Permit #2023010137
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00150-0140 |
| Block: 00150 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-585-2654 |
| Location Address: 7 REGIS LN |
| Type: DU - DUPLEX |
| Issue Date: 01/19/2023 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: JV CUSTOM HOMES LLC |
|
Address 1732 AVIATION BLVD UNIT 304 REDONDO BEACH, CA 90278 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
DESIDERIO CARLOS CARREIRO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/20/2023 | FINAL APPROVED | JWALKER |
| Note: Both rear bathroom windows are to be tempered glass. Check at final | |||
| ROW - FINAL INSPECTION | 12/20/2023 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. --------------------------------------------------------------------------- 12/15/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN VACANT 2) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULERT PLPE | |||
| U -UTILITY RESIDENTIAL FINAL | 12/19/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 12/15/2023 - PREVIOUS INSPECTION NOTES newly planted tree over pep system needs tobe relocated-no plantings allowed in/on pep system | |||
| U -UTILITY RESIDENTIAL FINAL | 12/15/2023 | Disapproved - NO FEE | LFITZGERALD |
| Note: newly planted tree over pep system needs tobe relocated-no plantings allowed in/on pep system | |||
| U-CROSS CONNECTION | 12/15/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 12/15/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 12/15/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN VACANT 2) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULERT PLPE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/13/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/13/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/08/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARTS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 09/26/2023 | APPROVED | JWALKER |
| GRAVITY SEWER TEST | 09/06/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 09/06/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 09/06/2023 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 08/08/2023 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 07/26/2023 | APPROVED | JWALKER |
| FIREWALL FINAL | 07/24/2023 | CANCELLED BY APPLICANT | WEB |
| FIREWALL FINAL | 07/24/2023 | APPROVED | FWILLIS |
| FIREWALL DRYWALL NAILING | 07/13/2023 | APPROVED | JWALKER |
| Note: 7/7/2023 - PREVIOUS INSPECTION NOTES This inspection for draft stop only. When all 5/8 sheet rock is fastened on fire wall and ceilings call for firewall drywall nailing. DO NOT SPACKLE AND TAPE. | |||
| INSULATION | 07/07/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 6/30/2023 - PREVIOUS INSPECTION NOTES 6/30/23 The fire wall or draft stop between the two units in the attic has not been completed. Please have drawing onsite showing which above listed situation is being used. Inspector Notes from Inspection 2420 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow. | |||
| INSULATION | 07/07/2023 | APPROVED | JWALKER |
| Note: New inspection due to canceled inspection 6/30/2023 - PREVIOUS INSPECTION NOTES 6/30/23 The fire wall or draft stop between the two units in the attic has not been completed. Please have drawing onsite showing which above listed situation is being used. Inspector Notes from Inspection 2420 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow. | |||
| FIREWALL DRYWALL NAILING | 07/07/2023 | CANCELLED BY APPLICANT | WEB |
| FIREWALL DRYWALL NAILING | 07/07/2023 | PARTIALLY APPROVED | JWALKER |
| Note: This inspection for draft stop only. When all 5/8 sheet rock is fastened on fire wall and ceilings call for firewall drywall nailing. DO NOT SPACKLE AND TAPE. | |||
| INSULATION | 06/30/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/30/23 The fire wall or draft stop between the two units in the attic has not been completed. Please have drawing onsite showing which above listed situation is being used. Inspector Notes from Inspection 2420 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow. | |||
| ALL ROUGH | 06/27/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow. | |||
| ALL ROUGH | 06/22/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow. | |||
| ALL ROUGH | 06/21/2023 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 1. Install H-2.5 anchors at the top of the overframing rafters. See over framing details. 2. Nail the over framing anchor just above the front entry doors in both units. Check for corrections at the All rough inspection | |||
| WALL SHEATHING | 05/16/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2340 met x-ray guy on site, need to submit report to portal | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/16/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Install H-2.5 anchors at the top of the overframing rafters. See over framing details. 2. Nail the over framing anchor just above the front entry doors in both units. Check for corrections at the All rough inspection | |||
| ROOF VALLEY & METAL | 05/16/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2340 met x-ray guy on site, need to submit report to portal | |||
| TIE BEAM / LINTEL | 05/11/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: met x-ray guy on site, need to submit report to portal | |||
| TIE BEAM / LINTEL | 05/10/2023 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 04/05/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 03/27/2023 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/10/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/03/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/15/2023 | 05/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/15/2023 | 05/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/05/2023 | 04/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/05/2023 | 04/05/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/05/2023 | 01/09/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/05/2023 | 01/06/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/05/2023 | 01/06/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/05/2023 | 01/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/05/2023 | 01/10/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/05/2023 | 01/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/05/2023 | 01/12/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/05/2023 | 01/06/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/05/2023 | 04/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 12/21/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 12/21/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/21/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/21/2023 |
| CONNECTION FEES | ¤2,332.52 | 01/19/2023 |
| WATER- TURN ON | ¤50.00 | 01/19/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/19/2023 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 01/19/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 01/19/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/19/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/19/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 01/19/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 01/19/2023 |
| SEWER CREDIT | (¤1,806.00) | 01/19/2023 |
| SEWER INSPECTION | ¤25.00 | 01/19/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 01/19/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 01/19/2023 |
| SITE PLAN 30 | ¤30.00 | 01/19/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 01/19/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 01/19/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 01/19/2023 |
| IMPACT FEE FIRE | ¤841.04 | 01/19/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 01/19/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 01/19/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 01/19/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 01/19/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 01/19/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 01/19/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 01/19/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 01/19/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/19/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 01/19/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/19/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/19/2023 |
| SW ENG PRE APRON | ¤30.00 | 01/19/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤39,047.76 |