I want to search for...

Permit #2022120458

Permit Details

Status: COED

Parcel Id: 07-11-31-5112-00000-0050
Total Square Footage: 0 sqft
Block: 00000
Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK
Job Phone: 386-238-1570
Location Address: 11 COMMERCE BLVD
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 03/14/2023
NOC: RECORDED
Applicant name: GARY LYNN ROBERTS
Owner: 11 COMMERCE EQUITIES LLC 11 COMMERCE ROBLES LLC &1

Address

24 CHURCH STREET

MONTCLAIR, NJ 07042

Address

ATTN: SCOTT GLAUBERG

MONTCLAIR, NJ 07042

Lot: 0050
Contracted Stated Job Value: ¤240,000.00
Job Description: Unit 6, 7 ,8 Interior Remodel Palm Coast Data
Type: CN

Contractor

COMMERCIAL CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
ACTIVE

7 SUNSHINE BLVD

ORMOND BEACH, FL 32174

CGC059441 (Exp: 08/31/2026) 386-238-1570 386-238-1571

Sub Contractors

MICHAEL WAYNE LYNCH
Status Location Address Mailing Address State License Number Phone
INACTIVE

512 FENTRESS BLVD

DAYTONA BEACH, FL 32114

STE I

DAYTONA BEACH, FL 32114

ER13015626 (Exp: 08/31/2023) 386-313-1719
FREDERICK JOSEPH PREVOST
Status Location Address State License Number Phone Fax
ACTIVE

887 BRENTWOOD DRIVE

DAYTONA BEACH, FL 0

CMC1250152 (Exp: 08/31/2026) 386-252-7047 386-257-7819
ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047

Inspection History

Type Request Date Result Inspector
BUILDING FINAL 02/15/2024 FINAL APPROVED FWILLIS
FIRE FINAL 02/14/2024 APPROVED RMARTIN
Note: 2/9/2024 - PREVIOUS INSPECTION NOTES EXIT IN HALL BETWEEN 7/8 NOT WORKING AND NEED TO VERIFY EXIT IN SMALL HALL UNIT 8
HVAC FINAL 02/13/2024 FINAL APPROVED CPISCITELLI
FIREWALL FINAL 02/12/2024 APPROVED FWILLIS
MONOLITHIC SLAB 02/09/2024 APPROVED FWILLIS
FIRE FINAL 02/09/2024 Disapproved -FEE REQUIRED RMARTIN
Note: EXIT IN HALL BETWEEN 7/8 NOT WORKING AND NEED TO VERIFY EXIT IN SMALL HALL UNIT 8
INSULATION 02/09/2024 APPROVED FWILLIS
ELECTRIC FINAL 02/08/2024 APPROVED - AS NOTED RMARTIN
Note: check em light in hall between 7/8 not working and exit light in small hall marked on plan check on fire final
ABOVE CEILING 02/07/2024 APPROVED RMARTIN
Note: 2/5/2024 3:45:54 PM- PREVIOUS INSPECTION NOTES
ABOVE CEILING 02/06/2024 CANCELLED BY APPLICANT CPISCITELLI
FIREWALL PENETRATIONS 02/05/2024 APPROVED FWILLIS
HVAC ROUGH 02/02/2024 CANCELLED BY INSPECTOR CPISCITELLI
Note: 1/10/2024 - PREVIOUS INSPECTION NOTES Inspected metal duct to wrap and flex duct and trunk line
BUILDING OTHER 01/25/2024 APPROVED FWILLIS
FIREWALL PENETRATIONS 01/25/2024 APPROVED FWILLIS
FIREWALL PENETRATIONS 01/24/2024 APPROVED FWILLIS
BUILDING OTHER 01/24/2024 CANCELLED BY INSPECTOR FWILLIS
HVAC OTHER 01/23/2024 APPROVED CPISCITELLI
Note: Inspected fire dampers in fire riser room
FIREWALL NAILING 01/19/2024 APPROVED FWILLIS
FIREWALL PENETRATIONS 01/17/2024 APPROVED FWILLIS
FIREWALL NAILING 01/16/2024 APPROVED FWILLIS
Note: 7/10/2023 - PREVIOUS INSPECTION NOTES WAITING FOR DAMPERS FOR FINAL INSPECTION.
HVAC ROUGH 01/10/2024 PARTIALLY APPROVED CPISCITELLI
Note: Inspected metal duct to wrap and flex duct and trunk line
ELECTRIC 2ND ROUGH 01/05/2024 PARTIALLY APPROVED RMARTIN
Note: walls in front room/riser room
FIREWALL FRAMING 01/05/2024 APPROVED FWILLIS
Note: PENDING ELECTRICAL INSPECTION.
FRAMING 10/09/2023 APPROVED FWILLIS
U - UTILITY COMMERCIAL FINAL 10/06/2023 FINAL APPROVED DHANEY
BUILDING FINAL 10/06/2023 APPROVED FWILLIS
Note: UNIT #5 ONLY
FIRE FINAL 10/06/2023 CANCELLED BY APPLICANT CPISCITELLI
ABOVE CEILING 09/21/2023 APPROVED RMARTIN
Note: 6/15/2023 - PREVIOUS INSPECTION NOTES 6/15/23 call back when grid is installed 6/13/2023 - PREVIOUS INSPECTION NOTES
FIREWALL FINAL 09/08/2023 APPROVED FWILLIS
FIREWALL NAILING 09/06/2023 APPROVED FWILLIS
Note: 6/30/2023 - PREVIOUS INSPECTION NOTES PARTIAL 2ND LAYER AT AREA 1. 9/6/23 - 2ND LAYER IN HALLWAYS, RISER ROOM AND ENTRY.
FIREWALL NAILING 09/01/2023 APPROVED FWILLIS
FIREWALL FRAMING 08/31/2023 APPROVED FWILLIS
HVAC ROUGH 08/25/2023 APPROVED CPISCITELLI
Note: 8/24/2023 - PREVIOUS INSPECTION NOTES Inspected partially fire dampers 6/2/2023 - PREVIOUS INSPECTION NOTES Inspected above hall for duct only. Did not inspect dampers and drops. Also need to inspect AHU when running and finished
HVAC ROUGH 08/24/2023 PARTIALLY APPROVED CPISCITELLI
Note: Inspected partially fire dampers 6/2/2023 - PREVIOUS INSPECTION NOTES Inspected above hall for duct only. Did not inspect dampers and drops. Also need to inspect AHU when running and finished
FLOOR/WALL PENETRATION 07/12/2023 PARTIALLY APPROVED LMILLER
Note: Partial for corridoors 6, 7, and 8 tops of walls last 1 foot only, Common loading room for 6,7, and 8 roof deck area only, Unit 6 top of north and west walls only' need to seal open wall penitrations by hvac final on room 6 nrth wall
FIREWALL NAILING 07/10/2023 PARTIALLY APPROVED FWILLIS
Note: WAITING FOR DAMPERS FOR FINAL INSPECTION.
FIREWALL NAILING 06/30/2023 PARTIALLY APPROVED FWILLIS
Note: PARTIAL 2ND LAYER AT AREA 1.
FIREWALL NAILING 06/20/2023 APPROVED FWILLIS
Note: 6/9/2023 - PREVIOUS INSPECTION NOTES PARTIAL SCREW EXTERIOR WALL, HIGHLIGHTED ON APPROVED PLANS. (6,7,8) 6/20/23 - PARTIAL INTERIOR FIREWALL SCREW.
ELECTRIC 2ND ROUGH 06/15/2023 APPROVED RMARTIN
ABOVE CEILING 06/15/2023 CANCELLED BY APPLICANT RMARTIN
Note: 6/15/23 call back when grid is installed 6/13/2023 - PREVIOUS INSPECTION NOTES
ABOVE CEILING 06/13/2023 CANCELLED BY APPLICANT RMARTIN
FIREWALL NAILING 06/09/2023 PARTIALLY APPROVED FWILLIS
Note: PARTIAL SCREW EXTERIOR WALL, HIGHLIGHTED ON APPROVED PLANS. (6,7,8)
HVAC ROUGH 06/02/2023 PARTIALLY APPROVED CPISCITELLI
Note: Inspected above hall for duct only. Did not inspect dampers and drops. Also need to inspect AHU when running and finished
FRAMING 06/01/2023 APPROVED FWILLIS
Note: Corridors and doorways. Two doors are pending revision for being moved. Marked on plans. suggested that he contact Chris for all HVAC questions before closing the ceiling.

Review History

Department Status Date In Date Out
BLD COMPLETE 11/22/2023 11/22/2023
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
DSD COMPLETE 11/22/2023 11/22/2023
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
ELEC COMPLETE 11/22/2023 11/30/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 COMPLETE 11/22/2023 12/04/2023
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
MECH COMPLETE 11/22/2023 11/30/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 11/22/2023 12/08/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
UD1 COMPLETE 11/22/2023 12/06/2023
Note: Released By: ALEXANDER BLAKE - - ABLAKE@PALMCOASTGOV.COM
BLD COMPLETE 11/22/2023 12/08/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BLD COMPLETE 02/27/2023 03/13/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
MECH COMPLETE 02/27/2023 02/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
FI1 COMPLETE 02/16/2023 02/22/2023
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
MECH HOLD 02/16/2023 02/23/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Page M101 is cut off at the top. Upload new M101
BLD HOLD 02/16/2023 02/16/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. A revision to sheet X2 and X3 is required. Revise to show the bathroom renovations. 2. Various sheets reference a future UL rated wall. Will be constructed under this application? If not, remove the reference to the proposed wall and separate application will be required when the wall is to be constructed.
ELEC COMPLETE 02/16/2023 02/24/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 12/22/2022 12/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 12/12/2022 12/27/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. A revision to sheet X2 and X3 is required. Revise to show the bathroom renovations. 2. Various sheets reference a future UL rated wall. Will be constructed under this application? If not, remove the reference to the proposed wall and separate application will be required when the wall is to be constructed.
DSD COMPLETE 12/12/2022 12/21/2022
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM multitenant use is permit per deputy chief community development officer.
ELEC HOLD 12/12/2022 12/21/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Automatic lighting controls are not permitted where electrical equipment is placed. NEC 2017 110.26 (D) 2. Need emergency lighting where electrical equipment is located. NEC 2017 110.26(D)
FI1 HOLD 12/12/2022 12/16/2022
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Need to show Fire extinguishers per Sheet A2 (Life Safety Plans - unit 8) Per FBC 2017 Section 906, and FFPC 1, section 13.6, and Table 13.6.1.2
MECH HOLD 12/12/2022 12/22/2022
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Mechanical plans need to be digitally signed, sealed and verifable. F.S.471.025 2. Provide Ventilation calculation for each area 6,7, and 8 per Table 403.3.1.1 FBC Mechanical 2020 7Th edition 3. Provide Heatload Calculation for each area 6,7, and 8 per C403.2.1 FBC Energy Conservation 2020 7Th edition 4. Provide details on existing equipment for all areas on schedule and what is new. Provide condensing equpment details also. 5. Provide duct layout for all areas showing supply, return, fresh air and exhaust. 6. Provide thermostat location for each area.
PLUM COMPLETE 12/12/2022 12/27/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
UD1 COMPLETE 12/12/2022 12/12/2022
Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 02/14/2024
SURCHARGE FS 533.721 ¤10.72 03/14/2023
SURCHARGE - FS 468.631 ¤16.09 03/14/2023
SITE PLAN 30 ¤30.00 03/14/2023
ADJUSTMENT 50% (¤1,015.50) 03/14/2023
ADMINISTRATIVE - COMMERCIAL ¤75.00 03/14/2023
INSPECTION COMMERCIAL ¤1,680.00 03/14/2023
PLAN REVIEW - COMMERCIAL ¤276.00 03/14/2023