I want to search for...
Permit #2022121030
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-0340 |
| CONDITIONED SPACE: 2651 sqft |
| GARAGE: 497 sqft |
| OPENED PORCH (WITH ROOF) : 461 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| Total Square Footage: 3659 sqft |
| Block: 01010 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-313-6221 |
| Location Address: 635 MAHOGANY RUN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/06/2023 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: ILSOON YANG |
|
Address 1345 TOMOKA TOWN CENTER DRIVE #207 DAYTONA BEACH, FL 32117 |
| Lot: 34 |
| Contracted Stated Job Value: ¤555,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
TODD MICHAEL ORIE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
560 S. YONGE ST. ORMOND BEACH, FL 32174 |
CBC036417 (Exp: 08/31/2026) | (386)673-4589 | (386)673-8045 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/28/2024 | FINAL APPROVED | JWALKER |
| U-CROSS CONNECTION | 03/08/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has master meter/backflow-reclaim | |||
| ROW - FINAL APRON (AFTER POUR) | 03/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/8/24 PAVERS GLUED. NONE CRACKED OR BROKEN AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/7/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS FIELD SURVEY INSPECTION. APPROVING THIS FIELD INSPECTION AS NOTED. _________________________________________________________________________________________________________________________ 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ROW - STORMWATER FINAL | 03/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/8/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/7/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS FIELD SURVEY INSPECTION. APPROVING THIS FIELD INSPECTION AS NOTED. _________________________________________________________________________________________________________________________ 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| U -UTILITY RESIDENTIAL FINAL | 03/08/2024 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/07/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/7/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS FIELD SURVEY INSPECTION. APPROVING THIS FIELD INSPECTION AS NOTED. _________________________________________________________________________________________________________________________ 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/29/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/16/2024 | APPROVED | TPOLACEK |
| Note: 02/16/24 0 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/16/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ROW- PRE-APRON (PRE-POUR) | 01/17/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ROW- PRE-APRON (PRE-POUR) | 01/16/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ELECTRIC - EARLY POWER | 09/18/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 0914. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 08/04/2023 | PARTIALLY APPROVED | EMADISON |
| Note: ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________ | |||
| ROW- PAVER RESTRAINTS | 08/04/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/04/23 READY TO POUR PAVERR RESTRAINTS ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| INSULATION | 05/12/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2460 04-21-2023 Back SGD not installed. Check stops at next inspection. 05-09-2023 1. SGD and frme not installed. Check at insulation. 2. Two broken windows. Superintendent is aware. 3. Please revise and submit to the building department the energy calcs. Window stickers SHGC iis .28 and the calcs are .21 and have on site. 4. Guest bath plumbing line above ceiling not supported properly. Check at next imspection. | |||
| ELECTRIC-TUG | 05/12/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 0914. Release Power | |||
| ALL ROUGH | 05/09/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2460 04-21-2023 Back SGD not installed. Check stops at next inspection. 05-09-2023 1. SGD and frme not installed. Check at insulation. 2. Two broken windows. Superintendent is aware. 3. Please revise and submit to the building department the energy calcs. Window stickers SHGC iis .28 and the calcs are .21 and have on site. 4. Guest bath plumbing line above ceiling not supported properly. Check at next imspection. | |||
| GRAVITY SEWER TEST | 05/02/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: BRASS C/O IS REQUIRED WHERE 2/WAY C/O IS IN THE DRIVEWAY | |||
| U - SEWER TIE IN | 05/02/2023 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/21/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 04-21-2023 Back SGD not installed. Check stops at next inspection. | |||
| WALL SHEATHING | 04/14/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/14/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 04-14-2023 S4 GEO1 pleaese remove sheathing for anchor bolt attachment at back lanai on right side. | |||
| ROOF VALLEY & METAL | 04/05/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2465 03-29-2023 Right side of roof towards the back the sheathing is not laying completely flat. | |||
| ROOF SHEATHING | 03/29/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 03-29-2023 Right side of roof towards the back the sheathing is not laying completely flat. | |||
| TIE BEAM / LINTEL | 02/27/2023 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 02/21/2023 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 02/06/2023 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/01/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/01/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/20/2024 | 02/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/26/2023 | 06/28/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/04/2023 | 04/10/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/03/2023 | 03/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/17/2023 | 02/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/17/2023 | 02/21/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/05/2023 | 01/05/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/05/2023 | 01/05/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM We cannot submittals electronically if the permit was created manually. You must continue with the initial chosen method of submittal until the permit has been issued. | |||
| BLD | HOLD | 12/28/2022 | 12/29/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Provide product approval for garage door. b. Provide product approval for proposed soffit material. | |||
| CUSVC | COMPLETE | 12/28/2022 | 01/05/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 12/28/2022 | 12/29/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/28/2022 | 12/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/28/2022 | 01/04/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 12/28/2022 | 12/28/2022 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/28/2022 | 12/29/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/28/2022 | 12/29/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/28/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/28/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/31/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/31/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/31/2024 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/06/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/06/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 01/06/2023 |
| IMPACT FEE FIRE | ¤420.52 | 01/06/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/06/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/06/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 01/06/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/06/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 01/06/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/06/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/06/2023 |
| SURCHARGE FS 533.721 | ¤6.07 | 01/06/2023 |
| SURCHARGE - FS 468.631 | ¤9.10 | 01/06/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/06/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/06/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/06/2023 |
| CONNECTION FEES | ¤25.00 | 01/06/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/06/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/06/2023 |
| TRANS IMPACT FEE ADMIN | (¤52.92) | 01/06/2023 |
| TRANS IMPACT FEE ADMIN | ¤52.92 | 01/06/2023 |
| SEWER INSPECTION | ¤25.00 | 01/06/2023 |
| SITE PLAN 30 | ¤30.00 | 01/06/2023 |
| WATER-METER | ¤505.39 | 01/06/2023 |
| ADJUSTMENT 50% | (¤994.58) | 01/06/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/06/2023 |
| INSPECTION - RESIDENTIAL | ¤1,526.25 | 01/06/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤432.90 | 01/06/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,469.30 |