I want to search for...

Permit #2022120570

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00020-0290
CONDITIONED SPACE: 2784 sqft
GARAGE: 900 sqft
OPENED PORCH (WITH ROOF) : 260 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
Total Square Footage: 4088 sqft
Block: 00020
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 386-627-0430
Location Address: 38 PINE HILL LN
Type: DU - DUPLEX
Issue Date: 01/10/2023
NOC: RECORDED
Applicant name: ANNA WIKTORIA LISOWSKI
Owner: LESNIEWSKI PIOTR & ADRIANA LESNIEWSKI H&W

Address

63 JACKLYN CT

INWOOD, NY 11096

Lot: 0290
Contracted Stated Job Value: ¤400,000.00
Job Description: Duplex
Type: CN

Contractor

GOLDEN FOX HOME REMODELING, INC
Status Location Address State License Number Phone
ACTIVE

72 HERNANDEZ AVE

PALM COAST, FL 32137

CBC1259266 (Exp: 08/31/2026) 386-627-0430

Sub Contractors

DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926
WILLIAM TODD SIKES
Status Location Address State License Number Phone
ACTIVE

83 PORT ROYAL DR

ST AUGUSTINE, FL 32084

EC0002726 (Exp: 08/31/2026) 904-762-8762
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
SCOTT H STILLWELL
Status Location Address State License Number Phone
ACTIVE

4500 US 1 UNIT 206

BUNNELL, FL 32110

CAC1819433 (Exp: 08/31/2026) 386-864-4404

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/21/2023 FINAL APPROVED KSANDOE
ROW - FINAL INSPECTION 09/21/2023 APPROVED FSLADISH
Note: 09/21/23 ALL CORRECTIONS MADE LOOKED GOOD AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 9/5/2023 - PREVIOUS INSPECTION NOTES 09/05/23 NEED TO CONTINUE WHERE YOU STOPPED IN THE RIGHT REAR WHERE IT IS OUTLINED IN PAINT AND STILL LOW. NEEDS TO COME UP JUST A BIT IN THAT AREA TO MOVE WATER FORWARD. CULVERTS ARE FUL, OF DIRT AND SILT, NEED TO BE FULLY CLEANED OUT. NOT GOING TO FEE YOU TODAY AS I WAS HERE FOR THE AFTERPOUR. PLEASE MAKE CORRECTIONS BEFORE CALLING IN ROW FINAL INSPECTION. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 08/17/23 UPON WALKING THE PROPERTY DETERMINED RIGHT SIDE PROPERTY LINE IN REAR AND FORWARD THERE IS ALSO A SPOT THAT WILL NEED TO BE RAISED A BIT TO MOVE WATER FORWARD. FRONT SWALE HAS A LOT OF DIRT AND DEBRIS THAT WILL NEED ATTENTION BEFORE ROW FINAL. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 08/17/23 ONE SPOT IN REAR RIGHT WILL LOOK AT DURING FIELD SURVEY.
U -UTILITY RESIDENTIAL FINAL 09/21/2023 FINAL APPROVED LFITZGERALD
Note: 9/5/2023 - PREVIOUS INSPECTION NOTES need access to circuit breakers for pep tank
ROW - FINAL INSPECTION 09/05/2023 Disapproved - NO FEE FSLADISH
Note: 09/05/23 NEED TO CONTINUE WHERE YOU STOPPED IN THE RIGHT REAR WHERE IT IS OUTLINED IN PAINT AND STILL LOW. NEEDS TO COME UP JUST A BIT IN THAT AREA TO MOVE WATER FORWARD. CULVERTS ARE FUL, OF DIRT AND SILT, NEED TO BE FULLY CLEANED OUT. NOT GOING TO FEE YOU TODAY AS I WAS HERE FOR THE AFTERPOUR. PLEASE MAKE CORRECTIONS BEFORE CALLING IN ROW FINAL INSPECTION. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 08/17/23 UPON WALKING THE PROPERTY DETERMINED RIGHT SIDE PROPERTY LINE IN REAR AND FORWARD THERE IS ALSO A SPOT THAT WILL NEED TO BE RAISED A BIT TO MOVE WATER FORWARD. FRONT SWALE HAS A LOT OF DIRT AND DEBRIS THAT WILL NEED ATTENTION BEFORE ROW FINAL. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 08/17/23 ONE SPOT IN REAR RIGHT WILL LOOK AT DURING FIELD SURVEY.
U -UTILITY RESIDENTIAL FINAL 09/05/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: need access to circuit breakers for pep tank
ROW - FINAL APRON (AFTER POUR) 09/05/2023 APPROVED - AS NOTED FSLADISH
Note: 09/05/23 PIPES ARE GOOD. CUTS MADE. HOT PATCHES COMPLETE CULVERTS NEED TO BE DUG OUT. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 08/17/23 UPON WALKING THE PROPERTY DETERMINED RIGHT SIDE PROPERTY LINE IN REAR AND FORWARD THERE IS ALSO A SPOT THAT WILL NEED TO BE RAISED A BIT TO MOVE WATER FORWARD. FRONT SWALE HAS A LOT OF DIRT AND DEBRIS THAT WILL NEED ATTENTION BEFORE ROW FINAL. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 08/17/23 ONE SPOT IN REAR RIGHT WILL LOOK AT DURING FIELD SURVEY.
U-CROSS CONNECTION 09/05/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/17/2023 APPROVED - AS NOTED FSLADISH
Note: 08/17/23 ONE SPOT IN REAR RIGHT WILL LOOK AT DURING FIELD SURVEY.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/17/2023 APPROVED - AS NOTED FSLADISH
Note: 08/17/23 UPON WALKING THE PROPERTY DETERMINED RIGHT SIDE PROPERTY LINE IN REAR AND FORWARD THERE IS ALSO A SPOT THAT WILL NEED TO BE RAISED A BIT TO MOVE WATER FORWARD. FRONT SWALE HAS A LOT OF DIRT AND DEBRIS THAT WILL NEED ATTENTION BEFORE ROW FINAL. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 08/17/23 ONE SPOT IN REAR RIGHT WILL LOOK AT DURING FIELD SURVEY.
ELECTRIC - EARLY POWER 07/12/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 0938. Release Power
ROW- PRE-APRON (PRE-POUR) 06/26/2023 APPROVED FSLADISH
Note: 06/26/23 PIPE IS GOOD READY TO POUR. LOOKED GOOD AT TIME OF THE INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 6/20/2023 - PREVIOUS INSPECTION NOTES WAY TO MUCH WATER IN POURING AREA AT THIS TIME OF THE INSPECTION WATER IN CULVERTS AND IN THE INTIRE FOOTERS ----------------------------------------------------------------------------------- 6/16/2023 - PREVIOUS INSPECTION NOTES 6/16/23= CONSTRUTION SITE IS UNDER WATER, TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. 300 E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 06/23/2023 CANCELLED BY APPLICANT RGROSS
Note: 6/20/2023 - PREVIOUS INSPECTION NOTES WAY TO MUCH WATER IN POURING AREA AT THIS TIME OF THE INSPECTION WATER IN CULVERTS AND IN THE INTIRE FOOTERS ----------------------------------------------------------------------------------- 6/16/2023 - PREVIOUS INSPECTION NOTES 6/16/23= CONSTRUTION SITE IS UNDER WATER, TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. 300 E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 06/20/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: WAY TO MUCH WATER IN POURING AREA AT THIS TIME OF THE INSPECTION WATER IN CULVERTS AND IN THE INTIRE FOOTERS ----------------------------------------------------------------------------------- 6/16/2023 - PREVIOUS INSPECTION NOTES 6/16/23= CONSTRUTION SITE IS UNDER WATER, TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. 300 E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 06/16/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 6/16/23= CONSTRUTION SITE IS UNDER WATER, TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHTS RAIN. WAY TOO SOFT TO POUR. 300 E RESIDENTIAL CULVERT DETAIL
U - SEWER TIE IN 06/06/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 06/06/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 05/15/2023 APPROVED CSTONE
INSULATION 04/27/2023 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Dryer vents need to be sealed at roof sheathing. Both sides Bathroom exhaust vent ducting needs to be supported every 4'. Both sides 5FT head test failed. Unit B
ALL ROUGH 04/20/2023 APPROVED - AS NOTED KSANDOE
Note: Dryer vents need to be sealed at roof sheathing. Both sides Bathroom exhaust vent ducting needs to be supported every 4'. Both sides 5FT head test failed. Unit B
FIREWALL FINAL 04/20/2023 APPROVED KSANDOE
WALL SHEATHING 04/10/2023 APPROVED - AS NOTED KSANDOE
Note: I was able to inspect nailing on wall sheathing from inside this time. DO NOT cover wall sheathing prior to inspection.
FIREWALL DRYWALL NAILING 04/10/2023 APPROVED KSANDOE
Note: 4/3/2023 - PREVIOUS INSPECTION NOTES 4/3/23 firewall needs to extend into front soffit like the rear Inspector Notes from Inspection 2460 Continous lateral bracing on firewall trusses needs to be addressed. Drywall cannot be installed properly with bracing as it is currently installed 3/17/2023 - PREVIOUS INSPECTION NOTES Job box needs attention
LATH/BRICK/ WATER BARRIER 04/10/2023 APPROVED KSANDOE
ROOF VALLEY & METAL 04/03/2023 APPROVED RMARTIN
Note: Inspector Notes from Inspection 2460 Continous lateral bracing on firewall trusses needs to be addressed. Drywall cannot be installed properly with bracing as it is currently installed 3/17/2023 - PREVIOUS INSPECTION NOTES Job box needs attention
FIREWALL DRYWALL NAILING 04/03/2023 Disapproved - NO FEE RMARTIN
Note: 4/3/23 firewall needs to extend into front soffit like the rear Inspector Notes from Inspection 2460 Continous lateral bracing on firewall trusses needs to be addressed. Drywall cannot be installed properly with bracing as it is currently installed 3/17/2023 - PREVIOUS INSPECTION NOTES Job box needs attention
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/21/2023 APPROVED - AS NOTED KSANDOE
Note: Continous lateral bracing on firewall trusses needs to be addressed. Drywall cannot be installed properly with bracing as it is currently installed 3/17/2023 - PREVIOUS INSPECTION NOTES Job box needs attention
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/17/2023 Disapproved - NO FEE KSANDOE
Note: Job box needs attention
FOUND SURVEY APPROVED (OFFICE) 02/24/2023 APPROVED TBAKER
TIE BEAM / LINTEL 02/22/2023 APPROVED KSANDOE
MONOLITHIC SLAB 02/10/2023 APPROVED TSTAUFFACHER
Note: 2/9/2023 - PREVIOUS INSPECTION NOTES Potable water supply lines running through foundation areas, outside of relieving arch, need to be protected/sleeved.
MONOLITHIC SLAB 02/09/2023 Disapproved - NO FEE KSANDOE
Note: Potable water supply lines running through foundation areas, outside of relieving arch, need to be protected/sleeved.
PLUMBING 1ST ROUGH UNDERGROUND 02/02/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/17/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 07/31/2023 08/01/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 07/17/2023 07/18/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM update mechanical subcontractor
ENGIN1 COMPLETE 02/23/2023 02/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/23/2023 02/23/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/03/2023 01/04/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 12/21/2022 12/21/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
LOCATE COMPLETE 12/21/2022 12/27/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
BLD HOLD 12/21/2022 12/21/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Firewall Section references U338. Per the UL detail, 5/8 think type-x gypsum wallboard is required. Detail submitted only references 5/8 gypsum. Revise detail to reflect the UL detail.
ENGIN1 COMPLETE 12/21/2022 12/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 12/21/2022 01/03/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
SWALE COMPLETE 12/15/2022 03/31/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 12/14/2022 12/16/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Two family dwellings requires minimum of 1 hour fire separation. UL U910 is for the masonry – CMU. The fire septation is to continue from the foundation to the roof. Provide a UL listing and continuation of the fire wall to the roof. R302.3
CUSVC COMPLETE 12/14/2022 12/20/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 12/14/2022 12/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/14/2022 12/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE HOLD 12/14/2022 12/15/2022
Note: Held By: TONI CHURCHILL - - Wrong Plot Plan
MECH COMPLETE 12/14/2022 12/15/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/14/2022 12/19/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 12/14/2022 12/15/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: please correct map panel number 0139E

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 09/21/2023
REINSPECTION FEE ¤40.00 09/21/2023
SW ENG REINSPECTION 30 ¤30.00 09/21/2023
SW ENG REINSPECTION 30 ¤30.00 09/21/2023
PLAN REVIEW - REVISION ¤32.50 09/21/2023
CONNECTION FEES ¤1,166.26 01/10/2023
SW ENG - REVIEW 20 ¤20.00 01/10/2023
SW ENG RES REVIEW 200 ¤200.00 01/10/2023
SEWER CREDIT (¤2,294.00) 01/10/2023
SEWER INSPECTION ¤25.00 01/10/2023
SEWER CAPITAL FACILITY ¤5,344.82 01/10/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 01/10/2023
SITE PLAN 30 ¤30.00 01/10/2023
SURCHARGE FS 533.721 ¤4.50 01/10/2023
SURCHARGE - FS 468.631 ¤6.75 01/10/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/10/2023
SW ENG INSPECTION 80 ¤80.00 01/10/2023
SW ENG PRE APRON ¤30.00 01/10/2023
WATER- TURN ON ¤25.00 01/10/2023
ADJUSTMENT 50% (¤721.00) 01/10/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/10/2023
INSPECTION - RESIDENTIAL ¤1,100.00 01/10/2023
PLAN REVIEW - RESIDENTIAL ¤312.00 01/10/2023
FIRE IMPACT FEE ADMIN ¤25.23 01/10/2023
FIRE IMPACT FEE ADMIN (¤25.23) 01/10/2023
FIRE IMPACT FEE ADMIN ¤82.14 01/10/2023
FIRE IMPACT FEE ADMIN (¤82.14) 01/10/2023
FC IMPACT FEE EMS ¤124.00 01/10/2023
IMPACT FEE FIRE ¤841.04 01/10/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 01/10/2023
FC IMPACT FEE LIBRARY ¤536.00 01/10/2023
IMPACT FEE PARKS ¤3,538.30 01/10/2023
IMPACT FEE SCHOOL ¤10,900.00 01/10/2023
IMPACT FEE TRANSPORTATION ¤2,738.00 01/10/2023
WATER -IRRIGATION INSPECTION ¤25.00 01/10/2023
PARKS IMPACT FEE ADMIN ¤106.15 01/10/2023
PARKS IMPACT FEE ADMIN (¤106.15) 01/10/2023
Fees Total Due: ¤0.00 Total Paid: ¤28,594.05