I want to search for...

Permit #2022120997

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00450-0260
CONDITIONED SPACE: 1906 sqft
GARAGE: 400 sqft
OPENED PORCH (WITH ROOF) : 20 sqft
Total Square Footage: 2326 sqft
Block: 00450
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 470-817-1259
Location Address: 26 PRATTWOOD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/23/2023
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

1080 HOLCOMB BRIDGE ROAD 100-330

ROSWELL, GA 30076

Lot: 0260
Contracted Stated Job Value: ¤239,639.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/29/2023 Disapproved - NO FEE RSIMS
Note: 12/28/23: Revision does not include Energy Calcs so verification could not be done. Energy calcs on the counter do not match the originally approved Energy Calcs. Please submit a revision to include updated energy calcs with the new equipment numbers. 12/21/2023 - PREVIOUS INSPECTION NOTES 12/20/2023 - PREVIOUS INSPECTION NOTES 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved.
BLD - BUILDING FINAL 12/29/2023 FINAL APPROVED RSIMS
Note: 12/29/23: Confirmed that the equipment matches the submitted revision on 2/8/23 under duct layout. 12/29/2023 - PREVIOUS INSPECTION NOTES 12/28/23: Revision does not include Energy Calcs so verification could not be done. Energy calcs on the counter do not match the originally approved Energy Calcs. Please submit a revision to include updated energy calcs with the new equipment numbers. 12/21/2023 - PREVIOUS INSPECTION NOTES 12/20/2023 - PREVIOUS INSPECTION NOTES 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved.
BLD - BUILDING FINAL 12/21/2023 CANCELLED BY APPLICANT KSANDOE
Note: 12/20/2023 - PREVIOUS INSPECTION NOTES 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved.
BLD - BUILDING FINAL 12/20/2023 Disapproved - NO FEE BTAYLOR
Note: 12/19/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 12-20-23 1. Energy cals have not been approved.
BLD - BUILDING FINAL 12/19/2023 Disapproved - NO FEE KSANDOE
Note: Energy calcs do not match installed equipment. Submit revised energy calcs for review 12/18/2023 - PREVIOUS INSPECTION NOTES Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final.
BLD - BUILDING FINAL 12/18/2023 Disapproved -FEE REQUIRED KSANDOE
Note: Door is locked. Need access for inspection. 10/12/23: * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final.
U-CROSS CONNECTION 12/15/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW - STORMWATER FINAL 12/15/2023 APPROVED GBERTOLA
Note: 12/15/23= CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/12/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT ------------------------------------------------------------------------------ 11/27/2023 - PREVIOUS INSPECTION NOTES NEED TO READ THE NOTES FROM LAST INSPECTION TO PASS NONE HAVE BEEN ADDRESSED --------------------------------------------------------------------------------- NEED TO REMOVE THE STRAW FROM THE RIGHT SIDE BACK PROPERTY LINE AND REPLACE WITH SOD NEED TO CLEAN THE CULVERT PIPE, REMOVE THE SILT AND DIRT INSIDE
ROW - STORMWATER FINAL 12/12/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF THE CULVERT ------------------------------------------------------------------------------ 11/27/2023 - PREVIOUS INSPECTION NOTES NEED TO READ THE NOTES FROM LAST INSPECTION TO PASS NONE HAVE BEEN ADDRESSED --------------------------------------------------------------------------------- NEED TO REMOVE THE STRAW FROM THE RIGHT SIDE BACK PROPERTY LINE AND REPLACE WITH SOD NEED TO CLEAN THE CULVERT PIPE, REMOVE THE SILT AND DIRT INSIDE
U -UTILITY RESIDENTIAL FINAL 12/11/2023 FINAL APPROVED LFITZGERALD
Note: 11/27/2023 - PREVIOUS INSPECTION NOTES sewer C/O needs lowering
ELECTRIC-TUG 12/07/2023 CANCELLED BY INSPECTOR KSANDOE
Note: Inspector Notes from Inspection 2190 10/12/23: FPL emailed to release power. * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 5/11/2023 - PREVIOUS INSPECTION NOTES Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician.
U -UTILITY RESIDENTIAL FINAL 11/27/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: sewer C/O needs lowering
ROW - STORMWATER FINAL 11/27/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO READ THE NOTES FROM LAST INSPECTION TO PASS NONE HAVE BEEN ADDRESSED --------------------------------------------------------------------------------- NEED TO REMOVE THE STRAW FROM THE RIGHT SIDE BACK PROPERTY LINE AND REPLACE WITH SOD NEED TO CLEAN THE CULVERT PIPE, REMOVE THE SILT AND DIRT INSIDE
ROW FIELD SURVEY /GRADING CERTIFICATION 11/22/2023 APPROVED GBERTOLA
Note: 11/22/23= CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23 UPON WALKING PROPERTY FOUND THAT IN THE RIGHT REAR CORNER AREA AT THE PROPERTY LINE THERE ARE SEVERAL DIPS AND GULLEY WASHOUTS THAT NEED TO BE FILLED IN AND LEVELED OUT TO MAKE AN EVEN GRADE AND ALLOW PROPER DRAINAGE.
ROW - FINAL APRON (AFTER POUR) 11/22/2023 APPROVED GBERTOLA
Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/15/2023 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 11/15/2023 Disapproved - NO FEE FSLADISH
Note: 11/15/23 UPON WALKING PROPERTY FOUND THAT IN THE RIGHT REAR CORNER AREA AT THE PROPERTY LINE THERE ARE SEVERAL DIPS AND GULLEY WASHOUTS THAT NEED TO BE FILLED IN AND LEVELED OUT TO MAKE AN EVEN GRADE AND ALLOW PROPER DRAINAGE.
ELECTRIC - EARLY POWER 10/12/2023 APPROVED - AS NOTED RSIMS
Note: 10/12/23: FPL emailed to release power. * Note: Please identify breakers in meter panel and protect range wire into range outlet where drywall is cut out prior to Building Final. 5/11/2023 - PREVIOUS INSPECTION NOTES Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician.
INSULATION 08/15/2023 APPROVED KSANDOE
Note: 6/14/2023 - PREVIOUS INSPECTION NOTES Need revised engineering repair for drilled/notched floor trusses for plumbing drain.
U - SEWER TIE IN 08/11/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 08/11/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 07/05/2023 APPROVED FSLADISH
Note: 07/05/23 PIPE IS GOOD.POUR AREA LOOKED GOOD AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
INSULATION 06/14/2023 Disapproved - NO FEE KSANDOE
Note: Need revised engineering repair for drilled/notched floor trusses for plumbing drain.
ALL ROUGH 06/13/2023 APPROVED KSANDOE
Note: 6/12/2023 - PREVIOUS INSPECTION NOTES Check for proper Class A foam on penetrations.
ALL ROUGH 06/12/2023 CANCELLED BY APPLICANT KSANDOE
Note: Check for proper Class A foam on penetrations.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/09/2023 APPROVED LMILLER
Note: 6-9-23 notes bollow resolved /31/2023 - PREVIOUS INSPECTION NOTES T5 trusses still missing bracing Window still not installed 5/26/2023 - PREVIOUS INSPECTION NOTES T5 trusses still missing bracing *** Annular holes must be filled with fire rated foam or caulking. 2nd floor window must be installed prior to All Rough inspection 5/1/2023 - PREVIOUS INSPECTION NOTES Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC
LATH/BRICK/ WATER BARRIER 06/08/2023 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/31/2023 Disapproved -FEE REQUIRED KSANDOE
Note: T5 trusses still missing bracing Window still not installed 5/26/2023 - PREVIOUS INSPECTION NOTES T5 trusses still missing bracing *** Annular holes must be filled with fire rated foam or caulking. 2nd floor window must be installed prior to All Rough inspection 5/1/2023 - PREVIOUS INSPECTION NOTES Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/26/2023 Disapproved - NO FEE KSANDOE
Note: T5 trusses still missing bracing *** Annular holes must be filled with fire rated foam or caulking. 2nd floor window must be installed prior to All Rough inspection 5/1/2023 - PREVIOUS INSPECTION NOTES Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC
LATH/BRICK/ WATER BARRIER 05/22/2023 Disapproved - NO FEE KSANDOE
Note: House needs to have corner beading and wire mesh installed for this inspection
ELECTRIC - EARLY POWER 05/11/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Wrong inspection called in. This house is not ready for for early power. Early power is when all drywall is done and all finish electric is safe. This house has an above ground service and does not qualify for TUG ( temporary under ground). In order to get power, you must install a temporary power pole supplied by the electrician.
ELECTRIC-TUG 05/01/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Wromg size wire for 200 AMP service Overhead wire used , under ground wire needed for TUG
WALL SHEATHING 05/01/2023 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/01/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Truss T05 (2of them) missing engineering In hall way, Studs spacing greater than 24" OC
ROOF SHEATHING 05/01/2023 APPROVED TSTAUFFACHER
ROOF VALLEY & METAL 05/01/2023 APPROVED TSTAUFFACHER
FOUND SURVEY APPROVED (OFFICE) 04/26/2023 APPROVED TBAKER
TIE BEAM / LINTEL 03/30/2023 APPROVED KSANDOE
MONOLITHIC SLAB 03/17/2023 APPROVED KSANDOE
Note: 3/16/2023 - PREVIOUS INSPECTION NOTES Plans call for 4" slab. Areas measuring 3" need to be corrected Footer plans are 20"x 20". Areas measuring less than 18" width need to be corrected
MONOLITHIC SLAB 03/16/2023 Disapproved -FEE REQUIRED KSANDOE
Note: Plans call for 4" slab. Areas measuring 3" need to be corrected Footer plans are 20"x 20". Areas measuring less than 18" width need to be corrected
PLUMBING 1ST ROUGH UNDERGROUND 03/10/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/17/2023 APPROVED TSCHWEERS

Review History

Department Status Date In Date Out
MECH CANCEL 12/20/2023 12/28/2023
Note: 1. Spoke to bulder and did not need to resubmit energy calcs. The upload was a mistake.
BADMIN INFORMATION 12/19/2023 12/19/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ENGIN1 COMPLETE 04/26/2023 04/26/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/26/2023 04/26/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 02/21/2023 02/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 02/08/2023 02/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 02/02/2023 02/03/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
ZON COMPLETE 01/06/2023 01/06/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 01/06/2023 01/06/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SWALE COMPLETE 12/28/2022 04/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/27/2022 12/28/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 12/27/2022 12/29/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/27/2022 12/28/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/27/2022 12/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/27/2022 12/28/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 12/27/2022 12/28/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Design location on Form 405 is to be Daytona Beach. 2. Form 405 is to be signed by Owner/Agent
SW1 COMPLETE 12/27/2022 01/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 12/27/2022 12/28/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: width of walkway Landscape: Please choose Shrubs for the foundation plantings that will be tolerant in our area this shrub Arboricola is also known as Dwarf Schefflera and is on the non credit planting list. Please look up the commonly used approved shrubs like Holly, vibumum, ligustrum those are tolerant in our area. Please list proposed sod and if it will need irrigation. A/C will need 7 gallon shrubs for screening

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/29/2023
SW ENG REINSPECTION 20 ¤20.00 12/13/2023
SW ENG REINSPECTION 20 ¤20.00 12/13/2023
REINSPECTION FEE ¤40.00 12/13/2023
REINSPECTION RESIDENTIAL ¤40.00 12/13/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
REINSPECTION RESIDENTIAL ¤40.00 04/13/2023
CONTRACTOR CHANGE ¤20.00 04/13/2023
CONTRACTOR CHANGE ¤20.00 04/13/2023
CONTRACTOR CHANGE ¤20.00 04/13/2023
CONTRACTOR CHANGE ¤20.00 04/13/2023
FIRE IMPACT FEE ADMIN ¤12.62 01/23/2023
FIRE IMPACT FEE ADMIN (¤12.62) 01/23/2023
FC IMPACT FEE EMS ¤62.00 01/23/2023
IMPACT FEE FIRE ¤420.52 01/23/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/23/2023
FC IMPACT FEE LIBRARY ¤268.00 01/23/2023
IMPACT FEE PARKS ¤1,769.15 01/23/2023
IMPACT FEE SCHOOL ¤5,450.00 01/23/2023
IMPACT FEE TRANSPORTATION ¤1,764.00 01/23/2023
WATER -IRRIGATION INSPECTION ¤25.00 01/23/2023
PARKS IMPACT FEE ADMIN ¤53.07 01/23/2023
PARKS IMPACT FEE ADMIN (¤53.07) 01/23/2023
CONNECTION FEES ¤1,166.26 01/23/2023
WATER- TURN ON ¤25.00 01/23/2023
ADJUSTMENT 50% (¤438.60) 01/23/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/23/2023
INSPECTION - RESIDENTIAL ¤660.00 01/23/2023
PLAN REVIEW - RESIDENTIAL ¤187.20 01/23/2023
SW ENG - REVIEW 20 ¤20.00 01/23/2023
SW ENG RES REVIEW 200 ¤200.00 01/23/2023
TRANS IMPACT FEE ADMIN ¤52.92 01/23/2023
TRANS IMPACT FEE ADMIN (¤52.92) 01/23/2023
SEWER CREDIT (¤1,342.00) 01/23/2023
SEWER INSPECTION ¤25.00 01/23/2023
SEWER CAPITAL FACILITY ¤5,344.82 01/23/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 01/23/2023
SITE PLAN 30 ¤30.00 01/23/2023
SURCHARGE FS 533.721 ¤2.89 01/23/2023
SURCHARGE - FS 468.631 ¤4.33 01/23/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/23/2023
SW ENG INSPECTION 80 ¤80.00 01/23/2023
SW ENG PRE APRON ¤30.00 01/23/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,290.45