I want to search for...

Permit #2023010402

Permit Details

Status: COED

Parcel Id: 07-11-31-7064-00390-0010
CONDITIONED SPACE: 1831 sqft
GARAGE: 473 sqft
OPENED PORCH (WITH ROOF) : 116 sqft
OPENED PORCH (WITH ROOF) : 245 sqft
OPENED PORCH (WITH ROOF) : 85 sqft
Total Square Footage: 2750 sqft
Block: 00390
Subdivision: -
Job Phone: 386-237-1210
Location Address: 42 LLEWELLYN TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/19/2023
NOC: RECORDED
Applicant name: ANDREW POPOV
Owner: SILVER BREEZE LLC

Address

1 SEATHORN PATH UNIT A

PALM COAST, FL 32164

Lot: 0010
Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SILVER BREEZE HOMES
Status Location Address State License Number Phone
ACTIVE

1 SEATHORN PATH UNIT A

PALM COAST, FL 32164

RR282812121 (Exp: 08/31/2027) 386-237-7700

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/15/2025 FINAL APPROVED KSANDOE
U-CROSS CONNECTION 05/16/2025 APPROVED BWRIGHT
U -UTILITY RESIDENTIAL FINAL 05/16/2025 FINAL APPROVED BWRIGHT
ROW - STORMWATER FINAL 05/14/2025 APPROVED FSLADISH
Note: 5/14/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ROW - FINAL APRON (AFTER POUR) 05/14/2025 APPROVED FSLADISH
Note: 5/14/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/08/2025 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 05/08/2025 APPROVED FSLADISH
Note: 5/8/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ NOTE TO INSPECTOR BUILDER WANTS TO PUT ROCK BED ON LEFT SIDE OF POOL OUT LIKE 10' THEN SOD REST. ANY QUESTION CALL PARREN OR TALK WITH BUILDER.
ROW- PROJECT STATUS 04/17/2025 Status Check PFLANAGAN
Note: MEETING WITH BUILDER ABOUT GRADING AND WHERE HE NEEDS TO PUT SOD BEHIND FENCE.
ROW- PRE-APRON (PRE-POUR) 02/27/2025 APPROVED FSLADISH
Note: 2/27/25 PIPE ELEVATIONS GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
WINDOW NAILING 12/09/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2490 Please leave trim off front entry and dwelling/garage door for inspection 10/30/2024 - PREVIOUS INSPECTION NOTES 10/30/2024 1. Previous notes not addressed. House needs to be sealed for insulation. Inspector Notes from Inspection 2420 10/21/2024 1. Front and House to Garage doors not installed. Check at insulation.
ELECTRIC - EARLY POWER 12/02/2024 APPROVED PKNAPIK
Note: Release Power Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 9/24/2024 1:02:34 PM *** did this inspection on 9/23/24 9/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 9/24/2024 9:19:17 AM *** Need to have sch 80 pvc for underground nec 300.5, also need to glue connections when sch 80 is installed
GRAVITY SEWER TEST 11/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 11/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 11/04/2024 APPROVED - AS NOTED KSANDOE
Note: Please leave trim off front entry and dwelling/garage door for inspection 10/30/2024 - PREVIOUS INSPECTION NOTES 10/30/2024 1. Previous notes not addressed. House needs to be sealed for insulation. Inspector Notes from Inspection 2420 10/21/2024 1. Front and House to Garage doors not installed. Check at insulation.
INSULATION 10/30/2024 Disapproved - NO FEE PKNAPIK
Note: 10/30/2024 1. Previous notes not addressed. House needs to be sealed for insulation. Inspector Notes from Inspection 2420 10/21/2024 1. Front and House to Garage doors not installed. Check at insulation.
PEP TANK INSTALLATION REQUEST 10/23/2024 APPROVED CBOWERMASTER
ALL ROUGH 10/21/2024 APPROVED - AS NOTED PKNAPIK
Note: 10/21/2024 1. Front and House to Garage doors not installed. Check at insulation.
LATH/BRICK/ WATER BARRIER 10/15/2024 APPROVED PKNAPIK
ELECTRIC-TUG 09/25/2024 APPROVED - AS NOTED RMARTIN
Note: *** NOTES ADDED BY RMARTIN 9/24/2024 1:02:34 PM *** did this inspection on 9/23/24 9/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 9/24/2024 9:19:17 AM *** Need to have sch 80 pvc for underground nec 300.5, also need to glue connections when sch 80 is installed
ELECTRIC-TUG 09/24/2024 Disapproved - NO FEE RMARTIN
Note: *** NOTES ADDED BY RMARTIN 9/24/2024 9:19:17 AM *** Need to have sch 80 pvc for underground nec 300.5, also need to glue connections when sch 80 is installed
ROOF VALLEY & METAL 09/24/2024 APPROVED BTAYLOR
ELECTRIC-TUG 09/23/2024 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/19/2024 APPROVED KSANDOE
Note: 9/17/2024 - PREVIOUS INSPECTION NOTES 9/17/24: No Change 9/6/2024 - PREVIOUS INSPECTION NOTES Garage dwelling seperation wall must have support bearing more than existing. FBC2304.3.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/17/2024 Disapproved - NO FEE RSIMS
Note: 9/17/24: No Change 9/6/2024 - PREVIOUS INSPECTION NOTES Garage dwelling seperation wall must have support bearing more than existing. FBC2304.3.1
WALL SHEATHING 09/06/2024 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/06/2024 Disapproved - NO FEE KSANDOE
Note: *** NOTES ADDED BY KSANDOE 9/6/2024 10:42:48 AM *** Ok to dry in roof Garage dwelling seperation wall must have support bearing more than existing. FBC2304.3.1
TIE BEAM / LINTEL 08/16/2024 APPROVED KSANDOE
FOUND SURVEY APPROVED (OFFICE) 03/04/2024 APPROVED TBAKER
MONOLITHIC SLAB 02/21/2024 Disapproved -FEE REQUIRED RSIMS
Note: 2/21/24: 1). Garage entry footer still does not match plan details. Needs to be 16" deep per the scale listed on the plan. Please run a string line equal with the finished garage floor height at this footer and leave in place for the re-inspection. 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24: Please fix chairs that have come out of place & add any chairs needed to maintain wire mesh clearance. 1). Footers at the garage and at front do not match plan details. Highlighted.
MONOLITHIC SLAB 02/21/2024 APPROVED KSANDOE
Note: 2/21/2024 - PREVIOUS INSPECTION NOTES 2/21/24: 1). Garage entry footer still does not match plan details. Needs to be 16" deep per the scale listed on the plan. Please run a string line equal with the finished garage floor height at this footer and leave in place for the re-inspection. 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24: Please fix chairs that have come out of place & add any chairs needed to maintain wire mesh clearance. 1). Footers at the garage and at front do not match plan details. Highlighted.
MONOLITHIC SLAB 02/20/2024 Disapproved - NO FEE RSIMS
Note: 2/20/24: Please fix chairs that have come out of place & add any chairs needed to maintain wire mesh clearance. 1). Footers at the garage and at front do not match plan details. Highlighted.
PLUMBING 1ST ROUGH UNDERGROUND 01/19/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/08/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 10/01/2024 10/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 09/25/2024 09/30/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Highlight changed number or only submit number tht is changing.
BLD COMPLETE 09/18/2024 09/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 09/11/2024 09/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 07/15/2024 07/15/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/15/2024 07/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/15/2024 07/22/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 07/08/2024 07/08/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show driveway width at the widest point of the 2 car garage It cannot exceed 36ft before you start the circular. Please show a minimum 5ft setback from the arc to the front property line
ENGIN1 COMPLETE 03/04/2024 03/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/04/2024 03/04/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
ZON COMPLETE 10/02/2023 10/02/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/02/2023 10/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/02/2023 10/03/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
LOCATE COMPLETE 10/02/2023 10/04/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
ZON HOLD 09/21/2023 09/21/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please revise site plan - the closest point of the front of the home must meet the minimum 25' required front setback.
SWALE COMPLETE 01/12/2023 04/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 01/09/2023 01/13/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 01/09/2023 01/12/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 01/09/2023 01/10/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/09/2023 01/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/09/2023 01/12/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 01/09/2023 01/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/09/2023 01/18/2023
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON COMPLETE 01/09/2023 01/10/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE TRANSPORTATION ¤1,812.00 06/30/2025
IMPACT FEE FIRE ¤420.52 06/30/2025
IMPACT FEE PARKS ¤1,769.15 06/30/2025
IMPACT FEE SCHOOL ¤5,450.00 07/19/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/19/2023
FC IMPACT FEE LIBRARY ¤268.00 07/19/2023
WATER- TURN ON ¤25.00 07/19/2023
ADJUSTMENT 50% (¤456.25) 07/19/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/19/2023
INSPECTION - RESIDENTIAL ¤687.50 07/19/2023
PLAN REVIEW - RESIDENTIAL ¤195.00 07/19/2023
CONNECTION FEES ¤1,166.26 07/19/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/19/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/19/2023
FC IMPACT FEE EMS ¤62.00 07/19/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/19/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/19/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/19/2023
SURCHARGE FS 533.721 ¤2.99 07/19/2023
SURCHARGE - FS 468.631 ¤4.48 07/19/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/19/2023
SW ENG INSPECTION 80 ¤80.00 07/19/2023
SW ENG PRE APRON ¤30.00 07/19/2023
SW ENG - REVIEW 20 ¤20.00 07/19/2023
SW ENG RES REVIEW 200 ¤200.00 07/19/2023
TRANS IMPACT FEE ADMIN ¤54.36 07/19/2023
TRANS IMPACT FEE ADMIN (¤54.36) 07/19/2023
SEWER CREDIT (¤850.00) 07/19/2023
SEWER INSPECTION ¤25.00 07/19/2023
SEWER CAPITAL FACILITY ¤5,344.82 07/19/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 07/19/2023
SITE PLAN 30 ¤30.00 07/19/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,503.35