I want to search for...
Permit #2022111063
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7059-00960-0250 |
| CONDITIONED SPACE: 1831 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 116 sqft |
| OPENED PORCH (WITH ROOF) : 245 sqft |
| OPENED PORCH (WITH ROOF) : 85 sqft |
| Total Square Footage: 2750 sqft |
| Block: 00960 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 34 SEA BREEZE TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/12/2023 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: RYUMA DMITRY |
|
Address 100 WEST AVE UNIT 1510 MIAMI BEACH, FL 33139 |
| Lot: 0250 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF VALLEY & METAL | 04/20/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix item before next inspection FBC 3302.2-NEEDS DUMPSTER Inspector Notes from Inspection 2460 FBC 3302.2-NEEDS DUMPSTER | |||
| WALL SHEATHING | 04/15/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/15/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: FBC 3302.2-NEEDS DUMPSTER | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/03/2026 | APPROVED | STHOMAS |
| ROW - DRAINAGE | 10/08/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/8/25 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. WILL MONITER SITR FOR CONTINUED COMPLIANCE. ________________________________________________________________________________________________________________________ 10/2/2025 - PREVIOUS INSPECTION NOTES 10/2/25 YOU ARE REQUIRED TO CLEAN OUT YOUR TEMPORARY PIPE, OVERGROWN VEGETATION IN FRONT SWALE AND MAKE SURE IT IS AT POSITIVE FLOWABLE GRADE TO THE COPC DRAINAGE DITCH SPILLWAY. YOU ARE HOLDING UP THE ENTIRE UPSTREAM DRAINAGE FROM REACHING THE COPC DRAINAGE DITCH, RE-ESTABLISH SILT FENCE. PHOTO FOR REFERENCE. YOU HAVE 5 CALANDER DAYS TO MAKE REQUIRED CORRECTIONS. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 10/9/25. | |||
| ROW - DRAINAGE | 10/02/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 10/2/25 YOU ARE REQUIRED TO CLEAN OUT YOUR TEMPORARY PIPE, OVERGROWN VEGETATION IN FRONT SWALE AND MAKE SURE IT IS AT POSITIVE FLOWABLE GRADE TO THE COPC DRAINAGE DITCH SPILLWAY. YOU ARE HOLDING UP THE ENTIRE UPSTREAM DRAINAGE FROM REACHING THE COPC DRAINAGE DITCH, RE-ESTABLISH SILT FENCE. PHOTO FOR REFERENCE. YOU HAVE 5 CALANDER DAYS TO MAKE REQUIRED CORRECTIONS. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 10/9/25. | |||
| TIE BEAM / LINTEL | 06/11/2025 | APPROVED | BTAYLOR |
| ELECTRIC TEMP POLE | 12/20/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 12-20-24 1. Emailed FPL at 1:22. | |||
| MONOLITHIC SLAB | 07/01/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/24/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/20/2023 | APPROVED | BVITALE |
| Note: 12/19/2023 3:36:16 PM- PREVIOUS INSPECTION NOTES NCL WOODED LOT | |||
| WATER METER INSTALLATION REQUEST | 12/18/2023 | Disapproved -FEE REQUIRED | BVITALE |
| Note: NCL WOODED LOT | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| GRAVITY SEWER TEST | |||
| ELECTRIC - EARLY POWER | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/07/2026 | 04/10/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/17/2026 | 03/19/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. No changes indicated on plan sheets. Look same as original. 2. Plan A-2 and A-3 need to be digitally signed, dealed, and verifiable. | |||
| ZON | COMPLETE | 03/17/2026 | 03/17/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/17/2024 | 12/17/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/17/2024 | 12/17/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/10/2024 | 06/11/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 approval valid with the following notes: Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lids/covers SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 06/10/2024 | 06/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/10/2024 | 06/10/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/29/2024 | 06/05/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Our apologies as the SW1 review requirements have changed since your last review: 1) The main structure FFE is out of tolerance (too high). Please adjust to meet the following: Min. FFE must be no less than 12" above the road centerline. Max. FFE must be no more than 22" above the road centerline. Additionally, the FFE must be within 10" of adjoining improved lots. To avoid being significantly lower, the structure FFE may exceed the road centerline tolerance in order to match the FFE of adjoining improved lots. The 10" tolerance shall never be exceeded 2) Please add proposed elevations along the North property side line - adjoining reserved parcel O-1. If the intent is to match existing, please note that along the property line. | |||
| ZON | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Move the house forward 5' to the setback | |||
| BADMIN | INFORMATION | 12/12/2023 | 12/12/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Projects not started will not be granted an extension into the new code cycle that goes into effect December 31st. | |||
| BADMIN | INFORMATION | 12/15/2022 | 12/15/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM WE CANNOT MAKE THIS PERMIT READY YOUR UTILITY APPLICATION SAYS DUPLEX IS THIS A DUPLEX OR A SINGLE FAMILY THIS MAKES A HUGE DIFFERENCE ON THE FEES. | |||
| CUSVC | COMPLETE | 12/15/2022 | 12/19/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ZON | COMPLETE | 12/07/2022 | 12/07/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/07/2022 | 12/14/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/07/2022 | 12/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/28/2022 | 12/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/28/2022 | 11/29/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 11/28/2022 | 11/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/28/2022 | 11/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/28/2022 | 12/01/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/28/2022 | 11/28/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/28/2022 | 12/05/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SOD ELEVATIONS AROUND THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE FOR A CONCRETE BLOCK HOME AND 6" BELOW A WOOD FRAME HOME | |||
| ZON | HOLD | 11/28/2022 | 11/28/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Cover porch area on landscape plan must match all other plans add the cover porch area to rear right side | |||
| SWALE | COMPLETE | 11/28/2022 | 03/22/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 06/12/2023 |
| ADJUSTMENT 50% | (¤456.25) | 06/12/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/12/2023 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 06/12/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 06/12/2023 |
| CONNECTION FEES | ¤1,166.26 | 06/12/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/12/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/12/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/12/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/12/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/12/2023 |
| SURCHARGE FS 533.721 | ¤2.99 | 06/12/2023 |
| SURCHARGE - FS 468.631 | ¤4.48 | 06/12/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/12/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/12/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/12/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/12/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 06/12/2023 |
| SEWER CREDIT | (¤1,466.00) | 06/12/2023 |
| SEWER INSPECTION | ¤25.00 | 06/12/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/12/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/12/2023 |
| SITE PLAN 30 | ¤30.00 | 06/12/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/12/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/12/2023 |
| REINSPECTION FEE | ¤40.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | |
| IMPACT FEE PARKS | ||
| IMPACT FEE FIRE | ¤420.52 | |
| PLAN REVIEW - REVISION | ¤32.50 | |
| Fees | Total Due: ¤2,297.02 | Total Paid: ¤16,004.29 |