48 | 06/29/2023 |
| SITE PLAN 30 | ¤30.00 | 05/22/2023 |
| WATER-METER | ¤505.39 | 05/22/2023 |
| WATER-METER | ¤419.86 | 05/22/2023 |
| ADJUSTMENT 50% | (¤639.81) | 05/22/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/22/2023 |
| INSPECTION - RESIDENTIAL | ¤973.50 | 05/22/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤276.12 | 05/22/2023 |
| CONNECTION FEES | ¤25.00 | 05/22/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 05/22/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 05/22/2023 |
| SURCHARGE FS 533.721 | ¤4.04 | 05/22/2023 |
| SURCHARGE - FS 468.631 | ¤6.06 | 05/22/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/22/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/22/2023 |
| SW ENG PRE APRON | ¤30.00 | 05/22/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/22/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/22/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 05/22/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 05/22/2023 |
| SEWER INSPECTION | ¤25.00 | 05/22/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 05/22/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 05/22/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 05/22/2023 |
| IMPACT FEE FIRE | ¤420.52 | 05/22/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/22/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/22/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 05/22/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/22/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 05/22/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,542.42 |