Permit #2022111075
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00340-0110 |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| CONDITIONED SPACE: 1589 sqft |
| GARAGE: 427 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| Total Square Footage: 4464 sqft |
| Block: 00340 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 386-237-1210 |
| Location Address: 2 SERVICE BERRY PL |
| Type: DU - DUPLEX |
| Issue Date: 12/09/2022 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: SEAWAY UNITED LLC A FLORIDA LIMITED |
|
Address 1690 SEAGRAPE WAY HOLLYWOOD , FL 33019 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/05/2024 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL INSPECTION | 01/18/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/18/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. I AM APPROVING THIS AS NOTED. THERE IS A SMALL AMOUNT OF DIRT IN THE CULVERT END THAT NEEDS TO BE REMOVED. IT IS YOUR RESPONSIBILTY TO MAKE SURE IT IS REMOVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/09/2024 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 01/09/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation,no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/22/2023 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/22/2023 | APPROVED | RGROSS |
| Note: 12/20/2023 - PREVIOUS INSPECTION NOTES YOUR DRAINAGE IN THE BACK IS IMPACTING THE LOT BEHIND YOURS NEED TO REGRADE SO WATER WILL NOT IMPACT THE LOT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/20/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: YOUR DRAINAGE IN THE BACK IS IMPACTING THE LOT BEHIND YOURS NEED TO REGRADE SO WATER WILL NOT IMPACT THE LOT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/19/2023 | APPROVED | GBERTOLA |
| Note: 12/19/23 Check the culvert pipe and is good. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/15/2023 | Disapproved - NO FEE | TPOLACEK |
| Note: 12/15/23 CULVERT PIPE ON SERVICE BERRY WAS APPROVED DURING PRE POUR INSPECTION. THIS WAS THE ONLY PIPE ON THE SWALE PLAN DIAGRAM AT TIME OF INSPECTION. THE PIPE ON THE RIGHT SIDE WAS NEVER INSPECTED AND THERFOR WILL REQUIRE AN INSPECTION | |||
| ELECTRIC - EARLY POWER | 12/11/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 12-11-23 1. Emailed FPL at 2:23. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/07/2023 | APPROVED | FSLADISH |
| Note: 11/07/23 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U - SEWER TIE IN | 10/18/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 10/18/2023 | APPROVED | MGIBSON |
| INSULATION | 10/09/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 9-25-23 1. Holes in roof. | |||
| ALL ROUGH | 09/25/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-25-23 1. Holes in roof. | |||
| LATH/BRICK/ WATER BARRIER | 08/18/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 08/18/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 08/10/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/10/2023 | APPROVED | BTAYLOR |
| FIREWALL FINAL | 08/09/2023 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 07/24/2023 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 02/10/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 02/09/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/30/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/26/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/05/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/15/2024 | 02/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/09/2023 | 02/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/09/2023 | 02/09/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/05/2022 | 12/05/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/05/2022 | 12/06/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/28/2022 | 12/02/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/28/2022 | 11/29/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 11/28/2022 | 11/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/28/2022 | 11/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/28/2022 | 12/01/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/28/2022 | 11/28/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/28/2022 | 12/05/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/28/2022 | 11/28/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape Plan: Please wrap the rear Right corner of the home as the Right side faces the ROW and will need a total of 6 foundation shrubs currently you only have 4 schrubs. Please indicated the proposed sod and if it will need irrigation. Elevation plans: Labeled incorrectly. Left should be right and vise versa. | |||
| SWALE | COMPLETE | 11/28/2022 | 03/22/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/04/2024 |
| CONNECTION FEES | ¤2,332.52 | 12/09/2022 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 12/09/2022 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 12/09/2022 |
| FC IMPACT FEE EMS | ¤124.00 | 12/09/2022 |
| IMPACT FEE FIRE | ¤841.04 | 12/09/2022 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 12/09/2022 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 12/09/2022 |
| IMPACT FEE PARKS | ¤3,538.30 | 12/09/2022 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 12/09/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 12/09/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 12/09/2022 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 12/09/2022 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 12/09/2022 |
| SURCHARGE FS 533.721 | ¤4.55 | 12/09/2022 |
| SURCHARGE - FS 468.631 | ¤6.83 | 12/09/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/09/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/09/2022 |
| SW ENG PRE APRON | ¤30.00 | 12/09/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/09/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/09/2022 |
| TRANS IMPACT FEE ADMIN | ¤82.14 | 12/09/2022 |
| TRANS IMPACT FEE ADMIN | (¤82.14) | 12/09/2022 |
| SEWER CREDIT | (¤4,587.09) | 12/09/2022 |
| SEWER INSPECTION | ¤25.00 | 12/09/2022 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 12/09/2022 |
| WATER CREDIT | (¤195.66) | 12/09/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 12/09/2022 |
| SITE PLAN 30 | ¤30.00 | 12/09/2022 |
| WATER- TURN ON | ¤50.00 | 12/09/2022 |
| ADJUSTMENT 50% | (¤729.83) | 12/09/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/09/2022 |
| INSPECTION - RESIDENTIAL | ¤1,113.75 | 12/09/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤315.90 | 12/09/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤36,479.21 |