Permit #2022120996
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00450-0280 |
| CONDITIONED SPACE: 1215 sqft |
| GARAGE: 396 sqft |
| Total Square Footage: 1611 sqft |
| Block: 00450 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 470-817-1259 |
| Location Address: 30 PRATTWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/23/2023 |
| NOC: Unknown |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORP |
|
Address 1080 HOLCOMB BRIDGE RD SUTIE 100-330 ROSWELL , GA 30076 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤198,291.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/12/2023 | FINAL APPROVED | KSANDOE |
| Note: 9/8/2023 - PREVIOUS INSPECTION NOTES 9/8/23- Standing water at front doo and in front bedroom please fix. FYI please seal all tubs at floor. 9/1/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES Missing gooseneck for dryer vent. Dishwasher drain line needs to route to the top of the cabinet before terminating at sink drain. Energy calcs do not match installed equipent. Breaker for air handler exceeds MOCP | |||
| BLD - BUILDING FINAL | 09/08/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 9/8/23- Standing water at front doo and in front bedroom please fix. FYI please seal all tubs at floor. 9/1/2023 - PREVIOUS INSPECTION NOTES 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES Missing gooseneck for dryer vent. Dishwasher drain line needs to route to the top of the cabinet before terminating at sink drain. Energy calcs do not match installed equipent. Breaker for air handler exceeds MOCP | |||
| BLD - BUILDING FINAL | 09/01/2023 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 8/31/2023 - PREVIOUS INSPECTION NOTES 8/29/2023 - PREVIOUS INSPECTION NOTES Missing gooseneck for dryer vent. Dishwasher drain line needs to route to the top of the cabinet before terminating at sink drain. Energy calcs do not match installed equipent. Breaker for air handler exceeds MOCP | |||
| BLD - BUILDING FINAL | 08/31/2023 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 8/29/2023 - PREVIOUS INSPECTION NOTES Missing gooseneck for dryer vent. Dishwasher drain line needs to route to the top of the cabinet before terminating at sink drain. Energy calcs do not match installed equipent. Breaker for air handler exceeds MOCP | |||
| BLD - BUILDING FINAL | 08/29/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Missing gooseneck for dryer vent. Dishwasher drain line needs to route to the top of the cabinet before terminating at sink drain. Energy calcs do not match installed equipent. Breaker for air handler exceeds MOCP | |||
| ROW - STORMWATER FINAL | 08/29/2023 | APPROVED | GBERTOLA |
| Note: 8/29/23= At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/28/2023 - PREVIOUS INSPECTION NOTES 08/28/23 A LOT DIRT INSIDE THE CULVERT PIPE. NEEDS TO BE CLEANED OUT. NEED TO MATCH GRADE IN THE SWALE AT THE PROPERTY LINES. NEED TO PICK UP ALL TRASH AND DEBRIS ON SITE BEFORE ROW FINAL PASSED. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/29/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: work order with city now done as stated by Matt-bldg,super 8/28/2023 - PREVIOUS INSPECTION NOTES replace brokem water meter transmitter wire-contact customer-service@palmcoastgov.com | |||
| U -UTILITY RESIDENTIAL FINAL | 08/28/2023 | Disapproved - NO FEE | LFITZGERALD |
| Note: replace brokem water meter transmitter wire-contact customer-service@palmcoastgov.com | |||
| ROW - STORMWATER FINAL | 08/28/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 08/28/23 A LOT DIRT INSIDE THE CULVERT PIPE. NEEDS TO BE CLEANED OUT. NEED TO MATCH GRADE IN THE SWALE AT THE PROPERTY LINES. NEED TO PICK UP ALL TRASH AND DEBRIS ON SITE BEFORE ROW FINAL PASSED. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/28/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 08/28/23 PIPE IS OK. CUTS MADE. HOT PATCH COMPLETED. CULVERT FULL OF DIRT. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 08/25/23 CORRECTIONS MADE. 8/24/2023 - PREVIOUS INSPECTION NOTES 08/24/23 NOTHING HAS CHANGED SINCE PREVIOUS INSPECTION, FRONT ROW/PROPERTY LINE IS STILL SHOWING LOWER THAN THE CENTERLINE. Front property line elevations need to be equal or greater than centerline elevation. Property line Section 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. I WILL NOT FEE YOU FOR THIS INSPECTION. ______________________________________________________________________________________________________________________ 8/22/2023 - PREVIOUS INSPECTION NOTES 08/22/23 Front property line elevationd need to be equal or greater than centerline elevation. Property line Section 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. Appears rear right property coner will end up negatively inpacting adjacent property owner based on the elevation numbers. Inspector Notes from Inspection 9270 06/27/23 PIPE IS GOOD MAKE SURE TO REMOVE ANY DIRT FROM CULVERT ENDS BEFORE POURING. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2023 | APPROVED | FSLADISH |
| Note: 08/25/23 UPON WALKING PROPERTY APPEARS AS DRAINAGE WILL WORK AS INDICATED. _______________________________________________________________________________________________________________________ 8/24/2023 - PREVIOUS INSPECTION NOTES 08/24/23 PREVIOUS INSPECTION NOTES 08/22/23 YOU MUST FIRST PASS A FINAL SURVEY INSPECTION BEFORE A FIELD SURVEY INSPECTION CAN BE COMPLETED. ________________________________________________________________________________________________________________________ 8/22/2023 - PREVIOUS INSPECTION NOTES 08/22/23 YOU MUST FIRST PASS A FINAL SURVEY INSPECTION BEFORE A FIELD SURVEY INSPECTION CAN BE COMPLETED. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 06/27/23 PIPE IS GOOD MAKE SURE TO REMOVE ANY DIRT FROM CULVERT ENDS BEFORE POURING. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/24/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 08/24/23 NOTHING HAS CHANGED SINCE PREVIOUS INSPECTION, FRONT ROW/PROPERTY LINE IS STILL SHOWING LOWER THAN THE CENTERLINE. Front property line elevations need to be equal or greater than centerline elevation. Property line Section 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. I WILL NOT FEE YOU FOR THIS INSPECTION. ______________________________________________________________________________________________________________________ 8/22/2023 - PREVIOUS INSPECTION NOTES 08/22/23 Front property line elevationd need to be equal or greater than centerline elevation. Property line Section 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. Appears rear right property coner will end up negatively inpacting adjacent property owner based on the elevation numbers. Inspector Notes from Inspection 9270 06/27/23 PIPE IS GOOD MAKE SURE TO REMOVE ANY DIRT FROM CULVERT ENDS BEFORE POURING. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/24/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 08/24/23 PREVIOUS INSPECTION NOTES 08/22/23 YOU MUST FIRST PASS A FINAL SURVEY INSPECTION BEFORE A FIELD SURVEY INSPECTION CAN BE COMPLETED. ________________________________________________________________________________________________________________________ 8/22/2023 - PREVIOUS INSPECTION NOTES 08/22/23 YOU MUST FIRST PASS A FINAL SURVEY INSPECTION BEFORE A FIELD SURVEY INSPECTION CAN BE COMPLETED. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 06/27/23 PIPE IS GOOD MAKE SURE TO REMOVE ANY DIRT FROM CULVERT ENDS BEFORE POURING. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/22/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 08/22/23 YOU MUST FIRST PASS A FINAL SURVEY INSPECTION BEFORE A FIELD SURVEY INSPECTION CAN BE COMPLETED. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 06/27/23 PIPE IS GOOD MAKE SURE TO REMOVE ANY DIRT FROM CULVERT ENDS BEFORE POURING. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/22/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 08/22/23 front property line elevationd need to be equal or greater than centerline elevation. Property line Section 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. Appears rear right property coner will end up negatively inpacting adjacent property owner based on the elevation numbers. Inspector Notes from Inspection 9270 06/27/23 PIPE IS GOOD MAKE SURE TO REMOVE ANY DIRT FROM CULVERT ENDS BEFORE POURING. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| U-CROSS CONNECTION | 08/22/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 07/13/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1049. Release Power 5/11/2023 - PREVIOUS INSPECTION NOTES Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/27/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 06/27/23 PIPE IS GOOD MAKE SURE TO REMOVE ANY DIRT FROM CULVERT ENDS BEFORE POURING. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 6/23/2023 - PREVIOUS INSPECTION NOTES 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| ROW- PRE-APRON (PRE-POUR) | 06/23/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 06/23/23=ORGANICS NEED TO BE REMOVED FROM THE POUR AREA. * FOOTERS HAVE WASHED IN NEED TO BE DUG OUT NEED 24 INCHES OF #4 REBAR IS PLACED UNDER EACH END OF THE PIPE. PIPE SHOULD BE DUG OUT 6 INCHES DEEP BY 6 INCHES LONG UNDER EACH END OF THE PIPE. culvert pipe elevation is OK | |||
| INSULATION | 06/01/2023 | APPROVED | KSANDOE |
| Note: 5/31/2023 - PREVIOUS INSPECTION NOTES 5/30/2023 - PREVIOUS INSPECTION NOTES Insulation incomplete. Crews still working. Annular holes, plumbing and dryer vent, thermostat wire, empty hole above sink, need to be filled with fire rated foam or caulk Inspector Notes from Inspection 2420 Form boards used as purlins in garage have not been changed out. Bath fan exhaust ducting needs to be supported every 4ft Dryer vent needs nail plates at top plate 5/11/2023 - PREVIOUS INSPECTION NOTES Bath fans not connected to vents Unable to inspect meter can due to stucco crew on site and meter can is taped off | |||
| INSULATION | 05/31/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Annular holes, plumbing and dryer vent, thermostat wire, empty hole above sink, need to be filled with fire rated foam or caulk 5/30/2023 - PREVIOUS INSPECTION NOTES Insulation incomplete. Crews still working. Annular holes, plumbing and dryer vent, thermostat wire, empty hole above sink, need to be filled with fire rated foam or caulk Inspector Notes from Inspection 2420 Form boards used as purlins in garage have not been changed out. Bath fan exhaust ducting needs to be supported every 4ft Dryer vent needs nail plates at top plate 5/11/2023 - PREVIOUS INSPECTION NOTES Bath fans not connected to vents Unable to inspect meter can due to stucco crew on site and meter can is taped off | |||
| INSULATION | 05/30/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Insulation incomplete. Crews still working. Inspector Notes from Inspection 2420 Form boards used as purlins in garage have not been changed out. Bath fan exhaust ducting needs to be supported every 4ft Dryer vent needs nail plates at top plate 5/11/2023 - PREVIOUS INSPECTION NOTES Bath fans not connected to vents Unable to inspect meter can due to stucco crew on site and meter can is taped off | |||
| GRAVITY SEWER TEST | 05/26/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ANY AND ALL COQUINA ROCK BEFORE BACKFILLING. WILL CHECK AT NEXT INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 05/26/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ALL ROUGH | 05/19/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Form boards used as purlins in garage have not been changed out. Bath fan exhaust ducting needs to be supported every 4ft Dryer vent needs nail plates at top plate 5/11/2023 - PREVIOUS INSPECTION NOTES Bath fans not connected to vents Unable to inspect meter can due to stucco crew on site and meter can is taped off | |||
| ALL ROUGH | 05/11/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Bath fans not connected to vents Unable to inspect meter can due to stucco crew on site and meter can is taped off | |||
| ELECTRIC - EARLY POWER | 05/11/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician. | |||
| LATH/BRICK/ WATER BARRIER | 05/09/2023 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 05/08/2023 | CANCELLED BY APPLICANT | KSANDOE |
| ELECTRIC TEMP POLE | 04/28/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: No temp pole installed. Not ready for inspection | |||
| WALL SHEATHING | 04/26/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Cannot use repurposed materials. 2x10 purlin in garage needs to be replaced. | |||
| ROOF SHEATHING | 04/26/2023 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 04/26/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 04/25/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/04/2023 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 03/21/2023 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/16/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ANY AND ALL COQUINA ROCK BEFORE BACKFILLING. WILL CHECK AT NEXT INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 02/17/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/06/2023 | 09/07/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/31/2023 | 09/05/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Provide Entire energy calc with heatload and duct layout | |||
| ENGIN1 | COMPLETE | 04/25/2023 | 04/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/25/2023 | 04/25/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes | |||
| MECH | COMPLETE | 02/08/2023 | 02/08/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/02/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| MECH | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/28/2022 | 04/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/27/2022 | 12/29/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Design location on Energy Forms is to be Daytona Beach. 2. Form 405 is to be signed by Owner/Agent | |||
| SW1 | COMPLETE | 12/27/2022 | 01/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: width of walkway Landscape: Please choose Shrubs for the foundation plantings that will be tolerant in our area this shrub Arboricola is also known as Dwarf Schefflera and is on the non credit planting list. Please look up the commonly used approved shrubs like Holly, vibumum, ligustrum those are tolerant in our area. Please list proposed sod and if it will need irrigation. A/C will need 7 gallon shrubs for screening |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/12/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/12/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/12/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/23/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/23/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 01/23/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/23/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/23/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/23/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/23/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/23/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/23/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/23/2023 |
| SURCHARGE FS 533.721 | ¤2.47 | 01/23/2023 |
| SURCHARGE - FS 468.631 | ¤3.71 | 01/23/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/23/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/23/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/23/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/23/2023 |
| WATER- TURN ON | ¤25.00 | 01/23/2023 |
| ADJUSTMENT 50% | (¤366.24) | 01/23/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/23/2023 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 01/23/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 01/23/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/23/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/23/2023 |
| SEWER CREDIT | (¤1,147.00) | 01/23/2023 |
| SEWER INSPECTION | ¤25.00 | 01/23/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/23/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/23/2023 |
| SITE PLAN 30 | ¤30.00 | 01/23/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,209.54 |