Permit #2022121008
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00730-0130 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00730 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 470-817-1259 |
| Location Address: 57 RAMBLEWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/23/2023 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOEM CORP |
|
Address 1080 HOLCOMB BRIDGE RDO 100-330 ROSWELL, GA 30076 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤209,353.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/27/2023 | FINAL APPROVED | JWALKER |
| Note: 12/21/2023 - PREVIOUS INSPECTION NOTES 1. The heat accessory label has not been affixed to the AHU. 2. Due to the closet where the AHU is installed being used as the return plenum. The 3 wall penetrations of the pipe off of the water heater will need to be sealed. 3. The Heat pump has been installed in the path of the bedroom emergency window and will need to be relocted to allow for an unobstructed clear pathway. R-310 and 311. | |||
| BLD - BUILDING FINAL | 12/21/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The heat accessory label has not been affixed to the AHU. 2. Due to the closet where the AHU is installed being used as the return plenum. The 3 wall penetrations of the pipe off of the water heater will need to be sealed. 3. The Heat pump has been installed in the path of the bedroom emergency window and will need to be relocted to allow for an unobstructed clear pathway. R-310 and 311. | |||
| ROW - STORMWATER FINAL | 12/21/2023 | APPROVED | TPOLACEK |
| Note: 12/21/23 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/21/2023 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irrigation-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/20/2023 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------- 12/19/2023 - PREVIOUS INSPECTION NOTES 12/5/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE THE WATER BE ABLE TO REACH TO THE ROADSIDE SWALE ON THE LEFT SIDE ---------------------------------------------------------------------------- 11/28/2023 - PREVIOUS INSPECTION NOTES THE LEFT SIDE DRAINAGE STILL WILL NOT WORK NEED TO MAKE ALL WATER GO TO ROAD SIDE SWALE ALL WATER IS BEING TRAPED BEHIND THE NEW SOD --------------------------------------------------------------------------- 11/13/2023 - PREVIOUS INSPECTION NOTES 1) THE RIGHT SIDE DRAINAGE PATTERN NEED TO BE FIXED DO TO THE GRADING OF THE ADJACENT LOT THE DRAINAGE IS NOT CONSISTENT FALL FROM BACK TO FRONT 2) THE LEFT SIDE ALL NEW SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING SO WATER DONT GET HELD FROM REACHING ROAD SIDE SWALE | |||
| ROW - FINAL APRON (AFTER POUR) | 12/20/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/19/2023 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 12/5/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE THE WATER BE ABLE TO REACH TO THE ROADSIDE SWALE ON THE LEFT SIDE ---------------------------------------------------------------------------- 11/28/2023 - PREVIOUS INSPECTION NOTES THE LEFT SIDE DRAINAGE STILL WILL NOT WORK NEED TO MAKE ALL WATER GO TO ROAD SIDE SWALE ALL WATER IS BEING TRAPED BEHIND THE NEW SOD --------------------------------------------------------------------------- 11/13/2023 - PREVIOUS INSPECTION NOTES 1) THE RIGHT SIDE DRAINAGE PATTERN NEED TO BE FIXED DO TO THE GRADING OF THE ADJACENT LOT THE DRAINAGE IS NOT CONSISTENT FALL FROM BACK TO FRONT 2) THE LEFT SIDE ALL NEW SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING SO WATER DONT GET HELD FROM REACHING ROAD SIDE SWALE | |||
| U - SEWER TIE IN | 12/07/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 12/07/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 4/13/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 REMOVE ANY AND ALL COQUINA ROCK FROM SLAB BEFORE BACKFILLING SEWERNOT RAN, AT ALL YET. THIS WAS A VIRTUAL INSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/05/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO MAKE THE WATER BE ABLE TO REACH TO THE ROADSIDE SWALE ON THE LEFT SIDE ---------------------------------------------------------------------------- 11/28/2023 - PREVIOUS INSPECTION NOTES THE LEFT SIDE DRAINAGE STILL WILL NOT WORK NEED TO MAKE ALL WATER GO TO ROAD SIDE SWALE ALL WATER IS BEING TRAPED BEHIND THE NEW SOD --------------------------------------------------------------------------- 11/13/2023 - PREVIOUS INSPECTION NOTES 1) THE RIGHT SIDE DRAINAGE PATTERN NEED TO BE FIXED DO TO THE GRADING OF THE ADJACENT LOT THE DRAINAGE IS NOT CONSISTENT FALL FROM BACK TO FRONT 2) THE LEFT SIDE ALL NEW SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING SO WATER DONT GET HELD FROM REACHING ROAD SIDE SWALE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/28/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE LEFT SIDE DRAINAGE STILL WILL NOT WORK NEED TO MAKE ALL WATER GO TO ROAD SIDE SWALE ALL WATER IS BEING TRAPED BEHIND THE NEW SOD --------------------------------------------------------------------------- 11/13/2023 - PREVIOUS INSPECTION NOTES 1) THE RIGHT SIDE DRAINAGE PATTERN NEED TO BE FIXED DO TO THE GRADING OF THE ADJACENT LOT THE DRAINAGE IS NOT CONSISTENT FALL FROM BACK TO FRONT 2) THE LEFT SIDE ALL NEW SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING SO WATER DONT GET HELD FROM REACHING ROAD SIDE SWALE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/13/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------- 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23=NEED TO SUBMIT A NEW FINAL SURVEY. THE LEFT FRONT YARD IS ALL TORE UP . 9/7/2023 - PREVIOUS INSPECTION NOTES 09/07/23 YOUR SITE PLAN SHOWS A COMMON SWALE, YOUR FINAL SURVEY SHOWS A COMMON SWALE. A COMMON SWALE IS REQUIRED. Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/13/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE RIGHT SIDE DRAINAGE PATTERN NEED TO BE FIXED DO TO THE GRADING OF THE ADJACENT LOT THE DRAINAGE IS NOT CONSISTENT FALL FROM BACK TO FRONT 2) THE LEFT SIDE ALL NEW SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING SO WATER DONT GET HELD FROM REACHING ROAD SIDE SWALE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/01/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 11/1/23=NEED TO SUBMIT A NEW FINAL SURVEY. THE LEFT FRONT YARD IS ALL TORE UP . 9/7/2023 - PREVIOUS INSPECTION NOTES 09/07/23 YOUR SITE PLAN SHOWS A COMMON SWALE, YOUR FINAL SURVEY SHOWS A COMMON SWALE. A COMMON SWALE IS REQUIRED. Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. | |||
| U-CROSS CONNECTION | 09/20/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ELECTRIC - EARLY POWER | 09/20/2023 | APPROVED | JWALKER |
| Note: 8/11/2023 - PREVIOUS INSPECTION NOTES 1. There is not disconnect installed or wiring for the heat pump. 2. The main electrical panel in the garage is missing the cover. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/07/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/07/23 YOUR SITE PLAN SHOWS A COMMON SWALE, YOUR FINAL SURVEY SHOWS A COMMON SWALE. A COMMON SWALE IS REQUIRED. Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. | |||
| PEP TANK INSTALLATION REQUEST | 08/31/2023 | APPROVED | CBOWERMASTER |
| ELECTRIC - EARLY POWER | 08/11/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. There is not disconnect installed or wiring for the heat pump. 2. The main electrical panel in the garage is missing the cover. | |||
| INSULATION | 07/06/2023 | APPROVED | JWALKER |
| Note: 7/5/2023 - PREVIOUS INSPECTION NOTES 7/5/23: 1). Master Bathroom - pack out wall at bathtub is missing firestop along top plate separation. 2). Laundry room - pack out wall missing firestop along top plate separations. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23 1. Flex has been corrected. 2. Full set of approved energy calculations along with duct layout drawing still not onsite. Inspector Notes from Inspection 2420 6/23/23 Flex duct support listed below has not been corrected CHECK all. Seal the torn flex just above the supply plenum. Energy calculations tacked in the job box are not the complete set and do not contain the approved duct lay out. P Check above listed at INSULATION INSPECTION 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 Below listed correction have not been made. 5/12/2023 - PREVIOUS INSPECTION NOTES 1.The bracing listed from roof brace has not been installed. The X bracing and bottom chord bracing has not been installed. See detail TB05 on page D2. Please have installed before ALL ROUGH inspection. 2. All HVAC flex duct is to be supported minimum of 4' o.c. the flex also needs to be supported where the duct make the bend into the register needs to be supported to prevent kinking of the duct. 3. Bathroom exhaust fan ducts have not been connected and sealed. Duct is 4" and will need a proper transition fitting to attach to the 3" fan outlet. 4. Please have the approved HVAC and product approval sheets onsite for reispection 5. Install a nail plate at the laundry plumbing vent top plate. 6. Spray foam used to seal the annualar spaces is to be of the fire resistant type. Remove the yellow foam or provide the can showing to correct foam type. | |||
| INSULATION | 07/05/2023 | Disapproved - NO FEE | RSIMS |
| Note: 7/5/23: 1). Master Bathroom - pack out wall at bathtub is missing firestop along top plate separation. 2). Laundry room - pack out wall missing firestop along top plate separations. 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23 1. Flex has been corrected. 2. Full set of approved energy calculations along with duct layout drawing still not onsite. Inspector Notes from Inspection 2420 6/23/23 Flex duct support listed below has not been corrected CHECK all. Seal the torn flex just above the supply plenum. Energy calculations tacked in the job box are not the complete set and do not contain the approved duct lay out. P Check above listed at INSULATION INSPECTION 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 Below listed correction have not been made. 5/12/2023 - PREVIOUS INSPECTION NOTES 1.The bracing listed from roof brace has not been installed. The X bracing and bottom chord bracing has not been installed. See detail TB05 on page D2. Please have installed before ALL ROUGH inspection. 2. All HVAC flex duct is to be supported minimum of 4' o.c. the flex also needs to be supported where the duct make the bend into the register needs to be supported to prevent kinking of the duct. 3. Bathroom exhaust fan ducts have not been connected and sealed. Duct is 4" and will need a proper transition fitting to attach to the 3" fan outlet. 4. Please have the approved HVAC and product approval sheets onsite for reispection 5. Install a nail plate at the laundry plumbing vent top plate. 6. Spray foam used to seal the annualar spaces is to be of the fire resistant type. Remove the yellow foam or provide the can showing to correct foam type. | |||
| INSULATION | 06/29/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/29/23 1. Flex has been corrected. 2. Full set of approved energy calculations along with duct layout drawing still not onsite. Inspector Notes from Inspection 2420 6/23/23 Flex duct support listed below has not been corrected CHECK all. Seal the torn flex just above the supply plenum. Energy calculations tacked in the job box are not the complete set and do not contain the approved duct lay out. P Check above listed at INSULATION INSPECTION 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 Below listed correction have not been made. 5/12/2023 - PREVIOUS INSPECTION NOTES 1.The bracing listed from roof brace has not been installed. The X bracing and bottom chord bracing has not been installed. See detail TB05 on page D2. Please have installed before ALL ROUGH inspection. 2. All HVAC flex duct is to be supported minimum of 4' o.c. the flex also needs to be supported where the duct make the bend into the register needs to be supported to prevent kinking of the duct. 3. Bathroom exhaust fan ducts have not been connected and sealed. Duct is 4" and will need a proper transition fitting to attach to the 3" fan outlet. 4. Please have the approved HVAC and product approval sheets onsite for reispection 5. Install a nail plate at the laundry plumbing vent top plate. 6. Spray foam used to seal the annualar spaces is to be of the fire resistant type. Remove the yellow foam or provide the can showing to correct foam type. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/27/2023 | APPROVED | FSLADISH |
| Note: 06/27/23 PIPE IS GOOD READY TO POUR. LOOKED GOOD AT TIME OF INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ALL ROUGH | 06/23/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 6/23/23 Flex duct support listed below has not been corrected CHECK all. Seal the torn flex just above the supply plenum. Energy calculations tacked in the job box are not the complete set and do not contain the approved duct lay out. P Check above listed at INSULATION INSPECTION 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/23 Below listed correction have not been made. 5/12/2023 - PREVIOUS INSPECTION NOTES 1.The bracing listed from roof brace has not been installed. The X bracing and bottom chord bracing has not been installed. See detail TB05 on page D2. Please have installed before ALL ROUGH inspection. 2. All HVAC flex duct is to be supported minimum of 4' o.c. the flex also needs to be supported where the duct make the bend into the register needs to be supported to prevent kinking of the duct. 3. Bathroom exhaust fan ducts have not been connected and sealed. Duct is 4" and will need a proper transition fitting to attach to the 3" fan outlet. 4. Please have the approved HVAC and product approval sheets onsite for reispection 5. Install a nail plate at the laundry plumbing vent top plate. 6. Spray foam used to seal the annualar spaces is to be of the fire resistant type. Remove the yellow foam or provide the can showing to correct foam type. | |||
| ALL ROUGH | 05/25/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 5/25/23 Below listed correction have not been made. 5/12/2023 - PREVIOUS INSPECTION NOTES 1.The bracing listed from roof brace has not been installed. The X bracing and bottom chord bracing has not been installed. See detail TB05 on page D2. Please have installed before ALL ROUGH inspection. 2. All HVAC flex duct is to be supported minimum of 4' o.c. the flex also needs to be supported where the duct make the bend into the register needs to be supported to prevent kinking of the duct. 3. Bathroom exhaust fan ducts have not been connected and sealed. Duct is 4" and will need a proper transition fitting to attach to the 3" fan outlet. 4. Please have the approved HVAC and product approval sheets onsite for reispection 5. Install a nail plate at the laundry plumbing vent top plate. 6. Spray foam used to seal the annualar spaces is to be of the fire resistant type. Remove the yellow foam or provide the can showing to correct foam type. 5/25/23 Please disregaurd items numbered 3,5 and 6. | |||
| ALL ROUGH | 05/12/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1.The bracing listed from roof brace has not been installed. The X bracing and bottom chord bracing has not been installed. See detail TB05 on page D2. Please have installed before ALL ROUGH inspection. 2. All HVAC flex duct is to be supported minimum of 4' o.c. the flex also needs to be supported where the duct make the bend into the register needs to be supported to prevent kinking of the duct. 3. Bathroom exhaust fan ducts have not been connected and sealed. Duct is 4" and will need a proper transition fitting to attach to the 3" fan outlet. 4. Please have the approved HVAC and product approval sheets onsite for reispection | |||
| LATH/BRICK/ WATER BARRIER | 05/09/2023 | APPROVED | JWALKER |
| LATH/BRICK/ WATER BARRIER | 05/08/2023 | CANCELLED BY APPLICANT | JWALKER |
| WALL SHEATHING | 05/05/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/05/2023 | APPROVED - AS NOTED | JWALKER |
| Note: The X bracing and bottom chord bracing has not been installed. See detail TB05 on page D2. Please have installed before ALL ROUGH inspection. | |||
| ROOF SHEATHING | 05/05/2023 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 05/05/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 05/04/2023 | APPROVED | TBAKER |
| GRAVITY SEWER TEST | 04/13/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ANY AND ALL COQUINA ROCK FROM SLAB BEFORE BACKFILLING SEWERNOT RAN, AT ALL YET | |||
| TIE BEAM / LINTEL | 04/04/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 03/23/2023 | APPROVED | JWALKER |
| Note: 3/21/2023 - PREVIOUS INSPECTION NOTES Slab depth is to be a minimum of 4". Note 2 on page S-1. Test lines have been left in place. Please remove excess soil and reinstall string lines for depth check | |||
| MONOLITHIC SLAB | 03/21/2023 | Disapproved - NO FEE | JWALKER |
| Note: Slab depth is to be a minimum of 4". Note 2 on page S-1. Test lines have been left in place. Please remove excess soil and reinstall string lines for depth check | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/16/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ANY AND ALL COQUINA ROCK FROM SLAB BEFORE BACKFILLING | |||
| WATER METER INSTALLATION REQUEST | 03/16/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 10/31/2023 | 10/31/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A final survey was not uploaded | |||
| BLD | COMPLETE | 06/20/2023 | 06/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/03/2023 | 05/04/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/03/2023 | 05/03/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/02/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| ZON | COMPLETE | 01/11/2023 | 01/12/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/11/2023 | 01/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/11/2023 | 01/19/2023 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/06/2023 | 01/06/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site Plan is missing a rear setback | |||
| SWALE | COMPLETE | 12/28/2022 | 04/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/27/2022 | 12/29/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/27/2022 | 12/29/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Design location on Energy Forms is to be Daytona Beach. 2. Form 405 is to be signed by Owner/Agent | |||
| SW1 | COMPLETE | 12/27/2022 | 01/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: width of walkway Landscape: Please choose Shrubs for the foundation plantings that will be tolerant in our area this shrub Arboricola is also known as Dwarf Schefflera and is on the non credit planting list. Please look up the commonly used approved shrubs like Holly, vibumum, ligustrum those are tolerant in our area. Please list proposed sod and if it will need irrigation. A/C will need 7 gallon shrubs for screening |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/22/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/22/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/07/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/07/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/07/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/23/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/23/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 01/23/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/23/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/23/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/23/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/23/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/23/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/23/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/23/2023 |
| SURCHARGE FS 533.721 | ¤2.58 | 01/23/2023 |
| SURCHARGE - FS 468.631 | ¤3.88 | 01/23/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/23/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/23/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/23/2023 |
| WATER- TURN ON | ¤25.00 | 01/23/2023 |
| ADJUSTMENT 50% | (¤385.65) | 01/23/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/23/2023 |
| INSPECTION - RESIDENTIAL | ¤577.50 | 01/23/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤163.80 | 01/23/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/23/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/23/2023 |
| SEWER CREDIT | (¤1,147.00) | 01/23/2023 |
| SEWER INSPECTION | ¤25.00 | 01/23/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/23/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/23/2023 |
| SITE PLAN 30 | ¤30.00 | 01/23/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/23/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,371.74 |