Permit #2023010135
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00100-0070 |
| CONDITIONED SPACE: 1381 sqft |
| GARAGE: 505 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| CONDITIONED SPACE: 1508 sqft |
| GARAGE: 487 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| OPENED PORCH (WITH ROOF) : 56 sqft |
| Total Square Footage: 4330 sqft |
| Block: 00100 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 386-585-2654 |
| Location Address: 93 PONY EXPRESS DR |
| Type: DU - DUPLEX |
| Issue Date: 01/26/2023 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: PONY EXPRESS DRIVE LLC |
|
Address 1732 AVIATION BLVD UNIT 304 REDONDO, CA 90278 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
DESIDERIO CARLOS CARREIRO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
GREGORY ALLEN HENRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1332 SUNSET BLVD DAYTONA BEACH, FL 32117 |
EC13009193 (Exp: 08/31/2026) | 386-679-6908 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/20/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 1/10/24: (Early Power) FPL emailed to release power. Below will need to be reolved prior to Building Final Inspection. 1). Both Units: Romex feeding the range outlet is exposed to damage. Needs to be fully in the wall or protected from damage per FBC-E3404.10 Prevent physical damage. In locations where electrical equipment is likely to be exposed to physical damage,enclosures or guards shall be so arranged and of such strength as to prevent such damage. [110.27(B)]. 2). Unit A: Meter panel deadfront is missing a screw. | |||
| BLD - BUILDING FINAL | 03/20/2024 | FINAL APPROVED | KSANDOE |
| Note: New inspection due to canceled inspection 1/10/24: (Early Power) FPL emailed to release power. Below will need to be reolved prior to Building Final Inspection. 1). Both Units: Romex feeding the range outlet is exposed to damage. Needs to be fully in the wall or protected from damage per FBC-E3404.10 Prevent physical damage. In locations where electrical equipment is likely to be exposed to physical damage,enclosures or guards shall be so arranged and of such strength as to prevent such damage. [110.27(B)]. 2). Unit A: Meter panel deadfront is missing a screw. | |||
| ROW - FINAL INSPECTION | 03/14/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: NEED TO REMOVE ALL DIRT FROM CULVERT PASSING AS NOTED -------------------------------------------------------------------------------- 3/12/2024 - PREVIOUS INSPECTION NOTES ** 03/12/24 AS INDICATED IN THE PREVIOUS INSPECTION NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL WHICH IS THE CITIES EASEMENT. SOD NEEDS TO BE IN PLAVE OF THE SEED AND STRAW ____________________________________________________________________________________________________________________ 3/7/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE PORTER JOHN OR PUT IT ON THE DRIVEWAY TO BE PICKED UP. IF THE SOD IS DEAD UNDER IT NEED TO REPAIR WITH SOD AND SOD NEEDS TO MATCH GRADE SURROUNDING IT. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT AND THE RESERVE PARCEL 3) NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE VACANT ABOVE THE RIGHT OF WAY | |||
| ROW - FINAL INSPECTION | 03/12/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 03/12/24 AS INDICATED IN THE PREVIOUS INSPECTION NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL WHICH IS THE CITIES EASEMENT. SOD NEEDS TO BE IN PLAVE OF THE SEED AND STRAW ____________________________________________________________________________________________________________________ 3/7/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE PORTER JOHN OR PUT IT ON THE DRIVEWAY TO BE PICKED UP. IF THE SOD IS DEAD UNDER IT NEED TO REPAIR WITH SOD AND SOD NEEDS TO MATCH GRADE SURROUNDING IT. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT AND THE RESERVE PARCEL 3) NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE VACANT ABOVE THE RIGHT OF WAY | |||
| U -UTILITY RESIDENTIAL FINAL | 03/08/2024 | FINAL APPROVED | LFITZGERALD |
| Note: 3/7/2024 - PREVIOUS INSPECTION NOTES need 2nd pep panel to be wired from house -wires in pep box | |||
| U -UTILITY RESIDENTIAL FINAL | 03/07/2024 | Disapproved - NO FEE | LFITZGERALD |
| Note: need 2nd pep panel to be wired from house -wires in pep box | |||
| U-CROSS CONNECTION | 03/07/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 03/07/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 03/07/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE PORTER JOHN OR PUT IT ON THE DRIVEWAY TO BE PICKED UP. IF THE SOD IS DEAD UNDER IT NEED TO REPAIR WITH SOD AND SOD NEEDS TO MATCH GRADE SURROUNDING IT. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT AND THE RESERVE PARCEL 3) NEED TO HAVE SOD ON ALL BARE AREAS ON THE RESERVE PARCEL 4) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN THE VACANT ABOVE THE RIGHT OF WAY | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/04/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/04/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/29/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/29/24 PIPES ARE GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 01/10/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 1/10/24: FPL emailed to release power. Below will need to be reolved prior to Building Final Inspection. 1). Both Units: Romex feeding the range outlet is exposed to damage. Needs to be fully in the wall or protected from damage per FBC-E3404.10 Prevent physical damage. In locations where electrical equipment is likely to be exposed to physical damage,enclosures or guards shall be so arranged and of such strength as to prevent such damage. [110.27(B)]. 2). Unit A: Meter panel deadfront is missing a screw. | |||
| GRAVITY SEWER TEST | 12/22/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 12/22/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 11/16/2023 | APPROVED | CBOWERMASTER |
| Note: 11/13/2023 7:17:25 AM- PREVIOUS INSPECTION NOTES dumpster | |||
| PEP TANK INSTALLATION REQUEST | 11/09/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: dumpster | |||
| FIREWALL FINAL | 10/03/2023 | APPROVED | LMILLER |
| LATH/BRICK/ WATER BARRIER | 09/25/2023 | APPROVED | JWALKER |
| INSULATION | 09/11/2023 | APPROVED | FWILLIS |
| ALL ROUGH | 09/05/2023 | APPROVED | KSANDOE |
| FIREWALL DRYWALL NAILING | 08/18/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2023 | APPROVED | KSANDOE |
| Note: 6/27/2023 - PREVIOUS INSPECTION NOTES Repairs to missing web members is insufficient. Engineering repair required 6/20/2023 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/27/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Repairs to missing web members is insufficient. Engineering repair required 6/20/2023 - PREVIOUS INSPECTION NOTES | |||
| ROOF VALLEY & METAL | 06/27/2023 | APPROVED | KSANDOE |
| Note: 6/20/2023 - PREVIOUS INSPECTION NOTES | |||
| WALL SHEATHING | 06/27/2023 | APPROVED | KSANDOE |
| Note: 6/20/2023 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/20/2023 | CANCELLED BY APPLICANT | KSANDOE |
| WALL SHEATHING | 06/20/2023 | CANCELLED BY APPLICANT | KSANDOE |
| ROOF VALLEY & METAL | 06/20/2023 | CANCELLED BY APPLICANT | KSANDOE |
| TIE BEAM / LINTEL | 06/01/2023 | APPROVED | KSANDOE |
| Note: 5/31/2023 - PREVIOUS INSPECTION NOTES Not ready for inspection. Crews still working | |||
| TIE BEAM / LINTEL | 05/31/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Not ready for inspection. Crews still working | |||
| TIE BEAM / LINTEL | 05/30/2023 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 05/01/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 04/18/2023 | APPROVED | KSANDOE |
| Note: 4/17/2023 - PREVIOUS INSPECTION NOTES Plans call for 4" slab. Multiple areas less than 4" marked with orange. Check entire slab | |||
| MONOLITHIC SLAB | 04/17/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Plans call for 4" slab. Multiple areas less than 4" marked with orange. Check entire slab | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/06/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 03/08/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/02/2024 | 01/03/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/27/2023 | 08/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/27/2023 | 07/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/07/2023 | 07/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/28/2023 | 05/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/28/2023 | 04/28/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/17/2023 | 01/18/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/17/2023 | 01/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/17/2023 | 01/17/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/05/2023 | 04/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/04/2023 | 01/09/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: Provide a completed City of Palm Coast Product Approval Sheet for exterior components. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 01/04/2023 | 01/06/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 01/04/2023 | 01/05/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need outlet in master bedroom bath left side. NEC 2017 210.52 (D) 2. Need correct outlet spacing in bed 2 and 3 rigth side. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 01/04/2023 | 01/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/04/2023 | 01/10/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/04/2023 | 01/09/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in attic and R4.1 on walls. Energy Calcs say R38 in attic and R5 on walls. Revise to match | |||
| SW1 | COMPLETE | 01/04/2023 | 01/11/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/04/2023 | 01/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 03/11/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/11/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 03/11/2024 |
| SEWER CREDIT | (¤5,728.31) | 01/26/2023 |
| SEWER INSPECTION | ¤25.00 | 01/26/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 01/26/2023 |
| WATER CREDIT | (¤96.20) | 01/26/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 01/26/2023 |
| SITE PLAN 30 | ¤30.00 | 01/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/26/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/26/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 01/26/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 01/26/2023 |
| WATER- TURN ON | ¤50.00 | 01/26/2023 |
| ADJUSTMENT 50% | (¤685.70) | 01/26/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/26/2023 |
| INSPECTION - RESIDENTIAL | ¤1,045.00 | 01/26/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤296.40 | 01/26/2023 |
| CONNECTION FEES | ¤2,332.52 | 01/26/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 01/26/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 01/26/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 01/26/2023 |
| IMPACT FEE FIRE | ¤841.04 | 01/26/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 01/26/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 01/26/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 01/26/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 01/26/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 01/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 01/26/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 01/26/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 01/26/2023 |
| SURCHARGE FS 533.721 | ¤4.30 | 01/26/2023 |
| SURCHARGE - FS 468.631 | ¤6.45 | 01/26/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/26/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/26/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/26/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤35,514.20 |