Permit #2022110736

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0220
CONDITIONED SPACE: 2712 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
PATIO/DECK (NO ROOF) : 442 sqft
Total Square Footage: 4009 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 120 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/19/2023
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0220
Contracted Stated Job Value: ¤300,000.00
Job Description: single family residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
NICHOLAS KEITH REX
Status Location Address State License Number Phone
ACTIVE

1408 HAMLIN UNIT B

SAINT CLOUD, FL 34771

EC13006779 (Exp: 08/31/2026) 407-873-2231
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/16/2024 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 05/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/13/2024 10:41:52 AM *** has reclaim irr-no cross cnnection 5/10/2024 - PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 05/13/2024 FINAL APPROVED LFITZGERALD
Note: 5/10/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/10/2024 10:04:21 AM *** Need water meter pit located .
U -UTILITY RESIDENTIAL FINAL 05/10/2024 Disapproved - NO FEE DHANEY
Note: *** NOTES ADDED BY DHANEY 5/10/2024 10:04:21 AM *** Need water meter pit located .
U-CROSS CONNECTION 05/10/2024 Disapproved - NO FEE DHANEY
Note: *** NOTES ADDED BY DHANEY 5/10/2024 10:03:29 AM *** Need water meter pit laocated
ROW - FINAL APRON (AFTER POUR) 05/01/2024 APPROVED - AS NOTED FSLADISH
Note: 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/01/2024 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 05/01/2024 APPROVED - AS NOTED FSLADISH
Note: 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 05/01/2024 APPROVED - AS NOTED FSLADISH
Note: 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 5/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 03/27/2024 APPROVED TPOLACEK
Note: 03/27/24 PAVER RESTRAINTS AND BASE ARE SET. READY TO LAY PAVERS --------------------------------------------------------------------------------------------------------- 3/14/2024 - PREVIOUS INSPECTION NOTES READY TO POUR CONCRETE FOR THE PAVER RESTRAINTS AND THE SIDEWALK AND APRON ONLY. ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS BEFORE NEXT PRE POUR. YOU NEED TO HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION IF THERE ARE PAVERS YOU WILL NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ROW- PAVER RESTRAINTS 03/14/2024 APPROVED PFLANAGAN
Note: ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ROW- PRE-APRON (PRE-POUR) 03/14/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR CONCRETE FOR THE PAVER RESTRAINTS AND THE SIDEWALK AND APRON ONLY. ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS BEFORE NEXT PRE POUR. YOU NEED TO HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION IF THERE ARE PAVERS YOU WILL NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
TIE BEAM / LINTEL 03/05/2024 APPROVED BTAYLOR
ELECTRIC - EARLY POWER 02/12/2024 APPROVED RSIMS
Note: 2/12/24: FPL emailed to release power. Inspector Notes from Inspection 2200 8-14-23 1. Emailed FPL at 2:40.
GRAVITY SEWER TEST 12/06/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WASX A VIRTUAL INSPECTION
U - SEWER TIE IN 12/06/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 11/08/2023 APPROVED BTAYLOR
INSULATION 10/19/2023 APPROVED BTAYLOR
ALL ROUGH 10/17/2023 APPROVED BTAYLOR
ROOF VALLEY & METAL 09/14/2023 APPROVED BTAYLOR
WALL SHEATHING 09/07/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/28/2023 APPROVED BTAYLOR
Note: 8/24/2023 - PREVIOUS INSPECTION NOTES 8-24-23 1. Just roof sheeting approved.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/24/2023 PARTIALLY APPROVED BTAYLOR
Note: 8-24-23 1. Just roof sheeting approved.
TIE BEAM / LINTEL 08/15/2023 APPROVED BTAYLOR
ELECTRIC-TUG 08/14/2023 APPROVED - AS NOTED BTAYLOR
Note: 8-14-23 1. Emailed FPL at 2:40.
FOUND SURVEY APPROVED (OFFICE) 08/14/2023 APPROVED TBAKER
MONOLITHIC SLAB 08/01/2023 APPROVED BTAYLOR
Note: 7/27/2023 - PREVIOUS INSPECTION NOTES 07/27/2023: Dowels still outside block and many do not meet 3?4 inch clearance to the web or exterior of wall. 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23: deficiencies highlighted & noted on (both) plans. 1). Missing dowel rods in 3 locations. 2). Dowel rod is outside of cinderblock wall/footer on back right side.
MONOLITHIC SLAB 07/27/2023 Disapproved - NO FEE TSTAUFFACHER
Note: 07/27/2023: Dowels still outside block and many do not meet 3?4 inch clearance to the web or exterior of wall. 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23: deficiencies highlighted & noted on (both) plans. 1). Missing dowel rods in 3 locations. 2). Dowel rod is outside of cinderblock wall/footer on back right side.
MONOLITHIC SLAB 07/26/2023 Disapproved - NO FEE RSIMS
Note: 7/26/23: deficiencies highlighted & noted on (both) plans. 1). Missing dowel rods in 3 locations. 2). Dowel rod is outside of cinderblock wall/footer on back right side.
PLUMBING 1ST ROUGH UNDERGROUND 07/24/2023 APPROVED KSANDOE
FOOTER 07/10/2023 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 06/29/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 05/21/2024 05/21/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM BLOWER DOOR NOT INDICATING PASS/FAIL
ENGIN1 COMPLETE 08/11/2023 08/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/11/2023 08/11/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 06/26/2023 06/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 05/23/2023 05/24/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Nochanges for zoning only stormwater
SW1 COMPLETE 05/23/2023 05/31/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/23/2023 05/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/23/2023 05/25/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
LOCATE COMPLETE 05/15/2023 05/18/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/15/2023 05/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 05/15/2023 05/23/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM THE SITE PLAN NEED TO SHOW ELEVATION
ZON HOLD 05/15/2023 05/15/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provided the wrong survey look at the address
BLD COMPLETE 05/12/2023 05/15/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 05/08/2023 05/08/2023
Note: Released By: HALEIGH HAND - - Water/Sewer Impact Fees will be added at a later date after all utility agreements are final.
CUSVC HOLD 12/29/2022 12/29/2022
Note: Held By: HALEIGH HAND - - Utility agreements have not been accepted yet.
URB COMPLETE 11/17/2022 11/18/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 11/16/2022 11/23/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 11/16/2022 11/21/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 11/16/2022 11/16/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/16/2022 11/16/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE HOLD 11/16/2022 11/16/2022
Note: Held By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM project has not been completed
MECH COMPLETE 11/16/2022 11/17/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/16/2022 11/22/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 11/16/2022 11/18/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 05/21/2024
PLAN REVIEW - REVISION ¤32.50 05/21/2024
CONNECTION FEES ¤25.00 06/19/2023
WATER-METER ¤505.39 06/19/2023
WATER-METER ¤419.86 06/19/2023
ADJUSTMENT 50% (¤639.81) 06/19/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/19/2023
INSPECTION - RESIDENTIAL ¤973.50 06/19/2023
PLAN REVIEW - RESIDENTIAL ¤276.12 06/19/2023
FIRE IMPACT FEE ADMIN ¤12.62 06/19/2023
FIRE IMPACT FEE ADMIN (¤12.62) 06/19/2023
FC IMPACT FEE EMS ¤62.00 06/19/2023
IMPACT FEE FIRE ¤420.52 06/19/2023
IMPACT FEE FIRE ¤420.52 06/19/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/19/2023
FC IMPACT FEE LIBRARY ¤268.00 06/19/2023
IMPACT FEE PARKS ¤1,769.15 06/19/2023
IMPACT FEE SCHOOL ¤5,450.00 06/19/2023
IMPACT FEE TRANSPORTATION ¤3,224.00 06/19/2023
WATER -IRRIGATION INSPECTION ¤25.00 06/19/2023
PARKS IMPACT FEE ADMIN ¤53.07 06/19/2023
PARKS IMPACT FEE ADMIN (¤53.07) 06/19/2023
SURCHARGE FS 533.721 ¤4.04 06/19/2023
SURCHARGE - FS 468.631 ¤6.06 06/19/2023
SW ENG - FOUNDATION SURVEY ¤20.00 06/19/2023
SW ENG INSPECTION 80 ¤80.00 06/19/2023
SW ENG PRE APRON ¤30.00 06/19/2023
SW ENG - REVIEW 20 ¤20.00 06/19/2023
SW ENG RES REVIEW 200 ¤200.00 06/19/2023
TRANS IMPACT FEE ADMIN ¤52.92 06/19/2023
TRANS IMPACT FEE ADMIN (¤52.92) 06/19/2023
SEWER INSPECTION ¤25.00 06/19/2023
SEWER CAPITAL FACILITY ¤1,682.11 06/19/2023
WATER CAPITAL FACILITY FEE ¤1,398.48 06/19/2023
SITE PLAN 30 ¤30.00 06/19/2023
Fees Total Due: ¤0.00 Total Paid: ¤16,995.44