Permit #2023010137

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00150-0140
Block: 00150
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 386-585-2654
Location Address: 7 REGIS LN
Type: DU - DUPLEX
Issue Date: 01/19/2023
NOC: RECORDED
Applicant name: DESIDERIO CARLOS CARREIRO
Owner: JV CUSTOM HOMES LLC

Address

1732 AVIATION BLVD UNIT 304

REDONDO BEACH, CA 90278

Lot: 0140
Contracted Stated Job Value: ¤200,000.00
Job Description: DUPLEX
Type: CN

Contractor

RED LINE CONSTRUCTION CO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
FERNANDO M FARIA
Status Location Address State License Number Phone
ACTIVE

23 FREELAND LANE

PALM COAST, FL 32137

RF11067823 (Exp: 08/31/2027) 386-569-4336
DESIDERIO CARLOS CARREIRO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/20/2023 FINAL APPROVED JWALKER
Note: Both rear bathroom windows are to be tempered glass. Check at final
ROW - FINAL INSPECTION 12/20/2023 APPROVED PFLANAGAN
Note: CORRECTIONS MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. --------------------------------------------------------------------------- 12/15/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN VACANT 2) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULERT PLPE
U -UTILITY RESIDENTIAL FINAL 12/19/2023 FINAL APPROVED LFITZGERALD
Note: 12/15/2023 - PREVIOUS INSPECTION NOTES newly planted tree over pep system needs tobe relocated-no plantings allowed in/on pep system
U -UTILITY RESIDENTIAL FINAL 12/15/2023 Disapproved - NO FEE LFITZGERALD
Note: newly planted tree over pep system needs tobe relocated-no plantings allowed in/on pep system
U-CROSS CONNECTION 12/15/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 12/15/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - FINAL INSPECTION 12/15/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO HAVE SEED AND STRAW ON ALL BARE AREAS IN VACANT 2) NEED TO CLEAN ALL DIRT AND OVER POURED CONCRETE OUT OF CULERT PLPE
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/13/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/13/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 11/08/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARTS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 09/26/2023 APPROVED JWALKER
GRAVITY SEWER TEST 09/06/2023 APPROVED MGIBSON
U - SEWER TIE IN 09/06/2023 APPROVED MGIBSON
U-CROSS CONNECTION 09/06/2023 CANCELLED BY APPLICANT WEB
PEP TANK INSTALLATION REQUEST 08/08/2023 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 07/26/2023 APPROVED JWALKER
FIREWALL FINAL 07/24/2023 CANCELLED BY APPLICANT WEB
FIREWALL FINAL 07/24/2023 APPROVED FWILLIS
FIREWALL DRYWALL NAILING 07/13/2023 APPROVED JWALKER
Note: 7/7/2023 - PREVIOUS INSPECTION NOTES This inspection for draft stop only. When all 5/8 sheet rock is fastened on fire wall and ceilings call for firewall drywall nailing. DO NOT SPACKLE AND TAPE.
INSULATION 07/07/2023 CANCELLED BY APPLICANT WEB
Note: 6/30/2023 - PREVIOUS INSPECTION NOTES 6/30/23 The fire wall or draft stop between the two units in the attic has not been completed. Please have drawing onsite showing which above listed situation is being used. Inspector Notes from Inspection 2420 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow.
INSULATION 07/07/2023 APPROVED JWALKER
Note: New inspection due to canceled inspection 6/30/2023 - PREVIOUS INSPECTION NOTES 6/30/23 The fire wall or draft stop between the two units in the attic has not been completed. Please have drawing onsite showing which above listed situation is being used. Inspector Notes from Inspection 2420 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow.
FIREWALL DRYWALL NAILING 07/07/2023 CANCELLED BY APPLICANT WEB
FIREWALL DRYWALL NAILING 07/07/2023 PARTIALLY APPROVED JWALKER
Note: This inspection for draft stop only. When all 5/8 sheet rock is fastened on fire wall and ceilings call for firewall drywall nailing. DO NOT SPACKLE AND TAPE.
INSULATION 06/30/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/30/23 The fire wall or draft stop between the two units in the attic has not been completed. Please have drawing onsite showing which above listed situation is being used. Inspector Notes from Inspection 2420 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow.
ALL ROUGH 06/27/2023 APPROVED - AS NOTED JWALKER
Note: 6/27/23 Windows in the two rear bathrooms need to be tempered glass and will be checked at final. 6/22/2023 - PREVIOUS INSPECTION NOTES 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow.
ALL ROUGH 06/22/2023 Disapproved - NO FEE JWALKER
Note: 1. Wire at the electrical panel needs to be secrued within 12" of the panel. All wire needs to be secured within 12" of the 2x4 top plates. 2. Tub drain concrete cut out need to be grouted in. 3. Bath room fan duct need to be sealed. 4. The 4 recessed can lights above the tubs and showers are to be listed for wet locations. 5. Both rear bathroom windows are to be tempered glass. 6. Install a nail plate, unit b kitchen wall for the 12-2 wire at mid wall. 7. The return flex in unit B needs to make a smooth turn as to not restrict air flow.
ALL ROUGH 06/21/2023 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2460 1. Install H-2.5 anchors at the top of the overframing rafters. See over framing details. 2. Nail the over framing anchor just above the front entry doors in both units. Check for corrections at the All rough inspection
WALL SHEATHING 05/16/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2340 met x-ray guy on site, need to submit report to portal
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/16/2023 APPROVED - AS NOTED JWALKER
Note: 1. Install H-2.5 anchors at the top of the overframing rafters. See over framing details. 2. Nail the over framing anchor just above the front entry doors in both units. Check for corrections at the All rough inspection
ROOF VALLEY & METAL 05/16/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2340 met x-ray guy on site, need to submit report to portal
TIE BEAM / LINTEL 05/11/2023 APPROVED - AS NOTED RMARTIN
Note: met x-ray guy on site, need to submit report to portal
TIE BEAM / LINTEL 05/10/2023 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 04/05/2023 APPROVED TBAKER
MONOLITHIC SLAB 03/27/2023 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 03/10/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/03/2023 APPROVED TSCHWEERS

Review History

Department Status Date In Date Out
MECH COMPLETE 12/14/2023 12/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 05/15/2023 05/16/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 05/15/2023 05/16/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/05/2023 04/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/05/2023 04/05/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 01/05/2023 01/09/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 01/05/2023 01/06/2023
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 01/05/2023 01/06/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/05/2023 01/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/05/2023 01/10/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 01/05/2023 01/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/05/2023 01/12/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 01/05/2023 01/06/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 01/05/2023 04/19/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/21/2023
CONTRACTOR CHANGE ¤20.00 12/21/2023
SW ENG REINSPECTION 20 ¤20.00 12/21/2023
PLAN REVIEW - REVISION ¤32.50 12/21/2023
REINSPECTION RESIDENTIAL ¤40.00 12/21/2023
CONNECTION FEES ¤2,332.52 01/19/2023
WATER- TURN ON ¤50.00 01/19/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/19/2023
INSPECTION - RESIDENTIAL ¤60.00 01/19/2023
PLAN REVIEW - RESIDENTIAL ¤65.00 01/19/2023
SW ENG - REVIEW 20 ¤20.00 01/19/2023
SW ENG RES REVIEW 200 ¤200.00 01/19/2023
TRANS IMPACT FEE ADMIN ¤54.36 01/19/2023
TRANS IMPACT FEE ADMIN (¤54.36) 01/19/2023
SEWER CREDIT (¤1,806.00) 01/19/2023
SEWER INSPECTION ¤25.00 01/19/2023
SEWER CAPITAL FACILITY ¤10,689.64 01/19/2023
WATER CAPITAL FACILITY FEE ¤7,847.76 01/19/2023
SITE PLAN 30 ¤30.00 01/19/2023
FIRE IMPACT FEE ADMIN ¤12.62 01/19/2023
FIRE IMPACT FEE ADMIN (¤12.62) 01/19/2023
FC IMPACT FEE EMS ¤124.00 01/19/2023
IMPACT FEE FIRE ¤841.04 01/19/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 01/19/2023
FC IMPACT FEE LIBRARY ¤536.00 01/19/2023
IMPACT FEE PARKS ¤3,538.30 01/19/2023
IMPACT FEE SCHOOL ¤10,900.00 01/19/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 01/19/2023
WATER -IRRIGATION INSPECTION ¤50.00 01/19/2023
PARKS IMPACT FEE ADMIN ¤53.07 01/19/2023
PARKS IMPACT FEE ADMIN (¤53.07) 01/19/2023
SURCHARGE FS 533.721 ¤2.00 01/19/2023
SURCHARGE - FS 468.631 ¤2.00 01/19/2023
SW ENG - FOUNDATION SURVEY ¤20.00 01/19/2023
SW ENG INSPECTION 80 ¤80.00 01/19/2023
SW ENG PRE APRON ¤30.00 01/19/2023
Fees Total Due: ¤0.00 Total Paid: ¤39,047.76