I want to search for...
Permit #2022121010
Permit Details
Status: COED
| Parcel Id: 07-11-31-7065-00490-0010 |
| CONDITIONED SPACE: 1906 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00490 |
| Subdivision: - |
| Job Phone: 475-276-4384 |
| Location Address: 89 KARAS TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/23/2023 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORP |
|
Address 1080 HOLCOMB BRIDG RD 100-330 ROSWELL, GA 30076 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤239,639.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/25/2024 | FINAL APPROVED | RSIMS |
| Note: 6/24/2024 - PREVIOUS INSPECTION NOTES 6/24/24: 1). Dryer vent needs screen removed at termination per FBC M1502.3 2). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 3). Garage Door Buck: Left side (from inside) has a nut that has been loosened for the garage door track but was not resecured. | |||
| BLD - BUILDING FINAL | 06/24/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/24/24: 1). Dryer vent needs screen removed at termination per FBC M1502.3 2). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 3). Garage Door Buck: Left side (from inside) has a nut that has been loosened for the garage door track but was not resecured. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/24/2024 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 No irrigation, no cross connections. | |||
| ROW - STORMWATER FINAL | 06/21/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/21/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/21/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE TO GRADE ----------------------------------------------------------------------------------------- 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola Inspector Notes from Inspection 9200 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola Inspector Notes from Inspection 9200 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/21/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE AT THIS TIME --------------------------------------------------------------------- Note to the inspector: 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. 4. On the left side facing the house, near the AC unit, there is a hump that obstructs the flow of stormwater. It needs to be removed to allow the stormwater to flow freely. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola | |||
| ROW- PROJECT STATUS | 06/12/2024 | APPROVED - AS NOTED | GBERTOLA |
| Note: 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/11/2024 | CANCELLED BY APPLICANT | GBERTOLA |
| Note: 5/17/2024 - PREVIOUS INSPECTION NOTES 5/17/24 THE FINAL SURVEY DOES NOT MATCH YOUR SITE PLAN. YOU ARE SHOWING APPOXIMATELY A FOOT HIGHER ALONG THE REAR AND SIDES OF THE PROPERTY. YOUR SITE PLAN SHOWS A COMMON SWALE AND YOUR FINAL SURVEY SHOWS AND INSIDE SWALE. THE SITE PLAN AND FINAL SURVEY MUST MATCH TO WITHIN COPC SPECIFICATIONS. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback _______________________________________________________________________________________________________________________ 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 DARYL CALLED AND ASKED TO CANCEL AS THEY NEED TO GET THE FFE FROM NUMBER 91 ON THE SURVEY. HE WILL CALL IN WHEN THEY GET THE NUMBERS ____________________________________________________________________________________________________________________ 4/2/2024 - PREVIOUS INSPECTION NOTES 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/16/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 5/17/24 THE FINAL SURVEY DOES NOT MATCH YOUR SITE PLAN. YOU ARE SHOWING APPOXIMATELY A FOOT HIGHER ALONG THE REAR AND SIDES OF THE PROPERTY. YOUR SITE PLAN SHOWS A COMMON SWALE AND YOUR FINAL SURVEY SHOWS AND INSIDE SWALE. THE SITE PLAN AND FINAL SURVEY MUST MATCH TO WITHIN COPC SPECIFICATIONS. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback _______________________________________________________________________________________________________________________ 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 DARYL CALLED AND ASKED TO CANCEL AS THEY NEED TO GET THE FFE FROM NUMBER 91 ON THE SURVEY. HE WILL CALL IN WHEN THEY GET THE NUMBERS ____________________________________________________________________________________________________________________ 4/2/2024 - PREVIOUS INSPECTION NOTES 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/15/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 04/15/24 DARYL CALLED AND ASKED TO CANCEL AS THEY NEED TO GET THE FFE FROM NUMBER 91 ON THE SURVEY. HE WILL CALL IN WHEN THEY GET THE NUMBERS ____________________________________________________________________________________________________________________ 4/2/2024 - PREVIOUS INSPECTION NOTES 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/02/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U-CROSS CONNECTION | 04/02/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ELECTRIC - EARLY POWER | 03/11/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-11-24 1. Emailed FPL at 1:12. | |||
| GRAVITY SEWER TEST | 02/13/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 6/20/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB still need to remove all vegitation from slab THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 02/13/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 6/20/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB still need to remove all vegitation from slab THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/29/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| PEP TANK INSTALLATION REQUEST | 01/17/2024 | APPROVED | BVITALE |
| INSULATION | 01/16/2024 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 12/20/2023 | APPROVED | RSIMS |
| Note: 12/19/2023 - PREVIOUS INSPECTION NOTES 12/19/23: * Holes in CMU wall at lineset & hose bibb on left side need wire lath installed over openings. 12/18/2023 - PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 12/19/2023 | Disapproved - NO FEE | RSIMS |
| Note: 12/19/23: * Holes in CMU wall at lineset & hose bibb on left side need wire lath installed over openings. 12/18/2023 - PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 12/18/2023 | CANCELLED BY APPLICANT | KSANDOE |
| ALL ROUGH | 12/18/2023 | APPROVED | KSANDOE |
| Note: 12/12/2023 - PREVIOUS INSPECTION NOTES R319 address identification missing Missing 2nd floor window 5FT head test failed. Stand pipe is to be 5ft minimum *** Annular holes filled with standard gap foam will need to be cleaned out and sealed with fire rated foam or caulking meeting ASTM E814 12/6/2023 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 12/12/2023 | Disapproved - NO FEE | KSANDOE |
| Note: R319 address identification missing Missing 2nd floor window 5FT head test failed. Stand pipe is to be 5ft minimum *** Annular holes filled with standard gap foam will need to be cleaned out and sealed with fire rated foam or caulking meeting ASTM E814 12/6/2023 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 12/06/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 12/06/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 11/13/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 10/26/23 1. The stair treads have been constructed with 2 x 12 and no bull nosing. The prints on page 5.0 call for the treads to be 1 x with bull nosing. R311.7.5.3 Nosings. Nosings at treads, landings and floors of stairways shall have a radius of curvature at the nosing not greater than 9/16 inch (14 mm) or a bevel not exceeding 1/2 inch (12.7 mm). A nosing projection not less than 3/4 inch (19 mm) and not more than 11/4 inches (32 mm) shall be provided on stairways. The greatest nosing projection shall not exceed the smallest nosing projection by more than 3/8 inch (9.5 mm) Please construct the stairs as per the details. 2. 2nd floor the Dttz anchors shown in 4 locations have not been installed. Detail C2 3. Girder Roof Trusses T1 and T6 have not been nailed together as per the mitek engineering requirements at the top chords and the webbing members. Check for corrections at the ALL rough inspection. within a stairway. 10/20/2023 - PREVIOUS INSPECTION NOTES 10/20/23: Inspection stopped! Incomplete Inspection. You will need to clean up your job site inside & out to make it safe for future inspections. Examples Only: * Roof sheathing loose in 5 spots at about 50% check completion. You will need to check all. * Stairs: treads & risers do not match plans. * Missing 2" x 6" wall section shown on plans. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/26/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 10/26/23 1. The stair treads have been constructed with 2 x 12 and no bull nosing. The prints on page 5.0 call for the treads to be 1 x with bull nosing. R311.7.5.3 Nosings. Nosings at treads, landings and floors of stairways shall have a radius of curvature at the nosing not greater than 9/16 inch (14 mm) or a bevel not exceeding 1/2 inch (12.7 mm). A nosing projection not less than 3/4 inch (19 mm) and not more than 11/4 inches (32 mm) shall be provided on stairways. The greatest nosing projection shall not exceed the smallest nosing projection by more than 3/8 inch (9.5 mm) Please construct the stairs as per the details. 2. 2nd floor the Dttz anchors shown in 4 locations have not been installed. Detail C2 3. Girder Roof Trusses T1 and T6 have not been nailed together as per the mitek engineering requirements at the top chords and the webbing members. Check for corrections at the ALL rough inspection. within a stairway. 10/20/2023 - PREVIOUS INSPECTION NOTES 10/20/23: Inspection stopped! Incomplete Inspection. You will need to clean up your job site inside & out to make it safe for future inspections. Examples Only: * Roof sheathing loose in 5 spots at about 50% check completion. You will need to check all. * Stairs: treads & risers do not match plans. * Missing 2" x 6" wall section shown on plans. | |||
| WALL SHEATHING | 10/26/2023 | APPROVED | JWALKER |
| Note: 10/20/2023 - PREVIOUS INSPECTION NOTES 10/20/23: * Wall sheathing not nailed per requirements on page D2 - detail TB-13. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/20/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/20/23: Inspection stopped! Incomplete Inspection. You will need to clean up your jopb site inside & out to make it safe for future inspections. Examples Only: * Roof sheathing loose in 5 spots at about 50% check completeion. You will need to check all. * Stairs: treads & risers do not match plans. * Missing 2" x 6" wall section shown on plans. | |||
| WALL SHEATHING | 10/20/2023 | Disapproved - NO FEE | RSIMS |
| Note: 10/20/23: * Wall sheathing not nailed per reqyuirements on page D2 - detail TB-13. | |||
| TIE BEAM / LINTEL | 10/19/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 7/10/2023 - PREVIOUS INSPECTION NOTES 7/10/23: Down rods, dowels & Lintels checked & approved. 1). All three window sills have mortar beds that exceed the maximum thickness per FBC-R606.3.1. 1/2" maximum thickness. 10-19-23 1. House is already framed. | |||
| TIE BEAM / LINTEL | 10/19/2023 | APPROVED | RSIMS |
| Note: 10/19/23: As previously noted on 7/10/23: This was a partial approval as the down rods, dowels & lintels were checked and approved. The 2nd Tie Beam / Lintel Inspection was only to check the correct window sill mortar beds. Checked & approved. 10/19/2023 - PREVIOUS INSPECTION NOTES 7/10/2023 - PREVIOUS INSPECTION NOTES 7/10/23: Down rods, dowels & Lintels checked & approved. 1). All three window sills have mortar beds that exceed the maximum thickness per FBC-R606.3.1. 1/2" maximum thickness. 10-19-23 1. House is already framed. | |||
| ROW - DRAINAGE | 08/09/2023 | APPROVED | PFLANAGAN |
| Note: CORRECTION HAVE BEEN MADE -------------------------------------------------------------------------------- 8/8/2023 - PREVIOUS INSPECTION NOTES STILL NO PROGRESS ON THIS COMSTRUCTION SITE ---------------------------------------------------------------------------------- 8/7/2023 - PREVIOUS INSPECTION NOTES NO CHANGES STILL NEED TO OPEN SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------- 8/4/2023 - PREVIOUS INSPECTION NOTES STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 08/08/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NO PROGRESS ON THIS COMSTRUCTION SITE ---------------------------------------------------------------------------------- 8/7/2023 - PREVIOUS INSPECTION NOTES NO CHANGES STILL NEED TO OPEN SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------- 8/4/2023 - PREVIOUS INSPECTION NOTES STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 08/07/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NO CHANGES STILL NEED TO OPEN SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------- 8/4/2023 - PREVIOUS INSPECTION NOTES STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 08/04/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 08/03/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 08/02/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 08/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/31/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/28/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/27/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/26/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/25/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/24/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/18/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| ROW - DRAINAGE | 07/17/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION. | |||
| TIE BEAM / LINTEL | 07/10/2023 | PARTIALLY APPROVED | RSIMS |
| Note: 7/10/23: Down rods, dowels & Lintels checked & approved. 1). All three window sills have mortar beds that exceed the maximum thickness per FBC-R606.3.1. 1/2" maximum thickness. | |||
| MONOLITHIC SLAB | 06/29/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2250 4/10/23: At the time of inspection there was a very small amount of water in the footers but no cave in anywhere. Please remove any cave ins that may occur during the heavy down pours. Thank you 3/30/2023 - PREVIOUS INSPECTION NOTES 3/30/23: Cancelled by applicant via phone call at @ 09:40. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/26/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 6/20/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB still need to remove all vegitation from slab | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/20/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/01/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/20/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/10/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 4/10/23: At the time of inspection there was a very small amount of water in the footers but no cave in anywhere. Please remove any cave ins that may occur during the heavy down pours. Thank you 3/30/2023 - PREVIOUS INSPECTION NOTES 3/30/23: Cancelled by applicant via phone call at @ 09:40. | |||
| MONOLITHIC SLAB | 03/30/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: 3/30/23: Cancelled by applicant via phone call at @ 09:40. | |||
| WATER METER INSTALLATION REQUEST | 03/16/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/07/2024 | 06/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/07/2024 | 06/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/07/2024 | 06/07/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/06/2023 | 11/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/05/2023 | 07/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/05/2023 | 07/13/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/05/2023 | 07/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/20/2023 | 04/20/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/20/2023 | 04/20/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/21/2023 | 02/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/02/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| MECH | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/06/2023 | 01/06/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/28/2022 | 04/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/27/2022 | 12/29/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/27/2022 | 12/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/27/2022 | 12/29/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Design location on Energy Forms is to be Daytona Beach. 2. Form 405 is to be signed by Owner/Agent | |||
| SW1 | COMPLETE | 12/27/2022 | 01/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/27/2022 | 12/28/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of front entry walkway on site plan/survey AC screening should be 7 gallon Please provide sod type and if irrigation will be installed Please choose Shrubs for the foundation plantings that will be tolerant in our area this shrub Arboricola is also known as Dwarf Schefflera and is on the non credit planting list. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/24/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/24/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/22/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/22/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/07/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/07/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/23/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/23/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 01/23/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/23/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/23/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/23/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/23/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/23/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 01/23/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/23/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/23/2023 |
| SURCHARGE FS 533.721 | ¤2.89 | 01/23/2023 |
| SURCHARGE - FS 468.631 | ¤4.33 | 01/23/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/23/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/23/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/23/2023 |
| WATER- TURN ON | ¤25.00 | 01/23/2023 |
| ADJUSTMENT 50% | (¤438.60) | 01/23/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/23/2023 |
| INSPECTION - RESIDENTIAL | ¤660.00 | 01/23/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤187.20 | 01/23/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/23/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/23/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/23/2023 |
| SEWER CREDIT | (¤205.94) | 01/23/2023 |
| SEWER INSPECTION | ¤25.00 | 01/23/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/23/2023 |
| WATER CREDIT | (¤256.87) | 01/23/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/23/2023 |
| SITE PLAN 30 | ¤30.00 | 01/23/2023 |
| CONNECTION FEES | ¤1,166.26 | 01/23/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,429.64 |