Permit #2022120995

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00730-0120
CONDITIONED SPACE: 1215 sqft
GARAGE: 396 sqft
Total Square Footage: 1611 sqft
Block: 00730
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 407-432-2344
Location Address: 32 RAMBLING LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/23/2023
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORP

Address

1080 HOLCOMB BRIDGE 100-330

ROSWELL , GA 30076

Lot: 0120
Contracted Stated Job Value: ¤198,291.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820

Inspection History

Type Request Date Result Inspector
GRAVITY SEWER TEST 11/30/2023 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 3/17/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. The prints in the job box are not an approved set and are prints from 5 zollinger ln. REMOVE ALL COQUINA STONE FROM SLAB BEFORE BACKFILLING
U-CROSS CONNECTION 11/30/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation,no cross connections.
U - SEWER TIE IN 11/30/2023 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 3/17/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. The prints in the job box are not an approved set and are prints from 5 zollinger ln. REMOVE ALL COQUINA STONE FROM SLAB BEFORE BACKFILLING
BLD - BUILDING FINAL 11/29/2023 Disapproved -FEE REQUIRED JWALKER
Note: 11/29/23 Items listed below have not been corrected. 11/28/2023 - PREVIOUS INSPECTION NOTES 11/28/23 1. Right side roof has a boot flashing installed where the old electrical mast was installed. Boot will need to be removed and shingles installed. 2. The vent soffit above the meter can has been torn out. 3. Termite cert not posted. 11/27/2023 - PREVIOUS INSPECTION NOTES 1. The exterior outlet under the meter can needs to be of the weather resistant type. 2. Missing termite cert. 3. Heat appliance label not affixed to the AHU. Check for correct circuit breaker size. 4. Seal the garage wall and ceiling above the electical panel. 5. Hot water not working possibly due to breaker not being on.
BLD - BUILDING FINAL 11/29/2023 FINAL APPROVED JWALKER
Note: 11/29/2023 - PREVIOUS INSPECTION NOTES 11/29/23 Items listed below have not been corrected. 11/28/2023 - PREVIOUS INSPECTION NOTES 11/28/23 1. Right side roof has a boot flashing installed where the old electrical mast was installed. Boot will need to be removed and shingles installed. 2. The vent soffit above the meter can has been torn out. 3. Termite cert not posted. 11/27/2023 - PREVIOUS INSPECTION NOTES 1. The exterior outlet under the meter can needs to be of the weather resistant type. 2. Missing termite cert. 3. Heat appliance label not affixed to the AHU. Check for correct circuit breaker size. 4. Seal the garage wall and ceiling above the electical panel. 5. Hot water not working possibly due to breaker not being on.
BLD - BUILDING FINAL 11/28/2023 Disapproved - NO FEE JWALKER
Note: 11/28/23 1. Right side roof has a boot flashing installed where the old electrical mast was installed. Boot will need to be removed and shingles installed. 2. The vent soffit above the meter can has been torn out. 3. Termite cert not posted. Added not the boot flashing at the newly installed electrical mast is not installed properly. 11/27/2023 - PREVIOUS INSPECTION NOTES 1. The exterior outlet under the meter can needs to be of the weather resistant type. 2. Missing termite cert. 3. Heat appliance label not affixed to the AHU. Check for correct circuit breaker size. 4. Seal the garage wall and ceiling above the electical panel. 5. Hot water not working possibly due to breaker not being on.
BLD - BUILDING FINAL 11/27/2023 Disapproved - NO FEE JWALKER
Note: 1. The exterior outlet under the meter can needs to be of the weather resistant type. 2. Missing termite cert. 3. Heat appliance label not affixed to the AHU. Check for correct circuit breaker size. 4. Seal the garage wall and ceiling above the electical panel. 5. Hot water not working possibly due to breaker not being on.
ROW - FINAL APRON (AFTER POUR) 11/22/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------- 11/15/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE ROAD REPAIR DONE WITH HOT PATCH. 2) NEED TO HAVE SAW CUTS IN THE DRIVEWAY . -------------------------------------------------------------------------- Inspector Notes from Inspection 9465 11/14/23 DRAINAGE WILL WORK AS INDICATED IN SURVEY. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 11/13/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED
U -UTILITY RESIDENTIAL FINAL 11/22/2023 FINAL APPROVED DHANEY
Note: 11/17/2023 - PREVIOUS INSPECTION NOTES sewer C/Opipes still need lowering-no change 11/15/2023 - PREVIOUS INSPECTION NOTES sewer clean out pipes need lowering as well 11/15/2023 - PREVIOUS INSPECTION NOTES pep tank missing pumps-utility informed
U -UTILITY RESIDENTIAL FINAL 11/17/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: sewer C/Opipes still need lowering-no change 11/15/2023 - PREVIOUS INSPECTION NOTES sewer clean out pipes need lowering as well 11/15/2023 - PREVIOUS INSPECTION NOTES pep tank missing pumps-utility informed
ROW - STORMWATER FINAL 11/17/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------- 11/15/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT PIPE 2) NEED TO REMOVE ALL PALLETS FROM THE LOT AND THE VACANT ACCROSSED THE STREET 3) NEED TO REMOVE ALL LEFT OVER SOD FROM VACANT LOT ACCROSSED THE STREET 4) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS ACCROSSED THE STREET
U -UTILITY RESIDENTIAL FINAL 11/15/2023 Disapproved - NO FEE LFITZGERALD
Note: pep tank missing pumps-utility informed
U -UTILITY RESIDENTIAL FINAL 11/15/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: sewer clean out pipes need lowering as well 11/15/2023 - PREVIOUS INSPECTION NOTES pep tank missing pumps-utility informed
ROW - FINAL APRON (AFTER POUR) 11/15/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO HAVE ROAD REPAIR DONE WITH HOT PATCH. 2) NEED TO HAVE SAW CUTS IN THE DRIVEWAY . -------------------------------------------------------------------------- Inspector Notes from Inspection 9465 11/14/23 DRAINAGE WILL WORK AS INDICATED IN SURVEY. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 11/13/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED
ROW - STORMWATER FINAL 11/15/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT PIPE 2) NEED TO REMOVE ALL PALLETS FROM THE LOT AND THE VACANT ACCROSSED THE STREET 3) NEED TO REMOVE ALL LEFT OVER SOD FROM VACANT LOT ACCROSSED THE STREET 4) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS ACCROSSED THE STREET
ROW FIELD SURVEY /GRADING CERTIFICATION 11/14/2023 APPROVED - AS NOTED FSLADISH
Note: 11/14/23 DRAINAGE WILL WORK AS INDICATED IN SURVEY. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 11/13/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/14/2023 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 11/13/2023 Disapproved - NO FEE PFLANAGAN
Note: THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED
ROW- PRE-APRON (PRE-POUR) 09/01/2023 APPROVED FSLADISH
Note: 09/01/23 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 8/31/2023 - PREIOUS INSPECTION NOTES 8/31/23DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU.
PEP TANK INSTALLATION REQUEST 08/31/2023 APPROVED CBOWERMASTER
ROW- PRE-APRON (PRE-POUR) 08/31/2023 Disapproved - NO FEE GBERTOLA
Note: 8/31/23DUE TO HURRICANE IDALIA, ALL STORMWATER INSPECTIONS IN THE CITY OF PALM COAST ARE CANCELLED UNTIL FRIDAY, SEPTEMBER 1, 2023. BUILDERS SHOULD RESCHEDULE THE INSPECTIONS FOR NORMAL OPERATIONS ON FRIDAY SEPTEMBER 1, 2023. THANK YOU.
ELECTRIC - EARLY POWER 08/21/2023 APPROVED JWALKER
INSULATION 07/05/2023 APPROVED RSIMS
Note: 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23 Below listed corretions have not been made. PLEASE do not call for reinspection without first checking the job site Inspector Notes from Inspection 2420 6/23/23 Water distribution still no pressure. Approved duct layout still not onsited. Please have above listed corrected at insulation inspection to avoid fees and delays. 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 1. The smoke detector outlet in the hall way is to be a minimum of 3' from the HVAC supply register. 2. Please have the approved energy calculations with the approved duct layout onsite 3. No pressure on the water distrubution pipes. 4. Flex duct is to be supported a minimum of 4' o.c.. 5. The spray foam used to seal the annualar spaces at the top plates is to be of the fire resitant type. Remove the yellow foam or provide the can with the UL listing. 6. Check for AAV at final build in the rear right side bath. 7. The two item listed below have not been corrected from the previous inspection. 5/9/23 1. X- bracing and lateral bracing shown of page D2. Detail TBO5 need to be installed. 2. Trusses V1,2, and 3 need to be anchored down at both ends. Rear of truss good. Front sides need anchors installed. Check for corrections at all rough.
INSULATION 06/29/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/29/23 Below listed corretions have not been made. PLEASE do not call for reinspection without first checking the job site Inspector Notes from Inspection 2420 6/23/23 Water distribution still no pressure. Approved duct layout still not onsited. Please have above listed corrected at insulation inspection to avoid fees and delays. 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 1. The smoke detector outlet in the hall way is to be a minimum of 3' from the HVAC supply register. 2. Please have the approved energy calculations with the approved duct layout onsite 3. No pressure on the water distrubution pipes. 4. Flex duct is to be supported a minimum of 4' o.c.. 5. The spray foam used to seal the annualar spaces at the top plates is to be of the fire resitant type. Remove the yellow foam or provide the can with the UL listing. 6. Check for AAV at final build in the rear right side bath. 7. The two item listed below have not been corrected from the previous inspection. 5/9/23 1. X- bracing and lateral bracing shown of page D2. Detail TBO5 need to be installed. 2. Trusses V1,2, and 3 need to be anchored down at both ends. Rear of truss good. Front sides need anchors installed. Check for corrections at all rough.
ALL ROUGH 06/23/2023 APPROVED - AS NOTED JWALKER
Note: 6/23/23 Water distribution still no pressure. Approved duct layout still not onsited. Please have above listed corrected at insulation inspection to avoid fees and delays. 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 1. The smoke detector outlet in the hall way is to be a minimum of 3' from the HVAC supply register. 2. Please have the approved energy calculations with the approved duct layout onsite 3. No pressure on the water distrubution pipes. 4. Flex duct is to be supported a minimum of 4' o.c.. 5. The spray foam used to seal the annualar spaces at the top plates is to be of the fire resitant type. Remove the yellow foam or provide the can with the UL listing. 6. Check for AAV at final build in the rear right side bath. 7. The two item listed below have not been corrected from the previous inspection. 5/9/23 1. X- bracing and lateral bracing shown of page D2. Detail TBO5 need to be installed. 2. Trusses V1,2, and 3 need to be anchored down at both ends. Rear of truss good. Front sides need anchors installed. Check for corrections at all rough.
LATH/BRICK/ WATER BARRIER 06/05/2023 APPROVED JWALKER
ALL ROUGH 05/25/2023 Disapproved -FEE REQUIRED JWALKER
Note: 5/25/23 1. The smoke detector outlet in the hall way is to be a minimum of 3' from the HVAC supply register. 2. Please have the approved energy calculations with the approved duct layout onsite 3. No pressure on the water distrubution pipes. 4. Flex duct is to be supported a minimum of 4' o.c.. 5. The spray foam used to seal the annualar spaces at the top plates is to be of the fire resitant type. Remove the yellow foam or provide the can with the UL listing. 6. Check for AAV at final build in the rear right side bath. 7. The two item listed below have not been corrected from the previous inspection. 5/9/23 1. X- bracing and lateral bracing shown of page D2. Detail TBO5 need to be installed. 2. Trusses V1,2, and 3 need to be anchored down at both ends. Rear of truss good. Front sides need anchors installed. Check for corrections at all rough.
ALL ROUGH 05/23/2023 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 05/11/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2460 5/9/23 1. X- bracing and lateral bracing shown of page D2. Detail TBO5 need to be installed. 2. Trusses V1,2, and 3 need to be anchored down at both ends. Rear of truss good. Front sides need anchors installed. Check for corrections at all rough. 5/5/2023 - PREVIOUS INSPECTION NOTES 1. Please have a full set of approved plans onsite for all inspections. Prints in the job box are not the approved set. 2. Walked roof left side nails have been counter sunk too deep. Renail and leave underlayment off for reinspection. 3. Two down cells left side of the garage are not filled properly.
ROOF SHEATHING 05/09/2023 APPROVED JWALKER
Note: 5/5/2023 - PREVIOUS INSPECTION NOTES Roof sheating at left side roof nails have been sunk too deep into sheating and needs to be renailed. Leave underlayment off the roof for reinspection. NOTE TO THE CONTRACTOR A SEPARATE ROOF SHEATING INSPECTION IS NOT NEEDED, ROOF SHEATING IS CHECKED AT ROOF BRACE INSPECTION.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/09/2023 APPROVED - AS NOTED JWALKER
Note: 5/9/23 1. X- bracing and lateral bracing shown of page D2. Detail TBO5 need to be installed. 2. Trusses V1,2, and 3 need to be anchored down at both ends. Rear of truss good. Front sides need anchors installed. Check for corrections at all rough. 5/5/2023 - PREVIOUS INSPECTION NOTES 1. Please have a full set of approved plans onsite for all inspections. Prints in the job box are not the approved set. 2. Walked roof left side nails have been counter sunk too deep. Renail and leave underlayment off for reinspection. 3. Two down cells left side of the garage are not filled properly.
ROOF SHEATHING 05/05/2023 Disapproved - NO FEE JWALKER
Note: Roof sheating at left side roof nails have been sunk too deep into sheating and needs to be renailed. Leave underlayment off the roof for reinspection. NOTE TO THE CONTRACTOR A SEPARATE ROOF SHEATING INSPECTION IS NOT NEEDED, ROOF SHEATING IS CHECKED AT ROOF BRACE INSPECTION.
WALL SHEATHING 05/05/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/05/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. Please have a full set of approved plans onsite for all inspections. Prints in the job box are not the approved set. 2. Walked roof left side nails have been counter sunk too deep. Renail and leave underlayment off for reinspection. 3. Two down cells left side of the garage are not filled properly.
FOUND SURVEY APPROVED (OFFICE) 05/04/2023 APPROVED TBAKER
TIE BEAM / LINTEL 04/12/2023 APPROVED KSANDOE
MONOLITHIC SLAB 03/30/2023 APPROVED JWALKER
Note: 3/29/2023 - PREVIOUS INSPECTION NOTES Slab is to be a minimum of 4" see note 2 on page S 1.0 of the prints. Test lines are in place. Remove excess soil and tamp. Please reinstall test lines for reinspection.
MONOLITHIC SLAB 03/29/2023 Disapproved - NO FEE JWALKER
Note: Slab is to be a minimum of 4" see note 2 on page S 1.0 of the prints. Test lines are in place. Remove excess soil and tamp. Please reinstall test lines for reinspection.
PLUMBING 1ST ROUGH UNDERGROUND 03/21/2023 APPROVED - AS NOTED MGIBSON
Note: 3/17/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved prints onsite for inspection. The prints in the job box are not an approved set and are prints from 5 zollinger ln. REMOVE ALL COQUINA STONE FROM SLAB BEFORE BACKFILLING
PLUMBING 1ST ROUGH UNDERGROUND 03/17/2023 Disapproved -FEE REQUIRED JWALKER
Note: Please have a full set of approved prints onsite for inspection. The prints in the job box are not an approved set and are prints from 5 zollinger ln.
WATER METER INSTALLATION REQUEST 03/16/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 06/20/2023 06/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/03/2023 05/04/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/03/2023 05/03/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 02/08/2023 02/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 02/02/2023 02/03/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
MECH COMPLETE 01/06/2023 01/06/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 01/06/2023 01/06/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 12/28/2022 12/28/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of front entry walkway on site plan/survey AC screening should be 7 gallon Please provide sod type and if irrigation will be installed Please choose Shrubs for the foundation plantings that will be toloerant in our area this shrub Arboricola is also known as Dwarf Schefflera and is on the non credit planting list.
SWALE COMPLETE 12/28/2022 04/10/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/27/2022 12/28/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 12/27/2022 12/29/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/27/2022 12/28/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/27/2022 12/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/27/2022 12/28/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 12/27/2022 12/28/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Design location on Energy Forms is to be Daytona Beach. 2. Form 405 is to be signed by Owner/Agent
SW1 COMPLETE 12/27/2022 01/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 11/29/2023
SW ENG REINSPECTION 20 ¤20.00 11/29/2023
REINSPECTION FEE ¤40.00 11/29/2023
REINSPECTION FEE ¤40.00 11/29/2023
REINSPECTION RESIDENTIAL ¤40.00 11/29/2023
PLAN REVIEW - REVISION ¤32.50 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 07/17/2023
REINSPECTION RESIDENTIAL ¤40.00 04/13/2023
CONTRACTOR CHANGE ¤20.00 04/13/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
CONNECTION FEES ¤1,166.26 01/23/2023
SURCHARGE FS 533.721 ¤2.47 01/23/2023
SURCHARGE - FS 468.631 ¤3.71 01/23/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/23/2023
SW ENG INSPECTION 80 ¤80.00 01/23/2023
SW ENG PRE APRON ¤30.00 01/23/2023
SW ENG - REVIEW 20 ¤20.00 01/23/2023
SW ENG RES REVIEW 200 ¤200.00 01/23/2023
TRANS IMPACT FEE ADMIN ¤52.92 01/23/2023
TRANS IMPACT FEE ADMIN (¤52.92) 01/23/2023
SEWER CREDIT (¤1,147.00) 01/23/2023
SEWER INSPECTION ¤25.00 01/23/2023
SEWER CAPITAL FACILITY ¤5,344.82 01/23/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 01/23/2023
SITE PLAN 30 ¤30.00 01/23/2023
FIRE IMPACT FEE ADMIN ¤12.62 01/23/2023
FIRE IMPACT FEE ADMIN (¤12.62) 01/23/2023
FC IMPACT FEE EMS ¤62.00 01/23/2023
IMPACT FEE FIRE ¤420.52 01/23/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/23/2023
FC IMPACT FEE LIBRARY ¤268.00 01/23/2023
IMPACT FEE PARKS ¤1,769.15 01/23/2023
IMPACT FEE SCHOOL ¤5,450.00 01/23/2023
IMPACT FEE TRANSPORTATION ¤1,764.00 01/23/2023
WATER -IRRIGATION INSPECTION ¤25.00 01/23/2023
PARKS IMPACT FEE ADMIN ¤53.07 01/23/2023
PARKS IMPACT FEE ADMIN (¤53.07) 01/23/2023
WATER- TURN ON ¤25.00 01/23/2023
ADJUSTMENT 50% (¤366.24) 01/23/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/23/2023
INSPECTION - RESIDENTIAL ¤547.25 01/23/2023
PLAN REVIEW - RESIDENTIAL ¤155.22 01/23/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,472.04