I want to search for...
Permit #2022120472
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00120-0080 |
| CONDITIONED SPACE: 2765 sqft |
| GARAGE: 740 sqft |
| OPENED PORCH (WITH ROOF) : 224 sqft |
| Total Square Footage: 3729 sqft |
| Block: 00120 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 407-580-2657 |
| Location Address: 16 FIRCREST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/27/2023 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: EMERSON CHRISTINE LORRAINE & ROBERT E W&H |
|
Address 2712 HALE COURT WALDORF, MD 20603 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤700,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
KERRY DWAIN AYLESWORTH II
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2820 LEWIS SPEEDWAY ST AUGUSTINE, FL 32084 |
STE B ST AUGUSTINE, FL 32084 |
CAC1820713 (Exp: 08/31/2026) | 904-342-5709 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/01/2024 | FINAL APPROVED | AGAETANO |
| Note: 2/22/2024 - PREVIOUS INSPECTION NOTES 02-21-2024 1. Temp pole needs to be removed. 2. Gas rough and gas final not approved. No gas contractor or riser listed as on 12-14-2023 inspection. 3. Lanai switches not weather proof or cover installed. 4. Hole in AHU ceiling. Please seal at low voltage wire. 5. Hole at right side soffit. Check all. 6. Hole at exterior entry GFCI. Check all. Inspection stopped. Please walk your jobs prior to inspections. | |||
| BLD - BUILDING FINAL | 02/22/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 02-22-2024 1. Temp pole needs to be removed. 2. Gas rough and gas final not approved. No gas contractor or riser listed as on 12-14-2023 inspection. 3. Lanai switches not weather proof or cover installed. 4. Hole in AHU ceiling. Please seal at low voltage wire. 5. Hole at right side soffit. Check all. 6. Hole at exterior entry GFCI. Check all. Inspection stopped. Please walk your jobs prior to inspections. | |||
| U-CROSS CONNECTION | 02/08/2024 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 02/08/2024 | FINAL APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 02/02/2024 | APPROVED | AGAETANO |
| Note: 1/30/2024 - PREVIOUS INSPECTION NOTES 1/30/24 NEED REVISION SHOWING 400A SERVICE ON HOUSE 1/26/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Emailed FPL @ 11:10AM 01-26-2024 Conductors have been connected in meter main. | |||
| ELECTRIC - EARLY POWER | 01/30/2024 | Disapproved - NO FEE | RMARTIN |
| Note: 1/30/24 NEED REVISION SHOWING 400A SERVICE ON HOUSE 1/26/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Emailed FPL @ 11:10AM 01-26-2024 Conductors have been connected in meter main. | |||
| ELECTRIC - EARLY POWER | 01/26/2024 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 11:10AM 01-26-2024 Load side conductors have been connected in meter main. Power has not been released to the home yet. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/21/2023 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/21/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/21/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 12/21/2023 | APPROVED | EMADISON |
| GAS ROUGH | 12/14/2023 | Disapproved - NO FEE | MGIBSON |
| Note: CAN NOT APPROVE GAS ROUGH. NO GAS CONTRACTOR LISTED NO RISER FOR GAS NO PAPER WORK | |||
| ROW- PRE-APRON (PRE-POUR) | 11/06/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 11/06/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. _________________________________________________________________________________________________________________ | |||
| U - SEWER TIE IN | 10/25/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 10/25/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/31/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2490 8/25/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23 All previous items not addressed, repair all before calling in re-inspection, stopped inspection 8/11/2023 - PREVIOUS INSPECTION NOTES 08-11-2023 1. Kohler PVC not schedue 80. 2. Floor outlet added. Please revise to the building department and have on site. 3. Tub Set will be added. 4. UFER ground not visible. 5. Glass not installed at entry. Inspection stopped. 08-17-2023 Please cover entry door glass area with plywood or Tyvek prior to insulation. 08-25-2023 Multiple areas of walls at ceiling not completely insulated. Check all. Please remove high grass prior to next inspection. | |||
| INSULATION | 08/29/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 8/25/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23 All previous items not addressed, repair all before calling in re-inspection, stopped inspection 8/11/2023 - PREVIOUS INSPECTION NOTES 08-11-2023 1. Kohler PVC not schedue 80. 2. Floor outlet added. Please revise to the building department and have on site. 3. Tub Set will be added. 4. UFER ground not visible. 5. Glass not installed at entry. Inspection stopped. 08-17-2023 Please cover entry door glass area with plywood or Tyvek prior to insulation. 08-25-2023 Multiple areas of walls at ceiling not completely insulated. Check all. Please remove high grass prior to next inspection. | |||
| INSULATION | 08/25/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2420 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23 All previous items not addressed, repair all before calling in re-inspection, stopped inspection 8/11/2023 - PREVIOUS INSPECTION NOTES 08-11-2023 1. Kohler PVC not schedue 80. 2. Floor outlet added. Please revise to the building department and have on site. 3. Tub Set will be added. 4. UFER ground not visible. 5. Glass not installed at entry. Inspection stopped. 08-17-2023 Please cover entry door glass area with plywood or Tyvek prior to insulation. 08-25-2023 Multiple areas of walls at ceiling not completely insulated. Check all. | |||
| ALL ROUGH | 08/17/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 8/16/2023 - PREVIOUS INSPECTION NOTES 8/16/23 All previous items not addressed, repair all before calling in re-inspection, stopped inspection 8/11/2023 - PREVIOUS INSPECTION NOTES 08-11-2023 1. Kohler PVC not schedue 80. 2. Floor outlet added. Please revise to the building department and have on site. 3. Tub Set will be added. 4. UFER ground not visible. 5. Glass not installed at entry. Inspection stopped. 08-17-2023 Please cover entry door glass area with plywood or Tyvec prior to insulation. | |||
| ALL ROUGH | 08/16/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 8/16/23 All previous items not addressed, repair all before calling in re-inspection, stopped inspection. Electrical items listed have been addressed 8/11/2023 - PREVIOUS INSPECTION NOTES 08-11-2023 1. Kohler PVC not schedue 80. 2. Floor outlet added. Please revise to the building department and have on site. 3. Tub Set will be added. 4. UFER ground not visible. 5. Please provide fireblocking details for top plate area and wall details for drywall attachment. 6. Glass not installed at entry. Inspection stopped. | |||
| ELECTRIC-TUG | 08/16/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 11:10AM | |||
| ALL ROUGH | 08/11/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 08-11-2023 1. Kohler PVC not schedue 80. 2. Floor outlet added. Please revise to the building department and have on site. 3. Tub Set will be added. 4. UFER ground not visible. 5. Please provide fireblocking details for top plate area and wall details for drywall attachment. 6. Glass not installed at entry. Inspection stopped. | |||
| ROOF VALLEY & METAL | 05/23/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/19/2023 | APPROVED | AGAETANO |
| Note: 5/18/2023 - PREVIOUS INSPECTION NOTES 5/8/2023 - PREVIOUS INSPECTION NOTES 05-08-2023 1. Truss 41, middle bottom chord has been shaved. Please provide engineering to the building department and have on site prior to next inspection. 2. Sheet 2 garage wall detail indicates 2 x 12. Both 2 x 12 have been ripped to 10 1/2". Please provide engineering to the building department and have on site or install as per plans. 3. Trusses 19, 20, and 42 not fastened properly. Inspection stopped. 05-18-2023 Above issue has not been addressed. Truss 41 has not been repaired as per engineering letter. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/18/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 5/8/2023 - PREVIOUS INSPECTION NOTES 05-08-2023 1. Truss 41, middle bottom chord has been shaved. Please provide engineering to the building department and have on site prior to next inspection. 2. Sheet 2 garage wall detail indicates 2 x 12. Both 2 x 12 have been ripped to 10 1/2". Please provide engineering to the building department and have on site or install as per plans. 3. Trusses 19, 20, and 42 not fastened properly. Inspection stopped. 05-18-2023 Above issue has not been addressed. Truss 41 has not been repaired as per engineering letter. | |||
| WALL SHEATHING | 05/08/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/08/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 05-08-2023 1. Truss 42, middle bottom chord has been shaved. Please provide engineering to the building department and have on site prior to next inspection. 2. Sheet 2 garage wall detail indicates 2 x 12. Both 2 x 12 have been ripped to 10 1/2". Please provide engineering to the building department and have on site or install as per plans. 3. Trusses 19, 20, and 42 not fastened properly. Inspection stopped. | |||
| TIE BEAM / LINTEL | 04/11/2023 | APPROVED | TSTAUFFACHER |
| Note: 4/10/2023 - PREVIOUS INSPECTION NOTES 04-10-2023 Lanai lintel not complete. | |||
| TIE BEAM / LINTEL | 04/10/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 04-10-2023 Lanai lintel not complete. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/21/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/16/2023 | APPROVED | FWILLIS |
| Note: 3/15/2023 - PREVIOUS INSPECTION NOTES 03-15-2023 Entire slab needs to be tamped. | |||
| MONOLITHIC SLAB | 03/15/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 03-15-2023 Entire slab needs to be tamped. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/07/2023 | APPROVED | MGIBSON |
| ELECTRIC TEMP POLE | 02/17/2023 | APPROVED | AGAETANO |
| WATER METER INSTALLATION REQUEST | 02/14/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/16/2024 | 02/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/30/2024 | 02/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/15/2023 | 05/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/21/2023 | 03/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/21/2023 | 03/21/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 01/30/2023 | 01/30/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NAME OF AFFIANT MISSING AT BOTTOM. MUST BE RE-RECORDED WITH DIFFERENT INSTRUMENT # (2022050415) | |||
| MECH | COMPLETE | 01/09/2023 | 01/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/09/2023 | 01/10/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/09/2023 | 01/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 12/22/2022 | 12/22/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Rename your documents to the correct file names (page name, not street address) | |||
| ELEC | COMPLETE | 12/21/2022 | 12/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/13/2022 | 12/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/13/2022 | 12/19/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 12/13/2022 | 12/13/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need an outlet on the front of the house. NEC 2017 210.52 (E) 2. Submit a riser diagram for a 300 amp service. 3. Submit manufacture specs and a riser diagram for the generator. | |||
| ENGIN1 | COMPLETE | 12/13/2022 | 12/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/13/2022 | 12/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/13/2022 | 12/13/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout is not readable. Provide new Duct layout signed by AC contractor | |||
| SW1 | HOLD | 12/13/2022 | 12/19/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM YOUR DRAINAGE IS IMPACTING THE LOT BEHIND YOUR LOT. NEED TO MAKE ALL DRIANAGE GO TO THE FRONT SWALE | |||
| ZON | HOLD | 12/13/2022 | 12/14/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide garage door color on color sheet for review AC pad location must be shown on site plan All windows and doors facing public right of way must have banding Must have at least four shrubs along each front side of home | |||
| SWALE | COMPLETE | 12/13/2022 | 03/30/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| CONNECTION FEES | ¤1,166.26 | 01/27/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/27/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 01/27/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/27/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/27/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/27/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/27/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/27/2023 |
| SURCHARGE FS 533.721 | ¤7.53 | 01/27/2023 |
| SURCHARGE - FS 468.631 | ¤11.30 | 01/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/27/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/27/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/27/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/27/2023 |
| SEWER CREDIT | (¤1,466.00) | 01/27/2023 |
| SEWER INSPECTION | ¤25.00 | 01/27/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/27/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/27/2023 |
| SITE PLAN 30 | ¤30.00 | 01/27/2023 |
| WATER- TURN ON | ¤25.00 | 01/27/2023 |
| ADJUSTMENT 50% | (¤1,250.50) | 01/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/27/2023 |
| INSPECTION - RESIDENTIAL | ¤1,925.00 | 01/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤546.00 | 01/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,757.46 |