Permit #2022120997
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00450-0260 |
| CONDITIONED SPACE: 1906 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00450 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 470-817-1259 |
| Location Address: 26 PRATTWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/23/2023 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 1080 HOLCOMB BRIDGE ROAD 100-330 ROSWELL, GA 30076 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤239,639.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/29/2023 | Disapproved - NO FEE | RSIMS |
| Note: 12/28/23: Revision does not include Energy Calcs so verification could not be done. Energy calcs on the counter do not match the originally approved Energy Calcs. Please submit a revision to include updated energy calcs with the new equipment numbers. 12/21/2023 - PREVIOUS INSPECTION NOTES 12/20/2023 - PREVIOUS INSPECTION NOTES 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved. | |||
| BLD - BUILDING FINAL | 12/29/2023 | FINAL APPROVED | RSIMS |
| Note: 12/29/23: Confirmed that the equipment matches the submitted revision on 2/8/23 under duct layout. 12/29/2023 - PREVIOUS INSPECTION NOTES 12/28/23: Revision does not include Energy Calcs so verification could not be done. Energy calcs on the counter do not match the originally approved Energy Calcs. Please submit a revision to include updated energy calcs with the new equipment numbers. 12/21/2023 - PREVIOUS INSPECTION NOTES 12/20/2023 - PREVIOUS INSPECTION NOTES 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved. | |||
| BLD - BUILDING FINAL | 12/21/2023 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 12/20/2023 - PREVIOUS INSPECTION NOTES 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved. | |||
| BLD - BUILDING FINAL | 12/20/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved. | |||
| BLD - BUILDING FINAL | 12/19/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. | |||
| BLD - BUILDING FINAL | 12/18/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. | |||
| U-CROSS CONNECTION | 12/15/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ROW - STORMWATER FINAL | 12/15/2023 | APPROVED | GBERTOLA |
| Note: 12/15/23= CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/12/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT ------------------------------------------------------------------------------ 11/27/2023 - PREVIOUS INSPECTION NOTES NEED TO READ THE NOTES FROM LAST INSPECTION TO PASS NONE HAVE BEEN ADDRESSED --------------------------------------------------------------------------------- NEED TO REMOVE THE STRAW FROM THE RIGHT SIDE BACK PROPERTY LINE AND REPLACE WITH SOD NEED TO CLEAN THE CULVERT PIPE, REMOVE THE SILT AND DIRT INSIDE | |||
| ROW - STORMWATER FINAL | 12/12/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT ------------------------------------------------------------------------------ 11/27/2023 - PREVIOUS INSPECTION NOTES NEED TO READ THE NOTES FROM LAST INSPECTION TO PASS NONE HAVE BEEN ADDRESSED --------------------------------------------------------------------------------- NEED TO REMOVE THE STRAW FROM THE RIGHT SIDE BACK PROPERTY LINE AND REPLACE WITH SOD NEED TO CLEAN THE CULVERT PIPE, REMOVE THE SILT AND DIRT INSIDE | |||
| U -UTILITY RESIDENTIAL FINAL | 12/11/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 11/27/2023 - PREVIOUS INSPECTION NOTES sewer C/O needs lowering | |||
| ELECTRIC-TUG | 12/07/2023 | CANCELLED BY INSPECTOR | KSANDOE |
| Note: Inspector Notes from Inspection 2190 10/12/23: FPL emailed to release power. * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 5/11/2023 - PREVIOUS INSPECTION NOTES Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/27/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: sewer C/O needs lowering | |||
| ROW - STORMWATER FINAL | 11/27/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO READ THE NOTES FROM LAST INSPECTION TO PASS NONE HAVE BEEN ADDRESSED --------------------------------------------------------------------------------- NEED TO REMOVE THE STRAW FROM THE RIGHT SIDE BACK PROPERTY LINE AND REPLACE WITH SOD NEED TO CLEAN THE CULVERT PIPE, REMOVE THE SILT AND DIRT INSIDE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/22/2023 | APPROVED | GBERTOLA |
| Note: 11/22/23= CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23 UPON WALKING PROPERTY FOUND THAT IN THE RIGHT REAR CORNER AREA AT THE PROPERTY LINE THERE ARE SEVERAL DIPS AND GULLEY WASHOUTS THAT NEED TO BE FILLED IN AND LEVELED OUT TO MAKE AN EVEN GRADE AND ALLOW PROPER DRAINAGE. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/22/2023 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/15/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/15/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 11/15/23 UPON WALKING PROPERTY FOUND THAT IN THE RIGHT REAR CORNER AREA AT THE PROPERTY LINE THERE ARE SEVERAL DIPS AND GULLEY WASHOUTS THAT NEED TO BE FILLED IN AND LEVELED OUT TO MAKE AN EVEN GRADE AND ALLOW PROPER DRAINAGE. | |||
| ELECTRIC - EARLY POWER | 10/12/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 10/12/23: FPL emailed to release power. * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 5/11/2023 - PREVIOUS INSPECTION NOTES Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician. | |||
| INSULATION | 08/15/2023 | APPROVED | KSANDOE |
| Note: 6/14/2023 - PREVIOUS INSPECTION NOTES Need revised engineering repair for drilled/notched floor trusses for plumbing drain. | |||
| U - SEWER TIE IN | 08/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 08/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 07/05/2023 | APPROVED | FSLADISH |
| Note: 07/05/23 PIPE IS GOOD.POUR AREA LOOKED GOOD AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 06/14/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Need revised engineering repair for drilled/notched floor trusses for plumbing drain. | |||
| ALL ROUGH | 06/13/2023 | APPROVED | KSANDOE |
| Note: 6/12/2023 - PREVIOUS INSPECTION NOTES Check for proper Class A foam on penetrations. | |||
| ALL ROUGH | 06/12/2023 | CANCELLED BY APPLICANT | KSANDOE |
| Note: Check for proper Class A foam on penetrations. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2023 | APPROVED | LMILLER |
| Note: 6-9-23 notes bollow resolved /31/2023 - PREVIOUS INSPECTION NOTES T5 trusses still missing bracing Window still not installed 5/26/2023 - PREVIOUS INSPECTION NOTES T5 trusses still missing bracing *** Annular holes must be filled with fire rated foam or caulking. 2nd floor window must be installed prior to All Rough inspection 5/1/2023 - PREVIOUS INSPECTION NOTES Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC | |||
| LATH/BRICK/ WATER BARRIER | 06/08/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/31/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: T5 trusses still missing bracing Window still not installed 5/26/2023 - PREVIOUS INSPECTION NOTES T5 trusses still missing bracing *** Annular holes must be filled with fire rated foam or caulking. 2nd floor window must be installed prior to All Rough inspection 5/1/2023 - PREVIOUS INSPECTION NOTES Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/26/2023 | Disapproved - NO FEE | KSANDOE |
| Note: T5 trusses still missing bracing *** Annular holes must be filled with fire rated foam or caulking. 2nd floor window must be installed prior to All Rough inspection 5/1/2023 - PREVIOUS INSPECTION NOTES Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC | |||
| LATH/BRICK/ WATER BARRIER | 05/22/2023 | Disapproved - NO FEE | KSANDOE |
| Note: House needs to have corner beading and wire mesh installed for this inspection | |||
| ELECTRIC - EARLY POWER | 05/11/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician. | |||
| ELECTRIC-TUG | 05/01/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Wromg size wire for 200 AMP service Overhead wire used , under ground wire needed for TUG | |||
| WALL SHEATHING | 05/01/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/01/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC | |||
| ROOF SHEATHING | 05/01/2023 | APPROVED | TSTAUFFACHER |
| ROOF VALLEY & METAL | 05/01/2023 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 04/26/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/30/2023 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 03/17/2023 | APPROVED | KSANDOE |
| Note: 3/16/2023 - PREVIOUS INSPECTION NOTES Plans call for 4" slab. Areas measuring 3" need to be corrected Footer plans are 20"x 20". Areas measuring less than 18" width need to be corrected | |||
| MONOLITHIC SLAB | 03/16/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Plans call for 4" slab. Areas measuring 3" need to be corrected Footer plans are 20"x 20". Areas measuring less than 18" width need to be corrected | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/10/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/17/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | CANCEL | 12/20/2023 | 12/28/2023 |
| Note: 1. Spoke to bulder and did not need to resubmit energy calcs. The upload was a mistake. | |||
| BADMIN | INFORMATION | 12/19/2023 | 12/19/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| ENGIN1 | COMPLETE | 04/26/2023 | 04/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/26/2023 | 04/26/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/21/2023 | 02/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/02/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| ZON | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/28/2022 | 04/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/27/2022 | 12/29/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Design location on Form 405 is to be Daytona Beach. 2. Form 405 is to be signed by Owner/Agent | |||
| SW1 | COMPLETE | 12/27/2022 | 01/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: width of walkway Landscape: Please choose Shrubs for the foundation plantings that will be tolerant in our area this shrub Arboricola is also known as Dwarf Schefflera and is on the non credit planting list. Please look up the commonly used approved shrubs like Holly, vibumum, ligustrum those are tolerant in our area. Please list proposed sod and if it will need irrigation. A/C will need 7 gallon shrubs for screening |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/29/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/13/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/13/2023 |
| REINSPECTION FEE | ¤40.00 | 12/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/23/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/23/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 01/23/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/23/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/23/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/23/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/23/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/23/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/23/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/23/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/23/2023 |
| WATER- TURN ON | ¤25.00 | 01/23/2023 |
| ADJUSTMENT 50% | (¤438.60) | 01/23/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/23/2023 |
| INSPECTION - RESIDENTIAL | ¤660.00 | 01/23/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤187.20 | 01/23/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/23/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/23/2023 |
| SEWER CREDIT | (¤1,342.00) | 01/23/2023 |
| SEWER INSPECTION | ¤25.00 | 01/23/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/23/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/23/2023 |
| SITE PLAN 30 | ¤30.00 | 01/23/2023 |
| SURCHARGE FS 533.721 | ¤2.89 | 01/23/2023 |
| SURCHARGE - FS 468.631 | ¤4.33 | 01/23/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/23/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/23/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/23/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,290.45 |