I want to search for...

Permit #2022110882

Permit Details

Status: COED

Parcel Id: 35-11-31-4075-00000-0180
CONDITIONED SPACE: 2056 sqft
GARAGE: 492 sqft
OPENED PORCH (WITH ROOF) : 30 sqft
SCREEN PORCH (SOLID ROOF) : 291 sqft
Total Square Footage: 2869 sqft
Block: 00000
Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION
Job Phone: 863-647-5815
Location Address: 36 DEL PALMA DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/27/2022
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: SERRA JAMIE LEE

Address

1634 RTE 300

NEWBURGH, NY 12550

Lot: 0180
Contracted Stated Job Value: ¤408,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
IAN ALAN BRENNER
Status Location Address Mailing Address State License Number Phone
ACTIVE

691 GARDEN COMMERCE PKWY

WINTER GARDEN, FL 34787

STE 170

WINTER GARDEN, FL 34787

CCC1331270 (Exp: 08/31/2026) 407-649-1333
BOB BELL
Status Location Address State License Number Phone Fax
ACTIVE

3200 PARKER DRIVE

ST AUGUSTINE, FL 32084

LG35711 (Exp: 08/31/2027) 904-417-6470 877-566-4016
MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/11/2024 FINAL APPROVED BTAYLOR
Note: 6/7/2024 - PREVIOUS INSPECTION NOTES 6/7/24: 1). AHU is missing breaker label. (FBC-M1303.1) 2). AHU cover for unit breaker is missing. 3). AHU right side bottom duct seal is broken. 4). AC Condenser is not 3" above finished grade along the back (M1305.1.4.1) and 1 of 3 locking port caps is not locking. (M1411.8) 5). Guest bathroom: Tub spout is not sealed to the wall. ( FBC-P2705.1(3) Where fixtures come in contact with walls and floors, the contact shall be water tight.) 6). Right Side: 1st bathroom vent piping is not properly connected to the soffit vent. 7). Left Side: Bathroom vent piping is not properly connected to the soffit vent. 8). Kitchen exhaust hood: damper is not self closing. (needs to close securely unassisted). 9). Master bathroom shower stall: hot water is backwards. 10). Kitchen gas cooktop: Gas is off and the unit is covered with plastic so it could not be tested.
BLD - BUILDING FINAL 06/10/2024 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 06/07/2024 Disapproved -FEE REQUIRED RSIMS
Note: 6/7/24: 1). AHU is missing breaker label. (FBC-M1303.1) 2). AHU cover for unit breaker is missing. 3). AHU right side bottom duct seal is broken. 4). AC Condenser is not 3" above finished grade along the back (M1305.1.4.1) and 1 of 3 locking port caps is not locking. (M1411.8) 5). Guest bathroom: Tub spout is not sealed to the wall. ( FBC-P2705.1(3) Where fixtures come in contact with walls and floors, the contact shall be water tight.) 6). Right Side: 1st bathroom vent piping is not properly connected to the soffit vent. 7). Left Side: Bathroom vent piping is not properly connected to the soffit vent. 8). Kitchen exhaust hood: damper is not self closing. (needs to close securely unassisted). 9). Master bathroom shower stall: hot water is backwards. 10). Kitchen gas cooktop: Gas is off and the unit is covered with plastic so it could not be tested.
ROW - STORMWATER FINAL 06/07/2024 APPROVED - AS NOTED FSLADISH
Note: 6/7/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 06/07/2024 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 06/06/2024 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 06/06/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/06/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 06/06/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 04/05/2024 APPROVED TPOLACEK
Note: 04/05/24 READY FOR PAVERS AT THIS TIME. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 3/14/2024 - PREVIOUS INSPECTION NOTES READY TO POUR CONCRETE FOR THE PAVER RESTRAINTS AND THE SIDEWALK AND APRON ONLY. ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS BEFORE NEXT PRE POUR. YOU NEED TO HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION IF THERE ARE PAVERS YOU WILL NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ---------------------------------------------------------------------------------------------- 3/13/2024 - PREVIOUS INSPECTION NOTES THE FORM BOARDS FOR THE RIGHT SIDEWALK IS PITCHED MORE THAN 2% NEED TO BE 2% OR LESS PITCHED TOWARDS THE ROAD BUT NO MORE PER ADA STANDARDS. Sec 400.01A the elevation change between the street and the sidewalk, they must not compromise good pedestrian design practice. ADA Accessibility Guidelines (ADAAG) does not permit the cross slope of the sidewalk to exceed 2 percent.
ROW- PAVER RESTRAINTS 03/14/2024 APPROVED PFLANAGAN
Note: ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 03/14/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR CONCRETE FOR THE PAVER RESTRAINTS AND THE SIDEWALK AND APRON ONLY. ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS BEFORE NEXT PRE POUR. YOU NEED TO HAVE NO PAVERS LAID AT THE TIME OF THE INSPECTION IF THERE ARE PAVERS YOU WILL NEED TO REMOVE ALL PAVERS SO WE CAN INSPECT THE BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ---------------------------------------------------------------------------------------------- 3/13/2024 - PREVIOUS INSPECTION NOTES THE FORM BOARDS FOR THE RIGHT SIDEWALK IS PITCHED MORE THAN 2% NEED TO BE 2% OR LESS PITCHED TOWARDS THE ROAD BUT NO MORE PER ADA STANDARDS. Sec 400.01A the elevation change between the street and the sidewalk, they must not compromise good pedestrian design practice. ADA Accessibility Guidelines (ADAAG) does not permit the cross slope of the sidewalk to exceed 2 percent.
ROW- PRE-APRON (PRE-POUR) 03/13/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE FORM BOARDS FOR THE RIGHT SIDEWALK IS PITCHED MORE THAN 2% NEED TO BE 2% OR LESS PITCHED TOWARDS THE ROAD BUT NO MORE PER ADA STANDARDS. Sec 400.01A the elevation change between the street and the sidewalk, they must not compromise good pedestrian design practice. ADA Accessibility Guidelines (ADAAG) does not permit the cross slope of the sidewalk to exceed 2 percent.
ROW- PRE-APRON (PRE-POUR) 02/05/2024 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 12/27/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 12/27/2023 APPROVED MGIBSON
ELECTRIC - EARLY POWER 12/27/2023 APPROVED - AS NOTED BTAYLOR
Note: 12-27-23 1. Emailed FPL at 10:51.
LATH/BRICK/ WATER BARRIER 11/20/2023 APPROVED BTAYLOR
Note: 11/17/2023 - PREVIOUS INSPECTION NOTES 11/15/2023 - PREVIOUS INSPECTION NOTES 11-15-23 1. Not ready. 11-17-23 1. Not ready.
LATH/BRICK/ WATER BARRIER 11/17/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 11/15/2023 - PREVIOUS INSPECTION NOTES 11-15-23 1. Not ready. 11-17-23 1. Not ready.
LATH/BRICK/ WATER BARRIER 11/15/2023 Disapproved - NO FEE BTAYLOR
Note: 11-15-23 1. Not ready.
INSULATION 11/13/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 11-7-23 1. Front and rear slider not installed.
ALL ROUGH 11/07/2023 APPROVED - AS NOTED BTAYLOR
Note: 11-7-23 1. Front and rear slider not installed.
ALL ROUGH 11/02/2023 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/16/2023 APPROVED BTAYLOR
Note: 8/15/2023 - PREVIOUS INSPECTION NOTES 8/14/2023 - PREVIOUS INSPECTION NOTES 8-14-23 1. No plans in job box. 8-15-23 1. Builder needs to meet inspector on job.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/15/2023 Disapproved - NO FEE BTAYLOR
Note: 8/14/2023 - PREVIOUS INSPECTION NOTES 8-14-23 1. No plans in job box. 8-15-23 1. Builder needs to meet inspector on job.
ROOF VALLEY & METAL 08/14/2023 APPROVED BTAYLOR
WALL SHEATHING 08/14/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/14/2023 Disapproved - NO FEE BTAYLOR
Note: 8-14-23 1. No plans in job box.
FOUND SURVEY APPROVED (OFFICE) 08/11/2023 APPROVED TBAKER
ELECTRIC-TUG 06/06/2023 APPROVED RSIMS
Note: 6/6/23: FPL notified to release power.
TIE BEAM / LINTEL 05/19/2023 APPROVED BTAYLOR
Note: 5/18/2023 - PREVIOUS INSPECTION NOTES 5-18-23 1. Rebar dowels not tied. Circled on plans.
TIE BEAM / LINTEL 05/18/2023 Disapproved - NO FEE BTAYLOR
Note: 5-18-23 1. Rebar dowels not tied. Circled on plans.
MONOLITHIC SLAB 03/27/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 03/23/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/02/2023 APPROVED TSCHWEERS
FOOTER 02/01/2023 APPROVED TSTAUFFACHER

Review History

Department Status Date In Date Out
BLD CANCEL 03/05/2024 03/08/2024
MECH COMPLETE 03/05/2024 03/06/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/04/2024 03/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 12/14/2023 12/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 12/05/2023 12/11/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to highlight or show which numbers are changing.
ENGIN1 COMPLETE 08/11/2023 08/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/11/2023 08/11/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/16/2023 03/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/10/2023 03/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 12/08/2022 12/16/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/08/2022 12/08/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/08/2022 12/08/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
URB COMPLETE 11/21/2022 11/22/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 11/20/2022 11/23/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 11/20/2022 11/22/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 11/20/2022 11/28/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/20/2022 11/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/20/2022 11/29/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 11/20/2022 11/21/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 11/20/2022 11/30/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE ELEVATIONS DON'T MATCH THE PROPOSED ARROWS FOR THE DRAINAGE
ZON COMPLETE 11/20/2022 11/21/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 06/11/2024
PLAN REVIEW - REVISION ¤32.50 06/11/2024
REINSPECTION RESIDENTIAL ¤40.00 06/11/2024
REINSPECTION RESIDENTIAL ¤40.00 06/11/2024
SW ENG REINSPECTION 30 ¤30.00 06/11/2024
SW ENG - REVIEW 20 ¤20.00 12/27/2022
SW ENG RES REVIEW 200 ¤200.00 12/27/2022
TRANS IMPACT FEE ADMIN ¤96.72 12/27/2022
TRANS IMPACT FEE ADMIN (¤96.72) 12/27/2022
SEWER INSPECTION ¤25.00 12/27/2022
SEWER CAPITAL FACILITY ¤2,863.63 12/27/2022
WATER CAPITAL FACILITY FEE ¤2,675.20 12/27/2022
SITE PLAN 30 ¤30.00 12/27/2022
CONNECTION FEES ¤25.00 12/27/2022
WATER-METER ¤505.39 12/27/2022
ADJUSTMENT 50% (¤735.12) 12/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/27/2022
INSPECTION - RESIDENTIAL ¤1,122.00 12/27/2022
PLAN REVIEW - RESIDENTIAL ¤318.24 12/27/2022
FIRE IMPACT FEE ADMIN ¤12.62 12/27/2022
FIRE IMPACT FEE ADMIN (¤12.62) 12/27/2022
FC IMPACT FEE EMS ¤62.00 12/27/2022
IMPACT FEE FIRE ¤420.52 12/27/2022
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/27/2022
FC IMPACT FEE LIBRARY ¤268.00 12/27/2022
IMPACT FEE PARKS ¤1,769.15 12/27/2022
IMPACT FEE SCHOOL ¤5,450.00 12/27/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 12/27/2022
PARKS IMPACT FEE ADMIN ¤53.07 12/27/2022
PARKS IMPACT FEE ADMIN (¤53.07) 12/27/2022
SURCHARGE FS 533.721 ¤4.58 12/27/2022
SURCHARGE - FS 468.631 ¤6.88 12/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 12/27/2022
SW ENG INSPECTION 80 ¤80.00 12/27/2022
SW ENG PRE APRON ¤30.00 12/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤18,794.97