Permit #2022121010

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00490-0010
CONDITIONED SPACE: 1906 sqft
GARAGE: 400 sqft
OPENED PORCH (WITH ROOF) : 20 sqft
Total Square Footage: 2326 sqft
Block: 00490
Subdivision: -
Job Phone: 475-276-4384
Location Address: 89 KARAS TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/23/2023
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORP

Address

1080 HOLCOMB BRIDG RD 100-330

ROSWELL, GA 30076

Lot: 0010
Contracted Stated Job Value: ¤239,639.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/25/2024 FINAL APPROVED RSIMS
Note: 6/24/2024 - PREVIOUS INSPECTION NOTES 6/24/24: 1). Dryer vent needs screen removed at termination per FBC M1502.3 2). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 3). Garage Door Buck: Left side (from inside) has a nut that has been loosened for the garage door track but was not resecured.
BLD - BUILDING FINAL 06/24/2024 Disapproved -FEE REQUIRED RSIMS
Note: 6/24/24: 1). Dryer vent needs screen removed at termination per FBC M1502.3 2). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 3). Garage Door Buck: Left side (from inside) has a nut that has been loosened for the garage door track but was not resecured.
U -UTILITY RESIDENTIAL FINAL 06/24/2024 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No irrigation, no cross connections.
ROW - STORMWATER FINAL 06/21/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - FINAL APRON (AFTER POUR) 06/21/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/21/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE TO GRADE ----------------------------------------------------------------------------------------- 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola Inspector Notes from Inspection 9200 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola Inspector Notes from Inspection 9200 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola
ROW FIELD SURVEY /GRADING CERTIFICATION 06/21/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE AT THIS TIME --------------------------------------------------------------------- Note to the inspector: 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. 4. On the left side facing the house, near the AC unit, there is a hump that obstructs the flow of stormwater. It needs to be removed to allow the stormwater to flow freely. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola
ROW- PROJECT STATUS 06/12/2024 APPROVED - AS NOTED GBERTOLA
Note: 1. On the left side, a common swale needs to be created to direct stormwater from the back to the front. 2. Ensure that the transition starts from the house on the right side and extends to the property line. 3. Avoid having a 1-foot drop at the property line. We have an on-site meeting with the builder CM, Lynn Stevens, Jordan Myers, and Gabriel Bertola
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/11/2024 CANCELLED BY APPLICANT GBERTOLA
Note: 5/17/2024 - PREVIOUS INSPECTION NOTES 5/17/24 THE FINAL SURVEY DOES NOT MATCH YOUR SITE PLAN. YOU ARE SHOWING APPOXIMATELY A FOOT HIGHER ALONG THE REAR AND SIDES OF THE PROPERTY. YOUR SITE PLAN SHOWS A COMMON SWALE AND YOUR FINAL SURVEY SHOWS AND INSIDE SWALE. THE SITE PLAN AND FINAL SURVEY MUST MATCH TO WITHIN COPC SPECIFICATIONS. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback _______________________________________________________________________________________________________________________ 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 DARYL CALLED AND ASKED TO CANCEL AS THEY NEED TO GET THE FFE FROM NUMBER 91 ON THE SURVEY. HE WILL CALL IN WHEN THEY GET THE NUMBERS ____________________________________________________________________________________________________________________ 4/2/2024 - PREVIOUS INSPECTION NOTES 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/16/2024 Disapproved - NO FEE FSLADISH
Note: 5/17/24 THE FINAL SURVEY DOES NOT MATCH YOUR SITE PLAN. YOU ARE SHOWING APPOXIMATELY A FOOT HIGHER ALONG THE REAR AND SIDES OF THE PROPERTY. YOUR SITE PLAN SHOWS A COMMON SWALE AND YOUR FINAL SURVEY SHOWS AND INSIDE SWALE. THE SITE PLAN AND FINAL SURVEY MUST MATCH TO WITHIN COPC SPECIFICATIONS. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback _______________________________________________________________________________________________________________________ 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 DARYL CALLED AND ASKED TO CANCEL AS THEY NEED TO GET THE FFE FROM NUMBER 91 ON THE SURVEY. HE WILL CALL IN WHEN THEY GET THE NUMBERS ____________________________________________________________________________________________________________________ 4/2/2024 - PREVIOUS INSPECTION NOTES 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/15/2024 CANCELLED BY APPLICANT TPOLACEK
Note: 04/15/24 DARYL CALLED AND ASKED TO CANCEL AS THEY NEED TO GET THE FFE FROM NUMBER 91 ON THE SURVEY. HE WILL CALL IN WHEN THEY GET THE NUMBERS ____________________________________________________________________________________________________________________ 4/2/2024 - PREVIOUS INSPECTION NOTES 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/02/2024 Disapproved - NO FEE TPOLACEK
Note: 04/02/24 YOU MUST HAVE SURVEY SHOTS 10' OFF AT THE REAR OF THE STRUCTURE AND A MINIMUM OF 6" OF FALL OFF THE BACK. SURVEY SHOWS .2 PLEASE MAKE CORRECTIONS TO GRADE AND HAVE NEW SURVEY TO REFLECT CORRECTIONS. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Inspector Notes from Inspection 9270 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
U-CROSS CONNECTION 04/02/2024 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ELECTRIC - EARLY POWER 03/11/2024 APPROVED - AS NOTED BTAYLOR
Note: 3-11-24 1. Emailed FPL at 1:12.
GRAVITY SEWER TEST 02/13/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 6/20/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB still need to remove all vegitation from slab THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 02/13/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 6/20/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB still need to remove all vegitation from slab THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 01/29/2024 APPROVED - AS NOTED FSLADISH
Note: 1/29/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
PEP TANK INSTALLATION REQUEST 01/17/2024 APPROVED BVITALE
INSULATION 01/16/2024 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 12/20/2023 APPROVED RSIMS
Note: 12/19/2023 - PREVIOUS INSPECTION NOTES 12/19/23: * Holes in CMU wall at lineset & hose bibb on left side need wire lath installed over openings. 12/18/2023 - PREVIOUS INSPECTION NOTES
LATH/BRICK/ WATER BARRIER 12/19/2023 Disapproved - NO FEE RSIMS
Note: 12/19/23: * Holes in CMU wall at lineset & hose bibb on left side need wire lath installed over openings. 12/18/2023 - PREVIOUS INSPECTION NOTES
LATH/BRICK/ WATER BARRIER 12/18/2023 CANCELLED BY APPLICANT KSANDOE
ALL ROUGH 12/18/2023 APPROVED KSANDOE
Note: 12/12/2023 - PREVIOUS INSPECTION NOTES R319 address identification missing Missing 2nd floor window 5FT head test failed. Stand pipe is to be 5ft minimum *** Annular holes filled with standard gap foam will need to be cleaned out and sealed with fire rated foam or caulking meeting ASTM E814 12/6/2023 - PREVIOUS INSPECTION NOTES
ALL ROUGH 12/12/2023 Disapproved - NO FEE KSANDOE
Note: R319 address identification missing Missing 2nd floor window 5FT head test failed. Stand pipe is to be 5ft minimum *** Annular holes filled with standard gap foam will need to be cleaned out and sealed with fire rated foam or caulking meeting ASTM E814 12/6/2023 - PREVIOUS INSPECTION NOTES
ALL ROUGH 12/06/2023 CANCELLED BY APPLICANT BTAYLOR
LATH/BRICK/ WATER BARRIER 12/06/2023 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 11/13/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 10/26/23 1. The stair treads have been constructed with 2 x 12 and no bull nosing. The prints on page 5.0 call for the treads to be 1 x with bull nosing. R311.7.5.3 Nosings. Nosings at treads, landings and floors of stairways shall have a radius of curvature at the nosing not greater than 9/16 inch (14 mm) or a bevel not exceeding 1/2 inch (12.7 mm). A nosing projection not less than 3/4 inch (19 mm) and not more than 11/4 inches (32 mm) shall be provided on stairways. The greatest nosing projection shall not exceed the smallest nosing projection by more than 3/8 inch (9.5 mm) Please construct the stairs as per the details. 2. 2nd floor the Dttz anchors shown in 4 locations have not been installed. Detail C2 3. Girder Roof Trusses T1 and T6 have not been nailed together as per the mitek engineering requirements at the top chords and the webbing members. Check for corrections at the ALL rough inspection. within a stairway. 10/20/2023 - PREVIOUS INSPECTION NOTES 10/20/23: Inspection stopped! Incomplete Inspection. You will need to clean up your job site inside & out to make it safe for future inspections. Examples Only: * Roof sheathing loose in 5 spots at about 50% check completion. You will need to check all. * Stairs: treads & risers do not match plans. * Missing 2" x 6" wall section shown on plans.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/26/2023 APPROVED - AS NOTED JWALKER
Note: 10/26/23 1. The stair treads have been constructed with 2 x 12 and no bull nosing. The prints on page 5.0 call for the treads to be 1 x with bull nosing. R311.7.5.3 Nosings. Nosings at treads, landings and floors of stairways shall have a radius of curvature at the nosing not greater than 9/16 inch (14 mm) or a bevel not exceeding 1/2 inch (12.7 mm). A nosing projection not less than 3/4 inch (19 mm) and not more than 11/4 inches (32 mm) shall be provided on stairways. The greatest nosing projection shall not exceed the smallest nosing projection by more than 3/8 inch (9.5 mm) Please construct the stairs as per the details. 2. 2nd floor the Dttz anchors shown in 4 locations have not been installed. Detail C2 3. Girder Roof Trusses T1 and T6 have not been nailed together as per the mitek engineering requirements at the top chords and the webbing members. Check for corrections at the ALL rough inspection. within a stairway. 10/20/2023 - PREVIOUS INSPECTION NOTES 10/20/23: Inspection stopped! Incomplete Inspection. You will need to clean up your job site inside & out to make it safe for future inspections. Examples Only: * Roof sheathing loose in 5 spots at about 50% check completion. You will need to check all. * Stairs: treads & risers do not match plans. * Missing 2" x 6" wall section shown on plans.
WALL SHEATHING 10/26/2023 APPROVED JWALKER
Note: 10/20/2023 - PREVIOUS INSPECTION NOTES 10/20/23: * Wall sheathing not nailed per requirements on page D2 - detail TB-13.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/20/2023 Disapproved -FEE REQUIRED RSIMS
Note: 10/20/23: Inspection stopped! Incomplete Inspection. You will need to clean up your jopb site inside & out to make it safe for future inspections. Examples Only: * Roof sheathing loose in 5 spots at about 50% check completeion. You will need to check all. * Stairs: treads & risers do not match plans. * Missing 2" x 6" wall section shown on plans.
WALL SHEATHING 10/20/2023 Disapproved - NO FEE RSIMS
Note: 10/20/23: * Wall sheathing not nailed per reqyuirements on page D2 - detail TB-13.
TIE BEAM / LINTEL 10/19/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 7/10/2023 - PREVIOUS INSPECTION NOTES 7/10/23: Down rods, dowels & Lintels checked & approved. 1). All three window sills have mortar beds that exceed the maximum thickness per FBC-R606.3.1. 1/2" maximum thickness. 10-19-23 1. House is already framed.
TIE BEAM / LINTEL 10/19/2023 APPROVED RSIMS
Note: 10/19/23: As previously noted on 7/10/23: This was a partial approval as the down rods, dowels & lintels were checked and approved. The 2nd Tie Beam / Lintel Inspection was only to check the correct window sill mortar beds. Checked & approved. 10/19/2023 - PREVIOUS INSPECTION NOTES 7/10/2023 - PREVIOUS INSPECTION NOTES 7/10/23: Down rods, dowels & Lintels checked & approved. 1). All three window sills have mortar beds that exceed the maximum thickness per FBC-R606.3.1. 1/2" maximum thickness. 10-19-23 1. House is already framed.
ROW - DRAINAGE 08/09/2023 APPROVED PFLANAGAN
Note: CORRECTION HAVE BEEN MADE -------------------------------------------------------------------------------- 8/8/2023 - PREVIOUS INSPECTION NOTES STILL NO PROGRESS ON THIS COMSTRUCTION SITE ---------------------------------------------------------------------------------- 8/7/2023 - PREVIOUS INSPECTION NOTES NO CHANGES STILL NEED TO OPEN SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------- 8/4/2023 - PREVIOUS INSPECTION NOTES STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 08/08/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NO PROGRESS ON THIS COMSTRUCTION SITE ---------------------------------------------------------------------------------- 8/7/2023 - PREVIOUS INSPECTION NOTES NO CHANGES STILL NEED TO OPEN SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------- 8/4/2023 - PREVIOUS INSPECTION NOTES STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 08/07/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NO CHANGES STILL NEED TO OPEN SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------- 8/4/2023 - PREVIOUS INSPECTION NOTES STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 08/04/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NO CORRECTIONS MADE ON THIS JOB SITE -------------------------------------------------------------------------------------- 8/3/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 08/03/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NOTHING HAS CHANGED SINCE LAST INSPECTION NEED TO CLEAR SWALE OUT SO WATER CAN FLOW TO OUTFALL --------------------------------------------------------------------------------------- 8/2/2023 - PREVIOUS INSPECTION NOTES SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 08/02/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: SWALE STILL NEEDS TO CLEARED SO WATER WILL FLOW TO OUTFALL ----------------------------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 08/01/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NOTHING CHANGED AT THIS TIME OF INSPECTION STILL NEED TO CLEAR SWALE SO WATER WILL FLOW TO OUTFALL ------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/31/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NOTHING CHANGED SINCE THE LAST INSPECTION NEED TO CLEAR ROADSIDE SWALE TO GET THE INSPECTION HOLD ON THIS LOT. --------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/28/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NOTHIG CHANGED SINCE LAST INSPECTION ----------------------------------------------------------------------------- 7/27/2023 - PREVIOUS INSPECTION NOTES THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/27/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE IS A INSPECTION HOLD ON THIS SITE YOU WILL GET INSPECTED EVERYDAY INTILL YOU FIX ----------------------------------------------------------------------------- 7/26/2023 - PREVIOUS INSPECTION NOTES NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/26/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO CLEAT ALL DIRT AND CONCRETE OUT OF SWALE SO WATER CAN FLOW TO OUTFALL THERE WILL BE A STOP WORK ON THIS TOMORROW IF THIS IS NOT DONE AT THE TIME OF INSPECTION ----------------------------------------------------------------------------- 7/25/2023 - PREVIOUS INSPECTION NOTES PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/25/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: PLEASE CLEAR SWALE SO WATER CAN FLOW TO OUT FALL. NEXT INSPECTION ON 7/26/23 ----------------------------------------------------------------------------- 7/24/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/24/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO CLEAR SWALE SO WATER CAN FLOW TO THE OUTFALL. NEXT INSPECTION 7/25/23 ------------------------------------------------------------------------------ 7/18/2023 - PREVIOUS INSPECTION NOTES NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/18/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO STILL CLEAR ALL DIRT AND DEBRIS FROM SWALE SO WATER CA FLOW TO OUTFALL. NEXT INSPECTION 7/24/23 ------------------------------------------------------------------------------ 7/17/2023 - PREVIOUS INSPECTION NOTES 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
ROW - DRAINAGE 07/17/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 07/17/23 YOU ARE BLOCKING THE DRAINAGE FLOW MOVING DUE TO A PILE OF CONCRETE CLEAN OUT DEBRIS IN THE ROW SWALE. THIS NEEDS TO REMOVED IMMEDIATELY AND MAKE SURE THAT YOU EITHER INSTALL A TEMPORARY CULVERT PIPE MINIMUM OF 12" OR GRADE SWALE DAILY TO ENSURE FLOW. WILL BE BACK 07/18/23 FOR COMPLIANCE REINSPECTION.
TIE BEAM / LINTEL 07/10/2023 PARTIALLY APPROVED RSIMS
Note: 7/10/23: Down rods, dowels & Lintels checked & approved. 1). All three window sills have mortar beds that exceed the maximum thickness per FBC-R606.3.1. 1/2" maximum thickness.
MONOLITHIC SLAB 06/29/2023 APPROVED RSIMS
Note: Inspector Notes from Inspection 2250 4/10/23: At the time of inspection there was a very small amount of water in the footers but no cave in anywhere. Please remove any cave ins that may occur during the heavy down pours. Thank you 3/30/2023 - PREVIOUS INSPECTION NOTES 3/30/23: Cancelled by applicant via phone call at @ 09:40.
PLUMBING 1ST ROUGH UNDERGROUND 06/26/2023 APPROVED - AS NOTED MGIBSON
Note: 6/20/2023 - PREVIOUS INSPECTION NOTES 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB still need to remove all vegitation from slab
PLUMBING 1ST ROUGH UNDERGROUND 06/20/2023 Disapproved -FEE REQUIRED MGIBSON
Note: 5/1/2023 - PREVIOUS INSPECTION NOTES NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL STILL NO PLANS IN PERMIT BOX, NEED TO REMOVE ALL VEGITATION FROM INTERIOR OF SLAB
PLUMBING 1ST ROUGH UNDERGROUND 05/01/2023 Disapproved -FEE REQUIRED MGIBSON
Note: NO PLANS OR PERMIT POSTED , WATER DISTRIBUTION LINE NOT HOLDING PRESSURE, NEED SLEEVE ON 3/4'' WATER LINE PASSING THROUGH FOOTER ON BACK SIDE OF GARAGE WALL
FOUND SURVEY APPROVED (OFFICE) 04/20/2023 APPROVED TBAKER
MONOLITHIC SLAB 04/10/2023 APPROVED - AS NOTED RSIMS
Note: 4/10/23: At the time of inspection there was a very small amount of water in the footers but no cave in anywhere. Please remove any cave ins that may occur during the heavy down pours. Thank you 3/30/2023 - PREVIOUS INSPECTION NOTES 3/30/23: Cancelled by applicant via phone call at @ 09:40.
MONOLITHIC SLAB 03/30/2023 CANCELLED BY APPLICANT RSIMS
Note: 3/30/23: Cancelled by applicant via phone call at @ 09:40.
WATER METER INSTALLATION REQUEST 03/16/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 06/07/2024 06/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/07/2024 06/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/07/2024 06/07/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 11/06/2023 11/07/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/05/2023 07/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/05/2023 07/13/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 07/05/2023 07/05/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/20/2023 04/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/20/2023 04/20/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 02/21/2023 02/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 02/08/2023 02/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 02/02/2023 02/03/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
MECH COMPLETE 01/06/2023 01/06/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 01/06/2023 01/06/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 12/28/2022 04/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 12/27/2022 12/28/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 12/27/2022 12/29/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 12/27/2022 12/28/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/27/2022 12/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/27/2022 12/29/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 12/27/2022 12/28/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Plumbing REVIEW COMMENTS: 1. Design location on Energy Forms is to be Daytona Beach. 2. Form 405 is to be signed by Owner/Agent
SW1 COMPLETE 12/27/2022 01/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 12/27/2022 12/28/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of front entry walkway on site plan/survey AC screening should be 7 gallon Please provide sod type and if irrigation will be installed Please choose Shrubs for the foundation plantings that will be tolerant in our area this shrub Arboricola is also known as Dwarf Schefflera and is on the non credit planting list.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 06/24/2024
REINSPECTION RESIDENTIAL ¤40.00 06/24/2024
REINSPECTION RESIDENTIAL ¤40.00 12/22/2023
REINSPECTION RESIDENTIAL ¤40.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
SW ENG - INSPECTION 20 ¤20.00 12/22/2023
REINSPECTION RESIDENTIAL ¤40.00 07/07/2023
REINSPECTION RESIDENTIAL ¤40.00 07/07/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
CONTRACTOR CHANGE ¤20.00 04/13/2023
FIRE IMPACT FEE ADMIN ¤12.62 01/23/2023
FIRE IMPACT FEE ADMIN (¤12.62) 01/23/2023
FC IMPACT FEE EMS ¤62.00 01/23/2023
IMPACT FEE FIRE ¤420.52 01/23/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/23/2023
FC IMPACT FEE LIBRARY ¤268.00 01/23/2023
IMPACT FEE PARKS ¤1,769.15 01/23/2023
IMPACT FEE SCHOOL ¤5,450.00 01/23/2023
IMPACT FEE TRANSPORTATION ¤1,764.00 01/23/2023
WATER -IRRIGATION INSPECTION ¤25.00 01/23/2023
PARKS IMPACT FEE ADMIN ¤53.07 01/23/2023
PARKS IMPACT FEE ADMIN (¤53.07) 01/23/2023
SURCHARGE FS 533.721 ¤2.89 01/23/2023
SURCHARGE - FS 468.631 ¤4.33 01/23/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/23/2023
SW ENG INSPECTION 80 ¤80.00 01/23/2023
SW ENG PRE APRON ¤30.00 01/23/2023
WATER- TURN ON ¤25.00 01/23/2023
ADJUSTMENT 50% (¤438.60) 01/23/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/23/2023
INSPECTION - RESIDENTIAL ¤660.00 01/23/2023
PLAN REVIEW - RESIDENTIAL ¤187.20 01/23/2023
SW ENG - REVIEW 20 ¤20.00 01/23/2023
SW ENG RES REVIEW 200 ¤200.00 01/23/2023
TRANS IMPACT FEE ADMIN ¤52.92 01/23/2023
TRANS IMPACT FEE ADMIN (¤52.92) 01/23/2023
SEWER CREDIT (¤205.94) 01/23/2023
SEWER INSPECTION ¤25.00 01/23/2023
SEWER CAPITAL FACILITY ¤5,344.82 01/23/2023
WATER CREDIT (¤256.87) 01/23/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 01/23/2023
SITE PLAN 30 ¤30.00 01/23/2023
CONNECTION FEES ¤1,166.26 01/23/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,429.64