I want to search for...

Permit #2022121030

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0340
CONDITIONED SPACE: 2651 sqft
GARAGE: 497 sqft
OPENED PORCH (WITH ROOF) : 461 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
Total Square Footage: 3659 sqft
Block: 01010
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-313-6221
Location Address: 635 MAHOGANY RUN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/06/2023
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: ILSOON YANG

Address

1345 TOMOKA TOWN CENTER DRIVE #207

DAYTONA BEACH, FL 32117

Lot: 34
Contracted Stated Job Value: ¤555,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

PATRICK FRANCIS MCADAMS
Status Location Address State License Number Phone Fax
ACTIVE

1201 South Flagler Ave

Flagler Beach, FL 32136

CFC057805 (Exp: 08/31/2026) 386-283-9236 321-248-0447
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
TODD MICHAEL ORIE
Status Location Address State License Number Phone Fax
ACTIVE

560 S. YONGE ST.

ORMOND BEACH, FL 32174

CBC036417 (Exp: 08/31/2026) (386)673-4589 (386)673-8045

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/28/2024 FINAL APPROVED JWALKER
U-CROSS CONNECTION 03/08/2024 APPROVED - AS NOTED LFITZGERALD
Note: has master meter/backflow-reclaim
ROW - FINAL APRON (AFTER POUR) 03/08/2024 APPROVED - AS NOTED FSLADISH
Note: 3/8/24 PAVERS GLUED. NONE CRACKED OR BROKEN AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/7/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS FIELD SURVEY INSPECTION. APPROVING THIS FIELD INSPECTION AS NOTED. _________________________________________________________________________________________________________________________ 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ROW - STORMWATER FINAL 03/08/2024 APPROVED - AS NOTED FSLADISH
Note: 3/8/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/7/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS FIELD SURVEY INSPECTION. APPROVING THIS FIELD INSPECTION AS NOTED. _________________________________________________________________________________________________________________________ 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
U -UTILITY RESIDENTIAL FINAL 03/08/2024 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 03/07/2024 APPROVED - AS NOTED FSLADISH
Note: 3/7/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS FIELD SURVEY INSPECTION. APPROVING THIS FIELD INSPECTION AS NOTED. _________________________________________________________________________________________________________________________ 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ROW FIELD SURVEY /GRADING CERTIFICATION 02/29/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 02/29/24 the sod that was added is on the adjoining lot. There can not be mulch on the property line or in the drainage conveyance. you must remove mulch and have at tleast one row of sod on the building site property line. 2/16/2024 - PREVIOUS INSPECTION NOTES 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/16/2024 APPROVED TPOLACEK
Note: 02/16/24 0 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ROW FIELD SURVEY /GRADING CERTIFICATION 02/16/2024 Disapproved - NO FEE TPOLACEK
Note: 02/16/24 ALL MULCH AREAS ALONG PROPERTY LINE NEED TO HAVE AT LEAST ONE ROW OF SOD. MULCH CANNOT BE PLACED ALONG THE PROPERTY LINE ITSELF. Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch,stones, plantings or landscaping of any kind, is not allowed in the Right of Way (theswale area, between the edge of pavement and the property line). Inspector Notes from Inspection 9270 ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ROW- PRE-APRON (PRE-POUR) 01/17/2024 APPROVED - AS NOTED EMADISON
Note: ** 01/17/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 1/16/2024 - PREVIOUS INSPECTION NOTES ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ROW- PRE-APRON (PRE-POUR) 01/16/2024 CANCELLED BY APPLICANT EMADISON
Note: ** 01/16/24 CANCELLED BY THE APPLICANT __________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ELECTRIC - EARLY POWER 09/18/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2200 Emailed FPL @ 0914. Release Power
ROW- PRE-APRON (PRE-POUR) 08/04/2023 PARTIALLY APPROVED EMADISON
Note: ** 08/04/23 SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET AND PAVERS UNTIL NEXT PRE-POUR INSPECTION HAS BEEN APPROVED _____________________________________________________________________________________________________________________________
ROW- PAVER RESTRAINTS 08/04/2023 APPROVED - AS NOTED EMADISON
Note: ** 08/04/23 READY TO POUR PAVERR RESTRAINTS ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.
INSULATION 05/12/2023 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2460 04-21-2023 Back SGD not installed. Check stops at next inspection. 05-09-2023 1. SGD and frme not installed. Check at insulation. 2. Two broken windows. Superintendent is aware. 3. Please revise and submit to the building department the energy calcs. Window stickers SHGC iis .28 and the calcs are .21 and have on site. 4. Guest bath plumbing line above ceiling not supported properly. Check at next imspection.
ELECTRIC-TUG 05/12/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 0914. Release Power
ALL ROUGH 05/09/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2460 04-21-2023 Back SGD not installed. Check stops at next inspection. 05-09-2023 1. SGD and frme not installed. Check at insulation. 2. Two broken windows. Superintendent is aware. 3. Please revise and submit to the building department the energy calcs. Window stickers SHGC iis .28 and the calcs are .21 and have on site. 4. Guest bath plumbing line above ceiling not supported properly. Check at next imspection.
GRAVITY SEWER TEST 05/02/2023 APPROVED - AS NOTED MGIBSON
Note: BRASS C/O IS REQUIRED WHERE 2/WAY C/O IS IN THE DRIVEWAY
U - SEWER TIE IN 05/02/2023 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 04/21/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2460 04-21-2023 Back SGD not installed. Check stops at next inspection.
WALL SHEATHING 04/14/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/14/2023 APPROVED - AS NOTED AGAETANO
Note: 04-14-2023 S4 GEO1 pleaese remove sheathing for anchor bolt attachment at back lanai on right side.
ROOF VALLEY & METAL 04/05/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2465 03-29-2023 Right side of roof towards the back the sheathing is not laying completely flat.
ROOF SHEATHING 03/29/2023 APPROVED - AS NOTED AGAETANO
Note: 03-29-2023 Right side of roof towards the back the sheathing is not laying completely flat.
TIE BEAM / LINTEL 02/27/2023 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 02/21/2023 APPROVED TDOAK
MONOLITHIC SLAB 02/06/2023 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 02/01/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/01/2023 APPROVED TSCHWEERS

Review History

Department Status Date In Date Out
MECH COMPLETE 02/20/2024 02/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/26/2023 06/28/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/04/2023 04/10/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/03/2023 03/07/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/17/2023 02/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/17/2023 02/21/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/05/2023 01/05/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN INFORMATION 01/05/2023 01/05/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM We cannot submittals electronically if the permit was created manually. You must continue with the initial chosen method of submittal until the permit has been issued.
BLD HOLD 12/28/2022 12/29/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Product Approval Specification Sheet; a. Provide product approval for garage door. b. Provide product approval for proposed soffit material.
CUSVC COMPLETE 12/28/2022 01/05/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 12/28/2022 12/29/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/28/2022 12/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/28/2022 01/04/2023
Note: Released By: TONI CHURCHILL - -
MECH COMPLETE 12/28/2022 12/28/2022
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
SW1 COMPLETE 12/28/2022 12/29/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 12/28/2022 12/29/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 03/28/2024
PLAN REVIEW - REVISION ¤32.50 03/28/2024
CONTRACTOR CHANGE ¤20.00 01/31/2024
CONTRACTOR CHANGE ¤20.00 01/31/2024
CONTRACTOR CHANGE ¤20.00 01/31/2024
FIRE IMPACT FEE ADMIN (¤12.62) 01/06/2023
FIRE IMPACT FEE ADMIN ¤12.62 01/06/2023
FC IMPACT FEE EMS ¤62.00 01/06/2023
IMPACT FEE FIRE ¤420.52 01/06/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/06/2023
FC IMPACT FEE LIBRARY ¤268.00 01/06/2023
IMPACT FEE PARKS ¤1,769.15 01/06/2023
IMPACT FEE SCHOOL ¤5,450.00 01/06/2023
IMPACT FEE TRANSPORTATION ¤3,224.00 01/06/2023
PARKS IMPACT FEE ADMIN ¤53.07 01/06/2023
PARKS IMPACT FEE ADMIN (¤53.07) 01/06/2023
SURCHARGE FS 533.721 ¤6.07 01/06/2023
SURCHARGE - FS 468.631 ¤9.10 01/06/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/06/2023
SW ENG INSPECTION 80 ¤80.00 01/06/2023
SW ENG PRE APRON ¤30.00 01/06/2023
CONNECTION FEES ¤25.00 01/06/2023
SW ENG - REVIEW 20 ¤20.00 01/06/2023
SW ENG RES REVIEW 200 ¤200.00 01/06/2023
TRANS IMPACT FEE ADMIN (¤52.92) 01/06/2023
TRANS IMPACT FEE ADMIN ¤52.92 01/06/2023
SEWER INSPECTION ¤25.00 01/06/2023
SITE PLAN 30 ¤30.00 01/06/2023
WATER-METER ¤505.39 01/06/2023
ADJUSTMENT 50% (¤994.58) 01/06/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/06/2023
INSPECTION - RESIDENTIAL ¤1,526.25 01/06/2023
PLAN REVIEW - RESIDENTIAL ¤432.90 01/06/2023
Fees Total Due: ¤0.00 Total Paid: ¤13,469.30