Permit #2022120906
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00060-0020 |
| CONDITIONED SPACE: 1942 sqft |
| GARAGE: 440 sqft |
| OPENED PORCH (WITH ROOF) : 220 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| Total Square Footage: 2722 sqft |
| Block: 00060 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 386-627-0430 |
| Location Address: 24 WOODSHIRE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/10/2023 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX PROPERTIES LLC |
|
Address 72 HERNANDEZ AVE PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/05/2023 | FINAL APPROVED | BTAYLOR |
| ROW - STORMWATER FINAL | 08/29/2023 | APPROVED | GBERTOLA |
| Note: 8/29/23= CORRECTION WERE MADE At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2023 - PREVIOUS INSPECTION NOTES ** 08/28/23 BUILDER STILL NEEDS TO LOWER AREAS HIGH LIGHTED WITH WHITE PAINT IN BOTH THE LEFT AND RIGHT SIDE ROAD SIDE SWALE ** LEFT SIDE NEED TO MAKE A 2:1 SLOPE AT THE CULVERT 8/21/23= THE SWALE ON THE LEFT AND RIGHT SIDES NEEDS TO BE LOWERED.HOLDING WATER. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/28/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 08/28/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/28/23 BUILDER STILL NEEDS TO LOWER AREAS HIGH LIGHTED WITH WHITE PAINT IN BOTH THE LEFT AND RIGHT SIDE ROAD SIDE SWALE ** LEFT SIDE NEED TO MAKE A 2:1 SLOPE AT THE CULVERT 8/21/23= THE SWALE ON THE LEFT AND RIGHT SIDES NEEDS TO BE LOWERED.HOLDING WATER. | |||
| U-CROSS CONNECTION | 08/28/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 08/21/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. It is the builder's responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/21/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. It is the builder's responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/21/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. It is the builder's responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/18/2023 | APPROVED | GBERTOLA |
| Note: 8/18/23= ready for paver | |||
| ROW- PRE-APRON (PRE-POUR) | 07/13/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: 7/13/23=YOU CAN NOT INSTALL THE PAVERS ON THE APRON UNTIL YOU REMOVE THE SAND AND ADD PAVER BASE: nOTE TO THE BUILDER YOU CAN NOT USE SAND UNDER THE PAVERS .PER GBERTOLA 7/12/2023 - PREVIOUS INSPECTION NOTES 07/12/23 AT THE TIME OF THIS INSPECTION THE PAVER BASE DOES NOT MEET THE COMPACTION REQUIREMENTS TO LAY PAVERS. 90% COMPACTION IS REQUIRED. I CAN EASILY MOVE IT WITH MY SHOE, IT IS NOT READY TO LAY PAVERS. 6/26/2023 - PREVIOUS INSPECTION NOTES ** 06/26/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 07/12/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 07/12/23 AT THE TIME OF THIS INSPECTION THE PAVER BASE DOES NOT MEET THE COMPACTION REQUIREMENTS TO LAY PAVERS. 90% COMPACTION IS REQUIRED. I CAN EASILY MOVE IT WITH MY SHOE, IT IS NOT READY TO LAY PAVERS. PLEASE SEE PHOTO FOR REFERENCE. 6/26/2023 - PREVIOUS INSPECTION NOTES ** 06/26/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC - EARLY POWER | 07/12/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 8:30 AM | |||
| ROW- PRE-APRON (PRE-POUR) | 06/26/2023 | PARTIALLY APPROVED | EMADISON |
| Note: ** 06/26/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED ________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PAVER RESTRAINTS | 06/26/2023 | APPROVED | EMADISON |
| Note: ** 06/26/23 READY TO POUR PAVER RESTRAINTS Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/23/2023 | CANCELLED BY APPLICANT | RGROSS |
| U - SEWER TIE IN | 06/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 06/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 05/15/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 05/11/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 05/09/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/9/23 1. Failed 5' head pressure test 2. Window STILL missing anchors in laudry room 5/5/2023 - PREVIOUS INSPECTION NOTES 5/5/23 1. Hood vent requires nail plat @ top extendinf 2'' below top plate 2. Outlet box not attached to stud in dinning area 3. Slab needs to be sealed @ island 4. WIndows missing anchors check all Stopped inspection, not ready 5/3/2023 - PREVIOUS INSPECTION NOTES 5/3/23 1. Plumbing lines in garage wall need to be protected where slab has blown out 2. A/C lineset nail plates are required to extend 2'' above or below FBC M1502.5 3. Failed 5' head pressure test FBC P2503.5.1 Stopped inspection 5/2/2023 - PREVIOUS INSPECTION NOTES 1. A/C tech still installing duct work 2. All metalic electrical boxes covers need to be removed to inspect that boxes are bonded 3. Exhaust fans not wired Stopped inspection, not ready | |||
| ALL ROUGH | 05/05/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/5/23 1. Hood vent requires nail plat @ top extendinf 2'' below top plate 2. Outlet box not attached to stud in dinning area 3. Slab needs to be sealed @ island 4. WIndows missing anchors check all Stopped inspection, not ready 5/3/2023 - PREVIOUS INSPECTION NOTES 5/3/23 1. Plumbing lines in garage wall need to be protected where slab has blown out 2. A/C lineset nail plates are required to extend 2'' above or below FBC M1502.5 3. Failed 5' head pressure test FBC P2503.5.1 Stopped inspection 5/2/2023 - PREVIOUS INSPECTION NOTES 1. A/C tech still installing duct work 2. All metalic electrical boxes covers need to be removed to inspect that boxes are bonded 3. Exhaust fans not wired Stopped inspection, not ready | |||
| ALL ROUGH | 05/03/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/3/23 1. Plumbing lines in garage wall need to be protected where slab has blown out 2. A/C lineset nail plates are required to extend 2'' above or below FBC M1502.5 3. Failed 5' head pressure test FBC P2503.5.1 Stopped inspection 5/2/2023 - PREVIOUS INSPECTION NOTES 1. A/C tech still installing duct work 2. All metalic electrical boxes covers need to be removed to inspect that boxes are bonded 3. Exhaust fans not wired Stopped inspection, not ready | |||
| ALL ROUGH | 05/02/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. A/C tech still installing duct work 2. All metalic electrical boxes covers need to be removed to inspect that boxes are bonded 3. Exhaust fans not wired Stopped inspection, not ready | |||
| LATH/BRICK/ WATER BARRIER | 04/19/2023 | APPROVED | MKRASKI |
| ELECTRIC-TUG | 04/13/2023 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 04/13/2023 | APPROVED | RMARTIN |
| Note: 4/12/2023 - PREVIOUS INSPECTION NOTES Not ready | |||
| ROOF VALLEY & METAL | 04/12/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Not ready | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/30/2023 | APPROVED | MKRASKI |
| WALL SHEATHING | 03/30/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Over framing not per detail Missing clips and collars | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/24/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Doc box is a mess and needs to be cleaned up with a good set of prints for inspector FBC 107.3.1 stopped inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/07/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/06/2023 | APPROVED | MKRASKI |
| Note: | |||
| TIE BEAM / LINTEL | 03/03/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 3/3/231. All previous items not repaired, make sure all items from previous inspection are repaired before calling in for reinspection, and clean outs must be clean of all debris. 3/2/2023 - PREVIOUS INSPECTION NOTES 3/2/23: NEED TRASH/DEBRIS CLEANED UP FROM JOB SITE AND PUT IN ON-SITE DUMPSTER BEFORE CONTINUING WORK! 1). Window embeds are too thick at areas highlighted on prints. (FBC 606.3.1) 1/2" max. 2). back wall has a mortar joint that is cracked. 3). Front header has a wood shim that needs to be removed and joint filled with mortar. | |||
| TIE BEAM / LINTEL | 03/02/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/2/23: NEED TRASH/DEBRIS CLEANED UP FROM JOB SITE AND PUT IN ON-SITE DUMPSTER BEFORE CONTINUING WORK! 1). Window embeds are too thick at areas highlighted on prints. (FBC 606.3.1) 1/2" max. 2). back wall has a mortar joint that is cracked. 3). Front header has a wood shim that needs to be removed and joint filled with mortar. | |||
| MONOLITHIC SLAB | 02/15/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/10/2023 | APPROVED | JSTEWART |
| WATER METER INSTALLATION REQUEST | 01/20/2023 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 08/16/2023 | 08/16/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because there is a prior inspection needed. | |||
| MECH | COMPLETE | 07/31/2023 | 08/01/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/17/2023 | 07/18/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM update mechanical subcontractor | |||
| SW1 | COMPLETE | 06/14/2023 | 06/14/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/05/2023 | 06/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/05/2023 | 06/12/2023 |
| Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM MUST HAVE PAVER DETAIL ON FILE OR INCLUDED ON SITE PLAN | |||
| ENGIN1 | HOLD | 05/24/2023 | 05/24/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM New survey is illegible | |||
| SW1 | COMPLETE | 05/24/2023 | 06/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/24/2023 | 05/24/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide a clearer survey setback cant be seen Bring originals of ROW to our office | |||
| ENGIN1 | COMPLETE | 03/07/2023 | 03/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/07/2023 | 03/07/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/28/2022 | 04/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/22/2022 | 12/27/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/22/2022 | 12/29/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/22/2022 | 12/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/22/2022 | 12/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/22/2022 | 12/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/22/2022 | 12/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/22/2022 | 01/04/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/22/2022 | 12/27/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/05/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 10/05/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 10/05/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/05/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/05/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/10/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/10/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/10/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/10/2023 |
| SEWER CREDIT | (¤1,147.00) | 01/10/2023 |
| SEWER INSPECTION | ¤25.00 | 01/10/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/10/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/10/2023 |
| SITE PLAN 30 | ¤30.00 | 01/10/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/10/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/10/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/10/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/10/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/10/2023 |
| SURCHARGE FS 533.721 | ¤2.99 | 01/10/2023 |
| SURCHARGE - FS 468.631 | ¤4.48 | 01/10/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/10/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/10/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/10/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/10/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/10/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 01/10/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/10/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/10/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/10/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/10/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/10/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/10/2023 |
| WATER-METER | ¤505.39 | 01/10/2023 |
| WATER- TURN ON | ¤25.00 | 01/10/2023 |
| WATER- TURN ON | ¤25.00 | 01/10/2023 |
| ADJUSTMENT 50% | (¤456.25) | 01/10/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/10/2023 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 01/10/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 01/10/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,060.24 |