Permit #2023010135

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00100-0070
CONDITIONED SPACE: 1381 sqft
GARAGE: 505 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
OPENED PORCH (WITH ROOF) : 53 sqft
CONDITIONED SPACE: 1508 sqft
GARAGE: 487 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
Total Square Footage: 4330 sqft
Block: 00100
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 386-585-2654
Location Address: 93 PONY EXPRESS DR
Type: DU - DUPLEX
Issue Date: 01/26/2023
NOC: RECORDED
Applicant name: DESIDERIO CARLOS CARREIRO
Owner: PONY EXPRESS DRIVE LLC

Address

1732 AVIATION BLVD UNIT 304

REDONDO, CA 90278

Lot: 0070
Contracted Stated Job Value: ¤200,000.00
Job Description: DUPLEX
Type: CN

Contractor

RED LINE CONSTRUCTION CO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
FERNANDO M FARIA
Status Location Address State License Number Phone
ACTIVE

23 FREELAND LANE

PALM COAST, FL 32137

RF11067823 (Exp: 08/31/2027) 386-569-4336
DESIDERIO CARLOS CARREIRO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654
GREGORY ALLEN HENRY
Status Location Address State License Number Phone
ACTIVE

1332 SUNSET BLVD

DAYTONA BEACH, FL 32117

EC13009193 (Exp: 08/31/2026) 386-679-6908

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/20/2024 CANCELLED BY APPLICANT WEB
Note: 1/10/24: (Early Power) FPL emailed to release power. Below will need to be reolved prior to Building Final Inspection. 1). Both Units: Romex feeding the range outlet is exposed to damage. Needs to be fully in the wall or protected from damage per FBC-E3404.10 Prevent physical damage. In locations where electrical equipment is likely to be exposed to physical damage,enclosures or guards shall be so arranged and of such strength as to prevent such damage. [110.27(B)]. 2). Unit A: Meter panel deadfront is missing a screw.
BLD - BUILDING FINAL 03/20/2024 FINAL APPROVED KSANDOE
Note: New inspection due to canceled inspection 1/10/24: (Early Power) FPL emailed to release power. Below will need to be reolved prior to Building Final Inspection. 1). Both Units: Romex feeding the range outlet is exposed to damage. Needs to be fully in the wall or protected from damage per FBC-E3404.10 Prevent physical damage. In locations where electrical equipment is likely to be exposed to physical damage,enclosures or guards shall be so arranged and of such strength as to prevent such damage. [110.27(B)]. 2). Unit A: Meter panel deadfront is missing a screw.
ROW - FINAL INSPECTION 03/14/2024 APPROVED - AS NOTED PFLANAGAN
Note: NEED TO REMOVE ALL DIRT FROM CULVERT PASSING AS NOTED -------------------------------------------------------------------------------- 3/12/2024 - PREVIOUS INSPECTION NOTES ** 03/12/24 AS INDICATED IN THE PREVIOUS INSPECTION NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL WHICH IS THE CITIES EASEMENT. SOD NEEDS TO BE IN PLAVE OF THE SEED AND STRAW ____________________________________________________________________________________________________________________ 3/7/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE PORTER JOHN OR PUT IT ON THE DRIVEWAY TO BE PICKED UP. IF THE SOD IS DEAD UNDER IT NEED TO REPAIR WITH SOD AND SOD NEEDS TO MATCH GRADE SURROUNDING IT. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT AND THE RESERVE PARCEL 3) NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE VACANT ABOVE THE RIGHT OF WAY
ROW - FINAL INSPECTION 03/12/2024 Disapproved - NO FEE EMADISON
Note: ** 03/12/24 AS INDICATED IN THE PREVIOUS INSPECTION NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL WHICH IS THE CITIES EASEMENT. SOD NEEDS TO BE IN PLAVE OF THE SEED AND STRAW ____________________________________________________________________________________________________________________ 3/7/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE PORTER JOHN OR PUT IT ON THE DRIVEWAY TO BE PICKED UP. IF THE SOD IS DEAD UNDER IT NEED TO REPAIR WITH SOD AND SOD NEEDS TO MATCH GRADE SURROUNDING IT. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT AND THE RESERVE PARCEL 3) NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE VACANT ABOVE THE RIGHT OF WAY
U -UTILITY RESIDENTIAL FINAL 03/08/2024 FINAL APPROVED LFITZGERALD
Note: 3/7/2024 - PREVIOUS INSPECTION NOTES need 2nd pep panel to be wired from house -wires in pep box
U -UTILITY RESIDENTIAL FINAL 03/07/2024 Disapproved - NO FEE LFITZGERALD
Note: need 2nd pep panel to be wired from house -wires in pep box
U-CROSS CONNECTION 03/07/2024 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW - FINAL APRON (AFTER POUR) 03/07/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - FINAL INSPECTION 03/07/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO REMOVE PORTER JOHN OR PUT IT ON THE DRIVEWAY TO BE PICKED UP. IF THE SOD IS DEAD UNDER IT NEED TO REPAIR WITH SOD AND SOD NEEDS TO MATCH GRADE SURROUNDING IT. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT AND THE RESERVE PARCEL 3) NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE VACANT ABOVE THE RIGHT OF WAY
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/04/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/04/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 01/29/2024 APPROVED - AS NOTED FSLADISH
Note: 1/29/24 PIPES ARE GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 01/10/2024 APPROVED - AS NOTED RSIMS
Note: 1/10/24: FPL emailed to release power. Below will need to be reolved prior to Building Final Inspection. 1). Both Units: Romex feeding the range outlet is exposed to damage. Needs to be fully in the wall or protected from damage per FBC-E3404.10 Prevent physical damage. In locations where electrical equipment is likely to be exposed to physical damage,enclosures or guards shall be so arranged and of such strength as to prevent such damage. [110.27(B)]. 2). Unit A: Meter panel deadfront is missing a screw.
GRAVITY SEWER TEST 12/22/2023 APPROVED MGIBSON
U - SEWER TIE IN 12/22/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 11/16/2023 APPROVED CBOWERMASTER
Note: 11/13/2023 7:17:25 AM- PREVIOUS INSPECTION NOTES dumpster
PEP TANK INSTALLATION REQUEST 11/09/2023 Disapproved -FEE REQUIRED CBOWERMASTER
Note: dumpster
FIREWALL FINAL 10/03/2023 APPROVED LMILLER
LATH/BRICK/ WATER BARRIER 09/25/2023 APPROVED JWALKER
INSULATION 09/11/2023 APPROVED FWILLIS
ALL ROUGH 09/05/2023 APPROVED KSANDOE
FIREWALL DRYWALL NAILING 08/18/2023 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/12/2023 APPROVED KSANDOE
Note: 6/27/2023 - PREVIOUS INSPECTION NOTES Repairs to missing web members is insufficient. Engineering repair required 6/20/2023 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/27/2023 Disapproved - NO FEE KSANDOE
Note: Repairs to missing web members is insufficient. Engineering repair required 6/20/2023 - PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 06/27/2023 APPROVED KSANDOE
Note: 6/20/2023 - PREVIOUS INSPECTION NOTES
WALL SHEATHING 06/27/2023 APPROVED KSANDOE
Note: 6/20/2023 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/20/2023 CANCELLED BY APPLICANT KSANDOE
WALL SHEATHING 06/20/2023 CANCELLED BY APPLICANT KSANDOE
ROOF VALLEY & METAL 06/20/2023 CANCELLED BY APPLICANT KSANDOE
TIE BEAM / LINTEL 06/01/2023 APPROVED KSANDOE
Note: 5/31/2023 - PREVIOUS INSPECTION NOTES Not ready for inspection. Crews still working
TIE BEAM / LINTEL 05/31/2023 Disapproved - NO FEE KSANDOE
Note: Not ready for inspection. Crews still working
TIE BEAM / LINTEL 05/30/2023 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 05/01/2023 APPROVED TBAKER
MONOLITHIC SLAB 04/18/2023 APPROVED KSANDOE
Note: 4/17/2023 - PREVIOUS INSPECTION NOTES Plans call for 4" slab. Multiple areas less than 4" marked with orange. Check entire slab
MONOLITHIC SLAB 04/17/2023 Disapproved - NO FEE KSANDOE
Note: Plans call for 4" slab. Multiple areas less than 4" marked with orange. Check entire slab
PLUMBING 1ST ROUGH UNDERGROUND 04/06/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 03/08/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 01/02/2024 01/03/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 07/27/2023 08/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 07/27/2023 07/31/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/07/2023 07/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/28/2023 05/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/28/2023 04/28/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 01/17/2023 01/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 01/17/2023 01/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/17/2023 01/17/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SWALE COMPLETE 01/05/2023 04/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 01/04/2023 01/09/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Provide a completed City of Palm Coast Product Approval Sheet for exterior components. Per F.S. 471.025 and F.A.C. 61 G15-23.005.
CUSVC COMPLETE 01/04/2023 01/06/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 01/04/2023 01/05/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need outlet in master bedroom bath left side. NEC 2017 210.52 (D) 2. Need correct outlet spacing in bed 2 and 3 rigth side. NEC 2017 210.52
ENGIN1 COMPLETE 01/04/2023 01/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/04/2023 01/10/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 01/04/2023 01/09/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in attic and R4.1 on walls. Energy Calcs say R38 in attic and R5 on walls. Revise to match
SW1 COMPLETE 01/04/2023 01/11/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 01/04/2023 01/05/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 03/11/2024
SW ENG REINSPECTION 20 ¤20.00 03/11/2024
UTILITY PEP REINSPECTION ¤40.00 03/11/2024
SEWER CREDIT (¤5,728.31) 01/26/2023
SEWER INSPECTION ¤25.00 01/26/2023
SEWER CAPITAL FACILITY ¤10,689.64 01/26/2023
WATER CREDIT (¤96.20) 01/26/2023
WATER CAPITAL FACILITY FEE ¤7,847.76 01/26/2023
SITE PLAN 30 ¤30.00 01/26/2023
SW ENG - REVIEW 20 ¤20.00 01/26/2023
SW ENG RES REVIEW 200 ¤200.00 01/26/2023
TRANS IMPACT FEE ADMIN ¤84.36 01/26/2023
TRANS IMPACT FEE ADMIN (¤84.36) 01/26/2023
WATER- TURN ON ¤50.00 01/26/2023
ADJUSTMENT 50% (¤685.70) 01/26/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/26/2023
INSPECTION - RESIDENTIAL ¤1,045.00 01/26/2023
PLAN REVIEW - RESIDENTIAL ¤296.40 01/26/2023
CONNECTION FEES ¤2,332.52 01/26/2023
FIRE IMPACT FEE ADMIN ¤25.23 01/26/2023
FIRE IMPACT FEE ADMIN (¤25.23) 01/26/2023
FC IMPACT FEE EMS ¤124.00 01/26/2023
IMPACT FEE FIRE ¤841.04 01/26/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 01/26/2023
FC IMPACT FEE LIBRARY ¤536.00 01/26/2023
IMPACT FEE PARKS ¤3,538.30 01/26/2023
IMPACT FEE SCHOOL ¤10,900.00 01/26/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 01/26/2023
WATER -IRRIGATION INSPECTION ¤50.00 01/26/2023
PARKS IMPACT FEE ADMIN ¤106.15 01/26/2023
PARKS IMPACT FEE ADMIN (¤106.15) 01/26/2023
SURCHARGE FS 533.721 ¤4.30 01/26/2023
SURCHARGE - FS 468.631 ¤6.45 01/26/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/26/2023
SW ENG INSPECTION 80 ¤80.00 01/26/2023
SW ENG PRE APRON ¤30.00 01/26/2023
Fees Total Due: ¤0.00 Total Paid: ¤35,514.20